FA520517R0004_Atch2_Drawings_6_Plumbing.pdf

PDF 3 MB Posted

Attached to
Improve Military Family Housing (IMFH) Phase III, A/C and Weatherization, Misawa Air Base, Japan
Solicitation number
FA5205-17-R-0004
Issued by

About this file

FA520517R0004_Atch2_Drawings_6_Plumbing

View the file

Other files

File Type Posted
FA520517R00040005_Amendment.pdf PDF
FA520517R00040005_Atch3.pdf PDF
FA520517R00040005_Atch1.pdf PDF
FA520517R00040005_Atch4.pdf PDF
FA520517R00040005_Atch7.pdf PDF
FA520517R00040005_Atch6.pdf PDF
FA520517R00040005_Atch2.pdf PDF
FA520517R00040005_Atch5.pdf PDF
FA520517R00040004_Atch4.pdf PDF
FA520517R00040004_Amendment.pdf PDF
FA520517R00040004_Atch3-4.pdf PDF
FA520517R00040004_Atch3-3.pdf PDF
FA520517R00040004_Atch5.pdf PDF
FA520517R00040004_Atch1.pdf PDF
FA520517R00040004_Atch2.pdf PDF
FA520517R00040004_Atch3-5.pdf PDF
FA520517R00040004_Atch3-2.pdf PDF
FA520517R00040004_Atch3-1.pdf PDF
FA520517R00040003_Atch1.pdf PDF
FA520517R00040003_Atch2.pdf PDF
FA520517R00040003_Amendment.pdf PDF
FA520517R00040002_Amendment.pdf PDF
FA520517R00040002_Atch.pdf PDF
FA520517R00040001_Atch2_Revised_Specification_Section.pdf PDF
FA520517R00040001_Amendment.pdf PDF
FA520517R00040001_Atch4_Revised_Solicitation_Page.pdf PDF
FA520517R00040001_Atch1_Addendum_No._1.pdf PDF
FA520517R00040001_Atch3_Revised_Drawings.pdf PDF
FA520517R0004_PreProposal_Conference_Minutes_&_Record_of_Site_Visit.pdf PDF
FA520517R0004_Atch2_Drawings_8_Electrical.pdf PDF
FA520517R0004_Atch10_Asbestos_Sampling_and_Analysis.pdf PDF
FA520517R0004_Atch2_Drawings_3_Structural.pdf PDF
FA520517R0004_Atch2_Drawings_2_Hazmat.pdf PDF
FA520517R0004_Atch2_Drawings_5_Mechanical.pdf PDF
FA520517R0004_Atch4_PPQ_Cvr_Ltr.pdf PDF
FA520517R0004_Solicitation.pdf PDF
FA520517R0004_Atch8_Acceptable_JPN_Product_Substitutes.pdf PDF
FA520517R0004_Atch2_Drawings_7_Controls.pdf PDF
FA520517R0004_Atch2_Drawings_4_Architectural.pdf PDF
FA520517R0004_Atch9_Mfr's_Cut_Sheet_Catalog_Info.pdf PDF
FA520517R0004_Atch2_Drawings_1_General.pdf PDF
FA520517R0004_Atch3_Other_Contract_Requirements.pdf PDF
FA520517R0004_Atch1_Specifications.pdf PDF
FA520517R0004_Atch6_Construction_Timeline.pdf PDF
FA520517R0004_Atch5_PPQ.pdf PDF
FA520517R0004_Atch7_Schedule_of_Material_Submittals.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N O

N E

T T

W C

T S

A N

D R

E W

J

B

A C

K E

S

P L U

M B

I N

G

C

O V

R

S

H E

E T

P-001

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

A L

I

T E

G R

A T

D

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

C T

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

P D

C

Q

K K

A

M I S

A W

A

A

B

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N

D A

T E

A P

P R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

F

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

T I M

O T

Y

W

E N

D T

T

X0 X1 X2 X3 X4

Y4

Y3

Y2

Y1

Y0

POC

POC

POC

POC

POC

POC

X0 X1 X2 X3 X4

Y4

Y3

Y2

Y1

Y0

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N

D A

T E

A P

P R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

C T

S T

T W

A N

D R

B

A C

K E

S

T Y

P

B

E D

R O

M

R A

W L

S

P A

C E

SCALE: 1:100

0 2000 4000

P L U

M B

I N

G

P

L A

N

TYPE 4P1 - 3 BEDROOM - CRAWL SPACE - NEW PLUMBING PLAN

4P1-P-101 4P1-P-101 SCALE: 1:100

GENERAL PLAN NOTES:

KEYED NOTES:

RE-ROUTE COLD WATER PIPING TO EXISTING EXTERIOR HOSE BIBB.

CUT-IN NEW WATER METER INTO EXISTING PIPING. REFER TO DETAIL FOR VALVE ARRANGEMENT. MAKE

SMALL OFFSETS IN PIPING IN ORDER TO MAINTAIN ADEQUATE CLEARANCE TO ADJACENT PIPING.

1. CUT-IN NEW WATER METER INTO EXISTING DOMESTIC COLD WATER SUPPLY PIPING AS SHOWN.

PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW EMCS

SYSTEM.

2. PROVIDE ALL NECESSARY PIPING, VALVES, WIRING, DDC CONTROLS AND SUPPORTS FOR NEW WATER

METERS AS SHOWN ON PLANS, DETAILS AND SPECIFICATIONS.

3. ALL WORK WILL TAKE PLACE IN CONFINED SPACE UNDER EXISTING BUILDING.

4. CONTRACTOR IS RESPONSIBLE FOR DRAINING EXISTING DOMESTIC WATER SYSTEM IN ITS ENTIRETY

PRIOR TO CONSTRUCTION. SYSTEM SHALL BE RESTORED TO UNIT (WHICH WILL BE OCCUPIED DURING

CONSTRUCTION) WITHIN 8 HRS, OTHERWISE ALTERNATIVE MEANS OF COLD OR HOT WATER SHALL BE

PROVIDED DURING CONSTRUCTION.

5. WHEN IT IS NECESSARY TO RE-ROUTE PIPING RUNOUT TO EXISTING EXTERIOR HOSE BIBB, CONTRACTOR SHALL PROVIDE ALL NECESSARY EXCAVATION, RESTORATION, AND CORING OF OPENING

THRU EXISTING CONCRETE WALL, AND SEAL PER DETAIL.

6. WATER SAMPLING IS REQUIRED AFTER ALL DOMESTIC WATER OUTAGES. WATER SAMPLING SHALL BE

SUBMITTED TO BASE BIO-ENVIROMENTAL ENGINEER TO ENSURE WATER IS SAFE TO CONSUME AFTER

WATER METER WORK IS COMPLETED AND BEFORE WATER SERVICE IS RESTORED TO UNIT.

LEGEND

PIPE CAP

EXISTING ACCESS TO CRAWL

SPACE

PIPE DOWN

PIPE UP

DOMESTIC COLD WATER

NEW WATER METER

PIPING TO BE DEMOLISHED

EXISTING HOT WATER SUPPLY

PIPING

HWS

EXISTING HOT WATER RETURN

PIPING

HWR

X

M

EXTERIOR HOSE BIBB (ETR)

UNDERGROUND GATE VALVE

POC

POINT OF CONNECTION TO

EXISTING PIPING

SCALE: 1:100

0 2000 4000

TYPE 4P1 - 3 BEDROOM - CRAWL SPACE - PLUMBING DEMOLITION PLAN

4P1-P-101 4P1-P-101 SCALE: 1:100

Y3

Y2

Y1

Y0

POC

POC

POC

POC

POC

POC

X0 X1 X2 X3 X4

Y4

Y3

Y2

Y1

Y0

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E A

P P

R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

C T

S T

T W

A N

D R

B

A C

K E

S

T Y

B

E D

R O

R A

W L

S

P A

C E

SCALE: 1:100

0 2000 4000

P L U

M B

I N

G

P

L A

N

TYPE 4P3 - 3 BEDROOM - CRAWL SPACE - NEW PLUMBING PLAN

4P3-P-101 4P3-P-101 SCALE: 1:100

GENERAL PLAN NOTES:

KEYED NOTES:

RE-ROUTE COLD WATER PIPING TO EXISTING EXTERIOR HOSE BIBB.

CUT-IN NEW WATER METER INTO EXISTING PIPING. REFER TO DETAIL FOR VALVE ARRANGEMENT. MAKE

SMALL OFFSETS IN PIPING IN ORDER TO MAINTAIN ADEQUATE CLEARANCE TO ADJACENT PIPING.

1. CUT-IN NEW WATER METER INTO EXISTING DOMESTIC COLD WATER SUPPLY PIPING AS SHOWN.

PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW EMCS

SYSTEM.

2. PROVIDE ALL NECESSARY PIPING, VALVES, WIRING, DDC CONTROLS AND SUPPORTS FOR NEW WATER

METERS AS SHOWN ON PLANS, DETAILS AND SPECIFICATIONS.

3. ALL WORK WILL TAKE PLACE IN CONFINED SPACE UNDER EXISTING BUILDING.

4. CONTRACTOR IS RESPONSIBLE FOR DRAINING EXISTING DOMESTIC WATER SYSTEM IN ITS ENTIRETY

PRIOR TO CONSTRUCTION. SYSTEM SHALL BE RESTORED TO UNIT (WHICH WILL BE OCCUPIED DURING

CONSTRUCTION) WITHIN 8 HRS, OTHERWISE ALTERNATIVE MEANS OF COLD OR HOT WATER SHALL BE

PROVIDED DURING CONSTRUCTION.

5. WHEN IT IS NECESSARY TO RE-ROUTE PIPING RUNOUT TO EXISTING EXTERIOR HOSE BIBB, CONTRACTOR SHALL PROVIDE ALL NECESSARY EXCAVATION, RESTORATION, AND CORING OF OPENING

THRU EXISTING CONCRETE WALL, AND SEAL PER DETAIL.

6. WATER SAMPLING IS REQUIRED AFTER ALL DOMESTIC WATER OUTAGES. WATER SAMPLING SHALL BE

SUBMITTED TO BASE BIO-ENVIROMENTAL ENGINEER TO ENSURE WATER IS SAFE TO CONSUME AFTER

WATER METER WORK IS COMPLETED AND BEFORE WATER SERVICE IS RESTORED TO UNIT.

LEGEND

PIPE CAP

EXISTING ACCESS TO CRAWL

SPACE

PIPE DOWN

PIPE UP

DOMESTIC COLD WATER

NEW WATER METER

PIPING TO BE DEMOLISHED

EXISTING HOT WATER SUPPLY

PIPING

HWS

EXISTING HOT WATER RETURN

PIPING

HWR

X

M

EXTERIOR HOSE BIBB (ETR)

UNDERGROUND GATE VALVE

POC

POINT OF CONNECTION TO

EXISTING PIPING

SCALE: 1:100

0 2000 4000

TYPE 4P3 - 3 BEDROOM - CRAWL SPACE - PLUMBING DEMOLITION PLAN

4P3-P-101 4P3-P-101 SCALE: 1:100

Y3

Y2

Y1

Y0

M

POC

POC

M

POC

POC

MM

X0 X1 X2 X3 X4

Y4

Y3

Y2

Y1

Y0

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N

D A

T E

A P

P R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

C T

S T

T W

A N

D R

B

A C

K E

S

T Y

B

E D

R O

R A

W L

S

P A

C E

SCALE: 1:100

0 2000 4000

P L U

M B

I N

G

P

L A

N

TYPE 6N - 4 BEDROOM - CRAWL SPACE - NEW PLUMBING PLAN

6N-P-101 6N-P-101 SCALE: 1:100

GENERAL PLAN NOTES:

KEYED NOTES:

RE-ROUTE COLD WATER PIPING TO EXISTING EXTERIOR HOSE BIBB.

CUT-IN NEW WATER METER INTO EXISTING PIPING. REFER TO DETAIL FOR VALVE ARRANGEMENT. MAKE

SMALL OFFSETS IN PIPING IN ORDER TO MAINTAIN ADEQUATE CLEARANCE TO ADJACENT PIPING.

1. CUT-IN NEW WATER METER INTO EXISTING DOMESTIC COLD WATER SUPPLY PIPING AS SHOWN.

PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW EMCS

SYSTEM.

2. PROVIDE ALL NECESSARY PIPING, VALVES, WIRING, DDC CONTROLS AND SUPPORTS FOR NEW WATER

METERS AS SHOWN ON PLANS, DETAILS AND SPECIFICATIONS.

3. ALL WORK WILL TAKE PLACE IN CONFINED SPACE UNDER EXISTING BUILDING.

4. CONTRACTOR IS RESPONSIBLE FOR DRAINING EXISTING DOMESTIC WATER SYSTEM IN ITS ENTIRETY

PRIOR TO CONSTRUCTION. SYSTEM SHALL BE RESTORED TO UNIT (WHICH WILL BE OCCUPIED DURING

CONSTRUCTION) WITHIN 8 HRS, OTHERWISE ALTERNATIVE MEANS OF COLD OR HOT WATER SHALL BE

PROVIDED DURING CONSTRUCTION.

5. WHEN IT IS NECESSARY TO RE-ROUTE PIPING RUNOUT TO EXISTING EXTERIOR HOSE BIBB, CONTRACTOR SHALL PROVIDE ALL NECESSARY EXCAVATION, RESTORATION, AND CORING OF OPENING

THRU EXISTING CONCRETE WALL, AND SEAL PER DETAIL.

6. WATER SAMPLING IS REQUIRED AFTER ALL DOMESTIC WATER OUTAGES. WATER SAMPLING SHALL BE

SUBMITTED TO BASE BIO-ENVIROMENTAL ENGINEER TO ENSURE WATER IS SAFE TO CONSUME AFTER

WATER METER WORK IS COMPLETED AND BEFORE WATER SERVICE IS RESTORED TO UNIT.

LEGEND

PIPE CAP

EXISTING ACCESS TO CRAWL

SPACE

PIPE DOWN

PIPE UP

DOMESTIC COLD WATER

NEW WATER METER

PIPING TO BE DEMOLISHED

EXISTING HOT WATER SUPPLY

PIPING

HWS

EXISTING HOT WATER RETURN

PIPING

HWR

X

M

EXTERIOR HOSE BIBB (ETR)

UNDERGROUND GATE VALVE

POC

POINT OF CONNECTION TO

EXISTING PIPING

SCALE: 1:100

0 2000 4000

TYPE 6N - 4 BEDROOM - CRAWL SPACE - PLUMBING DEMOLITION PLAN

6N-P-101 6N-P-101 SCALE: 1:100

Y3

Y2

Y1

Y0

M

POC

POC

POC

POC

M

POC

POC

POC

POC

40 40

MM

Y4

Y3

Y2

Y1

Y0

20 20

X0 X1 X2 X3 X4

X0 X1 X2 X3 X4

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N

D A

T E

A P

P R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

C T

S T

T W

A N

D R

B

A C

K E

S

T Y

B

E D

R O

R A

W L

S

P A

C E

SCALE: 1:100

0 2000 4000

P L U

M B

I N

G

P

L A

N

TYPE 6P1 - 4 BEDROOM - CRAWL SPACE - NEW PLUMBING PLAN

6P1-P-101 6P1-P-101 SCALE: 1:100

GENERAL PLAN NOTES:

KEYED NOTES:

RE-ROUTE COLD WATER PIPING TO EXISTING EXTERIOR HOSE BIBB.

CUT-IN NEW WATER METER INTO EXISTING PIPING. REFER TO DETAIL FOR VALVE ARRANGEMENT. MAKE

SMALL OFFSETS IN PIPING IN ORDER TO MAINTAIN ADEQUATE CLEARANCE TO ADJACENT PIPING.

1. CUT-IN NEW WATER METER INTO EXISTING DOMESTIC COLD WATER SUPPLY PIPING AS SHOWN.

PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW EMCS

SYSTEM.

2. PROVIDE ALL NECESSARY PIPING, VALVES, WIRING, DDC CONTROLS AND SUPPORTS FOR NEW WATER

METERS AS SHOWN ON PLANS, DETAILS AND SPECIFICATIONS.

3. ALL WORK WILL TAKE PLACE IN CONFINED SPACE UNDER EXISTING BUILDING.

4. CONTRACTOR IS RESPONSIBLE FOR DRAINING EXISTING DOMESTIC WATER SYSTEM IN ITS ENTIRETY

PRIOR TO CONSTRUCTION. SYSTEM SHALL BE RESTORED TO UNIT (WHICH WILL BE OCCUPIED DURING

CONSTRUCTION) WITHIN 8 HRS, OTHERWISE ALTERNATIVE MEANS OF COLD OR HOT WATER SHALL BE

PROVIDED DURING CONSTRUCTION.

5. WHEN IT IS NECESSARY TO RE-ROUTE PIPING RUNOUT TO EXISTING EXTERIOR HOSE BIBB, CONTRACTOR SHALL PROVIDE ALL NECESSARY EXCAVATION, RESTORATION, AND CORING OF OPENING

THRU EXISTING CONCRETE WALL, AND SEAL PER DETAIL.

6. WATER SAMPLING IS REQUIRED AFTER ALL DOMESTIC WATER OUTAGES. WATER SAMPLING SHALL BE

SUBMITTED TO BASE BIO-ENVIROMENTAL ENGINEER TO ENSURE WATER IS SAFE TO CONSUME AFTER

WATER METER WORK IS COMPLETED AND BEFORE WATER SERVICE IS RESTORED TO UNIT.

LEGEND

PIPE CAP

EXISTING ACCESS TO CRAWL

SPACE

PIPE DOWN

PIPE UP

DOMESTIC COLD WATER

NEW WATER METER

PIPING TO BE DEMOLISHED

EXISTING HOT WATER SUPPLY

PIPING

HWS

EXISTING HOT WATER RETURN

PIPING

HWR

X

M

EXTERIOR HOSE BIBB (ETR)

UNDERGROUND GATE VALVE

POC

POINT OF CONNECTION TO

EXISTING PIPING

SCALE: 1:100

0 2000 4000

TYPE 6P1 - 4 BEDROOM - CRAWL SPACE - PLUMBING DEMOLITION PLAN

6P1-P-101 6P1-P-101 SCALE: 1:100

Y3

Y2

Y1

Y0

POC

POC

POC

POC

X0 X1 X2 X3 X4

Y4

Y3

Y2

Y1

Y0

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N

D A

T E

A P

P R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

C T

S T

T W

A N

D R

B

A C

K E

S

T Y

B

E D

R O

R A

W L

S

P A

C E

SCALE: 1:100

0 2000 4000

P L U

M B

I N

G

P

L A

N

TYPE 6A - 4 BEDROOM - CRAWL SPACE - NEW PLUMBING PLAN

6A-P-101 6A-P-101 SCALE: 1:100

GENERAL PLAN NOTES:

KEYED NOTES:

RE-ROUTE COLD WATER PIPING TO EXISTING EXTERIOR HOSE BIBB.

CUT-IN NEW WATER METER INTO EXISTING PIPING. REFER TO DETAIL FOR VALVE ARRANGEMENT. MAKE

SMALL OFFSETS IN PIPING IN ORDER TO MAINTAIN ADEQUATE CLEARANCE TO ADJACENT PIPING.

1. CUT-IN NEW WATER METER INTO EXISTING DOMESTIC COLD WATER SUPPLY PIPING AS SHOWN.

PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW EMCS

SYSTEM.

2. PROVIDE ALL NECESSARY PIPING, VALVES, WIRING, DDC CONTROLS AND SUPPORTS FOR NEW WATER

METERS AS SHOWN ON PLANS, DETAILS AND SPECIFICATIONS.

3. ALL WORK WILL TAKE PLACE IN CONFINED SPACE UNDER EXISTING BUILDING.

4. CONTRACTOR IS RESPONSIBLE FOR DRAINING EXISTING DOMESTIC WATER SYSTEM IN ITS ENTIRETY

PRIOR TO CONSTRUCTION. SYSTEM SHALL BE RESTORED TO UNIT (WHICH WILL BE OCCUPIED DURING

CONSTRUCTION) WITHIN 8 HRS, OTHERWISE ALTERNATIVE MEANS OF COLD OR HOT WATER SHALL BE

PROVIDED DURING CONSTRUCTION.

5. WHEN IT IS NECESSARY TO RE-ROUTE PIPING RUNOUT TO EXISTING EXTERIOR HOSE BIBB, CONTRACTOR SHALL PROVIDE ALL NECESSARY EXCAVATION, RESTORATION, AND CORING OF OPENING

THRU EXISTING CONCRETE WALL, AND SEAL PER DETAIL.

6. WATER SAMPLING IS REQUIRED AFTER ALL DOMESTIC WATER OUTAGES. WATER SAMPLING SHALL BE

SUBMITTED TO BASE BIO-ENVIROMENTAL ENGINEER TO ENSURE WATER IS SAFE TO CONSUME AFTER

WATER METER WORK IS COMPLETED AND BEFORE WATER SERVICE IS RESTORED TO UNIT.

LEGEND

PIPE CAP

EXISTING ACCESS TO CRAWL

SPACE

PIPE DOWN

PIPE UP

DOMESTIC COLD WATER

NEW WATER METER

PIPING TO BE DEMOLISHED

EXISTING HOT WATER SUPPLY

PIPING

HWS

EXISTING HOT WATER RETURN

PIPING

HWR

X

M

EXTERIOR HOSE BIBB (ETR)

UNDERGROUND GATE VALVE

POC

POINT OF CONNECTION TO

EXISTING PIPING

SCALE: 1:100

0 2000 4000

TYPE 6A - 4 BEDROOM - CRAWL SPACE - PLUMBING DEMOLITION PLAN

6A-P-101 6A-P-101 SCALE: 1:100

Y2

Y1

Y0

M

POC

POC

POC

POC

M

POC

POC

POC

POC

MM

Y4

Y3

Y2

Y1

Y0

X0 X1 X2 X3 X4

X0 X1 X2 X3 X4

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N

D A

T E

A P

P R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

C T

S T

T W

A N

D R

B

A C

K E

S

T Y

B

E D

R O

R A

W L

S

P A

C E

SCALE: 1:100

0 2000 4000

P L U

M B

I N

G

P

L A

N

TYPE 7P2 - 4 BEDROOM - CRAWL SPACE - NEW PLUMBING PLAN

7P2-P-101 7P2-P-101 SCALE: 1:100

GENERAL PLAN NOTES:

KEYED NOTES:

RE-ROUTE COLD WATER PIPING TO EXISTING EXTERIOR HOSE BIBB.

CUT-IN NEW WATER METER INTO EXISTING PIPING. REFER TO DETAIL FOR VALVE ARRANGEMENT. MAKE

SMALL OFFSETS IN PIPING IN ORDER TO MAINTAIN ADEQUATE CLEARANCE TO ADJACENT PIPING.

1. CUT-IN NEW WATER METER INTO EXISTING DOMESTIC COLD WATER SUPPLY PIPING AS SHOWN.

PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW EMCS

SYSTEM.

2. PROVIDE ALL NECESSARY PIPING, VALVES, WIRING, DDC CONTROLS AND SUPPORTS FOR NEW WATER

METERS AS SHOWN ON PLANS, DETAILS AND SPECIFICATIONS.

3. ALL WORK WILL TAKE PLACE IN CONFINED SPACE UNDER EXISTING BUILDING.

4. CONTRACTOR IS RESPONSIBLE FOR DRAINING EXISTING DOMESTIC WATER SYSTEM IN ITS ENTIRETY

PRIOR TO CONSTRUCTION. SYSTEM SHALL BE RESTORED TO UNIT (WHICH WILL BE OCCUPIED DURING

CONSTRUCTION) WITHIN 8 HRS, OTHERWISE ALTERNATIVE MEANS OF COLD OR HOT WATER SHALL BE

PROVIDED DURING CONSTRUCTION.

5. WHEN IT IS NECESSARY TO RE-ROUTE PIPING RUNOUT TO EXISTING EXTERIOR HOSE BIBB, CONTRACTOR SHALL PROVIDE ALL NECESSARY EXCAVATION, RESTORATION, AND CORING OF OPENING

THRU EXISTING CONCRETE WALL, AND SEAL PER DETAIL.

6. WATER SAMPLING IS REQUIRED AFTER ALL DOMESTIC WATER OUTAGES. WATER SAMPLING SHALL BE

SUBMITTED TO BASE BIO-ENVIROMENTAL ENGINEER TO ENSURE WATER IS SAFE TO CONSUME AFTER

WATER METER WORK IS COMPLETED AND BEFORE WATER SERVICE IS RESTORED TO UNIT.

LEGEND

PIPE CAP

EXISTING ACCESS TO CRAWL

SPACE

PIPE DOWN

PIPE UP

DOMESTIC COLD WATER

NEW WATER METER

PIPING TO BE DEMOLISHED

EXISTING HOT WATER SUPPLY

PIPING

HWS

EXISTING HOT WATER RETURN

PIPING

HWR

X

M

EXTERIOR HOSE BIBB (ETR)

UNDERGROUND GATE VALVE

POC

POINT OF CONNECTION TO

EXISTING PIPING

SCALE: 1:100

0 2000 4000

TYPE 7P2 - 4 BEDROOM - CRAWL SPACE - PLUMBING DEMOLITION PLAN

7P2-P-101 7P2-P-101 SCALE: 1:100

Y3

Y2

Y1

Y0

POC

POC

POC

POC

X0 X1 X2 X3 X4

Y4

Y3

Y2

Y1

Y0

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N

D A

T E

A P

P R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

C T

S T

T W

A N

D R

B

A C

K E

S

T Y

B

E D

R O

R A

W L

S

P A

C E

SCALE: 1:100

0 2000 4000

P L U

M B

I N

G

P

L A

N

TYPE 7A - 4 BEDROOM - CRAWL SPACE - NEW PLUMBING PLAN

7A-P-101 7A-P-101 SCALE: 1:100

GENERAL PLAN NOTES:

KEYED NOTES:

RE-ROUTE COLD WATER PIPING TO EXISTING EXTERIOR HOSE BIBB.

CUT-IN NEW WATER METER INTO EXISTING PIPING. REFER TO DETAIL FOR VALVE ARRANGEMENT. MAKE

SMALL OFFSETS IN PIPING IN ORDER TO MAINTAIN ADEQUATE CLEARANCE TO ADJACENT PIPING.

1. CUT-IN NEW WATER METER INTO EXISTING DOMESTIC COLD WATER SUPPLY PIPING AS SHOWN.

PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW EMCS

SYSTEM.

2. PROVIDE ALL NECESSARY PIPING, VALVES, WIRING, DDC CONTROLS AND SUPPORTS FOR NEW WATER

METERS AS SHOWN ON PLANS, DETAILS AND SPECIFICATIONS.

3. ALL WORK WILL TAKE PLACE IN CONFINED SPACE UNDER EXISTING BUILDING.

4. CONTRACTOR IS RESPONSIBLE FOR DRAINING EXISTING DOMESTIC WATER SYSTEM IN ITS ENTIRETY

PRIOR TO CONSTRUCTION. SYSTEM SHALL BE RESTORED TO UNIT (WHICH WILL BE OCCUPIED DURING

CONSTRUCTION) WITHIN 8 HRS, OTHERWISE ALTERNATIVE MEANS OF COLD OR HOT WATER SHALL BE

PROVIDED DURING CONSTRUCTION.

5. WHEN IT IS NECESSARY TO RE-ROUTE PIPING RUNOUT TO EXISTING EXTERIOR HOSE BIBB, CONTRACTOR SHALL PROVIDE ALL NECESSARY EXCAVATION, RESTORATION, AND CORING OF OPENING

THRU EXISTING CONCRETE WALL, AND SEAL PER DETAIL.

6. WATER SAMPLING IS REQUIRED AFTER ALL DOMESTIC WATER OUTAGES. WATER SAMPLING SHALL BE

SUBMITTED TO BASE BIO-ENVIROMENTAL ENGINEER TO ENSURE WATER IS SAFE TO CONSUME AFTER

WATER METER WORK IS COMPLETED AND BEFORE WATER SERVICE IS RESTORED TO UNIT.

LEGEND

PIPE CAP

EXISTING ACCESS TO CRAWL

SPACE

PIPE DOWN

PIPE UP

DOMESTIC COLD WATER

NEW WATER METER

PIPING TO BE DEMOLISHED

EXISTING HOT WATER SUPPLY

PIPING

HWS

EXISTING HOT WATER RETURN

PIPING

HWR

X

M

EXTERIOR HOSE BIBB (ETR)

UNDERGROUND GATE VALVE

POC

POINT OF CONNECTION TO

EXISTING PIPING

SCALE: 1:100

0 2000 4000

TYPE 7A - 4 BEDROOM - CRAWL SPACE - PLUMBING DEMOLITION PLAN

7A-P-101 7A-P-101 SCALE: 1:100

Y3

Y2

Y1

Y0

POC

POC

POC

POC

X0 X1 X2 X3 X4

Y4

Y3

Y2

Y1

Y0

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N

D A

T E

A P

P R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

C T

S T

T W

A N

D R

B

A C

K E

S

T Y

B

E D

R O

R A

W L

S

P A

C E

SCALE: 1:100

0 2000 4000

P L U

M B

I N

G

P

L A

N

TYPE 8N - 3 BEDROOM - CRAWL SPACE - NEW PLUMBING PLAN

8N-P-101 8N-P-101 SCALE: 1:100

GENERAL PLAN NOTES:

KEYED NOTES:

RE-ROUTE COLD WATER PIPING TO EXISTING EXTERIOR HOSE BIBB.

CUT-IN NEW WATER METER INTO EXISTING PIPING. REFER TO DETAIL FOR VALVE ARRANGEMENT. MAKE

SMALL OFFSETS IN PIPING IN ORDER TO MAINTAIN ADEQUATE CLEARANCE TO ADJACENT PIPING.

1. CUT-IN NEW WATER METER INTO EXISTING DOMESTIC COLD WATER SUPPLY PIPING AS SHOWN.

PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW EMCS

SYSTEM.

2. PROVIDE ALL NECESSARY PIPING, VALVES, WIRING, DDC CONTROLS AND SUPPORTS FOR NEW WATER

METERS AS SHOWN ON PLANS, DETAILS AND SPECIFICATIONS.

3. ALL WORK WILL TAKE PLACE IN CONFINED SPACE UNDER EXISTING BUILDING.

4. CONTRACTOR IS RESPONSIBLE FOR DRAINING EXISTING DOMESTIC WATER SYSTEM IN ITS ENTIRETY

PRIOR TO CONSTRUCTION. SYSTEM SHALL BE RESTORED TO UNIT (WHICH WILL BE OCCUPIED DURING

CONSTRUCTION) WITHIN 8 HRS, OTHERWISE ALTERNATIVE MEANS OF COLD OR HOT WATER SHALL BE

PROVIDED DURING CONSTRUCTION.

5. WHEN IT IS NECESSARY TO RE-ROUTE PIPING RUNOUT TO EXISTING EXTERIOR HOSE BIBB, CONTRACTOR SHALL PROVIDE ALL NECESSARY EXCAVATION, RESTORATION, AND CORING OF OPENING

THRU EXISTING CONCRETE WALL, AND SEAL PER DETAIL.

6. WATER SAMPLING IS REQUIRED AFTER ALL DOMESTIC WATER OUTAGES. WATER SAMPLING SHALL BE

SUBMITTED TO BASE BIO-ENVIROMENTAL ENGINEER TO ENSURE WATER IS SAFE TO CONSUME AFTER

WATER METER WORK IS COMPLETED AND BEFORE WATER SERVICE IS RESTORED TO UNIT.

LEGEND

PIPE CAP

EXISTING ACCESS TO CRAWL

SPACE

PIPE DOWN

PIPE UP

DOMESTIC COLD WATER

NEW WATER METER

PIPING TO BE DEMOLISHED

EXISTING HOT WATER SUPPLY

PIPING

HWS

EXISTING HOT WATER RETURN

PIPING

HWR

X

M

EXTERIOR HOSE BIBB (ETR)

UNDERGROUND GATE VALVE

POC

POINT OF CONNECTION TO

EXISTING PIPING

SCALE: 1:100

0 2000 4000

TYPE 8N - 3 BEDROOM - CRAWL SPACE - PLUMBING DEMOLITION PLAN

8N-P-101 8N-P-101 SCALE: 1:100

Y2

Y1

Y0

POC

POC

POC

POC

POC

POC

POC

20 20

POC

X0 X1 X2 X3 X4

Y3

Y2

Y1

Y020

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N

D A

T E

A P

P R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

C T

S T

T W

A N

D R

B

A C

K E

S

T Y

B

E D

R O

R A

W L

S

P A

C E

SCALE: 1:100

0 2000 4000

P L U

M B

I N

G

P

L A

N

TYPE 15N - 2 BEDROOM - CRAWL SPACE - NEW PLUMBING PLAN

15N-P-101 15N-P-101 SCALE: 1:100

GENERAL PLAN NOTES:

KEYED NOTES:

RE-ROUTE COLD WATER PIPING TO EXISTING EXTERIOR HOSE BIBB.

CUT-IN NEW WATER METER INTO EXISTING PIPING. REFER TO DETAIL FOR VALVE ARRANGEMENT. MAKE

SMALL OFFSETS IN PIPING IN ORDER TO MAINTAIN ADEQUATE CLEARANCE TO ADJACENT PIPING.

1. CUT-IN NEW WATER METER INTO EXISTING DOMESTIC COLD WATER SUPPLY PIPING AS SHOWN.

PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW EMCS

SYSTEM.

2. PROVIDE ALL NECESSARY PIPING, VALVES, WIRING, DDC CONTROLS AND SUPPORTS FOR NEW WATER

METERS AS SHOWN ON PLANS, DETAILS AND SPECIFICATIONS.

3. ALL WORK WILL TAKE PLACE IN CONFINED SPACE UNDER EXISTING BUILDING.

4. CONTRACTOR IS RESPONSIBLE FOR DRAINING EXISTING DOMESTIC WATER SYSTEM IN ITS ENTIRETY

PRIOR TO CONSTRUCTION. SYSTEM SHALL BE RESTORED TO UNIT (WHICH WILL BE OCCUPIED DURING

CONSTRUCTION) WITHIN 8 HRS, OTHERWISE ALTERNATIVE MEANS OF COLD OR HOT WATER SHALL BE

PROVIDED DURING CONSTRUCTION.

5. WHEN IT IS NECESSARY TO RE-ROUTE PIPING RUNOUT TO EXISTING EXTERIOR HOSE BIBB, CONTRACTOR SHALL PROVIDE ALL NECESSARY EXCAVATION, RESTORATION, AND CORING OF OPENING

THRU EXISTING CONCRETE WALL, AND SEAL PER DETAIL.

6. WATER SAMPLING IS REQUIRED AFTER ALL DOMESTIC WATER OUTAGES. WATER SAMPLING SHALL BE

SUBMITTED TO BASE BIO-ENVIROMENTAL ENGINEER TO ENSURE WATER IS SAFE TO CONSUME AFTER

WATER METER WORK IS COMPLETED AND BEFORE WATER SERVICE IS RESTORED TO UNIT.

LEGEND

PIPE CAP

EXISTING ACCESS TO CRAWL

SPACE

PIPE DOWN

PIPE UP

DOMESTIC COLD WATER

NEW WATER METER

PIPING TO BE DEMOLISHED

EXISTING HOT WATER SUPPLY

PIPING

HWS

EXISTING HOT WATER RETURN

PIPING

HWR

X

M

EXTERIOR HOSE BIBB (ETR)

UNDERGROUND GATE VALVE

POC

POINT OF CONNECTION TO

EXISTING PIPING

SCALE: 1:100

0 2000 4000TYPE 15N - 2 BEDROOM - CRAWL SPACE - PLUMBING DEMOLITION PLAN

15N-P-101 15N-P-101 SCALE: 1:100

Y2

Y1

Y0

POC

POC

POC

POC

POC

POC

32 32

POC

POC

Y3

Y2

Y1

Y0

X0 X1 X2 X3 X4

X0 X1 X2 X3 X4

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N

D A

T E

A P

P R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

C T

S T

T W

A N

D R

B

A C

K E

S

T Y

B

E D

R O

R A

W L

S

P A

C E

SCALE: 1:100

0 2000 4000

P L U

M B

I N

G

P

L A

N

TYPE 12N - 3 BEDROOM - CRAWL SPACE - NEW PLUMBING PLAN

12N-P-101 12N-P-101 SCALE: 1:100

GENERAL PLAN NOTES:

KEYED NOTES:

RE-ROUTE COLD WATER PIPING TO EXISTING EXTERIOR HOSE BIBB.

CUT-IN NEW WATER METER INTO EXISTING PIPING. REFER TO DETAIL FOR VALVE ARRANGEMENT. MAKE

SMALL OFFSETS IN PIPING IN ORDER TO MAINTAIN ADEQUATE CLEARANCE TO ADJACENT PIPING.

1. CUT-IN NEW WATER METER INTO EXISTING DOMESTIC COLD WATER SUPPLY PIPING AS SHOWN.

PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW EMCS

SYSTEM.

2. PROVIDE ALL NECESSARY PIPING, VALVES, WIRING, DDC CONTROLS AND SUPPORTS FOR NEW WATER

METERS AS SHOWN ON PLANS, DETAILS AND SPECIFICATIONS.

3. ALL WORK WILL TAKE PLACE IN CONFINED SPACE UNDER EXISTING BUILDING.

4. CONTRACTOR IS RESPONSIBLE FOR DRAINING EXISTING DOMESTIC WATER SYSTEM IN ITS ENTIRETY

PRIOR TO CONSTRUCTION. SYSTEM SHALL BE RESTORED TO UNIT (WHICH WILL BE OCCUPIED DURING

CONSTRUCTION) WITHIN 8 HRS, OTHERWISE ALTERNATIVE MEANS OF COLD OR HOT WATER SHALL BE

PROVIDED DURING CONSTRUCTION.

5. WHEN IT IS NECESSARY TO RE-ROUTE PIPING RUNOUT TO EXISTING EXTERIOR HOSE BIBB, CONTRACTOR SHALL PROVIDE ALL NECESSARY EXCAVATION, RESTORATION, AND CORING OF OPENING

THRU EXISTING CONCRETE WALL, AND SEAL PER DETAIL.

6. WATER SAMPLING IS REQUIRED AFTER ALL DOMESTIC WATER OUTAGES. WATER SAMPLING SHALL BE

SUBMITTED TO BASE BIO-ENVIROMENTAL ENGINEER TO ENSURE WATER IS SAFE TO CONSUME AFTER

WATER METER WORK IS COMPLETED AND BEFORE WATER SERVICE IS RESTORED TO UNIT.

LEGEND

PIPE CAP

EXISTING ACCESS TO CRAWL

SPACE

PIPE DOWN

PIPE UP

DOMESTIC COLD WATER

NEW WATER METER

PIPING TO BE DEMOLISHED

EXISTING HOT WATER SUPPLY

PIPING

HWS

EXISTING HOT WATER RETURN

PIPING

HWR

X

M

EXTERIOR HOSE BIBB (ETR)

UNDERGROUND GATE VALVE

POC

POINT OF CONNECTION TO

EXISTING PIPING

SCALE: 1:100

0 2000 4000

TYPE 12N - 3 BEDROOM - CRAWL SPACE - PLUMBING DEMOLITION PLAN

12N-P-101 12N-P-101 SCALE: 1:100

Y1

Y0

POC

POC

POC

POC

POC

POC

POC

32 32

POC

X0 X1 X2 X3 X4

Y2

Y1

Y0

32 32

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N

D A

T E

A P

P R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

C T

S T

T W

A N

D R

B

A C

K E

S

T Y

B

E D

R O

R A

W L

S

P A

C E

SCALE: 1:100

0 2000 4000

P L U

M B

I N

G

P

L A

N

TYPE 16N - 4 BEDROOM - CRAWL SPACE - NEW PLUMBING PLAN

16N-P-101 16N-P-101 SCALE: 1:100

GENERAL PLAN NOTES:

KEYED NOTES:

RE-ROUTE COLD WATER PIPING TO EXISTING EXTERIOR HOSE BIBB.

CUT-IN NEW WATER METER INTO EXISTING PIPING. REFER TO DETAIL FOR VALVE ARRANGEMENT. MAKE

SMALL OFFSETS IN PIPING IN ORDER TO MAINTAIN ADEQUATE CLEARANCE TO ADJACENT PIPING.

1. CUT-IN NEW WATER METER INTO EXISTING DOMESTIC COLD WATER SUPPLY PIPING AS SHOWN.

PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW EMCS

SYSTEM.

2. PROVIDE ALL NECESSARY PIPING, VALVES, WIRING, DDC CONTROLS AND SUPPORTS FOR NEW WATER

METERS AS SHOWN ON PLANS, DETAILS AND SPECIFICATIONS.

3. ALL WORK WILL TAKE PLACE IN CONFINED SPACE UNDER EXISTING BUILDING.

4. CONTRACTOR IS RESPONSIBLE FOR DRAINING EXISTING DOMESTIC WATER SYSTEM IN ITS ENTIRETY

PRIOR TO CONSTRUCTION. SYSTEM SHALL BE RESTORED TO UNIT (WHICH WILL BE OCCUPIED DURING

CONSTRUCTION) WITHIN 8 HRS, OTHERWISE ALTERNATIVE MEANS OF COLD OR HOT WATER SHALL BE

PROVIDED DURING CONSTRUCTION.

5. WHEN IT IS NECESSARY TO RE-ROUTE PIPING RUNOUT TO EXISTING EXTERIOR HOSE BIBB, CONTRACTOR SHALL PROVIDE ALL NECESSARY EXCAVATION, RESTORATION, AND CORING OF OPENING

THRU EXISTING CONCRETE WALL, AND SEAL PER DETAIL.

6. WATER SAMPLING IS REQUIRED AFTER ALL DOMESTIC WATER OUTAGES. WATER SAMPLING SHALL BE

SUBMITTED TO BASE BIO-ENVIROMENTAL ENGINEER TO ENSURE WATER IS SAFE TO CONSUME AFTER

WATER METER WORK IS COMPLETED AND BEFORE WATER SERVICE IS RESTORED TO UNIT.

LEGEND

PIPE CAP

EXISTING ACCESS TO CRAWL

SPACE

PIPE DOWN

PIPE UP

DOMESTIC COLD WATER

NEW WATER METER

PIPING TO BE DEMOLISHED

EXISTING HOT WATER SUPPLY

PIPING

HWS

EXISTING HOT WATER RETURN

PIPING

HWR

X

M

EXTERIOR HOSE BIBB (ETR)

UNDERGROUND GATE VALVE

POC

POINT OF CONNECTION TO

EXISTING PIPING

SCALE: 1:100

0 2000 4000

TYPE 16N - 4 BEDROOM - CRAWL SPACE - PLUMBING DEMOLITION PLAN

16N-P-101 16N-P-101 SCALE: 1:100

X0 X1 X2

Y1

Y0

POC

POC

POC

POC

X0 X1 X2

Y2

Y1

Y0

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N

D A

T E

A P

P R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

C T

S T

T W

A N

D R

B

A C

K E

S

T Y

N

D

B

E D

R O

R A

W L

S

P A

C E

SCALE: 1:100

0 2000 4000

P L U

M B

I N

G

P

L A

N

TYPE 16ND - 4 BEDROOM - CRAWL SPACE - NEW PLUMBING PLAN

16ND-P-101 16ND-P-101 SCALE: 1:100

GENERAL PLAN NOTES:

KEYED NOTES:

RE-ROUTE COLD WATER PIPING TO EXISTING EXTERIOR HOSE BIBB.

CUT-IN NEW WATER METER INTO EXISTING PIPING. REFER TO DETAIL FOR VALVE ARRANGEMENT. MAKE

SMALL OFFSETS IN PIPING IN ORDER TO MAINTAIN ADEQUATE CLEARANCE TO ADJACENT PIPING.

1. CUT-IN NEW WATER METER INTO EXISTING DOMESTIC COLD WATER SUPPLY PIPING AS SHOWN.

PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW EMCS

SYSTEM.

2. PROVIDE ALL NECESSARY PIPING, VALVES, WIRING, DDC CONTROLS AND SUPPORTS FOR NEW WATER

METERS AS SHOWN ON PLANS, DETAILS AND SPECIFICATIONS.

3. ALL WORK WILL TAKE PLACE IN CONFINED SPACE UNDER EXISTING BUILDING.

4. CONTRACTOR IS RESPONSIBLE FOR DRAINING EXISTING DOMESTIC WATER SYSTEM IN ITS ENTIRETY

PRIOR TO CONSTRUCTION. SYSTEM SHALL BE RESTORED TO UNIT (WHICH WILL BE OCCUPIED DURING

CONSTRUCTION) WITHIN 8 HRS, OTHERWISE ALTERNATIVE MEANS OF COLD OR HOT WATER SHALL BE

PROVIDED DURING CONSTRUCTION.

5. WHEN IT IS NECESSARY TO RE-ROUTE PIPING RUNOUT TO EXISTING EXTERIOR HOSE BIBB, CONTRACTOR SHALL PROVIDE ALL NECESSARY EXCAVATION, RESTORATION, AND CORING OF OPENING

THRU EXISTING CONCRETE WALL, AND SEAL PER DETAIL.

6. WATER SAMPLING IS REQUIRED AFTER ALL DOMESTIC WATER OUTAGES. WATER SAMPLING SHALL BE

SUBMITTED TO BASE BIO-ENVIROMENTAL ENGINEER TO ENSURE WATER IS SAFE TO CONSUME AFTER

WATER METER WORK IS COMPLETED AND BEFORE WATER SERVICE IS RESTORED TO UNIT.

LEGEND

PIPE CAP

EXISTING ACCESS TO CRAWL

SPACE

PIPE DOWN

PIPE UP

DOMESTIC COLD WATER

NEW WATER METER

PIPING TO BE DEMOLISHED

EXISTING HOT WATER SUPPLY

PIPING

HWS

EXISTING HOT WATER RETURN

PIPING

HWR

X

M

EXTERIOR HOSE BIBB (ETR)

UNDERGROUND GATE VALVE

POC

POINT OF CONNECTION TO

EXISTING PIPING

SCALE: 1:100

0 2000 4000

TYPE 16ND - 4 BEDROOM - CRAWL SPACE - PLUMBING DEMOLITION PLAN

16ND-P-101 16ND-P-101 SCALE: 1:100

128_P-001
129_4P1-P-101
130_4P3-P-101
131_6N-P-101
132_6P1-P-101
133_6A-P-101
134_7P2-P-101
135_7A-P-101
136_8N-P-101
137_15N-P-101
138_12N-P-101
139_16N-P-101
140_16ND-P-101

File details come from the government source that posted it. Updated .