Pre-proposal Conference Minutes & Record of Site Visit dtd 28 Apr 17
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
35th FW Misawa Air Base
Pre-Proposal Conference / Site Visit Project No. QKKA 15-4008
Improve Military Family Housing (IMFH) Phase III, A/C & Weatherization, Misawa Air Base, Japan
RFP No. FA520517R0004
35 CONS/LGCP
35 CES/CENM
28 Apr 17
0900 hrs
Summary
Scope & Requirements General Requirement / Pricing Structure
RFP
CONS remarks for solicitation / filling instructions
CES tech briefing (Specs and Drwg)
Q&A Session
Site Visit to MFH area (see next slides)
Summary
Atch. 1 to Pre-proposal Conference Minutes & Record of Site Visit dated 28 Apr 17
Misawa Air Base Map
Scope & Requirements
Scope & Requirements
Project Site
Project Description (Sec B):
Install multi-split heat pump system (includes air conditioning (A/C) capability) and provide weatherization improvements in 594 Military Family Housing (MFH) units (132 bldgs and 1 twr)
Place: Main Base MFH area, Misawa Air Base, Japan
Contract Type: Firm-Fixed-Price
Performance Period: 900 CD (incl. 30 CD mobilization)
Scope & Requirements
Solicitation
RFPComplete block 14 through 20.
Fill-in
RFP
RFP - Page 2
Proposal of CLIN Amounts
Solicitation
RFP - Page 3
Fill-in
Section F
52.211-12 Liquidated Damages @¥68,940 (1st day ) & @¥39,701 (2nd day ~ )
Solicitation
RFP - Page 5
Section I
52.223-3 Hazardous Material
Solicitation
Fill-in
RFP - Page 7 - 18
Section J
List of Documents, Exhibits & Other Attachments Atch 1: Specifications
Atch 2: Drawings
Atch 3: Other Contract Requirements
Atch 4: Past Performance Questionnaire (PPQ) Cover Letter
Atch 5: Past/Present Performance Questionnaire (PPQ)
Atch 6: Construction Timeline
Atch 7: Schedule of Material Submittals
Atch 8: Acceptable Japanese Product Substitutes
Atch 9: Manufacturer’s Cut Sheet / Catalog Information
Atch 10: Asbestos Sampling and Analysis
Solicitation
RFP - Page 19
Section K
FAR 52.204-8 Annual Reps & Certs
FAR 52.209-7 Responsibility Matters Info
DFARS 252.204-7007 Alt. A Annual Reps & Certs
DFARS 252.247-7022 Transportation by Sea
Fill-in
Fill-in
Fill-in
Solicitation
Fill-in
RFP - Page 20 - 26
Section L
L-100 Proposal Preparation Instructions
Offer required to meet all sol. requirements, terms & conditions, reps & certs, & tech requirements
Prepare & Submit:
Part I – Summary & Misc. Data (Submit Orig. + 2 Copies)
Part II – Price Proposal (Submit Orig.)
Part III – Past Performance Proposal (Submit Orig. + 7 copies)
Solicitation
Submit
RFP - Page 27 - 33
Section M
M-900 Basis of Award & Evaluation
Weight of Importance:
Past Performance is approximately equal to price
Evaluation Process:
Price – Fairness and Reasonableness of price and price realism analysis
Past Performance – Recent and Relevant performance information
Solicitation
RFP - Page 34 - 35
Section M (Cont’d)
Past Performance Factor
Recency: Work within the last 3-Yr
Relevancy: Performance effort involved similar scope, magnitude of effort, and complexities to that required by this solicitation.
Integrated Assessment
The Gov’t reserves the right to award a contract to other than the lowest price offer if the difference in the PP Confidence Rating of another offeror justifies the higher price premium.
Solicitation
Special Cont. Req:
H002 Required Insurance Property Damage - ¥2,000,000
H003 Performance Bond Amount Required: 100% of awarded contract amt.
Submission: Within 30 CD after contract award
Other Contract Requirements
Attach. 3 - Page 3
Reps., Certs & Other Statements of Offerors
K001 Tax Exemption under SOFA
K002 Contractor’s Cert
K003 Construction Contractor License
Other Contract Requirements
Fill-in
Attach. 3 Page 4 - 6
Fill-in
Submit
Other Contract Requirements
Reps., Certs & Other Statements of Offerors (Cont’d)
K003 Construction Contractor License
Offeror shall submit 7 copies of “special construction license” under applicable law of Japan together with offer, to demonstrate compliance with FAR 52.236-7, as modified, and DFARS 252.225-7042.
Joint Venture or Partnership – the special construction license of each member of the JV or each partner of the partnership must be submitted together with the offer.
Such offer that fails in representation of the above required license will not be considered for award.
Let’s move on to Site Visit but please remind
RFP Closing Date / Time:
26 May 17 / 02:00 PM (JST)
Questions shall be submitted to 35 CONS/LGCP NLT 10 May 17 (JST)
35 CES Personnel Mr. Michael Dwyer, Deputy Engineering Flight Chief
Mr. Stephen Lacatena, Chief of Design
Lt. Ross King, OIC Project Management
Mr. Yasuhiro Yonaiyama, Arch Engineer
Mr. Mitsuhiro Kashiwazaki, Electrical Engineer
Mr. John Becquer, Chief of Housing Facilities
Mr. Rocky Hartley, GEITA Project Manager
Mr. Geoffrey Kumano, 35 CES Environmental
QKKA 15-4008, Improve Military Family Housing (IMFH), A/C and Weatherization Phase 3, Misawa AB, Japan
Atch. 2 to
Description of Work Requirement:
Install multi-split heat pump system in 594 MFH units
Provides energy efficient heating system Provides energy efficient air conditioning Provides de-humidifier function EMCS Controls for Energy Management
Provide facility weatherization upgrades to 594 MFH units
Install new energy efficient windows/doors Install solar film to existing windows (towers) Add roof insulation, as required
QKKA 15-4008, Improve Military Family Housing (IMFH), A/C and Weatherization Phase 3, Misawa AB, Japan
Occupied Housing units:
Governments responsibility:
Provides 35 FW Command letter directive to residents informing them of their responsibilities for moving personal household goods.
Provide Town Hall meetings for each street section to ensure residents understand their clearance requirements and dates required to be at their residents
Contractor responsibilities Coordination with residents prior to starting construction Covering interior belonging to protect against dust or damage
QKKA 15-4008, Improve Military Family Housing (IMFH), A/C and Weatherization Phase 3,
• Resident receives notice of construction 21 days prior to start of work
• Letter informs resident of dates they are staying in the designated swing space
• Residents pick up keys from housing two days prior
• Resident Moves into swing space
• KTR completes ACM Removal
• Base Receives Clearance
• KTR Starts demo of old units and installation of new units
• KTR starts replacement of power panels.
• Resident clears swing space with housing and returns key.
• KTR completes finish work on interior
• KTR continues exterior work
• KTR completes exterior work
• KTR Moves to next house
1 2 3
4 5 6
QKKA 15-4008, Improve Military Family Housing (IMFH), A/C and Weatherization Phase 3, QKKA 15-4008, Improve Military Family Housing (IMFH), A/C and Weatherization Phase 3, Misawa AB, Japan Haul Route:
Gate for materials and large trucks is now through Kamikita Gate
KTR required to submit for extra hours of operation and priority entrance
Normal hours are from 06:00-14:00 Mon-Saturday
Letters must be submitted to Security Forces prior to 24 Hrs to the trucks arrival
QKKA 15-4008, Improve Military Family Housing (IMFH), A/C and Weatherization Phase 3, Misawa AB, Japan
ACM: Expected Addendum
Scope of this project as been determined by Environmental is a Class III Asbestos work. Specification: 02 82 14.00 10 (Par 1.2.4)
The ACM abatement Plan will be prepared to determine the mitigation method and extent of containment. If the area is required to be negative pressured. The government has made arrangements for the units in Tower 231 to be used as swings space so the contractor can perform spot removal in locations identified with ACM. Specification: 02 82 14.00 10 (Par 1.6.1)
Contractor shall use glove bag, or wet method to remove known or presumed ACM from locations shown on the drawings.
Drawing: 4P1-H-101 (General Haz Mat Notes #1).
Travel Route (Approx 2hrs):
1. Start: B/656
2. B/1923 Exterior installation of Heat Pump (Past Project)
3. Tower 1939 (2E) Heat Pump Installation Sample (Past Project)
4. B/893-Windows & B/897 Mechanical room
5. B/198 example of house style for Project
6. Tower 231 for KTR laydown
7. B/347 Example of house configuration for Project
8. End: B/656
QKKA 15-4008, Improve Military Family Housing
Questions???
QKKA 15-4008, Improve Military Family Housing
Photos of Mechanical Room, Bldg. 897
Atch. 3 to