FA520517R00040004_Atch4.pdf

PDF 354 KB Posted

Attached to
Improve Military Family Housing (IMFH) Phase III, A/C and Weatherization, Misawa Air Base, Japan
Solicitation number
FA5205-17-R-0004
Issued by

About this file

FA520517R00040004_Atch4

View the file

Other files

File Type Posted
FA520517R00040005_Amendment.pdf PDF
FA520517R00040005_Atch3.pdf PDF
FA520517R00040005_Atch1.pdf PDF
FA520517R00040005_Atch4.pdf PDF
FA520517R00040005_Atch7.pdf PDF
FA520517R00040005_Atch6.pdf PDF
FA520517R00040005_Atch2.pdf PDF
FA520517R00040005_Atch5.pdf PDF
FA520517R00040004_Amendment.pdf PDF
FA520517R00040004_Atch3-4.pdf PDF
FA520517R00040004_Atch3-3.pdf PDF
FA520517R00040004_Atch5.pdf PDF
FA520517R00040004_Atch1.pdf PDF
FA520517R00040004_Atch2.pdf PDF
FA520517R00040004_Atch3-5.pdf PDF
FA520517R00040004_Atch3-2.pdf PDF
FA520517R00040004_Atch3-1.pdf PDF
FA520517R00040003_Atch1.pdf PDF
FA520517R00040003_Atch2.pdf PDF
FA520517R00040003_Amendment.pdf PDF
FA520517R00040002_Amendment.pdf PDF
FA520517R00040002_Atch.pdf PDF
FA520517R00040001_Atch2_Revised_Specification_Section.pdf PDF
FA520517R00040001_Amendment.pdf PDF
FA520517R00040001_Atch4_Revised_Solicitation_Page.pdf PDF
FA520517R00040001_Atch1_Addendum_No._1.pdf PDF
FA520517R00040001_Atch3_Revised_Drawings.pdf PDF
FA520517R0004_PreProposal_Conference_Minutes_&_Record_of_Site_Visit.pdf PDF
FA520517R0004_Atch2_Drawings_8_Electrical.pdf PDF
FA520517R0004_Atch2_Drawings_6_Plumbing.pdf PDF
FA520517R0004_Atch10_Asbestos_Sampling_and_Analysis.pdf PDF
FA520517R0004_Atch2_Drawings_3_Structural.pdf PDF
FA520517R0004_Atch2_Drawings_2_Hazmat.pdf PDF
FA520517R0004_Atch2_Drawings_5_Mechanical.pdf PDF
FA520517R0004_Atch4_PPQ_Cvr_Ltr.pdf PDF
FA520517R0004_Solicitation.pdf PDF
FA520517R0004_Atch8_Acceptable_JPN_Product_Substitutes.pdf PDF
FA520517R0004_Atch2_Drawings_7_Controls.pdf PDF
FA520517R0004_Atch2_Drawings_4_Architectural.pdf PDF
FA520517R0004_Atch9_Mfr's_Cut_Sheet_Catalog_Info.pdf PDF
FA520517R0004_Atch2_Drawings_1_General.pdf PDF
FA520517R0004_Atch3_Other_Contract_Requirements.pdf PDF
FA520517R0004_Atch1_Specifications.pdf PDF
FA520517R0004_Atch6_Construction_Timeline.pdf PDF
FA520517R0004_Atch5_PPQ.pdf PDF
FA520517R0004_Atch7_Schedule_of_Material_Submittals.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 31 PAGES

QKKA154008

IMFH Phase 3 A/C & Weatherization

01 32 01.00 10 SD-01 Preconstruction Submittals

3.4 GProject Schedule

01 33 00 SD-01 Preconstruction Submittals

1.4Submittal Register

01 35 29 SD-01 Preconstruction Submittals

1.6 G AAccident Prevention Plan (APP)

1.7 G AActivity Hazard Analysis (AHA)

SD-06 Test Reports

1.11Reports

1.11.1Accident Reports

1.11.3Monthly Exposure Reports

SD-07 Certificates

1.8Hot work permit

3.5.3Machinery & Mechanized

Equipment Certification Form

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9Verification Statement

01 57 20.00 10 SD-01 Preconstruction Submittals

1.7 GEnvironmental Protection Plan

01 74 19 SD-01 Preconstruction Submittals

1.6 GWaste Management Plan

SD-11 Closeout Submittals

1.7Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Atch. 4 to FA520517R00040004 Dated 31 May 17

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

01 78 00 SD-10 Operation and Maintenance

Data

1.4.1 GEquipment/Product Warranty List

SD-11 Closeout Submittals

1.3.1 GAs-Built Drawings

1.3.3 GRecord Of Materials

1.3.2 GUtility As-Built Drawings

1.4.2 GEquipment/Product Warranty Tag

GHazardous Material Reporting

1.2 GCertification of EPA Designated

Items

02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

1.11 GExisting Conditions

SD-07 Certificates

1.7 GNotification

SD-11 Closeout Submittals

3.3.2 GReceipts

02 82 14.00 10 SD-01 Preconstruction Submittals

1.3.2Asbestos Sampling Plan

SD-02 Shop Drawings

1.3 GDetailed Drawings

SD-03 Product Data

3.6.3.1 GAsbestos Waste Shipment

Records

3.6.3.1 GWeight Bills and Delivery Tickets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

02 82 14.00 10 2.1 GEncapsulants

1.8.1 GRespiratory Protection Program

3.6 GCleanup and Disposal

1.5.1 GQualifications

1.10 GTraining Program

1.7.1 GLicenses, Permits and

Notifications

3.6.3.2 GAsbestos Management Plan

SD-06 Test Reports

3.4 GExposure Assessment and Air

Monitoring

1.8 GMedical Surveillance

Requirements

03 33 00 SD-02 Shop Drawings

1.4.1 GDetail Drawings

SD-03 Product Data

1.2.1 GReport Of Mix Proportion

Ready-Mixed Concrete

SD-04 Samples

2.1 GMaterials

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 GErection Drawings

SD-02 Shop Drawings

1.4.2 GFabrication drawings

SD-03 Product Data

2.1 GGalvanizing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

05 12 00 2.5 GGalvanizing

2.4.1 GWelding electrodes and rods

2.4.2 GNon-Shrink Grout

2.3.3 GTension control bolts

SD-06 Test Reports

2.3 GBolts, nuts, and washers

3.6.1.2 GWeld Inspection Reports

SD-07 Certificates

2.2 GSteel

2.3 GBolts, nuts, and washers

1.4.3.1 GWelding Procedures and

Qualifications

07 14 00 SD-03 Product Data

2.1 GFluid-applied membrane

2.2 GMembrane primer

2.7 GElastomeric sheet

2.9 GFlexible foam-backed elastomeric

sheet

3.3 GSolvent

3.4.1 GMoisture meter

2.10 GProtection board

2.6 GBond breaker

SD-11 Closeout Submittals

1.6 GWarranty

3.6 GInformation Card

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

07 14 00 3.5 GInstructions To Government

Personnel

07 21 13 SD-02 Shop Drawings

2.1 GTaper Cants And Crickets

SD-03 Product Data

2.1 GBlock or board insulation

2.3 GPressure sensitive tape

2.5 GAccessories

2.5.2 GFasteners

2.4 GProtection Board

SD-08 Manufacturer’s Instructions

2.1 GBlock or Board Insulation

2.5.1 GAdhesive

07 41 13 SD-02 Shop Drawings

1.4.5 GRoofing Panels

1.4.5 GFlashing and Accessories

SD-03 Product Data

2.1 GRoof panels

1.4.5 GFactory-Applied Color Finish

2.4 GAccessories

1.4.5 GFasteners

2.6 GUnderlayments

2.7 GGaskets and Sealing/Insulating

Compounds

1.4.5 GAluminized Steel Repair Paint

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

07 41 13 2.1 GRoof Panels

1.4.5 GFactory-applied Color Finish

2.4 GAccessories

1.4.5 GFasteners

1.4.5 GGaskets and Sealant/Insulating

Compounds

SD-05 Design Data

1.2.1.2 GWind Uplift Resistance

SD-07 Certificates

2.1 GRoof Panels

1.4.1 GQualification of Manufacturer

1.4.2 GQualification of Applicator

SD-08 Manufacturer’s Instructions

1.4.5 GInstallation Manual

SD-09 Manufacturer’s Field

Reports

3.9.1 GManufacturer's Field Inspection

Reports

SD-11 Closeout Submittals

1.8 GWarranties

3.10 GInformation Card

07 60 00 SD-02 Shop Drawings

3.1.8 GEave flashing

07 84 00 SD-02 Shop Drawings

2.1 GFirestopping System

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

07 84 00 2.2 GFirestopping Materials

SD-06 Test Reports

3.3 GInspection

SD-07 Certificates

1.5.2 GInspector Qualifications

2.2 GFirestopping Materials

1.5.1 GInstaller Qualifications

07 92 00 SD-03 Product Data

2.1Sealants

2.2Primers

2.3Bond breakers

2.4Backstops

08 11 16 SD-02 Shop Drawings

1.5.1 GDoors

2.1 GDoors

SD-04 Samples

1.5.2.1Finish sample

SD-05 Design Data

1.5.1 Gcalculations

SD-08 Manufacturer’s Instructions

1.5.1Doors

2.1Doors

08 53 00 SD-02 Shop Drawings

2.2.1 GWindows

2.2.1 GWindows

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

08 53 00 2.2.1 GWindows

2.4.5Fasteners

2.4.3Hardware

2.4.6Accessories

SD-04 Samples

2.2.1 GWindows

SD-06 Test Reports

2.2.1 GWindows

SD-10 Operation and Maintenance

Data

2.2.1 GWindows

08 81 00 SD-02 Shop Drawings

3.2Installation

SD-04 Samples

1.5.1Insulating Glass

2.3.3Tape

2.3.1.1Sealant

SD-07 Certificates

1.5.1Insulating Glass

SD-08 Manufacturer’s Instructions

2.3Setting and Sealing Materials

3.3Glass Setting

08 87 13 SD-03 Product Data

2.2Sun-control and Heat Retention

Film

3.3Cleaning

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

08 87 13 SD-04 Samples

2.2 GSun-control and Heat Retention

Film

SD-06 Test Reports

2.2Sun-control and Heat Retention

Film

09 22 00 SD-02 Shop Drawings

2.1 GMetal support systems

09 29 00 SD-03 Product Data

2.1.1Gypsum Board

2.1.2Glass Mat Covered or Reinforced

Gypsum Sheathing

2.1.5Accessories

SD-07 Certificates

2.1 GAsbestos Free Materials

SD-10 Operation and Maintenance

Data

3.6Waste Management

09 90 00 SD-02 Shop Drawings

3.7Piping identification

3.7stencil

SD-03 Product Data

2.1 GCoating

2.1.1Epoxy Coatings

2.1Manufacturer's Technical Data

Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

09 90 00 3.2.4Sealant

SD-04 Samples

2.1 GColor

SD-07 Certificates

1.3Applicator's qualifications

1.4.1.2 GQualification Testing

SD-08 Manufacturer’s Instructions

3.3.1Application instructions

3.5.2Mixing

1.7.2Manufacturer's Material Safety

Data Sheets

SD-10 Operation and Maintenance

Data

2.1 GCoatings

22 00 00 SD-02 Shop Drawings

3.6.1 GPlumbing System

SD-03 Product Data

3.6.1Plumbing System

22 07 19.00 40 SD-02 Shop Drawings

3.1Installation Drawings

SD-03 Product Data

Part 2Adhesives

Part 2Coatings

Part 2Insulation Materials

Part 2Jacketing

Part 2Tape

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

22 07 19.00 40 SD-08 Manufacturer’s Instructions

3.1Installation Manual

23 00 00 SD-02 Shop Drawings

1.4.5Detail Drawings

SD-03 Product Data

2.9.1.1Duct Connectors

2.9.2Manual Balancing Dampers

2.9.4.1Diffusers

2.9.4.2Registers and Grilles

SD-06 Test Reports

3.9Performance Tests

SD-08 Manufacturer’s Instructions

3.2Manufacturer's Installation

Instructions

3.11.2Operation and Maintenance

Training

SD-10 Operation and Maintenance

Data

2.9.2Manual Balancing Dampers

23 05 15 SD-01 Preconstruction Submittals

1.2Material, Equipment, and Fixture

Lists

SD-02 Shop Drawings

1.2Record Drawings

1.2Connection Diagrams

1.2Coordination Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

23 05 15 3.1Installation Drawings

SD-03 Product Data

2.1Pipe and Fittings

2.2Piping Specialties

2.3Valves

2.4Miscellaneous Materials

2.5Supporting Elements

1.2Equipment Foundation Data

SD-05 Design Data

2.1Pipe and Fittings

SD-06 Test Reports

3.1Hydrostatic Tests

3.1Air Tests

3.1Valve-Operating Tests

3.1Drainage Tests

SD-10 Operation and Maintenance

Data

3.8Operation and Maintenance

Manuals

23 05 48.00 40 SD-02 Shop Drawings

1.2Installation Drawings

SD-03 Product Data

1.2Equipment and Performance

Data

2.3Isolators

23 05 93 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

23 05 93 1.3 GRecords of Existing Conditions

1.5.3.1 GTAB Firm

1.2 GTAB team assistants

1.2TAB team engineer

1.5.3.2 GTAB Specialist

1.2 GTAB team field leader

SD-02 Shop Drawings

1.2 GTAB Report Forms

SD-03 Product Data

1.3 GEquipment and Performance

Data

1.5.2 GTAB Procedures

1.5.2 GCalibration

1.5.4 GTAB Execution

SD-06 Test Reports

3.5TAB Work Execution Schedule

3.5TAB Procedures Summary

1.7.3.1 GDesign review report

3.5 GDesign review report

1.5.5.1TAB Report for Season 1

3.5TAB Report for Season 1

1.5.5.1 GTAB Report for Season 2

3.5 GTAB Report for Season 2

SD-07 Certificates

1.5.1 GIndependent TAB agency and

personnel qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

23 05 93 3.5 GAdvance Notice of TAB Field

Work

3.5Completed Season 1 Pre-TAB

Work Checklist

3.5Completed Season 1 Pre-TAB

Work Checklist

1.7.1 GTAB Submittal and Work

Schedule

1.7.3 GTAB Submittal and Work

Schedule

1.7.3.1 GDesign review report

3.5 GDesign review report

1.7.3.2 GPre-field TAB engineering report

23 07 00 SD-02 Shop Drawings

3.2.2.4 GMICA Plates

2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

SD-03 Product Data

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

SD-08 Manufacturer’s Instructions

2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

23 08 00.00 10 SD-02 Shop Drawings

1.5.2.2 GCommissioning Plan

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

23 08 00.00 10 3.2.1 GPre-Functional Performance Test

Checklists

3.2.2 GFunctional Performance Tests

SD-06 Test Reports

3.3 GCommissioning Report

SD-07 Certificates

1.5.1 GCommissioning Firm

1.5.2 GCommissioning Specialist

23 09 23.13 20 SD-02 Shop Drawings

1.3.1.1 GControl System Drawings Title

Sheet

1.3.1.2 GList of I/O Points

1.3.1.3 GControl System Components List

1.3.1.4 GControl System Schematics

1.3.1.5 GHVAC Equipment Electrical

Ladder Diagrams

1.3.1.6 GComponent Wiring Diagrams

1.3.1.7 GTerminal Strip Diagrams

1.3.1.8 GBACnet Communication

Architecture Schematic

2.1.3.4 GEMCS Front-End Interface

Graphic Screens

2.1.3.4 GEnergy Dashboard Interface

Graphic Screen And Reporting

SD-03 Product Data

2.1.1 GDirect Digital Controllers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

23 09 23.13 20 2.1.2 GDDC Software

2.1.3 GBACnet Operator Workstation

2.1.4 GNotebook Computer

2.2 GSensors and Input Hardware

SD-05 Design Data

3.4.2 GPerformance Verification Testing

Plan

3.4.4 GPre-Performance Verification

Testing Checklist

SD-06 Test Reports

3.4.10 GPerformance Verification Testing

Report

SD-07 Certificates

1.5.6 GContractor's Qualifications

SD-09 Manufacturer’s Field

Reports

3.4.1 GPre-PVT Checklist

SD-10 Operation and Maintenance

Data

1.3 GBACnet Direct Digital Control

Systems

3.3 GControls System Operators

Manuals

SD-11 Closeout Submittals

3.5.1 GTraining Documentation

23 09 33.00 40 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

23 09 33.00 40 1.2.1Material, Equipment, and Fixture

Lists

1.2.1Records of Existing Conditions

SD-02 Shop Drawings

1.2.2Fabrication Drawings

3.1Installation Drawings

SD-03 Product Data

2.1Control Components

2.1.3Thermostats

2.2Stand-Alone Controller

2.3 GSensors

2.4Dampers

2.5Operators

SD-08 Manufacturer’s Instructions

1.2.2Operating Instructions

SD-10 Operation and Maintenance

Data

2.4Dampers

2.5Operators

2.1.3Thermostats

2.2Stand-Alone Controller

2.3Outside Air Sensors

23 23 00 SD-02 Shop Drawings

2.3 GRefrigerant Piping System

SD-03 Product Data

2.3Refrigerant Piping System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

23 23 00 1.5.2Spare Parts

1.3.1 GQualifications

3.5 GRefrigerant Piping Tests

3.4 GDemonstrations

3.1Verification of Dimensions

SD-06 Test Reports

3.5Refrigerant Piping Tests

SD-10 Operation and Maintenance

Data

1.5Maintenance

3.4Operation and Maintenance

Manuals

23 31 13.00 40 SD-01 Preconstruction Submittals

1.5Material, Equipment, and Fixture

Lists

1.5Records of Existing Conditions

SD-02 Shop Drawings

1.6Connection Diagrams

1.6Record Drawings

SD-03 Product Data

2.1.1Galvanized Steel Ductwork

Materials

2.1.2Mill-Rolled Reinforcing and

Supporting Materials

2.2.1Round Sheet Metal Duct Fittings

2.2.4Flexible Connectors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

23 31 13.00 40 2.2.8Gravity Backdraft and Relief

Dampers

2.2.7Manual Volume Dampers

23 82 02.00 10 SD-02 Shop Drawings

1.4 GDrawings

SD-03 Product Data

2.1.1Materials and Equipment

1.6Spare Parts

3.4Posted Instructions

3.1Verification of Dimensions

3.6System Performance Tests

3.4 GDemonstrations

SD-06 Test Reports

3.5 GRefrigerant Tests, Charging, and

Start-Up

3.6 GSystem Performance Tests

SD-10 Operation and Maintenance

Data

3.4Operation and Maintenance

Manuals

25 10 10 SD-02 Shop Drawings

1.10.2 GWiring Diagrams

1.10.1 GDetail Drawings

3.5 GAs-Built Drawings

SD-03 Product Data

2.5.3 GTurbine Flowmeters

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

1051504620E Cross-Out

1051504620E Addendum No.2 stamp

1051504620E Polygon

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

25 10 10 2.5.2 GTemperature Sensors

2.5.2 GPressure Transmitters

2.5.4 GVortex-Shedding Flowmeters

2.5.5 GUltrasonic Flowmeters

2.5.6 GMagnetic Flowmeters

SD-07 Certificates

1.11.2 GManufacturer Qualifications

1.11.2 GInstaller Qualifications

3.2 GBicsi Certification

SD-10 Operation and Maintenance

Data

1.11.1 GSoftware

1.11.1.2 GOperation And Maintenance Data

SD-11 Closeout Submittals

1.9.2 GPreventive Maintenance Work

Plan

26 05 19.00 10 SD-03 Product Data

3.1Installation Instructions

3.2.1Cable data

SD-06 Test Reports

3.2Tests, Inspections, and

Verifications

26 05 48.00 10 SD-02 Shop Drawings

1.3Equipment Requirements

SD-03 Product Data

1.3 GEquipment Requirements

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

1051504620E Cross-Out

1051504620E Addendum No.2 stamp

1051504620E Polygon

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

26 05 48.00 10 1.2.2 GContractor Designed Bracing

26 05 71.00 40 SD-01 Preconstruction Submittals

2.1 GConnection Diagrams

2.1 GFabrication Drawings

2.4 GFuses

SD-02 Shop Drawings

3.1 GControl Devices

3.1 GProtective Devices

SD-03 Product Data

2.2 GEnclosures

2.3 GCircuit Breakers

3.1 GControl Devices

SD-06 Test Reports

3.2 GFinal Test Reports

SD-07 Certificates

2.5 GCircuit Tests

SD-08 Manufacturer’s Instructions

3.1 GControl Devices

3.1 GProtective Devices

26 08 00 SD-06 Test Reports

3.1 GAcceptance tests and inspections

SD-07 Certificates

1.4.1 GQualifications

1.4.3 GAcceptance test and inspections

procedure

26 20 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

26 20 00 2.12 GPanelboards

3.1.6.1 GMarking strips

SD-03 Product Data

2.11 GReceptacles

2.12.3 GCircuit breakers

2.14 GCircuit breakers

2.9 GSwitches

2.15 GEnclosed circuit breakers

2.6.4.1 GGrounding Busbar

2.2Conduit And Fittings

SD-06 Test Reports

3.5.2 G600-volt wiring test

3.5.4 GGrounding system test

3.5.3 GGround-fault receptacle test

SD-07 Certificates

2.10 GFuses

SD-10 Operation and Maintenance

Data

1.5.1 GElectrical Systems

26 24 16.00 40 SD-02 Shop Drawings

2.1.1Detail Drawings

2.1.1Outline Drawings

SD-03 Product Data

1.3Panelboards

2.1.1Panelboards

2.1.3Directory Card and Holder

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

26 24 16.00 40 SD-06 Test Reports

3.2Continuity Tests

3.2Insulation Tests

SD-07 Certificates

1.4Statements

SD-08 Manufacturer’s Instructions

1.3Panelboards

2.1.1Panelboards

SD-11 Closeout Submittals

2.1.1Keys

27 10 00 SD-02 Shop Drawings

1.5.1.1 GTelecommunications drawings

1.5.1.2 GTelecommunications Space

Drawings

SD-03 Product Data

2.3 GTelecommunications cabling

2.4.3 GPatch panels

2.4.1 GEquipment support frame

3.1.5.1 GConnector blocks

1.9.3 GSpare Parts

SD-06 Test Reports

3.5.1 GTelecommunications cabling

testing

SD-07 Certificates

1.5.2.1 GTelecommunications Contractor

1.5.2.2 GKey Personnel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

27 10 00 1.5.2.3 GManufacturer Qualifications

1.5.3 GTest plan

SD-09 Manufacturer’s Field

Reports

2.9.1 GFactory reel tests

SD-10 Operation and Maintenance

Data

1.9.1 GTelecommunications cabling and

pathway system

SD-11 Closeout Submittals

1.9.2 GRecord Documentation

27 21 10.00 40 SD-02 Shop Drawings

1.4.2.4 GFiber Optic System

3.1 GInstallation

SD-03 Product Data

1.4.2.4 GFiber Optic System

1.3.5 GSpare Parts

SD-07 Certificates

1.4.2.4 GFiber Optic System

SD-08 Manufacturer’s Instructions

3.1 GManufacturer's Instructions

SD-10 Operation and Maintenance

Data

3.3.2 GSystem Maintenance Training

Course

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

27 21 10.00 40 2.5.3.1Keys

28 05 26.00 40 SD-03 Product Data

1.3 GGrounding Systems

2.1.1 GGround Rods

2.1.2 GGround Wires

2.1.3 GConnectors and Fasteners

3.2.5 GBonding Materials

SD-06 Test Reports

3.3.1 GBond Resistance Test

3.3.2 GGround Resistance Tests

3.3.3 GGround Isolation Test

3.3.4 GContinuity Isolation Test

SD-08 Manufacturer’s Instructions

1.3 GGrounding Systems

SD-11 Closeout Submittals

3.4 GRecord Drawings

31 11 00 SD-03 Product Data

3.6.1 GNon-saleable Materials

SD-04 Samples

2.1 GTree Wound Paint

2.2 GHerbicide

31 23 00.00 20 SD-01 Preconstruction Submittals

1.7.1 GShoring and Sheeting Plan

1.7.2 GDewatering work plan

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

31 23 00.00 20 3.6 GBuried Warning And Identification

Tape

2.9 GDetection Wire For Non-Metallic

Piping

SD-04 Samples

2.6 GFilter Fabric

2.7 GGeogrid Reinforcement

SD-05 Design Data

2.3 GFlowable Fill

SD-06 Test Reports

1.6 GBorrow Site Testing

3.12.2.1 GFill and backfill

3.12.2.2 GSelect material

3.12.2.2 GSelect material

3.12.2.3 GDensity tests

2.2 GUtility Bedding Material

2.3 GFlowable Fill

2.5 GStructural Fill

2.6 GFilter Fabric

2.7 GGeogrid Reinforcement

SD-07 Certificates

2.7 GGeogrid Certificates Of

Compliance

31 41 16 SD-02 Shop Drawings

2.1 GMetal Sheet Piling

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

31 41 16 3.2.2.2Driving

3.2.1 GPile Driving Equipment

3.2.5 GPulling and Redriving

SD-06 Test Reports

2.3.1 GMaterials Tests

SD-11 Closeout Submittals

3.4 GPile Driving Record

31 63 29 SD-02 Shop Drawings

2.1.1 GDrilled Shaft Diameters

2.1.1 GDepth of Test Holes

2.1.1 GTop and Bottom of Shaft

Elevations

2.1.1 GSteel Reinforcement

2.1.1 GAccessories

SD-05 Design Data

2.1 GDrilled Shaft Foundation Design

Analysis

2.1 GMix Design Data

SD-06 Test Reports

3.3.1 GSoils Report

3.3.1 GGround Water Conditions

3.3.1 GLoad Test

3.3.1 GPenetration Test

3.3.1 GSlump

3.3.1 GConcrete

3.3.1 GCompressive Strength

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

31 63 29 SD-07 Certificates

2.1 GBill of Lading for Ready-Mix

Concrete Deliveries

2.1.1 GSteel Reinforcement

1.4.6 GWelding Certificates

2.2.1 GExcavation and Drilling

Equipment

1.4.4 GQualifications of Excavator

1.4.5 GQualifications of Engineer

32 05 33 SD-01 Preconstruction Submittals

2.4 GIntegrated Pest Management

Plan

SD-03 Product Data

2.1 GFertilizer

2.2.1 GHose

2.3 GMulches Topdressing

2.3.2 GOrganic Mulch Materials

SD-05 Design Data

3.1 GTree Plan

SD-07 Certificates

3.4.1 GMaintenance inspection report

3.4.2 GPlant quantities

SD-10 Operation and Maintenance

Data

3.4.1 GMaintenance

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

32 05 33 3.4.3 GTree, staking and guying removal

32 11 16.16 SD-03 Product Data

2.1 GMaterials

SD-06 Test Reports

2.1 GBearing ratio

2.1 GLiquid limit

2.1 GPlasticity index

2.1 GDry weight

2.1 GPercentage of wear

3.4.2.1 GGradation tests

3.4.2.3 GDensity tests

SD-07 Certificates

2.2 GSource

32 11 24 SD-06 Test Reports

3.5.2.1 GGradation

3.5.2.1 GGradation

2.1.1 GBearing ratio

2.1.1 GLiquid limit

2.1.1 GPlasticity index

2.1.1 GPercentage of wear

2.1.1 GDry weight

3.5.2.3 GDensity

3.5.2.3 GDensity

3.5.2.2 GSmoothness

3.5.2.5 GThickness

32 12 10 SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

32 12 10 3.7 GSampling and Testing

32 12 17 SD-05 Design Data

1.3.2 GJob-mix formula

2.2 GASPHALT CEMENT BINDER

2.3 GMIX DESIGN

SD-06 Test Reports

2.4.1 GSpecific gravity test of asphalt

2.4.1 GCoarse aggregate tests

2.4.1 GWeight of slag test

2.4.1 GPercent of crushed pieces in

gravel

2.4.1 GFine aggregate tests

2.4.1 GSpecific gravity of mineral filler

2.4.1 GBituminous mixture tests

3.5.2.1 GAggregates tests

3.5.2.2 GBituminous mix tests

3.5.2.3 GPavement courses

32 16 13 SD-03 Product Data

2.1 GConcrete

SD-06 Test Reports

3.8 GField Quality Control

32 92 23 SD-03 Product Data

2.4 GFertilizer

SD-06 Test Reports

2.2.3 GTopsoil composition tests

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 31 PAGES

IMFH Phase 3 A/C & Weatherization

32 92 23 2.1 Gsods

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .