FA520517R00040005_Amendment.pdf

PDF 94 KB Posted

Attached to
Improve Military Family Housing (IMFH) Phase III, A/C and Weatherization, Misawa Air Base, Japan
Solicitation number
FA5205-17-R-0004
Issued by

About this file

FA520517R00040005_Amendment

View the file

Other files

File Type Posted
FA520517R00040005_Atch3.pdf PDF
FA520517R00040005_Atch1.pdf PDF
FA520517R00040005_Atch4.pdf PDF
FA520517R00040005_Atch7.pdf PDF
FA520517R00040005_Atch6.pdf PDF
FA520517R00040005_Atch2.pdf PDF
FA520517R00040005_Atch5.pdf PDF
FA520517R00040004_Atch4.pdf PDF
FA520517R00040004_Amendment.pdf PDF
FA520517R00040004_Atch3-4.pdf PDF
FA520517R00040004_Atch3-3.pdf PDF
FA520517R00040004_Atch5.pdf PDF
FA520517R00040004_Atch1.pdf PDF
FA520517R00040004_Atch2.pdf PDF
FA520517R00040004_Atch3-5.pdf PDF
FA520517R00040004_Atch3-2.pdf PDF
FA520517R00040004_Atch3-1.pdf PDF
FA520517R00040003_Atch1.pdf PDF
FA520517R00040003_Atch2.pdf PDF
FA520517R00040003_Amendment.pdf PDF
FA520517R00040002_Amendment.pdf PDF
FA520517R00040002_Atch.pdf PDF
FA520517R00040001_Atch2_Revised_Specification_Section.pdf PDF
FA520517R00040001_Amendment.pdf PDF
FA520517R00040001_Atch4_Revised_Solicitation_Page.pdf PDF
FA520517R00040001_Atch1_Addendum_No._1.pdf PDF
FA520517R00040001_Atch3_Revised_Drawings.pdf PDF
FA520517R0004_PreProposal_Conference_Minutes_&_Record_of_Site_Visit.pdf PDF
FA520517R0004_Atch2_Drawings_8_Electrical.pdf PDF
FA520517R0004_Atch2_Drawings_6_Plumbing.pdf PDF
FA520517R0004_Atch10_Asbestos_Sampling_and_Analysis.pdf PDF
FA520517R0004_Atch2_Drawings_3_Structural.pdf PDF
FA520517R0004_Atch2_Drawings_2_Hazmat.pdf PDF
FA520517R0004_Atch2_Drawings_5_Mechanical.pdf PDF
FA520517R0004_Atch4_PPQ_Cvr_Ltr.pdf PDF
FA520517R0004_Solicitation.pdf PDF
FA520517R0004_Atch8_Acceptable_JPN_Product_Substitutes.pdf PDF
FA520517R0004_Atch2_Drawings_7_Controls.pdf PDF
FA520517R0004_Atch2_Drawings_4_Architectural.pdf PDF
FA520517R0004_Atch9_Mfr's_Cut_Sheet_Catalog_Info.pdf PDF
FA520517R0004_Atch2_Drawings_1_General.pdf PDF
FA520517R0004_Atch3_Other_Contract_Requirements.pdf PDF
FA520517R0004_Atch1_Specifications.pdf PDF
FA520517R0004_Atch6_Construction_Timeline.pdf PDF
FA520517R0004_Atch5_PPQ.pdf PDF
FA520517R0004_Atch7_Schedule_of_Material_Submittals.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QKKA 15-4008

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

See Schedule.

POC: Miyako Fujimoto, Contracting Officer/Comm Ph: 0176-77-2059

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Jun-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA520517R0004

X 9B. DATED (SEE ITEM 11)

05-Apr-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Jun-2017

CODE

35 CONS/LGC (JAPAN)

DODAAC: FA5205

BLDG. 656, MISAWA AIR BASE

MISAWA-SHI, AOMORI-KEN 033-0000

FA5205 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA520517R0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

This amendment is issued to incorporate Addendum No. 3 dated 14 Jun 17 into the subject solicitation and to revise the Consolidated List of the Gov’t Response / Clarification based on the additional questionnaires submitted by the prospective offerors. In association with the changes of Addendum No. 3, the closing time and date of the subject solicitation is extended.

(a) By incorporating Addendum No. 3 (Attachment 1 to this Amendment) and additional questionnaires, the following changes are provided to the solicitation.

(1) Section J.

(A) Attachment 1, Specifications. Following sections including Table of Contents are revised and/or deleted; therefore, replaced with attached revised specification sections dated 14 Jun 17 (Attachment 2 to this Amendment).

Revised Sections

Table of Contents 01 11 00 01 57 20.00 10 23 82 02.00 10

Deleted Sections

31 41 16 31 63 29

(B) Attachment 2, Drawings. Following drawing sheets are revised; therefore, replaced with the attached revised drawing sheets dated 14 Jun 17 (Attachment 3 to this Amendment).

4P3-ED101 7P2-ED101 16N-ED101 6N-ED101 4P1-ED101

6P1-ED101 6A-ED101 7A-ED101 8N-ED101 10N-ED102

15N-ED101 12N-ED101 16ND-ED102

(C) Attachment 3, Other Contract Requirements. Performance period specified in section 2, para. F002 is changed from 900 calendar days (CDs) to 1,095 CDs; therefore, replaced with the attached revised page (Attachment 4 to this Amendment).

(D) Attachment 6, Construction Timeline. Performance period is changed from 900 CDs to 1,095 CDs;

therefore, replaced with the attached revised construction timeline dated 14 Jun 17 (Attachment 5 to this Amendment).

(E) Attachment 11, Consolidated List of the Government Response/Clarification. Additional 36 questionnaires and the Government responses/clarifications are added; therefore, replaced with the attached revised Government Response/Clarification dated 14 Jun 17 (Attachment 6 to this

Amendment).

(2) Accordingly, “List of Documents, Exhibits and Other Attachments” is revised as follows:

Section J – List of Documents, Exhibits and Other Attachments

DOCMENT TYPE DESCRIPTION PAGE DATE

Attachment 1 Specifications 729 Rev. 14 Jun 17

Attachment 2 Drawings 237 Rev. 14 Jun 17

Attachment 3 Other Contract Requirements 6 Rev. 14 Jun 17

Attachment 4 Past Performance Questionnaire (PPQ) Cover Letter 1 5 Apr 17

Attachment 5 Past/Present Performance Questionnaire (PPQ) 6 5 Apr 17

FA520517R0004

Attachment 6 Construction Timeline 1 Rev. 14 Jun 17

Attachment 7 Schedule of Material Submittals 31 Rev. 31 May 17

Attachment 8 Acceptable Japanese Product Substitutes 2 27 Feb 17

Attachment 9 Manufacturer’s Cut Sheet / Catalog Information 90 27 Feb 17

Attachment 10 Asbestos Sampling and Analysis 90 27 Feb 17

Attachment 11 Consolidated List of the Gov’t Response / Clarification 36 Rev. 14 Jun 17

(b) As a result of the changes above, the proposal closing time and date specified in block 13A of SF1442 are extended to “2:00 PM” on “23 Jun 2017”.

(c) The offerors are required to replace solicitation, specifications, drawings, other contract requirements, construction timeline and consolidated list of the Government response/clarification with the revised pages/sheets provided under this amendment.

(d) Except as provided herein, all terms and conditions remain unchanged.

Attachments:

1. Addendum No. 3 dated 14 Jun 17, 2 pages

2. Revised Specifications Sections dated 14 Jun 17, 76 pages

3. Revised Drawings dated 14 Jun 17, 13 sheets

4. Revised Other Contract Requirements dated 14 Jun 17, 1 page

5. Revised Construction Timeline dated 14 Jun 17, 1 page

6. Revised Consolidated List of the Government Response/Clarification dated 14 Jun 17, 36 pages

7. Revised Solicitation page 1 and 19 numbered with FA520517R00040005, 2 pages

File details come from the government source that posted it. Updated .