Text version
QKKA 15-4008
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
See Schedule.
POC: Miyako Fujimoto, Contracting Officer/Comm Ph: 0176-77-2171
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-May-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA520517R0004
X 9B. DATED (SEE ITEM 11)
05-Apr-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-May-2017
CODE
35 CONS/LGC (JAPAN)
DODAAC: FA5205
BLDG. 656, MISAWA AIR BASE
MISAWA-SHI, AOMORI-KEN 033-0012
FA5205 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA520517R0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
This amendment is issued to incorporate Addendum No. 1 dated 2 May 17 into the subject solicitation.
(a) By incorporating Addendum No. 1 (Attachment 1 to this Amendment), the following changes are provided to the solicitation.
(1) Section J.
(A) Attachment 1, Specifications. Section 02 82 14.00 10 “Asbestos Hazard Control Activities” is revised;
therefore, replaced with the attached revised specification pages dated 2 May 17 (Attachment 2 to this
Amendment).
(B) Attachment 2, Drawings. Following drawing sheets are revised; therefore, replaced with the attached revised drawing sheets dated 1 May 17 (Attachment 3 to this Amendment).
4P1-H-101a 4P3-H-101a 6P1-H-101a 7P2-H-101a 8N-H-101a
10N-H-101a 15N-H-101a 12N-H-101a 16N-H-101a 16ND-H-101a
(2) Accordingly, “List of Documents, Exhibits and Other Attachments” is revised as follows:
Section J – List of Documents, Exhibits and Other Attachments
DOCMENT TYPE DESCRIPTION PAGE DATE
Attachment 1 Specifications 745 Rev. 2 May 17
Attachment 2 Drawings 247 Rev. 1 May 17
Attachment 3 Other Contract Requirements 6 5 Apr 17
Attachment 4 Past Performance Questionnaire (PPQ) Cover Letter 1 5 Apr 17
Attachment 5 Past/Present Performance Questionnaire (PPQ) 6 5 Apr 17
Attachment 6 Construction Timeline 1 27 Feb 17
Attachment 7 Schedule of Material Submittals 31 7 Dec 16
Attachment 8 Acceptable Japanese Product Substitutes 2 27 Feb 17
Attachment 9 Manufacturer’s Cut Sheet / Catalog Information 90 27 Feb 17
Attachment 10 Asbestos Sampling and Analysis 90 27 Feb 17
(b) To reflect the changes in para. (a) above, page 19 of the solicitation is revised. The offerors are required to replace solicitation, specifications, and drawings with the revised pages/sheets provided under this amendment.
(c) Except as provided herein, all terms and conditions remain unchanged.
Attachments:
1. Addendum No. 1 dated 2 May 17, 5 pages
2. Revised Specifications Section dated 2 May 17, 26 pages
3. Revised Drawings Sheets dated 1 May 17, 10 sheets
4. Revised Solicitation page 19 numbered with FA520517R00040001, 1 page