The file's text, extracted by GovTribe without its formatting.
DOD COUNTER NARCOTERRORISM PROGRAM OFFICE (cntpo) pROGRAM AND OPERATIONS SUPPORT counter narcotics and global threats (cngt) division northcoM – c-26 ENGINES, PARTS AND TOOLS
PERFORMANCE WORK STATEMENT (PWS)
TORP 0368
3 September 2014
1.0 MISSION OBJECTIVE.
The Department of Defense (DoD) Counter Narco-terrorism Program Office (CNTPO), currently being managed by the Counter Narcotics and Global Threats (CN>) Division was established to create worldwide counter narcotics technology networks, infrastructures, and capabilities that are focused on the detection, identification, and disruption of narcotics activities and organizations. This task effort will support the War Fighter in combating narcotics activities globally.
2.0 SCOPE.
2.1 Task Order (T/O) Objective. The T/O objective is to procure, ship and deliver C-26 engines, propellers and parts to the Government of Mexico (GOM) Army (SEDENA) in support of the Mexican Air Force (Fuerza Aerea Mexicana (FAM)) C-26 flying program.
2.2 Basic Contract PWS References. This T/O PWS establishes the requirement for the Contractor to provide support in the Basic Contract task area(s) of: 4.3.2.7 Logistics Support and Equipment; 4.3.2.8 Preservation, Packing and Marking; and 4.3.3.4 Material and Equipment Purchase.
3.0 BACKGROUND AND OVERVIEW.
In 1998, FAM received four U.S. C-26A aircraft (model SA277-AC) under Presidential Drawdown authority (Foreign Assistance Act, Section 506). The aircraft were initially configured (at Mexican expense) as airborne interceptors but the aircraft gradually fell into disrepair when the U.S. Department of State (DoS) ceased maintenance funding in 2008. In 2009, USNORTHCOM, DoS Office of Defense Counsel, and FAM agreed to recapitalize the aircraft into Intelligence, Surveillance, and Reconnaissance (ISR) platforms under DoD’s Counter Narcotics funding authority. This upgrade included ISR components, training of air and ground crews, command center improvements and training, as well as maintenance advisors, publications, spare/repair parts, and related support. Engines, propellers and parts procured under this T/O will be used to support the four FAM aircraft.
4.0 T/O PERFORMANCE REQUIREMENTS.
4.1 General. The Contractor shall:
4.1.1 Procure, ship and deliver the engines and parts specified in this T/O PWS.
4.1.2 Provide all labor, materials, equipment, travel, and required actions to satisfy the requirements specified in this T/O PWS.
4.1.3 Provide Technical Data and Documentation and standard OEM warranties IAW PWS paragraphs 9.8, 9.9 and 9.9.1. The terms of the warranties shall be clearly presented in the name of End User (EU). As prescribed in FAR 12.404, the contractor agrees that the supplies or services furnished under this contract shall be covered by the minimum warranties which are offered to the general public. All utilization of commercially available OEM warranty associated with the equipment shall be the responsibility of the EU upon receipt of the material from the United States Government.
4.1.4 All items shall be delivered Free on Board (FOB) in a single shipment to the SEDENA freight forwarder. Equipment shall be delivered within 9 months of contract award. Partial shipments of ordered items are not authorized unless preapproved or requested by the Contracting Officer's Representative (COR) or Program Manager (PM). Any change in the delivery location will be approved by the Contracting Officer (KO) via a modification to the T/O. Items shall be delivered to the SEDENA freight forwarder at:
UNI-TRADE Forwarding, LC.
506 Sandau Avenue Suite 650 San Antonio, Texas 78216
4.1.5 Complete and provide a DD250, Material Inspection and Receiving Report, for each delivery location. Serial numbered items shall be listed on the DD250. A draft DD250 shall be provided 1 month prior to delivery. Final DD250 shall be provided concurrent with delivery and US Government (USG) acceptance.
4.1.6 Final inspection and acceptance will be held at the SEDENA freight forwarder listed above. The contractor shall coordinate and facilitate the inspection visit.
4.1.7 Procure all applicable export licenses and associated technology transfer agreements for transfer of equipment to Mexico regardless of final delivery location. Export licenses, documentation, and approvals shall be obtained, IAW T/O PWS paragraph 9.7, before conducting any delivery activities. Export licenses and International Traffic in Arms Regulation (ITAR) compliance are required by the freight forwarder in order to export equipment to Mexico; therefore, the contractor shall be responsible for ITAR compliance, customs clearance, and all associated taxes (e.g. VAT), duties and customs fees, and other related charges. Waivers or exemptions may be available to preclude the payment of a VAT tax, customs fees, duties and other related charges. VAT, and all other taxes, will be a reimbursable expense IAW the basic contract. After the US Government accepts final delivery of the equipment at the freight-forwarder location, it will be the responsibility of the freight forwarder to deliver equipment to Mexico.
4.2 Base Requirement.
4.2.1 The contractor shall procure, ship, and deliver 1 rebuilt TPE 331-11U- 612G engine for the C-26A.
4.2.1.1 This requirement is to procure a rebuilt engine; no core engine will be provided by the USG. The engine shall be rebuilt by an OEM authorized service center; non-OEM cage code parts may be use. Engine life limited parts shall be zero timed. All open airworthiness directives shall be included in the engine. An FAA Form 8130, Airworthiness Approval Tag, shall be completed for, and accompany, the delivered engine.
4.2.2 The contractor shall procure, ship, and deliver 1 overhauled 4HFR34C652()/()-L106LA-0, 4-blade C-26 propeller compatible with the engine procured at PWS Paragraph 4.2.1.
4.2.3 The contractor shall procure, ship and deliver C-26 parts, tools and equipment contained in Appendix B. All items shall be new.
4.3 Optional Requirements.
4.3.1 Option A
4.3.1.1 The contractor shall procure, ship, and deliver 1 rebuilt TPE 331-11U- 612G engine for the C-26A. The contractor shall ensure this engine is the same make and model as the engine procured for PWS paragraph 4.2.1.
4.3.1.1.1 This requirement is to procure a rebuilt engine; no core engine will be provided by the USG. The engine shall be rebuilt by an OEM authorized service center; non-OEM cage code parts may be use. Engine life limited parts shall be zero timed. All open airworthiness directives shall be included in the engine. An FAA Form 8130, Airworthiness Approval Tag, shall be completed for, and accompany, the delivered engine.
4.3.1.2 The contractor shall procure, ship and deliver 1 overhauled 4-blade C-26 Propeller compatible with the engine procured at PWS Paragraph 4.3.1.1. The contractor shall ensure this propeller is the same make and model as the propeller procured for PWS paragraph 4.2.2.
4.3.2 Option B
4.3.2.1 The contractor shall procure, ship, and deliver 1 rebuilt TPE 331-11U- 612G engine for the C-26A. The contractor shall ensure this engine is the same make and model as the engine procured for PWS paragraph 4.2.1.
4.3.2.1.1 This requirement is to procure a rebuilt engine; no core engine will be provided by the USG. The engine shall be rebuilt by an OEM authorized service center; non-OEM cage code parts may be use. Engine life limited parts shall be zero timed. All open airworthiness directives shall be included in the engine. An FAA Form 8130, Airworthiness Approval Tag, shall be completed for, and accompany, the delivered engine.
4.3.2.2 The contractor shall procure, ship and deliver 1 overhauled 4-blade C-26 Propeller compatible with the engine procured at PWS Paragraph 4.3.1.1. The contractor shall ensure this propeller is the same make and model as the propeller procured for PWS paragraph 4.2.2.
4.3.3 Option C – Additional Warranty. Procure and provide an additional 1 year warranty for the engine procured in paragraph 4.2.1 (Base Requirement). This warranty shall take effect when the original warranty expires. Warranty work shall be completed in Mexico. Include warranty details IAW PWS paragraphs 9.9 and 9.9.1.
4.3.4 Option D. – Additional Warranty. Procure and provide an additional 1 year warranty for the engine procured in paragraph 4.3.1.1 (Option A). This warranty shall take effect when the original warranty expires. Warranty work shall be completed in Mexico. Include warranty details IAW PWS paragraphs 9.9 and 9.9.1.
4.3.5 Option E – Additional Warranty. Procure and provide an additional 1 year warranty for the engine procured in paragraph 4.3.2.1 (Option B). This warranty shall take effect when the original warranty expires. Warranty work shall be completed in Mexico. Include warranty details IAW PWS paragraphs 9.9 and 9.9.1.
5.0 OTHER PERFORMANCE REQUIREMENTS.
5.1 Work Hours and Location. The principal place of performance for this T/O shall be within the contiguous United States. Receipt and delivery of equipment, tools, technical data and documentation, and inspection shall take place at the freight forwarder identified in paragraph 4.1.4.
5.2 Meetings, Briefings, and Publications. The contractor shall participate in technical interchange meetings, to be scheduled upon request of the responsible KO or written designee, to discuss and to informally evaluate the contractor’s efforts and accomplishments in direct relation to this T/O PWS. During the meetings, the contractor shall present necessary data to enable a joint review of various assigned tasks, schedules, and resource expenditures. The contractor shall present and participate in technical discussions and shall inform the KO, PM and COR of any issues with contract execution and provide proposed solution. The contractor shall attend and participate in other meetings, as scheduled by the responsible KO or written designee.
6.0 TEMPORARY DUTY (TDY) TRAVEL.
The Contractor shall perform TDY travel, as required in the performance of this effort. Specific areas of travel: San Antonio, Texas, USA. The Contractor shall obtain approval from the COR or PM prior to performing any TDY travel. All travel required and approved under this T/O will be paid IAW the Basic Contract by reimbursement to the Contractor. Only required travel approved by the KO, COR or PM will be reimbursed under this T/O.
7.0 GOVERNMENT FURNISHED EQUIPMENT OR MATERIAL (GFE/GFM).
None.
8.0 SECURITY.
All work performed under this T/O shall be unclassified.
9.0 TASK ORDER DELIVERABLES.
The following deliverables are required as set forth in the basic contract:
| Name |
| CDRL # |
| # of Copies* |
| Basic Contract |
Reference
T/O PWS
Reference Due
| 9.1 |
| 7 calendar days after contract award |
| Task Order Quality Control Plan |
| A00G |
| 1 |
| 9.2 |
| 45 calendar days after contract award; subsequent reports are due the 15th of each month. |
| Contractor’s Progress Report |
| A002 |
| 1 |
| 4.2.2 |
| 9.3 |
| 45 calendar days after contract award; subsequent reports are due the 15th of each month. |
| Master Schedule |
| A002 |
| 1 |
| 4.2.2 |
| 9.4 |
| 45 calendar days after contract award; subsequent reports are due the 15th of each month. |
| Status Meetings |
| A003 |
| 1 |
| 4.2.3 |
| 9.5 |
| As scheduled by USG; meeting minutes are due 5 calendar days after the meeting |
| Program Reviews |
| A004 |
| 1 |
| 4.2.3 |
| 9.6 |
| As scheduled by USG |
| Licenses, Export Agreements & Certifications |
| A00G |
| 1 |
| 9.7 |
| 10 calendar days prior to final delivery |
| Technical Data and Documentation |
| A00H |
| 1 |
| 9.8 |
| Electronically 45 calendar days prior to delivery; physical documents are due concurrent with equipment delivery |
| Product Support Plan & Warranty |
| A00G |
| 1 |
| 9.9 & 9.91 |
| 45 calendar days prior to delivery |
*Unless otherwise stated, CDRLs shall be submitted electronically (Microsoft Office, i.e. Word, Excel, PowerPoint, etc.) to the KO, PM, COR, AMIC Acquisition Org Email (amic.pmt.acq@us.af.mil), and the Delivery Assurance Team email (cntposeta@meicompany.com). When sending Microsoft Access, Visio, or Project files, also submit an Adobe PDF version.
9.1 Management Plan (CDRL A00G). Deliver a management plan 7 calendar days after contract award. The plan shall define a management system to plan and control this T/O effort and delineate how the Contractor plans to accomplish the effort supporting the specific T/O. This plan shall include a breakout of Direct Productive Person Hours (DPPHs), travel, material, ODC, DBA Insurance, a milestone schedule, and a schedule for the planned expenditure of funds.
9.2 T/O Quality Control Plan (T/O QCP) (CDRL A00G). Deliver a draft T/O QCP with your TORP proposal. The final plan shall be provided 45 calendar days after contract award. Subsequent reports are due on the 15th of each month. At a minimum, the T/O QCP shall address the following:
· Quality Control (QC) Execution. The plan shall not be cursory, but discuss specifically how the prime contractor shall execute its QC responsibilities. The T/O QCP shall include a clearly defined QC process, key performance indicators, QC schedules and QC personnel, by name, to include those that will be performing subcontractor oversight and oversight of activities in-theater. The plan shall address how QC trend analysis and tracking of corrective actions will accomplished.
· The T/O QCP shall discuss the prime's management activity that will provide oversight and involvement in the QC process. QC personnel shall not be buried in the organization, but shall have a direct line to upper management.
· Reporting. Monthly status reports shall specifically discuss QC activities over the reporting period and planned activities for the next period. Information shall specifically address WHO conducted the QC, WHEN was the QC executed, HOW was the QC executed and WHAT the findings and corrective actions were. Trends overtime shall be discussed.
· Invoice quality control and review. The contractor shall discuss how invoice reviews will be conducted, to include discussion on how the primes, subcontractor and supplier supporting data will be reviewed for consistency with task order requirements and the contractor's approach to execute the task order.
9.3 Contractor’s Progress Report (CDRL A002). Deliver a comprehensive progress report 45 calendar days after contract award. Subsequent reports are due the 15th of each month. The report shall, at a minimum contain an overall schedule, the current status of funding on the T/O, accomplishments completed, potential issues, and any lessons learned.
9.4 Master Schedule (CDRL A002). Deliver a master schedule 45 calendar days after contract award. Subsequent reports are due the 15th of each month. The contractor shall create, maintain, and report the schedule in conjunction with the progress report after initial delivery. The schedule shall cover all phases of the project from T/O kick-off to T/O close-out. The master schedule shall, at a minimum include the following information:
· Timeline and milestones for procurement, shipment and delivery of equipment;
· Timeline and milestones for preparation and execution of applicable export document; and
· Timeline and milestones for deliverables.
In the event there are any changes or delays associated with equipment procurement or T/O deliverables, the Contractor shall update the master schedule and provide it to the USG for approval within 10 days of identifying the change or delay.
9.5 Status Meetings (CDRL A003). Participate in status meetings as scheduled by USG and deliver meeting minutes 5 calendar days after the meeting. Provide a T/O status either in person, via teleconference or via electronic mail as scheduled by the USG. Status meeting may be verbal and include workbooks or charts that address current status of the T/O, a technical/management review, a financial review, anticipated risks/risk mitigations, delivery status including anticipated dates, status of any export compliance/ITAR issues, country clearance concerns for personnel traveling OCONUS, anticipated modifications, etc.
9.6 Program Reviews (CDRL A004). Participate in and support program reviews (commonly referred to as Program Management Reviews (PMRs)) as scheduled by the USG. PMRs typically occur once per calendar quarter, but may be scheduled as necessary. Date and location will be announced well in advance of the PMR. PMR format will be provided by the PM or COR prior to the scheduled dates.
9.7 Licenses, Export Agreements & Certifications (CDRL A00G). Provide copies of applicable licenses, export agreements, and certifications 10 calendar days prior to final equipment delivery. At a minimum include the following components:
· Cover letter describing the purpose, a description of each attachment, point of contact, contract and TORP #;
· Attachments should be originals or certified originals that are dated, signed by cognizant authority, and indicate specific agreement terms; and
· English translation of foreign language documents.
9.8 Technical Data and Documentation (CDRL A00H). Deliver all applicable technical data and documentation electronically 45 calendar days prior to delivery in English. Physical documents are due concurrent with equipment delivery and shall be in Latin American Spanish. Technical data and documentation includes: OEM manuals and directions for use; maintenance manuals, system software documentation; installation instructions; warranty and licensing terms and conditions; and other related technical publications pertaining to the operation and support of the equipment delivered under this T/O. The contractor shall ensure Purchase Orders (POs) contain provisions for delivering all Technical Data and Documentation.
9.9 Product Support Plan (CDRL A00G). The contractor shall provide a Product Support Plan 45 calendar days prior to delivery. The plan shall describe a clear process that explains the acquisition, delivery, transfer, and end user product support for all items procured IAW this TO. The product support plan shall include:
· Roles and responsibilities of all entities involved in the acquisition, delivery, transfer and end user product support;
· How items will be delivered, from the manufacturer, through other parties, to the freight forwarder; include method of delivery (ex. ground, air, electronically) and delivery location(s). Identify documentation required to complete the delivery of items and items that require an export license;
· Product/Equipment List; see example at Annex 1. Identify items that have a shelf life or expiration date;
· Warranty agreement details; see example at 2. Details shall include product/item covered (ex. make, model, lot number, serial number, key, etc); date coverage begins and ends; coverage period; where coverage is applicable (specify geographical location); type of warranty; registration process; and how to obtain service/support;
· Process for renewing coverage; and
· Copies of warranty and maintenance agreements.
9.9.1 Warranty. The contractor shall provide standard OEM warranties for all items procured IAW this Task Order. The warranty shall be valid within the country of Mexico. Warranties issued shall be the same warranty offered to the general public. Warranties shall become effective upon date of delivery to and acceptance by the USG and upon signing the Form DD250. Upon delivery and acceptance it is the responsibility of the end user to register all warranties and follow the warranty process for communication and servicing. All requirements for shipping a product to the OEM for warranty analysis or repair will be the responsibility of the EU. Include warranty details IAW PWS paragraph 9.9 Product Support Plan and Annex 2.
ANNEX 1: Product/Equipment List Example
Ref
| Make |
| Model |
| Noun |
| Serial # |
| Warranty? |
| Export License? |
| Lot# |
| Expiration |
Date
| 1 |
| 3.1 |
| Dell |
| 1950 |
| Server |
| DP69DF1 |
| Yes |
| No |
| n/a |
| n/a |
| 2 |
| 3.3.1 |
| Scantrak |
| 10 |
| Portable X-Ray Machine |
| T316-0104 |
| Yes |
| ITAR |
| n/a |
| n/a |
| 3 |
| 3.6.3 |
| Overwatch |
| n/a |
| IMPACT Application |
| n/a |
| No |
| ITAR |
| n/a |
| n/a |
| 4 |
| 3.7.1 |
| CIDEX Solution |
| n/a |
| Sterilization Solution |
| n/a |
| No |
| No |
| X32579 |
| 31May17 |
ANNEX 2: Warranty Example
PWS
Reference
| Make |
| Model |
| Noun |
| Serial # |
| Warranty |
Start Warranty End
Applicability End User Contact Information
| 3.1 |
| Dell |
| 1950 |
| Server |
| DP69DF1 |
| 03Jan13 |
| 02Jan14 |
| Standard |
| Worldwide |
| 5 yr platinum, 4 hr 7x24 on site |
www.dell.support.com 1-800-624-9896
APPENDIX A
PERFORMANCE REQUIREMENTS SUMMARY MATRIX
PERFORMANCE
OBJECTIVE
| PERFORMANCE STANDARD |
| ACCEPTABLE QUALITY LEVEL |
| METHOD OF SURVEILLANCE |
| PERFORMANCE INCENTIVE |
| Customer Satisfaction (Quality of Service) |
| T/O requirements met with few minor and no significant problems encountered |
Performance meets all technical and functional requirements, and is highly responsive to changes in technical direction and/or the technical support environment
Personnel qualifications, assessments, evaluations, analyses, recommendations, and related input are thorough, reliable, highly relevant to T/O requirements, and consist of substantial depth and breadth of subject matter expertise.
Deliverable reports contain all required data and meet all applicable CDRL requirements Contractor technical performance meets all T/O requirements.
Adequate Key Personnel with appropriate qualifications including security clearances provided at least 95% of time. Problems that are encountered are minor and resolved in a satisfactory manner.
| Routine Assessment of Workforce Qualifications and Availability of Resources |
| Assignment of performance rating for Customer Satisfaction criteria: |
EXCEPTIONAL
Performance meets all and exceeds many T/O requirements. Performance delivered with no required re-performance/rework 99% of time; problems that are encountered are minor and resolved in a highly effective manner.
VERY GOOD
Performance and deliverables meet all and exceed some T/O requirements. Performance delivered with no required re-performance/rework at least 97% of time; problems that are encountered are minor and resolved in an effective manner.
SATISFACTORY
Performance and deliverables meet all T/O requirements. Performance delivered with no re-performance/rework at least 95% of time; problems that are encountered are minor and resolved in a satisfactory manner.
MARGINAL
Some T/O requirements not met and/or performance delivered with re-performance/rework required more than 20% of time. Problems encountered were resolved in a less than satisfactory manner.
UNSATISFACTORY
Many T/O requirements not met. Numerous re-performances/rework required. Substantial problems were encountered and inadequate corrective actions employed.
| Adherence to Schedule |
| T/O milestones, periods of performance, and/or data submission dates are met or exceeded; highly qualified Key Personnel are available as required. |
| Contractor meets T/O delivery requirements at least 95% of the time (excluding government- caused delays) |
| Routine Inspection of Deliverable Products/ |
Services Assignment of performance rating for schedule criteria:
EXCEPTIONAL
T/O milestones/ performance dates met or exceeded 99% of time (excluding government caused delays)
VERY GOOD
T/O milestones/ performance dates met or exceeded at least 97% of time (excluding government caused delays)
SATISFACTORY
T/O milestones/ performance dates met or exceeded at least 95% of time (excluding government caused delays)
MARGINAL
T/O milestones/ performance dates met less than 95% of time (excluding government caused delays)
UNSATISFACTORY
T/O schedule/performance dates met less than 80% of time (excluding government caused delays)
| Cost Control |
| Contract labor mix is controlled in efficient and effective manner; travel and ODCs effectively controlled. |
| Actual T/O labor resource mix is maintained within 3% of originally awarded T/O resource mix; travel and ODCs effectively monitored and controlled. |
| Routine Inspection of T/O Funds & Manpower Performance Reports, Payment Invoices |
| Assignment of performance rating for cost control criteria: |
EXCEPTIONAL
Actual T/O resource mix maintained within originally awarded TO resource mix
VERY GOOD
Actual T/O resource mix maintained within 1% of originally awarded TO resource mix
SATISFACTORY
Actual T/O resource mix maintained within 3% of originally awarded TO resource mix
MARGINAL
Actual T/O resource mix maintained within 10% of originally awarded TO resource mix UNSATISFACTORY Actual TO resource mix exceeds 10% of originally awarded TO resource mix
| Small Business Participation |
| Small business participation goals are met or exceeded. |
| Actual small business participation meets 80% of small business participation goals.[endnoteRef:1] [1: ] |
| Routine inspection of cost reports, including small business participation as a percentage of total task order value. |
| Assignment of performance rating for small business participation criteria: |
EXCEPTIONAL
Actual T/O small business participation meets or exceeds small business participation goals.
VERY GOOD
Actual T/O small business participation meets 90% of small business participation goals.
SATISFACTORY
Actual T/O small business participation meets 80% of small business participation goals.
MARGINAL
Actual T/O small business participation meets 75% of small business participation goals.
UNSATISFACTORY
Actual TO small business participation meets less than 75% of small business participation goals.
Small business participation percentages are based on total task order value. Small business participation percentage for performance rating calculated by adding equally weighted total small business participation, woman-owned small business participation, small disadvantaged business participation service disabled veteran owned participation and historically underutilized business zone small business participation.
APPENDIX B
C-26 Parts (Referenced in PWS paragraph 4.2.3)
| Item/Description |
| Part Number |
| Quantity |
| #21 COUNTER SINK |
| C-445CTE |
| 2 |
| #30 COUNTER SINK |
| C-445CTE |
| 2 |
| #40 COUNTER SINK |
| C-445CTE |
| 2 |
| 1/4" DRIVE SOCKET SET |
| 106TMU |
| 10 |
| 100'EXTENSION CORD |
| 3UY38 |
| 6 |
| 11PC METRIC CROW FOOT SET |
| 946864000 |
| 8 |
| 12 PT CROWS FOOT |
| AN85086B |
| 2 |
| 12 PT CROWS FOOT |
| AN85087B |
| 2 |
| 12 PT CROWS FOOT |
| AN85088B |
| 2 |
| 12 PT CROWS FOOT |
| AN85089B |
| 2 |
| 1200W SINGLE ENDED HMI LAMP |
| 3483986 |
| 2 |
| 12PC SCREW DRIVER SET |
| 945736 |
| 8 |
| 20GAL PARTS WASHER |
| 15986 |
| 1 |
| 25' TAPE MEASURE |
| YASG155 |
| 10 |
| 266PC MECH TOOL SET |
| 947971 |
| 8 |
| 2PC NEEDLE NOSE PIER SET |
| 945239 |
| 10 |
| 3/8 REVERSABLE DRILL |
| 919988 |
| 10 |
| 39 PC TAP&DIE SET |
| 952382 |
| 10 |
| 3PC AVIATION TIN SNIPS |
| 942890 |
| 10 |
| 3PC BRASS PUNCH SET |
| 946515 |
| 8 |
| 55GAL DRUM CRADLE |
| 2W269 |
| 2 |
| 5PC BALL PIN HAMMER SET |
| 938074 |
| 10 |
| 5PC LOCKING PLIER SET |
| 945215 |
| 10 |
| 7/8 TORQUE ADAPTOR |
| SRES28 |
| 2 |
| 8PC BLACK FILE SET |
| 931331 |
| 10 |
| AC TIRE PRESSURE |
| 14-6806-6011 |
| 2 |
| ACFT ENGINE TEST STAND |
| TEST STAND |
| 1 |
| ACFT WHEEL BALANCER MACH |
| S17SP |
| 1 |
| ACTUATOR ASSY |
| 27-53058-005 |
| 2 |
| AIR DATA COMP MOD KDC-481 |
| 065-0083-01 |
| 1 |
| AIR SVC CONDITION R-12, R-134 |
| 622-6793-001 |
| 2 |
| AIRCODITIONER TORQUE |
| 3102476-6N |
| 1 |
| AIRCRAFT JACK FOR C-26 |
| n/a |
| 3 |
| ALL PURPOSE MECH TOOL BOX WITH FOAM |
| ATKAPMB |
| 4 |
| ALT INDICATOR |
| 101735-11807 |
| 2 |
| AMPLIFIER ASSY |
| 27-829792-001 |
| 1 |
| ANGEL CARPET TRIM |
| 27-90120-009 |
| 1 |
| ANGLE WRENCH SET |
| VS814A |
| 8 |
| ANGLE WRENCH SET 1/4-3/4 |
| SVS807 |
| 2 |
| ARTIFICIAL HORIZON MOD AI-8040 |
| 501-1197-08 |
| 2 |
| AUTO BEAD BREAKER ACFT RIM |
| 8621 |
| 1 |
| AUTO-PILOT CONTROL HEAD MOD KMC-440 |
| 065-0700-30 |
| 2 |
| AVIONICS FAN |
| 071-4037-01 |
| 2 |
| BLOCK BRUSH ASSY |
| C-40151 |
| 1 |
| BRACKET ASSY PROP DEICE |
| 27-69000-SE01-01 |
| 1 |
| BYPASS TORQUE LIMITER VALVE |
| 897457-5 |
| 7 |
| CLEANER ACC KIT |
| 50-29-081 |
| 2 |
| COCKPIT VOICE RECORDER |
| 93-A100-10 |
| 2 |
| COMM CTRL HEAD |
| 071-1341-06 |
| 2 |
| CONN LOW PRESSURE OUTLET |
| 36240-205 |
| 1 |
| CONNECTOR |
| MS3456W18-9SW |
| 4 |
| CONNTACT CLEANER |
| 82130 |
| 60 |
| CONTROLER MOD KMC-440 |
| 065-0070-30 |
| 1 |
| CORE VALVE REMOVER |
| TR107A |
| 8 |
| COTTER PIN PULLER |
| SGCP1A |
| 2 |
| CRIMPING TOOL |
| M22520/1-01 |
| 2 |
| CRIMPING TOOL |
| M22520/5-01 |
| 2 |
| CROW FOOT STANDART |
| 946863000 |
| 8 |
| DRILL BIT SET 0-60 |
| DBC260A |
| 2 |
| DUAL LAMP TRIPOD |
| 3483986 |
| 1 |
| DUCK BILL PLIERS |
| 609ACP |
| 8 |
| EGT COMP RESISTER |
| 897476-4 |
| 4 |
| EGT INDICATOR |
| 07-19149-3 |
| 4 |
| ELECT DISPLAYS EFIS MOD ED-102G |
| 8095686-1001 |
| 6 |
| ELECTRICAL OUTLET STRIP |
| 5A311 |
| 4 |
| ENGINE ADAPTER KIT TPE331 |
| K-2110 |
| 2 |
| ENGINE COMP ADAPTER KIT TPE 331 |
| K-1057 |
| 1 |
| ENGINE COMPRESSOR WASHER |
| 08-4048-0013 |
| 1 |
| ENGINE CRANE PORTABLE 6K |
| FP-3A |
| 1 |
| ENGINE HOIST LEVELER FOR C-26 |
| n/a |
| 3 |
| ENGINE SLING |
| 08-0-103-4000 |
| 2 |
| ENGINE STAND |
| 08-2001-0000 |
| 2 |
| ENGINE STAND PPORT |
| 08-2023-0010 |
| 2 |
| ENGINE TUG FOR C-26 |
| n/a |
| 2 |
| FEELER GAUGE SET |
| FBL325A |
| 2 |
| FIRE BOTTLE ENGINE |
| 30300020 |
| 2 |
| FLUID SVC UNIT |
| 06-4035-0500 |
| 2 |
| FMS NAVE RECIEVER |
| 066-1126-000 |
| 2 |
| FOX CART MODEL 1600 |
| 405-5001-000 |
| 2 |
| FUEL CONTROL UNIT |
| 897801-5 |
| 4 |
| FUEL FLOW XMITTER |
| TFF917-3 |
| 4 |
| FUEL INDICATOR |
| 27-19163-003 |
| 5 |
| FUEL INDICATOR |
| 27-19164-009 |
| 1 |
| FUEL QTY IND |
| 27-19164-013 |
| 4 |
| FUEL QTY IND |
| 27-19164-015 |
| 4 |
| FUEL QUANTITY TEST BOX |
| 101-00420 |
| 2 |
| FUEL SAMPLE UNIT |
| 07-3006-6900 |
| 2 |
| GASKET, FCU COVER |
| 3054-726 |
| 1 |
| GENERATOR MOD SG-101B |
| 3614335-2016 |
| 1 |
| GUAUGE AC STRUT PRESSURE |
| 14-6805-6010 |
| 2 |
| GYRO VERTCAL MOD KVG-350 |
| 060-0026-00 |
| 2 |
| HALON EXTINGUISHER 150lb |
| HLN600 |
| 3 |
| HEARING PROTECTION |
| 6XF60 |
| 10 |
| HEARING PROTECTION |
| H10A |
| 3 |
| HEARING PROTECTION CANS |
| 3NLA3 |
| 10 |
| HYD POWER UNIT |
| 5120-PT-01 |
| 4 |
| HYD STACKER UNIT |
| MST1000 |
| 1 |
| IGNITION EXCITOR |
| 3070378-2 |
| 4 |
| INDICATOR AND WARNING ASSY |
| 27-82168-007 |
| 1 |
| INSPECTION MIRROR |
| GA294 |
| 6 |
| INTER MED MECH TOOL BOX |
| ATKIFLB |
| 6 |
| JETEX POWER UNIT |
| 500285A-001 |
| 2 |
| JOBBER DRILL SET |
| C-JDST-60N |
| 2 |
| KIT COUPLING HYD |
| KHC-1006 |
| 2 |
| MACHINEST SQUARE |
| SQUARE12 |
| 2 |
| MAIN TIRE FOR C-26 |
| 196K08-9 |
| 12 |
| MALE QUICK DISCONNECT |
| 110 |
| 2 |
| MANIFOLD ASSY |
| 35021-505 |
| 2 |
| MANIFOLD, FUEL NOZZLE |
| 3102469-2 |
| 4 |
| MILL FILE SET |
| SGHBF300A |
| 2 |
| MINI DIE GRINDER |
| 918809000 |
| 10 |
| MINI DIE GRINDER |
| 918814000 |
| 10 |
| NAV RECEIVER |
| 066-1101-00 |
| 1 |
| NEEDLE NOSE VISE GRIPS |
| VP4LN |
| 8 |
| NOSE TIRE FOR C-26 |
| 031-613-4 |
| 6 |
| NOSE WHEEL SOCKET |
| 99-1453 |
| 2 |
| NOZZLE |
| 3101235-11 OR 8,9 |
| 20 |
| OIL ANALYSIS SPECTROMETER |
| n/a |
| 1 |
| OIL TEMP IND |
| 27-19160-005 |
| 2 |
| OXY SVC CART |
| 20-4504-7000 |
| 2 |
| PACKING PREFORMED |
| 57560-00 |
| 10 |
| PANEL CONTROL EFIS SYS |
| 3614276-1027 |
| 3 |
| PITCH SERVO |
| 065-0076-11 |
| 2 |
| PITCH TRIM ACTUATOR |
| 27-19008-007 |
| 4 |
| PITCH TRIM RELAY |
| M83536/33-003L |
| 4 |
| PITOT STATIC TEST BOX |
| 101-00184 |
| 2 |
| PORP BALANCER |
| VIBREX 2000 |
| 2 |
| POT / RATE ASSY |
| 27-5305-0772 |
| 2 |
| POT / RATE ASSY FOLLOW |
| 27-53051-037 |
| 4 |
| POWER PACK HYD |
| 27-81009-015 |
| 2 |
| PROP ASSY |
| 4HFR340652-E/F/C |
| 4 |
| PROP GOVERNOR |
| 897410-16 |
| 4 |
| PROP PITCH CONTROL |
| 895481-20 |
| 4 |
| QAD KIT (LUCAS) |
| 23065-513 |
| 2 |
| REMOTE MEMORY MODULE |
| RM01-001 |
| 2 |
| ROLL AWAY 22 X 17 |
| 415-066 |
| 2 |
| SAFETY WIRE PLIERS |
| WT105 |
| 10 |
| SCREWDRIVER SET |
| SDDMR4B |
| 4 |
| SCREWDRIVER SET |
| SDDXL80O |
| 4 |
| SENSOR INLET AIR (SRL) |
| 694-001-9002 |
| 4 |
| SNAP RING PLIER |
| SPRC4700 |
| 2 |
| SPEC ANALYZER GEN KIT |
| MDO3SA |
| 2 |
| SPEED INDICATOR VERTICAL |
| 066-3077-45 |
| 1 |
| SRL COMPUTER |
| 2117420-3 / 2 |
| 2 |
| START PRESSURE REG. |
| 894441-6 |
| 2 |
| STARTER GENE AP |
| 300SG121Q |
| 3 |
| SWITCHING ACCESSORY MOO TYPE 1 |
| 1001-003 |
| 1 |
| TAIL STAND FOR C-26 |
| n/a |
| 2 |
| TCAS/VS IND |
| 066-50002-8101 |
| 2 |
| TENSIOMETER |
| T5-2002-101-00 |
| 2 |
| TESTER AMP NOSE GEAR STEERING |
| 7412-1,7412-1A |
| 1 |
| TESTER STEERING NOSE |
| 7802A, 9202 |
| 1 |
| THREAD RESTORER |
| TF1124B |
| 8 |
| TIRE INFLATOR AUTO |
| 5012/8571 |
| 1 |
| TORLON REM/INST TOOL |
| 298062-1 |
| 8 |
| TORQUE IND |
| 27-19158-009 |
| 2 |
| TOW BAR HEAD |
| 01-0507-0000 |
| 2 |
| TRICKLE CHARGER |
| TC-250A |
| 2 |
| TUBE CAPILLARY |
| 8004338-18 |
| 1 |
| TURBINE TEST SET |
| TT1000A |
| 2 |
| ULTRASONIC CLEANER |
| BT40-SE |
| 2 |
| VALVE ACTUATOR |
| BYLB50437-1 |
| 2 |
| VALVE ASSY |
| 27-19323-005 |
| 2 |
| VALVE ASSY, PROP FEATHERING |
| 3102892-2 |
| 2 |
| VALVE SERVO |
| PS98-1008-1 |
| 2 |
| VALVE, ANTI-ICE |
| 319980-13-1 |
| 6 |
| VALVE, FUEL SHUT-OFF |
| 394230-9-1 |
| 4 |
| VHF TRANSCEIVER MOD 401B |
| 064-1047-01 |
| 1 |
| WAAS SAFETY NAVIGATOR |
| KSN770 |
| 4 |
| WATER PUMP FOR MULE |
| n/a |
| 1 |
| WINDOW INSP KIT |
| 04-56001-2 |
| 10 |
| WRENCH SET 5/16-3/4 |
| VS8B |
| 6 |
| YAW TRIM SERVO |
| 065-0076-03 |
| 2 |