Atch_16_DD_1354_Quick_Notes.pdf

PDF 15 KB Posted

Attached to
Holloman AFB MACC Federal contract opportunity
Solicitation number
FA4801-11-R-0003
Issued by
Department of the Air Force Air Combat Command

About this file

DD 1354 Quick Notes

View the file

Other files for this federal contract opportunity

Other files attached to Holloman AFB MACC, newest first.
File Type Posted
AF66.xlsx XLSX spreadsheet
AF_From_3064_Progress_Schedule_excel_template_26_Oct_2011.xls XLS spreadsheet
01_Cover_Sheet.dwg DWG drawing
Geotech_Study_-_Fire_Stations.pdf PDF
MACC_QA_-_Round_2_Final_as_of_31_Oct_2013.xlsx XLSX spreadsheet
Summary_of_Amendments_to_MACC.xlsx XLSX spreadsheet
Consent_Letter_Past_Performance_29_Oct_13.pdf PDF
Atch_2_MACC_Statement_of_Work_17_Oct_2013.docx DOCX document
Atch_2_MACC_Statement_of_Work_10_Oct_2013.pdf PDF
Attach_2_MACC_Statement_of_Work_(SOW).pdf PDF
MACC_solicitation_amendment_6_dated_10_Oct_2013.pdf PDF
Historical_workload.pptx PPTX presentation
MACC_QA_Round_1_FINAL.xlsx XLSX spreadsheet
Atch_25_MACC_SITE_MAP.jpg JPG image
Atch_24__AF_3052.xlsx XLSX spreadsheet
Atch_8-1_Consent_Form.pdf PDF
Attachment_23_Financial_Information_Request.pdf PDF
MACC_Amend_1.pdf PDF
MACC_SITE_VISIT_List_of_Attendees_5_Sept_2013.docx DOCX document
A_MACC_Solicitation_19_Aug_2013.pdf PDF
Atch_13_Base_Access.pdf PDF
Atch_22_HAFB_Chemical_Reuse_Program.pdf PDF
Atch_9_Visitor_Access_Request_Form_and_Consent_Form.doc DOC document
Atch_1_Holloman_AFB_Local_Procedures_19_Aug_2013.pdf PDF
Atch_15_Form_1354.pdf PDF
Atch_10_2012_Holloman_AFB_Design_Compatibility_Standards.pdf PDF
Atch_19_HAFB_Municipal_Solid_Waste_Mgmt_Plan.pdf PDF
Atch_21_HAFB_Integrated_Natural_Resource_Mgmt_Plan.pdf PDF
Atch_11_MACC_Demonstration_Project_SOW_KWRD090122A.pdf PDF
Atch_12_AF_3064_--_Construction_Progress_Schedule.pdf PDF
Atch_8-2_Past_Performance_Info_Sheet.pdf PDF
Atch_8-4_Sample_Past_Experience_List.pdf PDF
Atch_14_HAFB_Standard_Design.pdf PDF
Atch_18_HAFB_Lead_Based_Paint_Mgmt_Plan.pdf PDF
Atch_2_MACC_Statement_of_Work_19_Aug_2013.pdf PDF
A_MACC_Solicitation_19_Aug_2013.pdf PDF
Atch_17_HAFB_Recycling_Guide.pdf PDF
Atch_6_Wage_Determination_NM130005_01-04-2013_Residential.pdf PDF
Atch_4_Wage_Determination_NM30008_01-04-2013_Heavy.pdf PDF
Atch_5_Wage_Determination_NM130050_01-04-2013_Highway.pdf PDF
Atch_8-3_Client_Authorization_Letter.pdf PDF
Atch_20_HAFB_Storm_Water_Pollution_Prevention_Plan.pdf PDF
Atch_7_AF_From_66_Sample.pdf PDF
Atch_3_Wage_Determination_NM130032_01-04-2013_Building.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD 1354 Quick Notes for Sep 2009 Version

BLOCK 1: Three options.

1. CoE

2. SABER Office and address, then representative from CEP completes their information and signs in Block 24 (a,b,&c).

3. Construction company and address, their representative information and signature in Block 24 (a,b,&c).

BLOCK 2: Date the DD 1354 is being prepared/typed.

BLOCK 3: Project number, example KWRD 03-0167. Installations are:

KWRD for Holloman main base projects.

BXSR for Boles Well Field projects.

BYPV for Bonito Pipeline projects.

OBGR for Oscura Range TUAL for RAMS projects.

ALAY for RATSCAT projects.

BLOCK 4: Serial number if applicable.

BLOCK 5: Real Estate Office address.

BLOCK 6: Will be the installation where the work was completed.

ALAY, BXSR, BYPV, KWRD, OBGR or TUAL

BLOCK 7: Contract number if applicable.

BLOCK 7a: Date the government accepts the project.

BLOCK 8: Self-Explanatory for a, b, & c.

BLOCK 9: This column will start with line item 1, next row, line item 2, etc.

BLOCK 10a: Correct facility number is placed with each line item. NOTE: If the work is outside the facility beyond 5 feet you will have a different facility number. Example:

Water line, sewer line, electric, sidewalk, curbs, storm drains, etc.

BLOCK 11: Category code for the facility number listed.

BLOCK 12: Official nomenclature of the category code.

BLOCK 13: Type of construction.

P = Permanent S = Semi-permanent T = Temporary

BLOCK 14 – 17: Unique to the category code used. If the category code only has one primary unit of measure (UOM) you will used block 14 & 15. If the category code has dual UOM’s both will be listed, with the secondary UOM in block 16 & 17. Note: You can use the DD 1354 checklist for a quick reference on the commonly used category codes. If you have something that is not listed, used the category codes list that was sent to you or if you still need assistance please call the Real Estate Office (572-7166).

BLOCK 18: All costs associated with the line item are placed here. Included parts & labor.

BLOCK 19: Check with you 49 CES Engineer POC to confirm. Commonly used are:

01 = MILCON

03 = O & M

04 = RDTE

10 = Foreign Funds

11 = NAF

13 = OTHER

BLOCK 20: Commonly used are:

00 = Army Active 03 = Air Force Active

23 = DECA

33 = DESC

63 = Other Nations

BLOCK 21: Commonly used are:

01 = Owned by DoD 02 = Owned by Federal Government (non-DoD) 05 = Owned by Foreign Government

BLOCK 22: Self explanatory.

BLOCK 23: Two options.

1. If SABER Office and address, is in Block 1 then representative from CEP completes their information and signs in a, b, & c.

2. If Construction company and address, is in Block 1 their representative information and signature in a, b, & c.

BLOCK 24: Normally BCE or Deputy BCE information and signature.

BLOCK 25: ACES-RP journal number is inserted once information is picked up on Air Force records.

BLOCK 26: Construction deficiencies MUST be listed here.

BLOCK 27: Area for additional information as required. Normally a detailed description of work and sub contractor info.