Atch_4_Wage_Determination_NM30008_01-04-2013_Heavy.pdf

PDF 32 KB Posted

Attached to
Holloman AFB MACC Federal contract opportunity
Solicitation number
FA4801-11-R-0003
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 4 Wage Determination

View the file

Other files for this federal contract opportunity

Other files attached to Holloman AFB MACC, newest first.
File Type Posted
AF_From_3064_Progress_Schedule_excel_template_26_Oct_2011.xls XLS spreadsheet
AF66.xlsx XLSX spreadsheet
Geotech_Study_-_Fire_Stations.pdf PDF
01_Cover_Sheet.dwg DWG drawing
Summary_of_Amendments_to_MACC.xlsx XLSX spreadsheet
MACC_QA_-_Round_2_Final_as_of_31_Oct_2013.xlsx XLSX spreadsheet
Consent_Letter_Past_Performance_29_Oct_13.pdf PDF
Atch_2_MACC_Statement_of_Work_17_Oct_2013.docx DOCX document
Atch_2_MACC_Statement_of_Work_10_Oct_2013.pdf PDF
MACC_solicitation_amendment_6_dated_10_Oct_2013.pdf PDF
Attach_2_MACC_Statement_of_Work_(SOW).pdf PDF
Historical_workload.pptx PPTX presentation
MACC_QA_Round_1_FINAL.xlsx XLSX spreadsheet
Atch_25_MACC_SITE_MAP.jpg JPG image
Atch_24__AF_3052.xlsx XLSX spreadsheet
Atch_8-1_Consent_Form.pdf PDF
Attachment_23_Financial_Information_Request.pdf PDF
MACC_Amend_1.pdf PDF
MACC_SITE_VISIT_List_of_Attendees_5_Sept_2013.docx DOCX document
A_MACC_Solicitation_19_Aug_2013.pdf PDF
Atch_16_DD_1354_Quick_Notes.pdf PDF
Atch_2_MACC_Statement_of_Work_19_Aug_2013.pdf PDF
A_MACC_Solicitation_19_Aug_2013.pdf PDF
Atch_6_Wage_Determination_NM130005_01-04-2013_Residential.pdf PDF
Atch_17_HAFB_Recycling_Guide.pdf PDF
Atch_5_Wage_Determination_NM130050_01-04-2013_Highway.pdf PDF
Atch_8-3_Client_Authorization_Letter.pdf PDF
Atch_20_HAFB_Storm_Water_Pollution_Prevention_Plan.pdf PDF
Atch_7_AF_From_66_Sample.pdf PDF
Atch_3_Wage_Determination_NM130032_01-04-2013_Building.pdf PDF
Atch_15_Form_1354.pdf PDF
Atch_10_2012_Holloman_AFB_Design_Compatibility_Standards.pdf PDF
Atch_19_HAFB_Municipal_Solid_Waste_Mgmt_Plan.pdf PDF
Atch_21_HAFB_Integrated_Natural_Resource_Mgmt_Plan.pdf PDF
Atch_11_MACC_Demonstration_Project_SOW_KWRD090122A.pdf PDF
Atch_12_AF_3064_--_Construction_Progress_Schedule.pdf PDF
Atch_8-2_Past_Performance_Info_Sheet.pdf PDF
Atch_8-4_Sample_Past_Experience_List.pdf PDF
Atch_14_HAFB_Standard_Design.pdf PDF
Atch_18_HAFB_Lead_Based_Paint_Mgmt_Plan.pdf PDF
Atch_13_Base_Access.pdf PDF
Atch_22_HAFB_Chemical_Reuse_Program.pdf PDF
Atch_9_Visitor_Access_Request_Form_and_Consent_Form.doc DOC document
Atch_1_Holloman_AFB_Local_Procedures_19_Aug_2013.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: NM130008 01/04/2013 NM8

Superseded General Decision Number: NM20120008

State: New Mexico

Construction Type: Heavy

County: Otero County in New Mexico.

HEAVY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 01/04/2013

* ELEC0583-007 12/01/2012

Rates Fringes

ELECTRICIAN......................$ 28.80 7.78

IRON0495-004 07/01/2011

Rates Fringes

IRONWORKER

Structural..................$ 25.50 11.73

SUNM2009-002 09/14/2010

Rates Fringes

CARPENTER........................$ 22.26 6.20

IRONWORKER, REINFORCING..........$ 22.75 9.60

LABORER: Common or General......$ 12.37 0.00

LABORER: Flagger................$ 10.90 0.00

OPERATOR: Backhoe...............$ 14.03 0.00

OPERATOR: Grader/Blade..........$ 21.70 4.73

OPERATOR: Loader (Front End)....$ 22.07 5.05

OPERATOR: Scraper...............$ 14.03 0.00

PIPEFITTER.......................$ 25.64 11.31

PLUMBER..........................$ 26.27 7.69

TRUCK DRIVER: Dump Truck........$ 11.90 0.00

TRUCK DRIVER: Water Truck.......$ 13.72 5.25

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.

The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.

0000/9999: weighted union wage rates will be published annually each January.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .