AF_From_3064_Progress_Schedule_excel_template_26_Oct_2011.xls

XLS spreadsheet 74 KB Posted

Attached to
Holloman AFB MACC Federal contract opportunity
Solicitation number
FA4801-11-R-0003
Issued by
Department of the Air Force Air Combat Command

About this file

In accordance with Round 2 Q As AF Form 3064 attached in Excel format.

View the file

Other files for this federal contract opportunity

Other files attached to Holloman AFB MACC, newest first.
File Type Posted
AF66.xlsx XLSX spreadsheet
01_Cover_Sheet.dwg DWG drawing
Geotech_Study_-_Fire_Stations.pdf PDF
MACC_QA_-_Round_2_Final_as_of_31_Oct_2013.xlsx XLSX spreadsheet
Summary_of_Amendments_to_MACC.xlsx XLSX spreadsheet
Consent_Letter_Past_Performance_29_Oct_13.pdf PDF
Atch_2_MACC_Statement_of_Work_17_Oct_2013.docx DOCX document
Atch_2_MACC_Statement_of_Work_10_Oct_2013.pdf PDF
Attach_2_MACC_Statement_of_Work_(SOW).pdf PDF
MACC_solicitation_amendment_6_dated_10_Oct_2013.pdf PDF
Historical_workload.pptx PPTX presentation
MACC_QA_Round_1_FINAL.xlsx XLSX spreadsheet
Atch_25_MACC_SITE_MAP.jpg JPG image
Atch_24__AF_3052.xlsx XLSX spreadsheet
Atch_8-1_Consent_Form.pdf PDF
Attachment_23_Financial_Information_Request.pdf PDF
MACC_Amend_1.pdf PDF
MACC_SITE_VISIT_List_of_Attendees_5_Sept_2013.docx DOCX document
A_MACC_Solicitation_19_Aug_2013.pdf PDF
Atch_16_DD_1354_Quick_Notes.pdf PDF
Atch_13_Base_Access.pdf PDF
Atch_22_HAFB_Chemical_Reuse_Program.pdf PDF
Atch_9_Visitor_Access_Request_Form_and_Consent_Form.doc DOC document
Atch_1_Holloman_AFB_Local_Procedures_19_Aug_2013.pdf PDF
Atch_15_Form_1354.pdf PDF
Atch_10_2012_Holloman_AFB_Design_Compatibility_Standards.pdf PDF
Atch_19_HAFB_Municipal_Solid_Waste_Mgmt_Plan.pdf PDF
Atch_21_HAFB_Integrated_Natural_Resource_Mgmt_Plan.pdf PDF
Atch_11_MACC_Demonstration_Project_SOW_KWRD090122A.pdf PDF
Atch_12_AF_3064_--_Construction_Progress_Schedule.pdf PDF
Atch_8-2_Past_Performance_Info_Sheet.pdf PDF
Atch_8-4_Sample_Past_Experience_List.pdf PDF
Atch_14_HAFB_Standard_Design.pdf PDF
Atch_18_HAFB_Lead_Based_Paint_Mgmt_Plan.pdf PDF
Atch_2_MACC_Statement_of_Work_19_Aug_2013.pdf PDF
A_MACC_Solicitation_19_Aug_2013.pdf PDF
Atch_17_HAFB_Recycling_Guide.pdf PDF
Atch_6_Wage_Determination_NM130005_01-04-2013_Residential.pdf PDF
Atch_4_Wage_Determination_NM30008_01-04-2013_Heavy.pdf PDF
Atch_5_Wage_Determination_NM130050_01-04-2013_Highway.pdf PDF
Atch_8-3_Client_Authorization_Letter.pdf PDF
Atch_20_HAFB_Storm_Water_Pollution_Prevention_Plan.pdf PDF
Atch_7_AF_From_66_Sample.pdf PDF
Atch_3_Wage_Determination_NM130032_01-04-2013_Building.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF3064 Front

CONTRACT PROGRESS SCHEDULEForm Approved
(See Contractor's Instructions on Reverse)OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering maintaining the data needed, and completing and reviewing
the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department Defense of Washington Headquarters Services, Directorate for information
Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project 0704-0188. Washington DC 20503. Please DO NOT RETURN your (form questionnaire) to
either of these addresses. Send your completed (form questionnaire) to: SAF AQCO. Washington DC 20330-1000.
1. CONTRACT NO.8. PROJECT TITLE10. APPROVAL RECOMMENDED BY:
FA4801-enter hereenter hereDATE SIGNEDINSTALLATIONS ENGINEERS'S SIGNATURE
2. STARTING DATEenter here
3. COMPLETION DATEenter here9. SUBMITTED BY:
4. PURCHASE REQUEST NO.n/aDATE SIGNEDCONTRACTOR'S NAME (Last, First, Middle Initial) ADDRESSCONTRACTOR'S SIGNATURE11. APPROVED BY:
5. PROJECT NO.enter KWRD#(Street, City, State, Zip Code)DATE SIGNEDCONTRACTING OFFICER'S SIGNATURE
6. ACTUAL STARTING DATEenter hereenter here
7. ACTUAL COMPLETION DATEenter here
LINE NO.WORK ELEMENTS%31-Oct-1130-Nov-1131-Dec-1131-Jan-1229-Feb-1231-Mar-1230-Apr-1231-May-1230-Jun-1231-Jul-1231-Aug-1230-Sep-1210-Oct-12line %
ABCDEFGHIJKLMNOPQ
1Excavation50%10%45%45%100%
5%23%23%0%0%0%0%0%0%0%0%0%0%
2Concrete Work30%33%33%34%100%
0%0%0%10%10%10%0%0%0%0%0%0%0%
3Backfill20%50%50%100%
0%0%0%0%0%0%10%10%0%0%0%0%0%
40%
0%0%0%0%0%0%0%0%0%0%0%0%0%
50%
0%0%0%0%0%0%0%0%0%0%0%0%0%
60%
0%0%0%0%0%0%0%0%0%0%0%0%0%
70%
0%0%0%0%0%0%0%0%0%0%0%0%0%
80%
0%0%0%0%0%0%0%0%0%0%0%0%0%
90%
0%0%0%0%0%0%0%0%0%0%0%0%0%
100%
0%0%0%0%0%0%0%0%0%0%0%0%0%
110%
0%0%0%0%0%0%0%0%0%0%0%0%0%
120%
0%0%0%0%0%0%0%0%0%0%0%0%0%
130%
0%0%0%0%0%0%0%0%0%0%0%0%0%
140%
0%0%0%0%0%0%0%0%0%0%0%0%0%
15Column Total5.0%22.5%22.5%9.9%9.9%10.2%10.0%10.0%0.0%0.0%0.0%0.0%0.0%
PROJECT TOTAL100.00%5.0%27.5%50.0%59.9%69.8%80.0%90.0%100.0%100.0%100.0%100.0%100.0%100.0%
AF Form 3064, JUN 90 PREVIOUS EDITION IS OBSOLETE

AF3064 Back

INSTRUCTIONS TO CONTRACTORS
1. Prepare three copies of AF Form 3064, in accordance with these instructions and submit to the contracting officer at the time stated in the contract or as established
by the contracting officer.
2. Blocks 1,2, and 3. Enter the contract number, starting date, and completion date as shown on the contract.
3. Block 8. Enter the title of the project as shown on the contract.
4. Block 9. Enter the name and address of your firm. The three copies submitted to the contracting officer must be dated and signed by the contractor or an authorized
representative of the firm.
5. Lines 1 through 15. Major elements of work (whether unit price or lump sum contract) such as excavation, concrete work, carpentry, engineering, installation of
communication electronic facilities, etc., will be shown in Column B in logical sequence and in sufficient detail to identify the element. If the contract
calls for more than 14 work elements, additional copies of the AF Form 3064 may be used as a continuation for the work elements.
6. The percentage of each listed work element to the complete job will be shown opposite each element in Column C. As an example, if 3 work elements are shown:
excavation, concrete work, and backfill, and it is estimated that excavation is 50% of the total job, concrete 30%, and backfill 20%, these percentages will be shown
opposite each element. The total must equal 100%.
7. Columns D through P will be used to show planned periodic progress, as required by the contracting officer, during the period of the contract. Only the top half of the
space under these columns will be used by contractors. Using the example cited above and assuming that the contract period for performance is 8 weeks, and it
is planned to accomplish 10% of the excavation work the 1st week and 45% each week until excavation is complete, 10 would be shown in the upper half of Line 1
under Column D, 45 under Column E and 45 under Column F for a total of 100%. If it is planned to accomplish the concrete work during the 4th, 5th, and 6th weeks
in equal amounts, 33,33, and 34 would be enteredd under columns G, H, and I on Line 2. Assuming the backfill will be accomplished during the 7th and 8th weeks, 50 would
be entered under Columns J and K on Line 3. If the contract extends beyond 14 weeks, additional copies of AF Form 3064 may be used as a continuation of performance record.
8. Total amount or work planned at intervals as shown in Columns D through Q will be totaled and entered in the top half of the space under the appropriate column of line 15.
Again, using the example cited above, the totals under Column D through K would read 10, 20, 20, 10, 10, 10, 10, 10, for a total of 100%. These totals will be
used to plot an overlay graph using Lines 4 through 11, beginning with Column D and extending to the right the number of columns (weeks) authorized by the contract
for performance time.
9. In the event the contract is modified by the contracting officer under terms of the contract, changing the progress of work as originally scheduled, adding or deleting
work or changing the original completion date, a revised progress schedule will be prepared and submitted to the contracting officer for approval. In preparing the revised
schedule, the amount of work completed will be considered, together with the changed new completion date set forth in the contract modification. Considering these
factors, the work under the contract will be rescheduled over the new total performance time in the same manner that the original schedule was prepared.
The new completion date will be entered in Block 3. "First Revised Schedule," "Second Revised Schedule," etc., will be entered to the left of the form title.
Time of submission of the revised schedule will be determined by the contracting officer.
10. At such intervals as may be established by the contracting officer, the contractor will submit to the contracting officer AF Form 3065 "Contract Progress Report,"
indicating the percentage of work accomplished for each work element during the established reporting period. Accurate reports are of the utmost importance to the
contractor and th the Government, since the percentage of completion, or progress, thus reported is used in administration of the contract and maybe used in connection
with approval of partial payments under the contract. Care should be taken to plan the work in such manner that it can be accomplished as stated in this schedule. If for
any reason it becomes known that any part of the progess under this contract will be delayed, this fact should be reported to the contracting officer immediately.
AF FORM 3064, JUN 90 (REVERSE)