Drawings-589A4-20-158 VOL 4-1 page.pdf

PDF 9 MB Posted

Attached to
Z2DA--Renovate Warehouse for Pandemic Preparedness PN: 589A4-20-158
Solicitation number
36C25521R0075
Issued by

About this file

This solicitation package describes requirements for a renovation project at the Harry S. Truman Memorial Veterans Hospital in Columbia, Missouri. The scope of work involves renovating an existing 12,500 square foot pre-engineered metal building warehouse to add 3,800 square feet of mezzanine storage space and upgrading building systems. Architectural work includes exterior CMU and insulated metal panel extensions, interior demolition and new partitions, and finishes. Structural upgrades include raising the roof and adding interior and exterior stairs. Mechanical systems will be replaced with a new air handling unit and terminal boxes. Plumbing and electrical systems will be extended and upgraded. Technology revisions include recabling for data, access control, alarm, and surveillance systems. The estimated price range for completion is $2,000,000 to $5,000,000. As a total SDVOSB set-aside, proposals are due by May 7, 2021 with award utilizing LPTA and no discussions. The contract duration is up to 330 calendar days from notice to proceed.

View the file

Other files

File Type Posted
AD102 Amendment 3.pdf PDF
MD101 Amendment 3.pdf PDF
M-301 Amendment 3.pdf PDF
EL101 Amendment 3.pdf PDF
EP101 Amendment 3.pdf PDF
S-501 Amendment 3.pdf PDF
AF101 Amendment 3.pdf PDF
PD101 Amendment 3.pdf PDF
M-102 Amendment 3.pdf PDF
M-101 Amendment 3.pdf PDF
AE101 Amendment 3.pdf PDF
AE401 Amendment 3.pdf PDF
M-500 Amendment 3.pdf PDF
P-101 Amendment 3.pdf PDF
S-301 Amendment 3.pdf PDF
PH101 Amendment 3.pdf PDF
AF502 Amendment 3.pdf PDF
ED101 Amendment 3.pdf PDF
11 00 00 Beam Scale Cut Sheet - Amendment 3.pdf PDF
AC102 Amendment 3.pdf PDF
31 62 00 Driven or Drilled Micropiles - Amendment 3.pdf PDF
36C25521R0075 0003.docx DOCX document
01 35 26 pgs 12-13 - Amendment 3.pdf PDF
AD101 Amendment 3.pdf PDF
PH103 Amendment 3.pdf PDF
S-001 Amendment 3.pdf PDF
00 01 10 pg 4 - Amendment 3.pdf PDF
ATTENDANCE ROSTER.pdf PDF
36C25521R0075 0002.docx DOCX document
589A4-20-158 GeoTech Report.pdf PDF
36C25521R0075 0001.docx DOCX document
Drawings 589A4-20-158 VOL 3- 1 page.pdf PDF
36C25521R0075_1.docx DOCX document
Drawings -589A4-20-158 VOL 2- 2 pages.pdf PDF
S02-Specifications 589A4-20-158- Volume 1 -630 pages.pdf PDF
S02-Specifications 589A4-20-158 - Volume 2 Divs 21-48- 848 pages.pdf PDF
Drawings 589A4-20-158 VOL 1- 90 pages.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FD

B

CDE

F

A

BULK/UNIT

STORAGE

W03

DRUG

CACHE/STORAGE

W03A

EQUIPMENT

PREP

STAGING

W05A

PROSTHETICS

STORAGE

W04

STERILE

CONSUMABLES

(SOFT

GOODS)

STORAGE

W05

PROSTHETICS

STORAGE

W04A

CORRIDOR

WC02

STORAGE

W06

VCS

STORAGE

W01

RECEIVING

DOCK

W02

CORRIDOR

WC01

RECEIVE/ISSUE

W10C

RECEIVE/ISSUE

W10A

SUPERVISOR

OFFICE

W09

BREAK

ROOM

W07

STAFF

TLT

W08

H

G

BLDG. 23 -

CHILLER

PLANT

BLDG. 14 -

WAREHOUSE

BLDG. 1 -

HOSPITAL

CONNECTING

CORRIDORI

K

J

L

MN

O

P Q

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

Incandescence Life Safety, Inc.

3575 Ringsby Court, #408, Denver, CO, 80216

Phone:(720) 722-3010

589A4-20-158

IMEG Corp.

15 Sunnen Drive, Suite 104

St. Louis, MO 63143

Phone:(314) 951-2534

BID SET RENOVATE WAREHOUSE FOR

PANDEMIC PREPAREDNESS

HARRY S. TRUMAN MEM. VETERANS HOSPITAL

800 HOSPITAL DR., COLUMBIA MO 65201

BID SET 03/24/2021

Dwg. # of 94

C

L H

D C

\H o m e

\t fi e s e lm a n \R e v it M o d e ls \R

-2

-2

A

-2

-1

R e n o v a te W a re h o u s e tf ie s e lm a n A

G

Y .r v t

/2

/2

:4

:0

A

M

RA104

EXISTING CONDITIONS PLAN, EXT. &

INT. PHOTOS - CORRS. & OPEN AREA

AHT TJF03/24/2021

1/8" = 1'-0"1

EXISTING CONDITION FLOOR PLAN

NOT TO SCALEB

CORR WC01A - W10A WORK STATION

NOT TO SCALEC

CORR WC01A IN-FLOOR SCALE

NOT TO SCALED

CORR WC01A-W10B @ COPIER

NOT TO SCALEE

CORR WC01A / W10C

NOT TO SCALEF

CORR WC01A @ EW08-EW09 ALCOVE

NOT TO SCALEA

CORR WC01 LOOKING EAST

EXIST CONC FLOOR (TYP) - SEE FINISH

PLAN FOR NEW EPOXY FLOOR COATING

EXIST LIGHT - SEE ELEC LIGHTING PLAN FOR DISPOSITION

EXIST CMU WALL TO REMAIN (TYP)

EXIST WALL-MTD TACKBOARD TO REMAIN

EXIST FIRE EXTINGUISHER / WALL BRACKET - VERIFY LOCATION W/

COR - RELOCATE AS DIRECTED

EXIST DOOR WC01 W/ AUTOMATIC OPENER & ACCESS CONTROL

NOT TO SCALEH

EXT. WH N. ROOF-CHILLER LINES

NOT TO SCALEG

CORR CBG1 ROOF - CW AREAWAY

NOT TO SCALEI

RM. W01 LOOKING SOUTH

NOT TO SCALEK

RM. W01 N. WALL

NOT TO SCALEJ

RM. W01 E. WALL

NOT TO SCALEM

RM. W01 FIRE RISER-ENTRANCE

NOT TO SCALEN

RM. W01 SW CORNER-FIRE RISER

NOT TO SCALEO

CORR WC01-DOOR W01A

NOT TO SCALEP

RM. W10A ABOVE WDW.

NOT TO SCALEQ

CORR WC01A LOOKING WEST

NOT TO SCALEL

RM. W01 SE CORNER

REPLACE FIRE EXTINGUISHER WALL FLAG - SEE FINISH & SIGNAGE

DRAWINGS - VERIFY LOCATION W/ COR, LOCATE AS DIRECTED BY

COR

EXIST CONC FLOOR - SEE FINISH PLAN

FOR NEW EPOXY FLOOR COATING

EXIST LIGHT (TYP) - SEE ELEC LIGHTING PLAN FOR DISPOSITION

EXIST CMU WALL TO REMAIN (TYP)

EXIST WALL-MTD SIGNAGE TO BE REMOVED AS PART OF

DEMOLITION (TYP)

EXIST PLASTIC LAMINATE/PARTICLE BOARD COUNTERTOP TO

REMOVE AND REPLACE W/ SOLID SURFACE COUNTERTOP

SEE FINISH / SIGNAGE PLAN AND ELECT/TECH FOR LOCATION OF

NEW PUSH BUTTON/SIGNAGE FOR CONTROL OF DOOR WC01

EXIST WOOD-FRAMED WINDOWS AND GWB / FRAMED INFILL ABOVE

TO REMOVE AT WORK STATIONS (TYP) - TO BE REPLACED W/

GWB/METAL STUD INFILL W/ HM BORROW LITE/LAMINATED GLASS

EXIST IN-FLOOR SCALE TO BE REMOVED - PIT TO INFILL W/ CONC EXIST IN-FLOOR SCALE TO BE REMOVED - PIT TO INFILL W/ CONC

EXIST IN-FLOOR SCALE EQUIPMENT TO BE REMOVED

EXIST PHONE TO REMOVE/RELOCATE - SEE ELECT/TECH

EXIST SHELVING UNIT (TYP) TO BE REMOVED BY VA PRIOR TO

DEMOLITION

EXIST LIGHT (TYP) - SEE ELEC LIGHTING PLAN FOR DISPOSITION

EXIST COPIER TO BE RELOCATED BY VA PRIOR TO WORK IN AREA

EXIST FURNITURE, COMPUTER AND EQUIPMENT (TYP) TO BE

REMOVED BY VA PRIOR TO DEMOLITION

EXIST CONC FLOOR - SEE FINISH PLAN FOR

NEW EPOXY FLOOR COATING

EXIST CONC FLOOR - SEE FINISH PLAN

FOR NEW EPOXY FLOOR COATING

EXIST LIGHT (TYP) - SEE ELEC LIGHTING PLAN FOR DISPOSITION

EXIST CMU WALL TO REMAIN (TYP)

EXIST PLASTIC LAMINATE/PARTICLE BOARD COUNTERTOP TO

REMOVE AND REPLACE W/ SOLID SURFACE COUNTERTOP

EXIST WOOD-FRAMED WINDOWS AND GWB / FRAMED INFILL

ABOVE TO REMOVE AT WORK STATIONS (TYP) - TO BE

REPLACED W/ GWB/METAL STUD INFILL W/ HM BORROW

LITE/LAMINATED GLASS

EXIST FURNITURE, COMPUTER AND EQUIPMENT (TYP) TO BE

REMOVED BY VA PRIOR TO DEMOLITION

EXIST WALL-MOUNTED EQUIPMENT TO BE REMOVED BY GC PRIOR

TO WORK IN AREA - STORE AND REINSTALL AS DIRECTED BY COR

EXIST CONC FLOOR - SEE FINISH PLAN

FOR NEW EPOXY FLOOR COATING

EXIST WALL-MOUNTED EQUIPMENT TO BE REMOVED BY GC

PRIOR TO WORK IN AREA - STORE AND REINSTALL AS DIRECTED

BY COR (TYP)

EXIST WALL-MOUNTED TOILET ACCESSORIES IN STAFF TOILET W08

TO BE REMOVED BY GC PRIOR TO WORK IN AREA - STORE AND

REINSTALL AS DIRECTED BY COR IN NEW STAFF TOILET W08 (TYP)

EXIST ROOMS W07, W08 & W09 TO DEMO -

SEE PHASING AND DEMOLITION PLANS

EXIST SHELVING (TYP) TO BE REMOVED BY VA

PRIOR TO DEMOLITION

EXIST ROCK MULCH

EXIST GUTTER TO REMAIN

EXIST CONC WALL/CURB (TYP)

EXIST ASPHALT ROLLED ROOFING -

MATCH FOR NEW WORK FOR NEW AHU /

ROOF CURB INSTALLATION

EXIST A/C CONDENSER / REFRIGERANT

LINES TO REMOVE - SEE MECH

EXIST CHILLED WATER LINES FROM

CHILLER PLANT (TYP)

EXIST CHILLED WATER AREAWELL

W/ BAR GRATING COVER

EXIST GUTTER TO REMAIN EAST OF GRID

LINE 4 - SEE DEMO & RENO ROOF PLANS

EXIST DOWNSPOUT BOOT / CONNECTOR

TO REMAIN - SEE DEMO & RENO ROOF

PLANS FOR EXTENTS

EXIST DOWNSPOUT TO REMAIN EAST OF

GRID LINE 4 - SEE DEMO & RENO ROOF

PLANS FOR EXTENTS

EXIST CONC PIPE SUPPORT PIER / PIPE SUPPORTS (TYP)

EXIST BATTEN SEAM ROOF TO REMAIN EAST OF GRID LINE 4 -

SEE PHASING, DEMO & RENO ROOF PLANS

EXIST CHILLED WATER LINES FROM CHILLER PLANT (TYP) -

PROTECT DURING CONSTRUCTION - REVEIW METHODS OF

PROTECTION W/ COR FOR APPROVAL PRIOR TO START OF WORK

APPROXIMATE OUTLINE OF NEW CONSTRUCTION WEST OF

GRID LINE 4

EXIST BATTEN SEAM ROOF TO REMOVE WEST OF GRID LINE 4 -

SEE PHASING, DEMO & RENO ROOF PLANS

EXIST UNIT HEATER - SEE MECH FOR DISPOSITION

EXIST LIGHTING - SEE ELEC FOR DISPOSITION

EXIST FIRE SPRINKLER RISER - SEE FIRE SPRINKLER

DRAWINGS

EXIST ROOF FRAMING / INSULATION TO REMAIN

EXIST SHELVING TO BE RELOCATED BY VA PRIOR TO

START OF WORK IN ROOM - COORDINATE W/ COR

EXIST HIGH-DENSITY STORAGE SYSTEM TO REMAIN -

COORDINATE W/ COR FOR PLACEMENT OF

TEMPORARY CONSTRUCTION PARTITIONS IN ROOM

EXIST SHELVING (TYP) TO BE RELOCATED BY VA PRIOR TO

START OF WORK IN ROOM FOR EXTERIOR WALLS -

COORDINATE W/ COR

EXIST ELEC DISTRIBUTION PANELS (TYP) - SEE ELEC FOR DISPOSITION

EXIST ELEC EQUIPMENT (TYP) - SEE ELEC FOR DISPOSITION

EXIST DOOR W01 - HM DOOR W/ SIMPLEX CIPHER LOCK - DOOR TO

REMAIN AND MODIFY FOR NEW HW; EXIST SIMPLEX LOCK TO REMOVE

AND REPLACE WITH NEW LATCH ASSEMBLY AND ACCESS CONTROL /

SECURITY HARDWARE RELOCATED FROM DOOR W06. SEE DOOR - HW

SCHEDULES AND ELECT/TECH

EXIST DOOR W01 - HM DOOR FRAME - FRAME TO REMAIN AND MODIFY

FOR NEW ELEC STRIKE AND ACCESS CONTROL / SECURITY HARDWARE

RELOCATED FROM DOOR W06. SEE DOOR - HW SCHEDULES AND

ELECT/TECH

EXIST HIGH-DENSITY STORAGE SYSTEM TO REMAIN -

COORDINATE W/ COR FOR PLACEMENT OF TEMPORARY

CONSTRUCTION PARTITIONS IN ROOM

EXIST SHELVING TO BE RELOCATED BY VA PRIOR TO START OF

WORK IN ROOM - COORDINATE W/ COR

EXIST FIRE EXTINGUISHER (TYP) - SEE DRAWINGS FOR LOCATION

OF NEW WALL BRACKET AND SIGNAGE

EXIST DOOR W01A - SEE DOOR-& HW SCHEDULES FOR NEW HW

EXIST SHELVING TO BE RELOCATED BY VA PRIOR TO START OF

WORK IN ROOM FOR NEW ELEC PANELS, SPRAY-FOAM INSULATION,

FURRING AND METAL WALL PANELS AT EXTERIOR WALLS -

COORDINATE W/ COR

EXIST LIGHTING (TYP) - SEE ELEC FOR DISPOSITION

EXIST LIGHTING (TYP) - SEE ELEC FOR DISPOSITION

EXIST UNIT HEATER - SEE MECH FOR DISPOSITION

EXIST HIGH-DENSITY STORAGE SYSTEM REMAIN -

COORDINATE W/ COR FOR PLACEMENT OF TEMPORARY

CONSTRUCTION PARTITIONS IN ROOM

EXIST FIRE SPRINKLER RISER - SEE FIRE SPRINKLER DRAWINGS

EXIST BACKFLOW PREVENTER-

SEE FIRE SPRINKLER DRAWINGS

EXIST MAIN DRAIN LINE

EXIST WALL-MTD ELEC WIREMOLD TO RELOCATE FOR NEW

EXTERIOR WALL INSULATION / FURRING / METAL WALL LINER

PANEL INSTALLATION AT EXTERIOR WALLS - SEE ELECT

EXIST EXTERIOR CMU WALL - PREP FOR NEW EXTERIOR

WALL INSULATION / FURRING / METAL WALL LINER

PANEL INSTALLATION AT EXTERIOR WALLS

EXIST LIGHTING (TYP) - SEE ELEC FOR DISPOSITION

EXIST LINE TO FDC

CONNECTION - SEE FIRE

SPRINKLER DRAWINGS

EXIST DOOR W01A - SEE DOOR-& HW

SCHEDULES FOR NEW HW

EXIST LIGHTING (TYP) - SEE ELEC FOR DISPOSITION

EXIST DOOR WC01 - SEE DOOR -

HW SCHEDULES FOR NEW HW;

SEE ELECT/TECH FOR NEW

ACCESS CONTROL HW

EXIST LIGHT (TYP) - SEE ELEC LIGHTING PLAN FOR

DISPOSITION

EXIST CMU WALL TO REMAIN (TYP)

EXIST WOOD-FRAMED WINDOWS AND GWB / FRAMED

INFILL ABOVE TO REMOVE AT WORK STATIONS (TYP) -

TO BE REPLACED W/ GWB/METAL STUD INFILL W/ HM

BORROW LITE/LAMINATED GLASS

EXIST GWB / FRAMED INFILL ABOVE WINDOWS TO

REMOVE AT WORK STATIONS (TYP) - TO BE REPLACED

W/ GWB/METAL STUD INFILL W/ HM BORROW

LITE/LAMINATED GLASS

EXIST FIRE SPRINKLER LINE (TYP) -

SEE FIRE SUPPRESSION DRAWINGS

SEAL ALL PENETRATIONS THROUGH WALL (TYP) -

PROVIDE FIRE SEALANT / FIRE STOPPING WHERE REQ'D.

EXIST IN-FLOOR SCALE EQUIPMENT TO BE REMOVED

EXIST PHONE TO REMOVE/RELOCATE - SEE ELECT/TECH

EXIST SHELVING UNIT (TYP) TO BE REMOVED BY VA

PRIOR TO DEMOLITION

EXIST CMU ROOMS & CONC DECK TO REMOVE -

SEE PHASING & DEMO DRAWINGS

EXIST CONC FLOOR (TYP) - SEE FINISH PLAN

FOR NEW EPOXY FLOOR COATING

COORDINATE W/ COR FOR INSTALLATION OF

TEMPORARY CONSTRUCTION BARRIERS TO ALLOW FOR

WORK BY VA WAREHOUSE STAFF TO CONTINUE IN

AREA DURING CONSTRUCTION - SEE PHASING AND

DEMO PLANS

WORKSTATION W10A - AREA TO REMAIN

OCCUPIED BY VA DURING CONSTRUCTION

OVERHEAD CABLE TRAY, ELECT, DATA AND STEAM

LINES (TYP) - SEE MECH, ELEC AND TECH FOR

TEMPORARY RELOCATION DURING CONSTRUCTION

Revisions: Date:

File details come from the government source that posted it. Updated .