This document includes plans and specifications for renovating a warehouse to prepare for pandemics. Key details include:

  • Renovating an existing 12,500 square foot single-story metal warehouse building including raising approximately 6,000 square feet of roof and adding a 3,800 square foot mezzanine.

  • Phased work to allow continued warehouse use including new roof superstructure, interior room demolition, and HVAC installation in Phase 1; roof and wall work in Phase 2; and mezzanine, interior walls and finishes in Phase 3.

  • Architectural work consists of exterior CMU and insulated metal panel walls and roofing as well as interior demolition, walls, ceilings, flooring and bathroom renovation.

  • Structural scope includes new roof structure, mezzanine, stairs and column foundations installed in phases.

  • Mechanical upgrades include a new 13,500 CFM air handler, terminal boxes and fans as well as full humidification.

  • Electrical work includes new panels, transformer and LED lighting while technology cabling, systems and cameras are also revised.

  • The solicitation number is 36C25521R0075 with an estimated $2-5 million budget and 330 day completion period. Proposals are due May 7, 2021 for the Department of Veterans Affairs project located at their Columbia, Missouri facility.

View the file

Other files

File Type Posted
AD102 Amendment 3.pdf PDF
MD101 Amendment 3.pdf PDF
M-301 Amendment 3.pdf PDF
EL101 Amendment 3.pdf PDF
EP101 Amendment 3.pdf PDF
S-501 Amendment 3.pdf PDF
AF101 Amendment 3.pdf PDF
PD101 Amendment 3.pdf PDF
M-102 Amendment 3.pdf PDF
M-101 Amendment 3.pdf PDF
AE101 Amendment 3.pdf PDF
M-500 Amendment 3.pdf PDF
P-101 Amendment 3.pdf PDF
S-301 Amendment 3.pdf PDF
PH101 Amendment 3.pdf PDF
AF502 Amendment 3.pdf PDF
ED101 Amendment 3.pdf PDF
11 00 00 Beam Scale Cut Sheet - Amendment 3.pdf PDF
AC102 Amendment 3.pdf PDF
31 62 00 Driven or Drilled Micropiles - Amendment 3.pdf PDF
36C25521R0075 0003.docx DOCX document
01 35 26 pgs 12-13 - Amendment 3.pdf PDF
AD101 Amendment 3.pdf PDF
PH103 Amendment 3.pdf PDF
S-001 Amendment 3.pdf PDF
00 01 10 pg 4 - Amendment 3.pdf PDF
ATTENDANCE ROSTER.pdf PDF
36C25521R0075 0002.docx DOCX document
589A4-20-158 GeoTech Report.pdf PDF
36C25521R0075 0001.docx DOCX document
Drawings 589A4-20-158 VOL 3- 1 page.pdf PDF
36C25521R0075_1.docx DOCX document
Drawings -589A4-20-158 VOL 2- 2 pages.pdf PDF
Drawings-589A4-20-158 VOL 4-1 page.pdf PDF
S02-Specifications 589A4-20-158- Volume 1 -630 pages.pdf PDF
S02-Specifications 589A4-20-158 - Volume 2 Divs 21-48- 848 pages.pdf PDF
Drawings 589A4-20-158 VOL 1- 90 pages.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B

C

4 5

B.4

AE301

AE310

C6

AE303

AE302

'-4

'-0

STAFF

TOILET

(NEW)

W08

AE310

C8

5'-0" 12'-1" 1'-6" 3'-4 1/8" 3'-0"

5'-0" 4'-8" 4'-0" M.O. 3'-5" 8'-3 3/4"

SUPERVISOR

OFFICE

(NEW)

W09

STAFF

LOUNGE

(NEW)

W04A PROSTHETICS

STORAGE

W04

CORRIDOR

WC03M6

M4M6

M6

M6

M6

M4

W04A W04

W09

W08

M6

'-4

'-4

CG-1

CG-1 CG-1

AE903

C3

C5

C6

C8

AE905

D5

D1

D3D7

W2

12'-0"

'-6

FE

FE

RELOCATED SECURITY PANEL - SEE ELECT.

LARGE SCALE PLANS-DETAILS SHEET NOTES:

1. FLOOR FINISH TRANSITION - REFER TO SHEET AF501 FOR

DETAILS AND ROOM FINISH SCHEDULE FOR FINISH

FLOORING TO BE USED.

2. PLUMBING FIXTURE - REFER TO PLUMBING DRAWINGS

FOR FIXTURE TYPE.

3. TOP OF CERAMIC TILE WALL TO HAVE BULLNOSED CAP

MATCHING CERAMIC TILE.

4. DELETE ICE & WATER DISPENSER IF BID ITEM #2 FOR

DELETION OF NEW ROOMS W08 AND W09 IS ACCEPTED.

5. FLOOR SCALE (CC). (TEMPORARY LOCATION) -

CONTRACTOR PROVIDED-CONTRACTOR INSTALLED. SEE

PHASING PLANS PH101 THRU PH103 AND SHEET AE101

FOR FINAL LOCATION AT END OF PHASE 3.

LARGE SCALE

PLANS & DETAILS

SHEET NOTES:

B

C

4 5 3.9

B.4

AE905 B3

B5

B7

STAFF

LOUNGE

(NEW)

W04A

STAFF

TOILET

(NEW)

W08

SUPERVISOR

OFFICE

(NEW)

W09

B1

AE903

C3

C5

C6

C8

AE905

D5

D1

D3D7

IW-1

RELOCATED EXIST (8)

HALF-HIGH LOCKERS

RELOCATED EXIST MW/STAND

RELOCATED EXIST

REFRIGERATOR/FREEZER

RELOCATED EXIST TABLE

RELOCATED EXIST BOARD

RELOCATED EXIST CLOCK

REUSE EXIST TOILET ACCESSORIES:

2-ROLL TP DISPENSER, SSTL SHELF,

HAND SOAP DISP, MIRROR, PAPER

TOWEL DISPENSER AND TRASH CAN.

- NO EXIST GRAB BARS!!

3/8" Ceramic Tile w/grout

GH-2, A5150

GH-1, A5145

GB-42, A5109

GB-18, A5109

TT-1, A5200

WP-1, F2010

PT-1, A5082

GB-36, A5109

SD-1, A5075

TYP.

Generic - 5"

D

C.6

AE401

F4

AE905

F1

AE905

F5

CORRIDOR

WC01A

RECEIVING/ISSUE

W10B

RECEIVING/ISSUE

W10A

RECEIVING/ISSUE

W10C

RECEIVING

DOCK

W02

CG-1 CG-1

CG-2 CG-2 CG-2 CG-2

NEW SOLID SURFACE

COUNTERTOP OVERLAY

NEW SOLID SURFACE

COUNTERTOP OVERLAY

W1 W1

WH 1ST FLR

723'-0"

D

WH T.O. EXIST WALL

736'-0"

'-1

/2

AF501

C6

'-8

AE701

F3

5/8" TYPE 'X' GWB EA SIDE W/

20 GA MTL STUDS @ 16" O.C.

HM BORROW LITE. W/ 1/4"T

TEMPERED GLAZING

SOILID SURFACE

COUNTERTOP.

AE701

E3

BID ITEMS & DEDUCT ALTS:

REFER TO SECTION 01 00 00 FOR STATEMENT OF BID ITEMS

A. BID ITEM #1, GENERAL CONSTRUCTION: BASE BID: Renovate Warehouse for Pandemic Preparedness: Includes all scope communicated in the drawings and specifications.

1. Work includes general construction, alterations, walks, grading, drainage, necessary removal of existing structures and construction of certain other items.

B. BID ITEM #2, Renovate Warehouse for Pandemic Preparedness:

Includes all scope described in Bid Item #1 – excluding Bid Deduct #1 described below:

1. Work associated with new Material Lift WE01.

2. Work associated with construction and finishes for new

Rooms W08 and W09 (Demolition of existing Rooms W07, W08 and W09, including plumbing, fixtures and finishes in Room W08 will be retained in Base Bid);

3. Work associated with installation of new ceilings and f inishes in Rooms W04, W05A and W06;

4. Demolition and renovation of work counters at Rooms W10A and W10C.

BID ITEMS & DEDUCT

ALTERNATES:

PHASING GENERAL NOTES:

PHASING TO BE DEVELOPED TO MINIMIZE DISRUPTION OF

OWNER-RELATED ACTIVITIES WITHIN THE PROJECT AREA.

REFER TO PHASING PLANS PH101 THRU PH103 FOR

ADDITIONAL INFORMATION.

BRIEF PHASING DESCRIPTION:

A. PHASE 1 - DEMOLITION AND INSTALLATION OF WEST

WAREHOUSE NEW ROOF SUPERSTRUCTURE,

MODIFICATION OF EXISTING EAST WAREHOUSE ROOF

AND BUILDING STRUCTURE; LIMITED DEMOLITION

EAST WAREHOUSE OF INTERIOR ROOMS W07-W08-

W09; CONSTRUCT HVAC FROM BLDG. 1 TO

WAREHOUSE.

B. PHASE 2 - DEMOLITION OF WEST WAREHOUSE

EXISTING ROOF/FRAMING, CONSTRUCTION OF WEST

WAREHOUSE UPPER EXTERIOR WALL ENCLOSURE;

LIMITED DEMOLITION OF WEST WAREHOUSE INTERIOR

ROOM W03A.

C. PHASE 3 - CONSTRUCTION OF NEW MEZZANINE

FLOOR AND DRUG STORAGE ROOM W03A;

CONSTRUCTION OF NEW OFFICE/TOILET W08-W09;

NEW EXTERIOR WALL INSULATION AND FINISHES.

PHASING NOTES:

LARGE-SCALE PLANS-DTLS GENERAL NOTES:

1. REFER TO PHASING, DEMOLITION AND RENOVATION PLANS FOR

REQUIREMENTS RELATED TO INSTALLATION OF NEW INTERIOR

WALLS AND ROOF MODIFICATIONS.

2. REFER TO COLOR SCHEDULE AND ROOM FINISH SCHEDULE ON

SHEET AE601 FOR INTERIOR AND EXTERIOR FINISH COLORS.

3. REFER TO "TEMPORARY BARRIERS AND ENCLOSURES" NOTES

ON SHEET G-002 FOR TEMPORARY ENCLOSURE, PROTECTION

OF EXISTING UTILITIES AND PROTECTION OF THE BUILDING

INTERIOR DURING DEMOLITION AND CONSTRUCTION.

4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD

VERIFICATION OF EXISTING CONDITIONS AND CHANGES MADE

TO THE BUILDING AND SITE SINCE THE PUBLISHED DATE OF THE

CONSTRUCTION DOCUMENTS.

5. BELOW-GRADE CONDITIONS SHOWN ARE BASED UPON AS-

BUILT DRAWINGS PROVIDED BY THE VA. VARIATION OF

EXISTING CONDITIONS WHICH DIFFER FROM THOSE SHOWN ON

THE DRAWINGS SHALL BE REPORTED TO THE COR UPON

DISCOVERY.

6. THE CONTRACTOR SHALL RETAIN THE SERVICES OF AN

UNDERGROUND UTILITY LOCATE SERVICE PRIOR TO START OF

WORK ON SITE THAT INCLUDES EXCAVATION, DEMOLITION OF

EXISTING PAVEMENT OR OTHER WORK THAT MAY DISTURB

BELOW-GRADE UTILITIES AND IMPROVEMENTS.

7. CONTRACTOR SHALL PROTECT ALL SITE INFRASTRUCTURE

UNLESS DIRECTED OTHERWISE BY COR.

8. REFER TO BID ITEMS AND DEDUCT ALTERNATES ON SHEET

G-002 FOR BID AND BID ITEM DESCRIPTIONS.

LARGE-SCALE

PLANS & DETAILS

GENERAL NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

Incandescence Life Safety, Inc.

3575 Ringsby Court, #408, Denver, CO, 80216

Phone:(720) 722-3010

589A4-20-158

IMEG Corp.

15 Sunnen Drive, Suite 104

St. Louis, MO 63143

Phone:(314) 951-2534

BID SET RENOVATE WAREHOUSE FOR

PANDEMIC PREPAREDNESS

HARRY S. TRUMAN MEM. VETERANS HOSPITAL

800 HOSPITAL DR., COLUMBIA MO 65201

Dwg. # of 94

C

L H

D C

\H o m e

\t fi e s e lm a n \R e v it M o d e ls \R

-2

-2

A

-2

-1

R e n o v a te W a re h o u s e tf ie s e lm a n A

G

Y .r v t

/6

/2

:0

:0

P M

AE401

LARGE SCALE PLANS & DETAILS

AHT TJF03/24/2021

1/4" = 1'-0"C1

RESTROOM (W08), OFFICE (W09) & LOUNGE (W04A)

ENLARGED FLOOR PLAN

1/4" = 1'-0"C5

ENLARGED EQUIPMENT / FINISH PLAN ROOMS W04A, W08 &

W09

EQUIPMENT SCHEDULE

KEY JSN DESCRIPTION PROVIDED INSTALLED

FS-1 - FLOOR SCALE & INDICATOR (SEE

NOTE 1)

C C

GB-18 A5109 GRAB BAR 18" (SEE NOTE 2) C C

GB-36 A5109 GRAB BAR 36" (SEE NOTE 2) C C

GB-42 A5109 GRAB BAR 42" (SEE NOTE 2) C C

GH-1 A5145 GRAB BAR 36" (SEE NOTE 2) C C

GH-2 A5150 GARMENT 4 HOOK - WALL-MTD. C C

IW-1 Uxxxx ICE & WATER DISPENSER (SEE

NOTE 2)

V C

MR-1 A1067 MIRROR 24"W X 36"H (SEE NOTE

2)

C C

PT-1 A5082 PAPER TOWEL DISPENSER (SEE

NOTE 2)

V C

RF-2 R5100 REFRIGERATOR / FREEZER V V

SD-1 A5075 SOAP DISPENSER (SEE NOTE 2) V V

TT-1 A5200 TOILET TISSUE DISPENSER (SEE

NOTE 2)

V C

WP-1 F2010 WASTE PAPER BASKET (SEE

NOTE 2)

V V

1/4" = 1'-0"D2

W10 WORK STATIONS ENLARGED PLAN

3/4" = 1'-0"F4

SECN - W10A-W10C WORK COUNTER

33Revisions: Date:

Amendment 3 5-7-21

X

NOTE 1: SEE PHASING AND FLOOR PLANS FOR TEMPORARY LOCATION OF SCALE

DURING CONSTRUCTION IN ROOM W07 AND FINAL LOCATION IN ROOM W03C.

NOTE 2: IF BID ITEM #2 IS ACCEPTED, DELETE TOILET ACCESSORIES IN ROOM W08 AND