This solicitation package describes a renovation project for the Department of Veterans Affairs. The scope of work involves renovating an existing 12,500 square foot warehouse building in three phases to raise approximately 6,000 square feet of roof, add a 3,800 square foot mezzanine, and upgrade mechanical, electrical, and technology systems. Architectural work includes interior and exterior renovations. Structural work will construct the new mezzanine. Mechanical upgrades include a new air handling unit and zone terminal units. Electrical work includes new panelboards and lighting. Technology revisions involve recabling for category 6A, a new access control system, and security camera additions. The estimated price range is $2-5 million. As a total SDVOSB set-aside pursuant to Public Law 109-461, the solicitation will be available on April 2nd with proposals due May 7th. An organized site visit is scheduled.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP
A
B
C
D
F
G
E
1 2 3 4 5 6 7
'-8
2'-6" 22'-6" 2'-0" 21'-0" 2'-0" 23'-0" 2'-0" 25'-0" 25'-0" 25'-0" 11 15/16"
'-0
'-4
'-0
'-0
'-4
2'-6" 22'-6" 2'-0" 21'-0" 2'-0" 23'-0" 2'-0" 25'-0" 25'-0" 25'-0" 11 15/16"
AE201
AE201
AE201 2
AE2013
BULK
ITEMS
STORAGE
W03
PROSTHETICS
STORAGE
W04
STERILE
CONSUMABLES
(SOFT
GOODS)
STORAGE
W05
RECEIVING
BREAKOUT
INSPECTION
(NEW)
W06
CORRIDOR
WC03
VETERANS
CANTEEN
SERVICE
(VCS)
STORAGE
W01
CORRIDOR
CBC2CORRIDOR
WC01A
RECEIVING
DOCK
W02
LOGICAL
UNIT
OF
MEASURE
(LUM)
STAGING
ROOM
(NEW_
W05A
OIT
CLOSET
W05B
BULK
ITEMS
STORAGE
W03B
DRUG
CACHE-STORAGE
W03A
2.11.1 2.9
3.9
'-0
'-8
/4
1'-4"
C.6
B.4
1'-4"
AE301
AE301
5'-0" 12'-1" 8'-3 3/4" 19'-1 1/4" 6'-0"
EXISTING
36'-1 1/4" 13'-7 1/4"
EXISTING F.O. CMU-F.O. CMU
24'-10 7/8"
EXISTING
19'-3 1/8"55'-8 11/16"
E X
IS
T
IN
G
'-0
E
X
IS
T
IN
G '-0
V
E R
IF
Y
'-1
E X
IS
T
IN
G
'-8
4 1/4"
V E
R
IF
Y '-5
/4
VERIFY
6'-0 13/16"
E X
IS
T
IN
G
'-1
/2
E X
IS
T
IN
G
'-4
/8
EXIST ELEC
PANELS -
SEE ELECT
EXIST GWB OVER MTL STUD
FRAMING OVER CONC/CMU
E X
IS
T
IN
G
'-7
/8
'-8
/1
'-1
'-5
/1
INFILL OPENING W/ 6" CMU
NEW PR 3-0X7-0
HM DR/FR W/ 2"
HEAD
ULTRA LOW
FREEZER AREA
PHARMACY
REFRIGERATOR AREA
EXIST FDC SIAMESE
CONNECTION - SEE FIRE
EXIST HIGH-DENSITY
FILE STORAGE SYSTEM
NEW ELEC
PANELS -
SEE ELECT
EXIST
CONC
WALL
EXIST EXTERIOR
AREA WAY
EXIST CHILLED
WATER PLANT
BLDG 23
STAFF
TOILET
(NEW)
W08
SUPERVISOR
OFFICE
(NEW)
W09
AE303
AE302
AE302
AE401
C1
V E
R
IF
Y '-1
/8
V E
R
IF
Y '-0
CORRIDOR
CBG1
CORRIDOR
WC01
E X
IS
T
IN
G
V
E R
IF
Y
'-1
/4
6'x6' MIN. CLEAR SPACE
IN FRONT OF LIFT
W02A W02 W01A
W03B
W09
W08
W04
W01
WC01
W05
W05B
W05A
W04B
W02E W02D W02C
W02B
M6
M6 M6
M4
M4 M6
AE303
AE310
C8
E X
IS
T
IN
G
'-1
/8
AE503
C5
AE504
C4
AE901
C1
C6
77'-4 15/16"
W04A
STAFF
LOUNGE
(NEW)
W04A
STAIRS
WS02
CORRIDOR
WC02
MATERIAL
LIFT
LOBBY
W03C
RECEIVING/ISSUE
W10C
RECEIVING/ISSUE
W10B
RECEIVING/ISSUE
W10A
EQUIPMENT
PREP/
STAGING
(NEW)
W07
AE503 C3 C013
W10
CBG1
G00Y
G00X
23-01
23-02
S
Rb Ra
12.5
13.4
13.5
S.9
9.1
10.4
T
13.2
U
10.2
9.8
8.9
DD CC.6 CC BB AA Z Y U.5VWW.3W.4X
11.5
F3 F2A
F2A
F2A
F3
F3
F3A
F2A
AE311
F1
AE311
F5
AE311
F3
AE311
F7
F2A
F1
CORRIDOR
CBC2
CG-3
CG-1
CG-1
CG-1
CG-1
CG-2
CG-3 CG-3
CG-3
CG-3CG-3
A1
A1
W03A
GALV STL EXTERIOR
STAIRS / LANDINGS (PH 3)
SHEET
METAL
SHOP
C013A
SHEET
METAL
SHOP
C013
CORRIDOR
G012
CORRIDOR
CBG2
MECHANICAL
ROOM
G001
ELECT
ROOM
G013
CLEAN
RECEIVING
BREAKOUT
G048
BULK
STORAGE
G047HALL
G046
STORAGE
W10
RELIEF
AIR
AREAWAY
G00Y
CHILLED
WATER/PIPING
AREAWAY
G00X
UNEXCAVATED
UNEX
FRESH
AIR
AREAWAY
G001A
CHASE
C00Z
CORRIDOR
CBG1A
CORRIDOR
CBG1B
1 HR FIRE BARRIER
VERT. OPQ (SHAFT)
FIRE BARRIER
EXIST
SEWER
MANHOLE
EXIST
CONC
WALK
NEW CONC
LANDING /
WALK
EXIST CONC
PIPE SUPPORT
(TYP)
AE310
F7
STAIR
WS01
MAT'L
LIFT
WE01
734.55 734.50733.48
732.38728.48723.06
723.51
726.99
731.10
733.85
CO
721.39 721.06
719.64719.27721.21722.59
722.71
722.47 721.12
719.65
721.89
723.07
723.15
722.40
721.23
722.82723.85
723.44
723.65 DS DS
719.63
719.26 PIV
719.38
719.22
722.96
719.80 719.69 719.76
719.50
721.90
719.34
719.93
719.34
FH
WV
CO W/
STL CVR
723.26
724.00 725.00 726.00 728.00 729.00 730.00 732.00 733.00 734.00 735.00
735.00734.00733.00
733.00
734.00
732.00
732.00
731.00730.00729.00728.00726.00 727.00725.00
725.00
724.00
723.25
723.00
DS
720.00
719.29
722.72
AE502
D1
MECHANICAL
ROOM
C012
MECHANICAL
ROOM
C011
F E
FE
F1
CG-2 CG-2
CG-2
CG-2CG-2
ECJ
ECJ
ECJ
ECJ
FE
AE902 F3
D1
D3
F1
F6
DS
AE503
F1
DS
DS DS
DS
24'-6 1/8"
CORRIDOR
WC04
CG-1
CG-3
730.2
EXIST
CHILLER
EXIST
CHILLER
AE902
B5
B3
AE904
C5
C3
C1
C7
LADDER
AE904 B3
B1
B8
B6
AE903
F1
F3
F5
F7
AE903
B1
B4C1
B7
AE904
F1
E1
E5E7
FORKLIFT CHARGING STATION
CORRIDOR
CBG1
W06
AE904
F4
F8
F3 F3
F3
F3
F2
NARCOTICS
STORAGE
CAGE
W03A1
F2A
F3
F3
CG-3
CG-3
F2A F2A
CG-3
CG-3CG-3CG-3
FEC
CG-3
CG-3
CG-3
CG-3
CG-3
CG-3CG-3CG-3CG-3
CG-3
CG-1
FEC
AE310
F9
'-0
/8
1'-0 1/2"
F1 F1
F3 F3 F3
INFILL W/ GWB/
MTL STUDS -
FINISH TO
MATCH EXIST
AE401
D2
CG-1 CG-1
DESK COPIER
A A
W2 9
FE
INFILL
OPENING W/
6" CMU
INFILL OPENING
W/ 6" CMU10
W1 W1
G012
G013
G001A
G048
G046A
G047A G047
CBG1B
G001B
DS
G
W
W
W W
S S
S S
S S
S S
S S
S S
SSS
S
SS SS
SS
W
S S
S
S
SS
W W W
W
SS
CW
CW
C W
SS
SS SSW
W
W
W
W
S
S
UGE
UGE UGE UGESS
UGE
UGE
UGE
S
S
S
S
SS
SS SS
S S
S S
S S
W
CO
CO
UGE
W03A1
FE
EXIST EMERG SHWR / EYE WASH
B1
B7
AE502
E8
DEMO/CAP
PORTION OF
ABANDONED UGE
OUTSIDE OF
BLDG - SEE ELECT
INTRUSION
ALARM
PANEL
ACCESS CONTROL
KEYPAD-CARD READER
EXIST MARKER BOARD
SHADED AREA NOT IN SCOPE OF WORK
SHADED
AREA
NOT IN
SCOPE
OF
WORK
SHADED
AREA NOT
IN SCOPE
OF WORK
DS
DS
PHASING GENERAL NOTES:
PHASING TO BE DEVELOPED TO MINIMIZE DISRUPTION OF
OWNER-RELATED ACTIVITIES WITHIN THE PROJECT AREA.
REFER TO PHASING PLANS PH101 THRU PH103 FOR
ADDITIONAL INFORMATION.
BRIEF PHASING DESCRIPTION:
A. PHASE 1 - DEMOLITION AND INSTALLATION OF WEST
WAREHOUSE NEW ROOF SUPERSTRUCTURE,
MODIFICATION OF EXISTING EAST WAREHOUSE ROOF
AND BUILDING STRUCTURE; LIMITED DEMOLITION
EAST WAREHOUSE OF INTERIOR ROOMS W07-W08-
W09; CONSTRUCT HVAC FROM BLDG. 1 TO
WAREHOUSE.
B. PHASE 2 - DEMOLITION OF WEST WAREHOUSE
EXISTING ROOF/FRAMING, CONSTRUCTION OF WEST
WAREHOUSE UPPER EXTERIOR WALL ENCLOSURE;
LIMITED DEMOLITION OF WEST WAREHOUSE INTERIOR
ROOM W03A.
C. PHASE 3 - CONSTRUCTION OF NEW MEZZANINE
FLOOR AND DRUG STORAGE ROOM W03A;
CONSTRUCTION OF NEW OFFICE/TOILET W08-W09;
NEW EXTERIOR WALL INSULATION AND FINISHES.
PHASING NOTES:
FLOOR PLAN SHEET NOTES:
1. NEW FLOOR SCALE. LOCATE PER COR DIRECTION.
2. NEW STEEL STAIRS. SEE SHEET AE502 FOR DETAILS. SEE
SECTION 055100 FOR DELEGATED DESIGN REQUIREMENTS.
3. NEW MATERIAL LIFT. SEE SECTION 142411.
4. NEW SAFETY RAILING. SEE SECTION 055217.
5. NEW MEZZANINE SAFETY GATE ASSEMBLY. SEE SECTION
134413.
6. SEE DEDUCT ALTERNATES FOR FINISHES TO BE REMOVED
FROM THIS ROOM.
7. SEE DEDUCT ALTERNATES FOR ITEMS TO BE REMOVED FROM
THE WORK.
8. EXIST 180 DEG. REFLECTOR TO REMAIN.
9. INSTALL SALVAGED MB 24x36 FROM W09.
10. SALVAGED REFRIGERATOR BY VA.
11. NEW KEYPAD / CARD READER + INTRUSION ALARM PANEL FOR
W01 - DUAL AUTHENTICATION.
12. EXIST TABLE TO REMAIN.
13. REINSTALL SALVAGED 40" x 24" DISPLAY BOARD AND CLOCK.
14. ICE / WATER DISPENSER - VA PROVIDED-CONTR. INSTALLED
(VC). SEE MECHANICAL DRAWINGS FOR WORK RELATED TO
LOCATION AND INSTALLATION OF VA-PROVIDED ICE & WATER
DISPENSER. IF BID ITEM #2 FOR DELETION OF NEW ROOMS
W08 AND W09 IS ACCEPTED, ICE & WATER DISPENSER IS TO
BE DELETED.
15. EXIST - 48" DEEP PALLET RACKS AGAINST WALLS. RELOCATE
FOR NEW DOOR.
16. NEW PR 3'-0" x 7'-0" HM DR / FR W/ 4" MASONRY HEAD.
17. SALVAGED EXIST TABLE.
18. REUSE SALVAGED CLOCK, 36" x 48" MB, MW STAND w/ MW AND
TABLE.
19. REINSTALL EXIST METAL LOCKERS FROM W07.
20. EXIST GWB / MTL. STUD WALL - EXIST CONST. 3 5/8" MTL. STUD,
1 LAYER GWB EA. SIDE
21. 4" DIA. SCHEDULE 80 PIPE BOLLARD - SET IN 4'-DEEP X 16" DIA.
CONC FOOTING; FILL BOLLARD W/ LEAN CONC & MOUND TOP;
PAINT BOLLARD SAFETY YELLOW.
22. EXIST MTL STUD WALL REMAINS (PH 1); PARTIALLY DEMOLISH
TOP OF WALL FOR EXIST ROOF REMOVAL w/ TEMPORARY
EXTENSION TO NEW ROOF (PH 2); DEMO EXIST/TEMP WALL &
REPLACE w/ NEW WALL FOR NEW UPPER FLOOR & PHYSICAL
SECURITY REQ'TS (PH 3).
23. 48" DEEP PALLET RACKS AGAINST WALL (V V).
24. DEMO EXIST GWB OVER MTL STUD FRAMING FOR NEW
STRUCT X-BRACE; REPLACE w/ NEW INSUL/FURR/GWB (PH 2).
25. DEMO EXIST GWB OVER MTL STUD FURRING OVER CMU;
INSTALL NEW INSUL/FURR/GWB (PH 2).
26. INFILL w/ CMU TO MATCH EXIST.
27. SEE MEP DRAWINGS FOR WORK OUTSIDE OF WAREHOUSE.
28. 48" DEEP PALLET RACKS AGAINST WALL (V V).
29. NEW CROSS BRACING - SEE STRUCT.
30. EXITING NARCOTICS STORAGE - WIRE CAGE 12'-6" W x 8'-4 1/2" D x 8'-6" H. CONTR TO REINSTALL AFTER NEW FLOORING IN
PLACE.
31. WIRE CAGE LIFT ENCLOSURE w/ DOUBLE VERT. LIFT GATES TO
+ 8'-0" ABOVE MEZZ. FLOOR BY LEFT MTG'T.
32. WIRE CAGE ENCLOSURE w/ GATE TO B.O. STRUCT. BY
CONTRACTOR.
33. NEW FLOOR SCALE (CC). SEE PHASING PLANS FOR
TEMPORARY LOCATION IN ROOM WO7 DURING
CONSTRUCTION.
34. NEW GWB OVER MTL. STUD FRAMING / INSUL. OVER
CONC./CMU.
35. 36" DEEP PALLETS RACKS (X2) w/ 6'-0" W AISLES (V V).
36. ADD INTRUSION SYSTEM FOR CANETTEN STORAGE - SEE ELEC
/ TECH.
37. NEW FIRE EXTINGUISHER / WALL BRACKET. BRACKET INSTALL
BY CONTR.
38. NEW FIRE EXTINGUISHER CABINET (CC).
39. ACCESS CONTROL KEYPAD-CARD READER. SEE ELEC / TECH.
40. INTRUSION ALARM PANEL. SEE ELEC / TECH.
41. EXTEND EXISTING GWB PARTITIONS FOR OIT CLOSET UP TO
BOTTOM OF STRUCTURE. MATCH EXISTING PARTITION
CONSTRUCTION. SEAL ALL THROUGH-WALL PENETRATIONS
AND TOPS OF WALLS PER REQ'TS. FOR 1-HOUR-RATED WALL
CONSTRUCTION.
FLOOR PLAN-
RENOVATION
SHEET NOTES:
FLOOR PLAN-RENO GENERAL NOTES:
1. REFER TO "GENERAL NOTES" ON SHEET G-002 FOR NEW
CONSTRUCTION GENERAL NOTES.
2. SEE "TEMPORARY BARRIERS & ENCLOSURES" ON SHEET G-002 FOR
TEMPORARY ENCLOSURE REQUIREMENTS DURING DEMOLITION
AND CONSTRUCTION.
3. SEE PH-SERIES SHEETS / PHASING PLANS FOR NOTES AND
INFORMATION RELATED TO TEMPORARY INTERIOR CONSTRUCTION
PARTITIONS AND OVERHEAD PROTECTION DURING CONSTRUCTION.
4. SEE RA-SERIES SHEETS FOR EXISTING CONDITIONS DRAWINGS AND
PHOTOS.
5. PALLET RACKING AND SHELVING TO BE VA-PROVIDED / VA-
INSTALLED (VV) UNLESS NOTED OTHERWISE.
6. CONTRACTOR TO INSTALL VA-PROVIDED EQUIPMENT AND TOILET
ACCESSOERIES NOTED AS 'VC'. SEE EQUIPMENT SCHEDULES.
FLOOR PLAN-
RENOVATION
GENERAL NOTES:
BLDG 14 -
WAREHOUSE
KEY PLAN
AREA 'G'
AREA 'C' AREA 'D'
AREA 'B' AREA 'A'
AREA 'E'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Calvin rchitects, P.C.L 3705 North 200th Street
Elkhorn, Nebraska 68022
Phone: 402.291.6941 Fax: 402.291.9193
AH. INZ
Incandescence Life Safety, Inc.
3575 Ringsby Court, #408, Denver, CO, 80216
Phone:(720) 722-3010
589A4-20-158
IMEG Corp.
15 Sunnen Drive, Suite 104
St. Louis, MO 63143
Phone:(314) 951-2534
BID SET RENOVATE WAREHOUSE FOR
PANDEMIC PREPAREDNESS
HARRY S. TRUMAN MEM. VETERANS HOSPITAL
800 HOSPITAL DR., COLUMBIA MO 65201
Dwg. # of 94
C
L H
D C
\H o m e
\t fi e s e lm a n \R e v it M o d e ls \R
-2
-2
A
-2
-1
R e n o v a te W a re h o u s e tf ie s e lm a n A
G
Y .r v t
/6
/2
:0
:1
P M
AE101
FLOOR PLAN - RENOVATION
AHT TJF03/24/2021
N O R
HT
1/8" = 1'-0"1
FLOOR PLAN
X
ACCESS CONTROL - CHANGE OUT EXIST
CARD READER TO KEYPAD-CARD READER
2424Revisions: Date:
Amendment 3 5-7-21
| Sheets |
| AE101 - FLOOR PLAN - RENOVATION |
File details come from the government source that posted it. Updated .