This document provides details for a federal construction contract opportunity to renovate a warehouse for pandemic preparedness at the Harry S. Truman Memorial Veterans Hospital in Columbia, Missouri. The scope of work includes raising part of the roof and adding mezzanine storage, interior renovations, upgrading building systems for energy efficiency and HVAC improvements. Phased work will allow continued warehouse use. Estimated value is $2-5 million. Pursuant to applicable public law, this will be a total SDVOSB set-aside. The solicitation number is 36C25521R0075 and will be available on April 2, 2021 with a response due date of May 7, 2021. A site visit is scheduled. Interested offerors should monitor the SAM website for amendments and ensure registration in SAM and VIP. The contract will be awarded using LPTA procedures by the Department of Veterans Affairs Veterans Health Administration VISN 15.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FE
T
A
B
C
D
F
G
E
1 2 3 4 5 6 7
C.6
B.4
12.5
13.4 13.5
S.9TU
11.5
A
B
C
D
F
G
E
1 2 3 4 5 6 7 2.1
1.1 2.9 3.9
C.6
B.4
S Ra R
12.5
13.4
13.5
S.9T
13.2
U
11.5
Q P
STERILE
CONSUMABLES
(SOFT
GOODS)
STORAGE
W05
LOGICAL
UNIT
OF
MEASURE
(LUM)
STAGING
ROOM
(NEW_
W05A
PROSTHETICS
STORAGE
W04
STAFF
LOUNGE
(NEW)
W04A
SUPERVISOR
OFFICE
(NEW)
W09
STAFF
TOILET
(NEW)
W08
RECEIVING
BREAKOUT
INSPECTION
(NEW)
W06
CORRIDOR
WC01
VETERANS
CANTEEN
SERVICE
(VCS)
STORAGE
W01
RECEIVING
DOCK
W02
MATERIAL
LIFT
LOBBY
W03C
STAIR
WS01
EQUIPMENT
PREP/
STAGING
(NEW)
W07
CORRIDOR
WC02
CORRIDOR
CBC2
CORRIDOR
CBG1
STORAGE
W10
RELIEF
AIR
AREAWAY
G00Y
CORRIDOR
WC01A
RECEIVING/ISSUE
W10C
RECEIVING/ISSUE
W10B
RECEIVING/ISSUE
W10A
BULK
ITEMS
STORAGE
W03
BULK
ITEMS
STORAGE
W03B
DRUG
CACHE-STORAGE
W03A
CHILLED
WATER/PIPING
AREAWAY
G00X
CHASE
C00Z
SHEET
METAL
SHOP
C013
SHEET
METAL
SHOP
C013A
MECHANICAL
ROOM
C011
STORAGE
C014
CORRIDOR
WC03 CORRIDOR
CBC3
LOADING
DOCK
CBC1A
CORRIDOR
CBC1
CORRIDOR
CBC2
TEMP FLOOR
SCALE LOC'N
PH 1-3
TEMPORARY STORAGE/STAGING AREA - PH 3
PALLET RACKS: ALONG WALLS - VA TO MOVE AWAY
FROM WALLS & PROTECT - MOVE INTO FINAL
POSITION AFTER FINISH WORK COMPLETED PH 3
ROOM TO BE
AVAILABLE FOR
USE AFTER
COMPLETION OF
FINISHES PH 3
NEW PLBG-CHASE PH 3
CONSTRUCTION
OF MEZZANINE
ABOVE PH 3
EARLY
ROOM TO BE
AVAILABLE FOR
USE DURING PH 3
AREA TO BE
AVAILABLE FOR
USE DURING PH 3
PALLET RACKS: ALONG WALLS -
MOVE AWAY FROM WALLS &
PROTECT - MOVE INTO FINAL
POSITION AFTER FINISH WORK
COMPLETED PH 3
AREA TO BE AVAILABLE
FOR USE DURING PH 3
FURRING-INSUL PH 1 LATE
AFTER MEP WORK COMPLETED
FURRING-INSUL
PH 1 LATE
FURRING-INSUL
PH 1 LATE
R A
M P
D N
R A
M P
D N
FURRING-INSUL PH 1 LATE
KEEP CLEAR AT ALL TIMES
W
S S
S S
S S
SSS
S
SS SS
S
S S
SS
CW
CW
C W
C W
SS
SS SS
S
UGE
UGE UGE UGE
SS
UGE
UGE
UGE
S
S
S
S
SS
SS SS
S S
S S
S S
W
UGE
W
ESTABLISH EXTENTS AND
COORDINATE LOCATION OF
TEMPORARY CONSTRUCTION
PARTITION W/ COR THIS ROOM
8 8
8 8
1617 19
5" Concrete
PHASING GENERAL NOTES:
PHASING TO BE DEVELOPED TO MINIMIZE DISRUPTION OF
OWNER-RELATED ACTIVITIES WITHIN THE PROJECT AREA.
REFER TO PHASING PLANS PH101 THRU PH103 FOR
ADDITIONAL INFORMATION.
BRIEF PHASING DESCRIPTION:
A. PHASE 1 - DEMOLITION AND INSTALLATION OF WEST
WAREHOUSE NEW ROOF SUPERSTRUCTURE,
MODIFICATION OF EXISTING EAST WAREHOUSE ROOF
AND BUILDING STRUCTURE; LIMITED DEMOLITION
EAST WAREHOUSE OF INTERIOR ROOMS W07-W08-
W09; CONSTRUCT HVAC FROM BLDG. 1 TO
WAREHOUSE.
B. PHASE 2 - DEMOLITION OF WEST WAREHOUSE
EXISTING ROOF/FRAMING, CONSTRUCTION OF WEST
WAREHOUSE UPPER EXTERIOR WALL ENCLOSURE;
LIMITED DEMOLITION OF WEST WAREHOUSE INTERIOR
ROOM W03A.
C. PHASE 3 - CONSTRUCTION OF NEW MEZZANINE
FLOOR AND DRUG STORAGE ROOM W03A;
CONSTRUCTION OF NEW OFFICE/TOILET W08-W09;
NEW EXTERIOR WALL INSULATION AND FINISHES.
PHASING NOTES:
PHASE 1
PHASE 2
PHASE 3
OUTSIDE
WORK
AREA
PHASE 3 SHEET NOTES:
1. NEW OFFICE / TOILET - CONSTRUCT PH 3 (EARLY-MID).
2. TEMPORARY 1-HR CONSTRUCTION PARTITION W/ 60M PR
3'-0"X7'-0" HM DOORS/FRAMES. REMOVE AFTER WORK
COMPLETED FOR MEZZANINE PH 3 (LATE). SEE "TEMPORARY
BARRIERS & ENCLOSURES" NOTES ON SHEET G-002.
3. NEW MEZZANINE PH 3 (EARLY-MID).
4. NEW INTERIOR STAIR PH 3 (MID-LATE).
5. NEW MATERIAL LIFT / PIT PH 3 (EARLY-MID).
6. NEW EXTERIOR FIRE STAIR & CONCRETE SITE WORK PH 3
(EARLY).
7. REMOVE EXIST GWB/INSUL; INSTALL NEW INSUL/FURRING/GWB
PH 3 (EARLY).
8. NEW INSUL/FURRING/GWB PH 3 (EARLY).
9. NEW DOOR/FRAME PH 3 (EARLY-MID).
10. CONTR. TO COORD. W/ VA TO MOVE PALLET RACKS AWAY FROM
WALL AND PROTECT WITH PLASTIC OR CANVAS DROP CLOTHS
DURING SPRAY INSULATION/FURRING/GWB/FINISH PH 3 (EARLY-
MID).
11. VA TO REINSTALL WALL RACKS AFTER COMPLETION OF NEW
WALL/FINISHES PH 3 (MID-LATE).
12. VA TO REINSTALL PALLET RACKS AFTER MEZZANINE FLOOR
FRAMING WORK COMPLETED PH3 (MID-LATE).
13. CONTR. TO REINSTALL NARCOTICS CAGE ENCLOSURE, SAFE AND
RELATED FURNISHINGS AFTER COMPLETION OF FINISHES IN
W03A PH 3 (LATE).
14. VA TO REINSTALL PALLET RACKS AFTER COMPLETION OF
FINISHES IN W03A PH 3 (LATE).
15. NEW RES-2 EPOXY FLOOR/BASE IN W03A - INSTALL AFTER WALL
FINISHES COMPLETED PH 3 (MID-LATE).
16. NEW RSF-1 FLOOR AND RUBBER BASE - INSTALL AFTER
COMPLETION OF WALL FINISHES PH 3 (MID).
17. CONTR TO INSTALL VA-PROVIDED EQUIPMENT INCLUDING
RELOCATED OR NEW LOCKERS, REFRIGERATOR AND
FURNISHING TO W04A AFTER FINISH WORK COMPLETED PH 3
(MID-LATE).
18. CONTR. REMOVE TEMPORARY CONSTRUCTION BARRIER AFTER
COMPLETION OF EXTERIOR WALL FINISHES PH 3 (MID).
19. ROOM TO BE PARTIALLY AVAILABLE FOR USE DURING PH 3.
20. PALLET RACKS: REINSTALL AFTER FINISH WORK COMPLETED IN
ROOM.
21. NEW SCALE & INDICATOR (MID-LATE). GC TO RELOCATE NEW
FLOOR SCALE AND WALL-MOUNTED DISPLAY FROM TEMPORARY
LOCATION TO PERMANENT LOCATION.
22. WORK FOR ICE & WATER DISPENSER TO BE DELETED IF BID ITEM
#2 ACCEPTED. SEE MECHANICAL DRAWINGS.
PHASE 3
SHEET NOTES: X
BLDG 14 -
WAREHOUSE
KEY PLAN
AREA 'G'
AREA 'C' AREA 'D'
AREA 'B' AREA 'A'
AREA 'E'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Calvin rchitects, P.C.L 3705 North 200th Street
Elkhorn, Nebraska 68022
Phone: 402.291.6941 Fax: 402.291.9193
AH. INZ
Incandescence Life Safety, Inc.
3575 Ringsby Court, #408, Denver, CO, 80216
Phone:(720) 722-3010
589A4-20-158
IMEG Corp.
15 Sunnen Drive, Suite 104
St. Louis, MO 63143
Phone:(314) 951-2534
BID SET RENOVATE WAREHOUSE FOR
PANDEMIC PREPAREDNESS
HARRY S. TRUMAN MEM. VETERANS HOSPITAL
800 HOSPITAL DR., COLUMBIA MO 65201
Dwg. # of 94
C
L H
D C
\H o m e
\t fi e s e lm a n \R e v it M o d e ls \R
-2
-2
A
-2
-1
R e n o v a te W a re h o u s e tf ie s e lm a n A
G
Y .r v t
/6
/2
:0
:3
P M
PH103
PHASING PLAN - PHASE 3
AHT TJF03/24/2021
N O R
HT
1/8" = 1'-0"1
MEZZANINE PLAN - PHASE 3
N O R
HT
1/8" = 1'-0"2
FLOOR PLAN - PHASE 3
10Revisions: Date:
Amendment 3 5-7-21
| Sheets |
| PH103 - PHASING PLAN - PHASE 3 |
File details come from the government source that posted it. Updated .