This solicitation package is for the renovation of a warehouse at the Harry S. Truman Memorial Veterans Hospital in Columbia, Missouri to prepare it for pandemic response. The scope of work involves raising approximately 6,000 square feet of roof and adding 3,800 square feet of mezzanine space. It will be conducted in three phases to allow for continuous warehouse operations. Requirements include architectural, structural, fire protection, mechanical, plumbing, electrical, and technology improvements. The estimated price range is $2,000,000 to $5,000,000. The North American Industry Classification Code is 236220 and the small business size standard is $39.5 million. The solicitation will be set aside as a total small business set-aside for Service-Disabled Veteran-Owned Small Businesses. The proposal due date is on or about May 7, 2021 and award will be made using Best Value Lowest Price Technically Acceptable tradeoff. The completion period is up to 330 calendar days from notice to proceed.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
T
T
T
T
T T T
T
T
T
T
T T
A
B
C
D
F
G
E
1 2 3 4 5 6 72.11.1 2.9 3.9
C.6
B.4
S
Rb
Ra
R
12.5
13.4 13.5
S.9
9.1
10.4
T
13.2
U
R'R"
10.2
8.2
9.8
8.9
8.3
7.6
CC.6 CC BB AA Z Y
7.1
U.5VWW.3W.4X
11.5
BULK ITEMS STORAGE
W03
PROSTHETICS STORAGE
W04
STERILE CONSUMABLES (SOFT
GOODS) STORAGE
W05
RECEIVING BREAKOUT & INSPECTION
(NEW)
W06
CORRIDOR
WC03
VETERANS CANTEEN SERVICE (VCS)
STORAGE
W01
CORRIDOR
CBC2CORRIDOR
WC01A
RECEIVING DOCK
W02
LOGICAL UNIT OF MEASURE (LUM)
STAGING ROOM (NEW_
W05A
OIT CLOSET
W05B
BULK ITEMS STORAGE
W03B
DRUG CACHE-STORAGE
W03A
STAFF TOILET (NEW)
W08
SUPERVISOR OFFICE (NEW)
W09
CORRIDOR
CBC3
CORRIDOR
CBG1
CORRIDOR
WC01
STAFF LOUNGE (NEW)
W04A
CORRIDOR
WC02
MATERIAL LIFT LOBBY
W03C
RECEIVING/ISSUE
W10C
RECEIVING/ISSUE
W10B
RECEIVING/ISSUE
W10A
EQUIPMENT PREP/ STAGING (NEW)
W07
CORRIDOR
CBC2
SHEET METAL SHOP
C013A
SHEET METAL SHOP
C013
STORAGE
C014
CORRIDOR
G012
CORRIDOR
CBG2
MECHANICAL ROOM
G001
ELECT ROOM
G013
CLEAN RECEIVING BREAKOUT
G048
BULK STORAGE
G047
STERILIZER ACCESS
G043A
ETO STERILIZER ACCESS
G045
HALL
G046
STORAGE
G005
OFFICE & SUPPLY
G051
STORAGE
W10
RELIEF AIR AREAWAY
G00Y
CHILLED WATER/PIPING AREAWAY
G00X
UNEXCAVATED
UNEX
FRESH AIR AREAWAY
G001A
CHASE
C00Z
CORRIDOR
CBG1A
CORRIDOR
CBG1B
SHOWER
G040A
SHOWER
G038A
STORAGE
G019B
ELEC RM
G008
OFFICE
G019A
OFFICE
G019
OFFICE
G018C
LOCKERS
G038
LOCKERS
G040
HALL
G037
STERILIZER ACCESS ROOM
G052C
CLEAN PROCESSING
G053
STAIR
WS01
MAT'L LIFT
WE01
Room
C010
MECHANICAL ROOM
C012
Room
C009F
MECHANICAL ROOM
C011
CORRIDOR
WC04
CORRIDOR
CBG1
NARCOTICS STORAGE CAGE
W03A1
EXISTING ELECTRIC
UNIT HEATER 14-EUH1
TO REMAIN.
EXISTING ELECTRIC
UNIT HEATER 14-EUH2
TO REMAIN.
38x18
30X20 SA UP
18x12 SA
Ø12 SA UP
18x12 SA UP TO FLOOR ABOVE.
PROVIDE DUCT SECURITY
BARRIER AT FLOOR
PENETRATION. REFER TO
DETAIL 10/M300.
18x14
12x12
8ø
18x10
W05-TU-01
W05A-TU-06W04-TU-07W04A-TU-09
W06-TU-02
W01-TU-03
W02-TU-04
1-1-TU05
SD-63
14x6/225
(TYP.4)
18x12
12x12
SD-63
14x6/280
(TYP.5)
EG-71
8x8/100
12x12 EA UP TO
WHSE-EF-1
SD-63
14x6/225
(TYP.7)
EG-81
10/260
EG-81
10/260
SD-13
10/220
(TYP. 2)
RG-31
TG-91
16x16/370
SD-41
10/185
(TYP. 2)
SD-12
8/175
(TYP. 4)
48x24
SD-12
8/180
38x18
W03-TU-10
W03-TU-13
W03A-TU-11
W03-TU-10
W04A-TU-09
W07-TU-08
W04-TU-07
W05A-TU-06
W06-TU-02
W01-TU-03
W02-TU-041-1-TU05
3/4"HWR
3/4"HWS
1 1/4" HWS UP
1 1/4" HWR UP
1 1/4"HWR
1 1/4"HWS
1 1/2"HWR
1 1/2"HWS
1 1/2"HWS
1 1/2"HWR
2"HWS
2"HWR
2"HWS
2"HWR
1 1/4" HWR UP
1 1/4" HWS UP
1"HWS
1"HWR
1" HWR UP
1" HWS UP
3/4" HWS&R UP TO 14-VAV-10.
RR-514
50x26/7450
RG-24
12/350
18"CWR
18"CWS
RG-31
48x24
3" CWS UP
3" CWR UP
TG-92
24x14
8"CWR
8"CWS
6"CWR
6"CWS6"CWS
6"CWR
"L
P S
1 1/2"HWR
1 1/2"HWS
16x10
EG-1
36x12/675
(TYP.2)
WHSE-EF-2
2 1/2" HWR DN
2 1/2" HWS DN
2 1/2"HWR
2 1/2"HWS
8"CWS
8"CWR
3/4" LPC DN
WHSE-SSHX-1
3" LPS DN TO WHSE-
HX1 AND WHSE-HX2
"L
P S
"L
P S
3/4"HWR
3/4"HWS RG-24
12/350
14-P4
2"LCS
SD-11
6/105
(TYP.10)
RG-31
RG-24
12/325
SD-12
8/215SD-12
8/215
SD-12
8/215
SD-12
8/150
SD-12
8/150
RG-24
10/300
SD-12
8/140
SD-12
8/140
2" LCS UP
REFER TO 8/M-301
FOR PUMPED COIL
DETAIL.
2"LCS
RG-31
RG-24
12/325
10x10
W07-TU-08
8x8
10x10
12x12
14x18
14x18
14x18
48x18
WHSE-RF-1
22X14 RETURN AIR DUCT
THROUGH WALL. PROVIDE DUCT
SECURITY BARRIER. REFER TO
DETAIL 10/M300.
22X14 RETURN AIR DUCT
THROUGH WALL. PROVIDE DUCT
SECURITY BARRIER. REFER TO
DETAIL 10/M300.
8x4
8x4
8x4
8x4
8x4
W05-TU-01RG-24
12/320
48x24 RA UP
RG-31
48x20
EXISTING 1 1/4" LPC TO
THE EXISTING BUILDING
EXISTING 1 1/4"CR TO
THE EXISTING BUILDING
"L
P S
44x18
12x12
12x8
10x10
10x10
REFER TO
M-102 FOR
CONTINUATION
REFER TO M-102 FOR
CONTINUATION
18"CWS UP THROUGH ROOF
18"CWR UP THROUGH ROOF
30x20
3"CWR
3"CWS WHSE-T3
WSHE-T1
3/4"CW DN
MAKEUP WATER BACKFLOW
PREVENTER. REFER TO P-101
FOR CONTINUATION.
3/4" CW DN
CUT AND CAP EXISTING LWS &
LWR PIPING AFTER WHSE-AHU-1
SYSTEM IS FULLY OPERATIONAL.
44x24 MOTORIZED EXHAUST DAMPER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Calvin rchitects, P.C.L 3705 North 200th Street
Elkhorn, Nebraska 68022
Phone: 402.291.6941 Fax: 402.291.9193
AH. INZ
Incandescence Life Safety, Inc.
3575 Ringsby Court, #408, Denver, CO, 80216
Phone:(720) 722-3010
589A4-20-158
IMEG Corp.
15 Sunnen Drive, Suite 104
St. Louis, MO 63143
Phone:(314) 951-2534
BID SET RENOVATE WAREHOUSE FOR
PANDEMIC PREPAREDNESS
HARRY S. TRUMAN MEM. VETERANS HOSPITAL
800 HOSPITAL DR., COLUMBIA MO 65201
Dwg. # of 94
C R e v it L o c a l F ile s \M
E P
T
.1
V A
T ru m a n W a re h o u s e
C
R u s s e ll.
J .A rn e s o n
.r v t
/2
/2
:0
:4
P
M
M-101
FIRST FLOOR PLAN - MECHANICAL
JASSNE ANUSHA03/24/2021
N O R
HT
1/8" = 1'-0"
FIRST FLOOR PLAN - MECHANICAL
SHEET NOTES:
1. REFER TO ARCHITECTURAL PHASING
DRAWINGS PH101, PH102, AND PH103 FOR
ADDITIONAL INFORMATION.
KEYNOTES:
1. BUILDING AUTOMATION SYSTEM CONTROL
PANEL.
2. UNDER BID ITEM #2 DO NOT PROVIDE
TERMINAL AIR BOX, COIL, AND ASSOCIATED
DUCTWORK, AIR DEVICE AND CONTROLS.
3. UNDER BID ITEM #2 PROVIDE 8X8 STUB DOWN
TOWARD FUTURE STAFF TOILET AND CAP
AIRTIGHT. DO NOT PROVIDE EXHAUST GRILLE
FOR STAFF TOILET W08.
Revisions: Date:
BID SET 03/24/2021
ADDENDUM NO. 1 4/29/2021
atast Text Box
AMENDMENT #3
atast Text Box 05/07/2021 atast Snapshot