Drawings 589A4-20-158 VOL 3- 1 page.pdf
PDF 12 MB Posted
- Solicitation number
- 36C25521R0075
About this file
This notice provides details for a solicitation seeking renovation services for a Department of Veterans Affairs warehouse. The scope of work involves raising approximately 6,000 square feet of roof, adding 3,800 square feet of mezzanine storage space, and renovating interior spaces including HVAC, electrical, and plumbing system upgrades. The estimated price range for the project is $2,000,000 to $5,000,000. The solicitation package will be available for download on or around April 2, 2021, with proposals due on or around May 7, 2021. The contract will be set aside for Service-Disabled Veteran-Owned Small Businesses and have a period of performance of up to 330 calendar days from notice to proceed. Interested offerors are encouraged to attend an organized site visit.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FD
N
E
H I
MC
DBREAK
ROOM
W07
SUPERVISOR
OFFICE
W09
STORAGE
W06
STERILE
CONSUMABLES
(SOFT
GOODS)
STORAGE
W05
EQUIPMENT
PREP
STAGING
W05A
PROSTHETICS
STORAGE
W04
CORRIDOR
WC02
BULK/UNIT
STORAGE
W03
DRUG
CACHE/STORAGE
W03A
RECEIVING
DOCK
W02
VCS
STORAGE
W01
STAFF
TLT
W08
PROSTHETICS
STORAGE
W04A
BA
L
F
J
K
G
BLDG. 23 -
CHILLER
PLANT
BLDG. 14 -
WAREHOUSE
BLDG. 1 -
HOSPITAL
CONNECTING
CORRIDOR
G
N
PO
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Calvin rchitects, P.C.L 3705 North 200th Street
Elkhorn, Nebraska 68022
Phone: 402.291.6941 Fax: 402.291.9193
AH. INZ
Incandescence Life Safety, Inc.
3575 Ringsby Court, #408, Denver, CO, 80216
Phone:(720) 722-3010
589A4-20-158
IMEG Corp.
15 Sunnen Drive, Suite 104
St. Louis, MO 63143
Phone:(314) 951-2534
BID SET RENOVATE WAREHOUSE FOR
PANDEMIC PREPAREDNESS
HARRY S. TRUMAN MEM. VETERANS HOSPITAL
800 HOSPITAL DR., COLUMBIA MO 65201
BID SET 03/24/2021
Dwg. # of 94
C
L H
D C
\H o m e
\t fi e s e lm a n \R e v it M o d e ls \R
-2
-2
A
-2
-1
R e n o v a te W a re h o u s e tf ie s e lm a n A
G
Y .r v t
/2
/2
:4
:5
A
M
RA103
EXISTING CONDITIONS PLAN & INT.
PHOTOS - NORTH-EAST ROOMS
AHT TJF03/24/2021
1/8" = 1'-0"1
EXISTING CONDITION FLOOR PLAN
NOT TO SCALEN
CORR CBC2 DOOR TO CBG1
NOT TO SCALEM
RM. W06 NORTH WALL
NOT TO SCALEH
RM. W05A WEST WALL
NOT TO SCALEI
RM. W05A EAST WALL
NOT TO SCALEE
RM. W04 DOORS
NOT TO SCALEC
RM W07 NORTH WALL
NOT TO SCALED
RM. W07 SW CORNER
NOT TO SCALEB
RM. W09 W. WALL-DESK
NOT TO SCALEA
RM. W09 EAST WALL
NOT TO SCALEL
RM. W06 SW CORNER
NOT TO SCALEF
RM. W04A SW CORNER
EXIST HM DOOR/FRAME TO REMOVE
EXIST CMU WALLS TO REMOVE (TYP)
EXIST ALARM AND ACCESS
CONTROL BOXES (TYP) - SEE
ELECT/TECH
EXIST FURNITURE, FIXED AND MOVEABLE EQUIPMENT
TO BE REMOVED BY VA PRIOR TO DEMO (TYP)
EXIST CMU WALL TO REMAIN - MODIFY AS REQ'D. FOR NEW
DOORS - SEE ARCH
EXIST LIGHT FIXTURES TO REMOVE (TYP) - SEE ELECT
EXIST CONC DECK TO REMOVE - SEE PHASING & DEMO
EXIST VCT FLOOR TO REMOVE (TYP) - SEE PHASING &
DEMO DRAWINGS
EXIST CMU WALLS TO REMOVE - SEE PHASING &
DEMO
EXIST DOORS W04 & WO4A - HM
DOORS/FRAMES TO REMOVE; INFILL W/ NEW
CMU (TYP) - SEE PHASING & DEMO
EXIST LIGHT FIXTURES TO REMOVE (TYP) - SEE ELECT
EXIST FURNITURE, FIXED AND MOVEABLE EQUIPMENT
TO BE REMOVED BY VA PRIOR TO DEMO (TYP)
NOT TO SCALEJ
RM. W05B OIT CLOSET
NOT TO SCALEK
RM. W05 NE CORNER
NOT TO SCALEG
RM. W05A SW CORNER
NOT TO SCALEO
CORR CBG1 LOOKING SOUTH
NOT TO SCALEP
CORR CBG1 ABOVE CLG
EXIST BLINDS TO REMOVE - SALVAGE & RETURN TO VA
EXIST HM BORROW LITE / GLAZING TO REMOVE
EXIST HVAC EQUIPMENT TO REMOVE (TYP) - SEE MECH
EXIST ELEC DEVICES TO REMOVE (TYP) - SEE ELECT
EXIST VCT FLOOR TO REMOVE (TYP) - SEE PHASING &
DEMO DRAWINGS
EXIST CONC DECK TO REMOVE - SEE PHASING & DEMO
EXIST FURNITURE, FIXED AND MOVEABLE EQUIPMENT
TO BE REMOVED BY VA PRIOR TO DEMO (TYP)
EXIST LIGHT FIXTURES TO REMOVE (TYP) - SEE ELECT
EXIST VCT FLOOR TO REMOVE (TYP), PREP FOR NEW
EPOXY FLOOR COATING - SEE PHASING, DEMO AND FINISH
PLANS
EXIST CMU WALLS TO REMOVE - SEE PHASING &
DEMO
EXIST MARKER BOARD - SALVAGE AND STORE FOR
REUSE IN NEW STAFF LOUNGE W04A - SEE PHASING-
DEMO PLANS AND INTERIOR ELEVATIONS
EXIST LOCKERS - SALVAGE AND STORE FOR
REUSE IN NEW STAFF LOUNGE W04A - SEE
PHASING-DEMO PLANS AND INTERIOR
ELEVATIONS
EXIST FURNITURE, FIXED AND MOVEABLE EQUIPMENT
TO BE REMOVED BY VA PRIOR TO DEMO (TYP)
EXIST CMU WALLS TO REMOVE (TYP) - SEE PHASING & DEMO
EXIST SECURITY CONTROL PANEL (BEYOND) TO
RELOCATE TO W04A - SEE PHASING, DEMO, ELECT/TECH
EXIST DOORS W07 & W09 TO REMOVE - SEE
PHASING/DEMO
EXIST VCT FLOOR TO REMOVE (TYP), PREP FOR NEW EPOXY
FLOOR COATING - SEE PHASING, DEMO AND FINISH PLANS
EXIST DUCTWORK TO REMOVE (TYP) - INFILL ABANDONED
OPENINGS W/ CMU - SEE MECH
EXIST ROOF STRUCTURE/INSULATION TO REMAIN (TYP) -
INSTALL NEW PURLINS BETWEEN GRID LINES 4-5 - SEE
STRUCT
EXIST SPEAKER - SEE ELECT/TECH FOR DISPOSITION
EXIST FIRE EXTINGUISHER / WALL BRACKET TO REMAIN -
SEE FINISH / SIGNAGE FOR REPLACEMENT OF EXISTING
SIGN WITH NEW FIRE EXTINGUISHER SIGNAGE
EXIST LIGHT FIXTURES TO REMOVE (TYP) - SEE ELECT
EXIST FIXED AND MOVEABLE EQUIPMENT TO BE
REMOVED BY VA PRIOR TO DEMO (TYP)
EXIST CONC FLOOR TO PREP FOR NEW FLOORING -
SEE FINISH PLANS
REMOVE PORTION OF EXIST CMU WALL FOR NEW
DOOR W04A HM DOOR FRAME AND LINTEL - SEE
PHASING, DEMO & RENO DRAWINGS; SEE STRUCT
FOR LINTEL SCHEDULE
EXIST CONC FLOOR TO PREP FOR NEW FLOORING -
SEE FINISH PLANS
EXIST DOOR W05A - HM DOORS/FRAMES TO
REMOVE; INFILL W/ NEW CMU (TYP) - SEE
PHASING & DEMO
EXIST FIXED AND MOVEABLE EQUIPMENT TO BE
REMOVED BY VA PRIOR TO DEMO (TYP)
EXIST FIXED AND MOVEABLE EQUIPMENT TO BE
REMOVED BY VA PRIOR TO DEMO (TYP)
EXIST DOOR W05A - HM DOORS/FRAMES TO
REMOVE; INFILL W/ NEW CMU (TYP) - SEE
PHASING & DEMO
EXIST SEALED CONC FLOOR TO REMAIN -
SEE FINISH PLANS
SEE MECH FOR NEW DUCTWORK AND PIPING
PENETRATIONS THROUGH WALLS
EXIST DUCTWORK TO REMOVE (TYP) - INFILL ABANDONED
OPENINGS W/ CMU - SEE MECH
EXIST LIGHT FIXTURES TO REMOVE (TYP) - SEE ELECT
REMOVE PORTION OF EXIST CMU WALL FOR NEW DOOR /
LINTEL - DOOR W04A - SEE PHASING, DEMO & RENO; SEE
STRUCT FOR LINTEL SCHEDULE
EXIST SEALED CONC FLOOR TO REMAIN -
SEE FINISH PLANS
EXIST DOOR W05 - HM DOORS/FRAMES TO
REMOVE; INFILL W/ NEW GWB / LT. GA. FRAMING
(TYP) - SEE PHASING, DEMO & RENO
EXIST FIXED AND MOVEABLE EQUIPMENT TO BE
REMOVED BY VA PRIOR TO DEMO (TYP)
EXIST RIGID WALL COVERING TO REMAIN (TYP)
SEE MECH FOR NEW DUCTWORK AND PIPING
PENETRATIONS THROUGH WALLS
EXIST DUCTWORK TO REMOVE (TYP) - INFILL ABANDONED
OPENINGS W/ GWB / LT. GA. FRAMING - SEE MECH
EXIST ROOF STRUCTURE/INSULATION TO REMAIN (TYP)
EXIST ROOF STRUCTURE/INSULATION TO REMAIN (TYP)
EXIST EXTERIOR GWB WALL TO REMOVE FOR NEW INSUL /
FURRING (TYP) - SEE PHASING, DEMO & RENO
EXIST EXTERIOR GWB WALL TO REMOVE FOR NEW INSUL /
FURRING (TYP) - SEE PHASING, DEMO & RENO
REMOVE PORTION OF EXIST GWB / LT. GA. FRAMING WALL
FOR NEW DOOR W05A - SEE PHASING, DEMO & RENO
EXIST DOOR W05 - HM DOORS/FRAMES TO
REMOVE; INFILL W/ NEW GWB / LT. GA. FRAMING
(TYP) - SEE PHASING, DEMO & RENO
EXIST SEALED CONC FLOOR TO REMAIN -
SEE FINISH PLANS
EXIST DOOR W05B - SEE HW, ELECT/TECH FOR
NEW ACCESS CONTROL DEVICES
EXIST FIRE EXTINGUISHER CABINET TO REMAIN
EXIST FIXED AND MOVEABLE EQUIPMENT TO BE
REMOVED BY VA PRIOR TO DEMO (TYP)
OIT CLOSET W05B - EXTEND EXIST GWB / LT. GA.
FRAMED WALLS TO B.O. ROOF; REMOVE & REPLACE
PORTION OF EXISTING SUSPENDED ACOUSTICAL
CLG AS REQ'D FOR ACCESS TO WORK;
COORDINATE W/ COR FOR ACCESS INTO ROOM
REMOVE & REPLACE PORTION OF EXISTING SUSPENDED
ACOUSTICAL CLG AS REQ'D FOR ACCESS TO
MECH/ELECT/TECH WORK; SEE PHASING, REFLECTED CLG
PLAN, MECH & ELECT/TECH
REMOVE & REPLACE PORTION OF EXISTING SUSPENDED
ACOUSTICAL CLG AS REQ'D FOR ACCESS TO
MECH/ELECT/TECH WORK; SEE PHASING, REFLECTED
CLG PLAN, MECH & ELECT/TECH
EXIST FIXED AND MOVEABLE EQUIPMENT TO BE
REMOVED BY VA PRIOR TO DEMO (TYP)
EXIST EXTERIOR GWB WALL TO REMOVE FOR NEW INSUL /
FURRING (TYP) - SEE PHASING, DEMO & RENO
EXIST SEALED CONC FLOOR TO REMAIN -
SEE FINISH PLANS
EXIST SEALED CONC FLOOR - PREP FOR
NEW EPOXY FINISH - SEE FINISH PLANS
EXIST DOOR W06 - HM DOOR/FRAME TO
REMOVE AND PORTION OF CMU WALL
REMOVED FOR NEW CMU LINTEL AND DOUBLE
HM DOOR/FRAME - RELOCATE EXIST ACCESS
CONTROL DEVICES, LIGHT SWITCH, ETC. - SEE
PHASING, DEMO, RENO & ELECT/TECH
REMOVE PORTION OF CMU WALL FOR NEW
LINTEL - SEE STRUCT FOR LINTEL SCHEDULE
EXIST SEALED CONC FLOOR - PREP FOR
NEW EPOXY FINISH - SEE FINISH PLANS
REMOVE PORTION OF EXIST CMU WALL FOR NEW
DOOR / LINTEL - DOOR W06A - SEE PHASING, DEMO
& RENO; SEE STRUCT FOR LINTEL SCHEDULE
REMOVE PORTION OF CMU WALL FOR NEW
LINTEL - SEE STRUCT FOR LINTEL SCHEDULE
EXIST CMU WALL TO REMAIN - MODIFY AS REQ'D.
FOR NEW DOORS - SEE ARCH
SEE FIRE SPRINKLER DRAWINGS FOR EXTENTS OF
DEMOLITION / NEW INSTALLATION
EXIST DUCTWORK TO REMOVE (TYP) - INFILL
ABANDONED OPENINGS W/ CMU - SEE MECH
EXIST PEMB END FRAME, ROOF STRUCTURE &
INSULATION TO REMAIN (TYP)
SEE MECH FOR NEW PENETRATIONS THRU
EXIST CMU WALLS FOR NEW DUCTWORK;
SEE STRUCT FOR LINTEL SCHEDULE
EXIST LIGHT FIXTURES TO REMOVE (TYP) - SEE ELECT
EXIST FIXED AND MOVEABLE EQUIPMENT TO BE
REMOVED BY VA PRIOR TO DEMO (TYP)
DOORS TO CORRIDOR CBG1
DOORS WC01 INTO WAREHOUSE
EXIST SECURITY CAMERA, AUTOMATIC
DOOR OPENER MOTION CONTROL
SENSOR (TYP) - SEE ELECT/TECH FOR
REPLACEMENT
EXIST CMU WALL/LINTEL - GRID LINE 7
EXIST ROOF STRUCT/INSUL TO REMAIN
EXIST PIPING, CABLE TRAY/CABLING
(TYP) - SEE ELECT/TECH FOR WORK
EXIST CMU WALL/LINTEL AT DOOR WC01
EXIST SUSPENDED ACOUSTICAL
CEILING (TYP) - REMOVE & REPLACE
AS REQ'D. FOR NEW WORK ABOVE
CEILING - SEE MECH, ELECT/TECH
EXIST GWB/LT.GA. FRAMING
BULKHEAD (TYP) - PATCH & REPAIR AS
REQ'D. FOR NEW WORK ABOVE
CEILING - SEE MECH, ELECT/TECH
EXIST SUSPENDED ACOUSTICAL CEILING (TYP) - REMOVE &
REPLACE AS REQ'D. FOR NEW WORK ABOVE CEILING - SEE
PHASING, REFLECTED CEILING PLAN, MECH, ELECT/TECH
DOORS TO CORRIDOR CBC2
EXIST VCT FLOORING - PROTECT
DURING CONSTRUCITON
CORRIDOR TO REMAIN OPEN DURING CONSTRUCTION -
COORDINATE W/ COR FOR SCHEDULING OF WORK DURING
AND/OR AFTER REGULAR WORKING HOURS
EXIST CONC WALL - PATCH AND REPAIR PENETRATIONS
THROUGH WALL TO MAINTAIN EXISTING FIRE RATING AS
REQ'D. FOR NEW ABOVE-CEILING WORK
EXIST SUSPENDED ACOUSTICAL CEILING (TYP) - REMOVE &
REPLACE AS REQ'D. FOR NEW WORK ABOVE CEILING - SEE
MECH, ELECT/TECH
EXIST CONC ROOF DECK OVER CORRIDOR - PATCH AND
REPAIR AS REQ'D. FOR THROUGH-ROOF PENETRATIONS
FOR NEW MECH/ELECT
EXIST STRUCT TO REMAIN
EXIST PIPING (TYP) - SEE MECH FOR EXTENTS OF WORK
EXIST CONC WALL - PATCH AND REPAIR AS REQ'D. FOR
NEW ABOVE-CEILING WORK; SEAL ALL PENETRATIONS TO
MAINTAIN EXISTING FIRE RATING
Revisions: Date: