Drawings 589A4-20-158 VOL 3- 1 page.pdf

PDF 12 MB Posted

Attached to
Z2DA--Renovate Warehouse for Pandemic Preparedness PN: 589A4-20-158
Solicitation number
36C25521R0075
Issued by

About this file

This notice provides details for a solicitation seeking renovation services for a Department of Veterans Affairs warehouse. The scope of work involves raising approximately 6,000 square feet of roof, adding 3,800 square feet of mezzanine storage space, and renovating interior spaces including HVAC, electrical, and plumbing system upgrades. The estimated price range for the project is $2,000,000 to $5,000,000. The solicitation package will be available for download on or around April 2, 2021, with proposals due on or around May 7, 2021. The contract will be set aside for Service-Disabled Veteran-Owned Small Businesses and have a period of performance of up to 330 calendar days from notice to proceed. Interested offerors are encouraged to attend an organized site visit.

View the file

Other files

File Type Posted
AD102 Amendment 3.pdf PDF
MD101 Amendment 3.pdf PDF
M-301 Amendment 3.pdf PDF
EL101 Amendment 3.pdf PDF
EP101 Amendment 3.pdf PDF
S-501 Amendment 3.pdf PDF
AF101 Amendment 3.pdf PDF
PD101 Amendment 3.pdf PDF
M-102 Amendment 3.pdf PDF
M-101 Amendment 3.pdf PDF
AE101 Amendment 3.pdf PDF
AE401 Amendment 3.pdf PDF
M-500 Amendment 3.pdf PDF
P-101 Amendment 3.pdf PDF
S-301 Amendment 3.pdf PDF
PH101 Amendment 3.pdf PDF
AF502 Amendment 3.pdf PDF
ED101 Amendment 3.pdf PDF
11 00 00 Beam Scale Cut Sheet - Amendment 3.pdf PDF
AC102 Amendment 3.pdf PDF
31 62 00 Driven or Drilled Micropiles - Amendment 3.pdf PDF
36C25521R0075 0003.docx DOCX document
01 35 26 pgs 12-13 - Amendment 3.pdf PDF
AD101 Amendment 3.pdf PDF
PH103 Amendment 3.pdf PDF
S-001 Amendment 3.pdf PDF
00 01 10 pg 4 - Amendment 3.pdf PDF
ATTENDANCE ROSTER.pdf PDF
36C25521R0075 0002.docx DOCX document
589A4-20-158 GeoTech Report.pdf PDF
36C25521R0075 0001.docx DOCX document
36C25521R0075_1.docx DOCX document
Drawings -589A4-20-158 VOL 2- 2 pages.pdf PDF
Drawings-589A4-20-158 VOL 4-1 page.pdf PDF
S02-Specifications 589A4-20-158- Volume 1 -630 pages.pdf PDF
S02-Specifications 589A4-20-158 - Volume 2 Divs 21-48- 848 pages.pdf PDF
Drawings 589A4-20-158 VOL 1- 90 pages.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FD

N

E

H I

MC

DBREAK

ROOM

W07

SUPERVISOR

OFFICE

W09

STORAGE

W06

STERILE

CONSUMABLES

(SOFT

GOODS)

STORAGE

W05

EQUIPMENT

PREP

STAGING

W05A

PROSTHETICS

STORAGE

W04

CORRIDOR

WC02

BULK/UNIT

STORAGE

W03

DRUG

CACHE/STORAGE

W03A

RECEIVING

DOCK

W02

VCS

STORAGE

W01

STAFF

TLT

W08

PROSTHETICS

STORAGE

W04A

BA

L

F

J

K

G

BLDG. 23 -

CHILLER

PLANT

BLDG. 14 -

WAREHOUSE

BLDG. 1 -

HOSPITAL

CONNECTING

CORRIDOR

G

N

PO

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

Incandescence Life Safety, Inc.

3575 Ringsby Court, #408, Denver, CO, 80216

Phone:(720) 722-3010

589A4-20-158

IMEG Corp.

15 Sunnen Drive, Suite 104

St. Louis, MO 63143

Phone:(314) 951-2534

BID SET RENOVATE WAREHOUSE FOR

PANDEMIC PREPAREDNESS

HARRY S. TRUMAN MEM. VETERANS HOSPITAL

800 HOSPITAL DR., COLUMBIA MO 65201

BID SET 03/24/2021

Dwg. # of 94

C

L H

D C

\H o m e

\t fi e s e lm a n \R e v it M o d e ls \R

-2

-2

A

-2

-1

R e n o v a te W a re h o u s e tf ie s e lm a n A

G

Y .r v t

/2

/2

:4

:5

A

M

RA103

EXISTING CONDITIONS PLAN & INT.

PHOTOS - NORTH-EAST ROOMS

AHT TJF03/24/2021

1/8" = 1'-0"1

EXISTING CONDITION FLOOR PLAN

NOT TO SCALEN

CORR CBC2 DOOR TO CBG1

NOT TO SCALEM

RM. W06 NORTH WALL

NOT TO SCALEH

RM. W05A WEST WALL

NOT TO SCALEI

RM. W05A EAST WALL

NOT TO SCALEE

RM. W04 DOORS

NOT TO SCALEC

RM W07 NORTH WALL

NOT TO SCALED

RM. W07 SW CORNER

NOT TO SCALEB

RM. W09 W. WALL-DESK

NOT TO SCALEA

RM. W09 EAST WALL

NOT TO SCALEL

RM. W06 SW CORNER

NOT TO SCALEF

RM. W04A SW CORNER

EXIST HM DOOR/FRAME TO REMOVE

EXIST CMU WALLS TO REMOVE (TYP)

EXIST ALARM AND ACCESS

CONTROL BOXES (TYP) - SEE

ELECT/TECH

EXIST FURNITURE, FIXED AND MOVEABLE EQUIPMENT

TO BE REMOVED BY VA PRIOR TO DEMO (TYP)

EXIST CMU WALL TO REMAIN - MODIFY AS REQ'D. FOR NEW

DOORS - SEE ARCH

EXIST LIGHT FIXTURES TO REMOVE (TYP) - SEE ELECT

EXIST CONC DECK TO REMOVE - SEE PHASING & DEMO

EXIST VCT FLOOR TO REMOVE (TYP) - SEE PHASING &

DEMO DRAWINGS

EXIST CMU WALLS TO REMOVE - SEE PHASING &

DEMO

EXIST DOORS W04 & WO4A - HM

DOORS/FRAMES TO REMOVE; INFILL W/ NEW

CMU (TYP) - SEE PHASING & DEMO

EXIST LIGHT FIXTURES TO REMOVE (TYP) - SEE ELECT

EXIST FURNITURE, FIXED AND MOVEABLE EQUIPMENT

TO BE REMOVED BY VA PRIOR TO DEMO (TYP)

NOT TO SCALEJ

RM. W05B OIT CLOSET

NOT TO SCALEK

RM. W05 NE CORNER

NOT TO SCALEG

RM. W05A SW CORNER

NOT TO SCALEO

CORR CBG1 LOOKING SOUTH

NOT TO SCALEP

CORR CBG1 ABOVE CLG

EXIST BLINDS TO REMOVE - SALVAGE & RETURN TO VA

EXIST HM BORROW LITE / GLAZING TO REMOVE

EXIST HVAC EQUIPMENT TO REMOVE (TYP) - SEE MECH

EXIST ELEC DEVICES TO REMOVE (TYP) - SEE ELECT

EXIST VCT FLOOR TO REMOVE (TYP) - SEE PHASING &

DEMO DRAWINGS

EXIST CONC DECK TO REMOVE - SEE PHASING & DEMO

EXIST FURNITURE, FIXED AND MOVEABLE EQUIPMENT

TO BE REMOVED BY VA PRIOR TO DEMO (TYP)

EXIST LIGHT FIXTURES TO REMOVE (TYP) - SEE ELECT

EXIST VCT FLOOR TO REMOVE (TYP), PREP FOR NEW

EPOXY FLOOR COATING - SEE PHASING, DEMO AND FINISH

PLANS

EXIST CMU WALLS TO REMOVE - SEE PHASING &

DEMO

EXIST MARKER BOARD - SALVAGE AND STORE FOR

REUSE IN NEW STAFF LOUNGE W04A - SEE PHASING-

DEMO PLANS AND INTERIOR ELEVATIONS

EXIST LOCKERS - SALVAGE AND STORE FOR

REUSE IN NEW STAFF LOUNGE W04A - SEE

PHASING-DEMO PLANS AND INTERIOR

ELEVATIONS

EXIST FURNITURE, FIXED AND MOVEABLE EQUIPMENT

TO BE REMOVED BY VA PRIOR TO DEMO (TYP)

EXIST CMU WALLS TO REMOVE (TYP) - SEE PHASING & DEMO

EXIST SECURITY CONTROL PANEL (BEYOND) TO

RELOCATE TO W04A - SEE PHASING, DEMO, ELECT/TECH

EXIST DOORS W07 & W09 TO REMOVE - SEE

PHASING/DEMO

EXIST VCT FLOOR TO REMOVE (TYP), PREP FOR NEW EPOXY

FLOOR COATING - SEE PHASING, DEMO AND FINISH PLANS

EXIST DUCTWORK TO REMOVE (TYP) - INFILL ABANDONED

OPENINGS W/ CMU - SEE MECH

EXIST ROOF STRUCTURE/INSULATION TO REMAIN (TYP) -

INSTALL NEW PURLINS BETWEEN GRID LINES 4-5 - SEE

STRUCT

EXIST SPEAKER - SEE ELECT/TECH FOR DISPOSITION

EXIST FIRE EXTINGUISHER / WALL BRACKET TO REMAIN -

SEE FINISH / SIGNAGE FOR REPLACEMENT OF EXISTING

SIGN WITH NEW FIRE EXTINGUISHER SIGNAGE

EXIST LIGHT FIXTURES TO REMOVE (TYP) - SEE ELECT

EXIST FIXED AND MOVEABLE EQUIPMENT TO BE

REMOVED BY VA PRIOR TO DEMO (TYP)

EXIST CONC FLOOR TO PREP FOR NEW FLOORING -

SEE FINISH PLANS

REMOVE PORTION OF EXIST CMU WALL FOR NEW

DOOR W04A HM DOOR FRAME AND LINTEL - SEE

PHASING, DEMO & RENO DRAWINGS; SEE STRUCT

FOR LINTEL SCHEDULE

EXIST CONC FLOOR TO PREP FOR NEW FLOORING -

SEE FINISH PLANS

EXIST DOOR W05A - HM DOORS/FRAMES TO

REMOVE; INFILL W/ NEW CMU (TYP) - SEE

PHASING & DEMO

EXIST FIXED AND MOVEABLE EQUIPMENT TO BE

REMOVED BY VA PRIOR TO DEMO (TYP)

EXIST FIXED AND MOVEABLE EQUIPMENT TO BE

REMOVED BY VA PRIOR TO DEMO (TYP)

EXIST DOOR W05A - HM DOORS/FRAMES TO

REMOVE; INFILL W/ NEW CMU (TYP) - SEE

PHASING & DEMO

EXIST SEALED CONC FLOOR TO REMAIN -

SEE FINISH PLANS

SEE MECH FOR NEW DUCTWORK AND PIPING

PENETRATIONS THROUGH WALLS

EXIST DUCTWORK TO REMOVE (TYP) - INFILL ABANDONED

OPENINGS W/ CMU - SEE MECH

EXIST LIGHT FIXTURES TO REMOVE (TYP) - SEE ELECT

REMOVE PORTION OF EXIST CMU WALL FOR NEW DOOR /

LINTEL - DOOR W04A - SEE PHASING, DEMO & RENO; SEE

STRUCT FOR LINTEL SCHEDULE

EXIST SEALED CONC FLOOR TO REMAIN -

SEE FINISH PLANS

EXIST DOOR W05 - HM DOORS/FRAMES TO

REMOVE; INFILL W/ NEW GWB / LT. GA. FRAMING

(TYP) - SEE PHASING, DEMO & RENO

EXIST FIXED AND MOVEABLE EQUIPMENT TO BE

REMOVED BY VA PRIOR TO DEMO (TYP)

EXIST RIGID WALL COVERING TO REMAIN (TYP)

SEE MECH FOR NEW DUCTWORK AND PIPING

PENETRATIONS THROUGH WALLS

EXIST DUCTWORK TO REMOVE (TYP) - INFILL ABANDONED

OPENINGS W/ GWB / LT. GA. FRAMING - SEE MECH

EXIST ROOF STRUCTURE/INSULATION TO REMAIN (TYP)

EXIST ROOF STRUCTURE/INSULATION TO REMAIN (TYP)

EXIST EXTERIOR GWB WALL TO REMOVE FOR NEW INSUL /

FURRING (TYP) - SEE PHASING, DEMO & RENO

EXIST EXTERIOR GWB WALL TO REMOVE FOR NEW INSUL /

FURRING (TYP) - SEE PHASING, DEMO & RENO

REMOVE PORTION OF EXIST GWB / LT. GA. FRAMING WALL

FOR NEW DOOR W05A - SEE PHASING, DEMO & RENO

EXIST DOOR W05 - HM DOORS/FRAMES TO

REMOVE; INFILL W/ NEW GWB / LT. GA. FRAMING

(TYP) - SEE PHASING, DEMO & RENO

EXIST SEALED CONC FLOOR TO REMAIN -

SEE FINISH PLANS

EXIST DOOR W05B - SEE HW, ELECT/TECH FOR

NEW ACCESS CONTROL DEVICES

EXIST FIRE EXTINGUISHER CABINET TO REMAIN

EXIST FIXED AND MOVEABLE EQUIPMENT TO BE

REMOVED BY VA PRIOR TO DEMO (TYP)

OIT CLOSET W05B - EXTEND EXIST GWB / LT. GA.

FRAMED WALLS TO B.O. ROOF; REMOVE & REPLACE

PORTION OF EXISTING SUSPENDED ACOUSTICAL

CLG AS REQ'D FOR ACCESS TO WORK;

COORDINATE W/ COR FOR ACCESS INTO ROOM

REMOVE & REPLACE PORTION OF EXISTING SUSPENDED

ACOUSTICAL CLG AS REQ'D FOR ACCESS TO

MECH/ELECT/TECH WORK; SEE PHASING, REFLECTED CLG

PLAN, MECH & ELECT/TECH

REMOVE & REPLACE PORTION OF EXISTING SUSPENDED

ACOUSTICAL CLG AS REQ'D FOR ACCESS TO

MECH/ELECT/TECH WORK; SEE PHASING, REFLECTED

CLG PLAN, MECH & ELECT/TECH

EXIST FIXED AND MOVEABLE EQUIPMENT TO BE

REMOVED BY VA PRIOR TO DEMO (TYP)

EXIST EXTERIOR GWB WALL TO REMOVE FOR NEW INSUL /

FURRING (TYP) - SEE PHASING, DEMO & RENO

EXIST SEALED CONC FLOOR TO REMAIN -

SEE FINISH PLANS

EXIST SEALED CONC FLOOR - PREP FOR

NEW EPOXY FINISH - SEE FINISH PLANS

EXIST DOOR W06 - HM DOOR/FRAME TO

REMOVE AND PORTION OF CMU WALL

REMOVED FOR NEW CMU LINTEL AND DOUBLE

HM DOOR/FRAME - RELOCATE EXIST ACCESS

CONTROL DEVICES, LIGHT SWITCH, ETC. - SEE

PHASING, DEMO, RENO & ELECT/TECH

REMOVE PORTION OF CMU WALL FOR NEW

LINTEL - SEE STRUCT FOR LINTEL SCHEDULE

EXIST SEALED CONC FLOOR - PREP FOR

NEW EPOXY FINISH - SEE FINISH PLANS

REMOVE PORTION OF EXIST CMU WALL FOR NEW

DOOR / LINTEL - DOOR W06A - SEE PHASING, DEMO

& RENO; SEE STRUCT FOR LINTEL SCHEDULE

REMOVE PORTION OF CMU WALL FOR NEW

LINTEL - SEE STRUCT FOR LINTEL SCHEDULE

EXIST CMU WALL TO REMAIN - MODIFY AS REQ'D.

FOR NEW DOORS - SEE ARCH

SEE FIRE SPRINKLER DRAWINGS FOR EXTENTS OF

DEMOLITION / NEW INSTALLATION

EXIST DUCTWORK TO REMOVE (TYP) - INFILL

ABANDONED OPENINGS W/ CMU - SEE MECH

EXIST PEMB END FRAME, ROOF STRUCTURE &

INSULATION TO REMAIN (TYP)

SEE MECH FOR NEW PENETRATIONS THRU

EXIST CMU WALLS FOR NEW DUCTWORK;

SEE STRUCT FOR LINTEL SCHEDULE

EXIST LIGHT FIXTURES TO REMOVE (TYP) - SEE ELECT

EXIST FIXED AND MOVEABLE EQUIPMENT TO BE

REMOVED BY VA PRIOR TO DEMO (TYP)

DOORS TO CORRIDOR CBG1

DOORS WC01 INTO WAREHOUSE

EXIST SECURITY CAMERA, AUTOMATIC

DOOR OPENER MOTION CONTROL

SENSOR (TYP) - SEE ELECT/TECH FOR

REPLACEMENT

EXIST CMU WALL/LINTEL - GRID LINE 7

EXIST ROOF STRUCT/INSUL TO REMAIN

EXIST PIPING, CABLE TRAY/CABLING

(TYP) - SEE ELECT/TECH FOR WORK

EXIST CMU WALL/LINTEL AT DOOR WC01

EXIST SUSPENDED ACOUSTICAL

CEILING (TYP) - REMOVE & REPLACE

AS REQ'D. FOR NEW WORK ABOVE

CEILING - SEE MECH, ELECT/TECH

EXIST GWB/LT.GA. FRAMING

BULKHEAD (TYP) - PATCH & REPAIR AS

REQ'D. FOR NEW WORK ABOVE

CEILING - SEE MECH, ELECT/TECH

EXIST SUSPENDED ACOUSTICAL CEILING (TYP) - REMOVE &

REPLACE AS REQ'D. FOR NEW WORK ABOVE CEILING - SEE

PHASING, REFLECTED CEILING PLAN, MECH, ELECT/TECH

DOORS TO CORRIDOR CBC2

EXIST VCT FLOORING - PROTECT

DURING CONSTRUCITON

CORRIDOR TO REMAIN OPEN DURING CONSTRUCTION -

COORDINATE W/ COR FOR SCHEDULING OF WORK DURING

AND/OR AFTER REGULAR WORKING HOURS

EXIST CONC WALL - PATCH AND REPAIR PENETRATIONS

THROUGH WALL TO MAINTAIN EXISTING FIRE RATING AS

REQ'D. FOR NEW ABOVE-CEILING WORK

EXIST SUSPENDED ACOUSTICAL CEILING (TYP) - REMOVE &

REPLACE AS REQ'D. FOR NEW WORK ABOVE CEILING - SEE

MECH, ELECT/TECH

EXIST CONC ROOF DECK OVER CORRIDOR - PATCH AND

REPAIR AS REQ'D. FOR THROUGH-ROOF PENETRATIONS

FOR NEW MECH/ELECT

EXIST STRUCT TO REMAIN

EXIST PIPING (TYP) - SEE MECH FOR EXTENTS OF WORK

EXIST CONC WALL - PATCH AND REPAIR AS REQ'D. FOR

NEW ABOVE-CEILING WORK; SEAL ALL PENETRATIONS TO

MAINTAIN EXISTING FIRE RATING

Revisions: Date:

File details come from the government source that posted it. Updated .