This document outlines a federal contract opportunity to renovate a warehouse for pandemic preparedness at a Veterans Affairs medical center. The project involves raising approximately 6,000 square feet of roof and adding 3,800 square feet of mezzanine storage space. Renovations will be phased to allow for continuous warehouse use. Scope includes upgrading building systems to current codes for energy efficiency, HVAC, data cabling, electrical distribution, and lighting. Structural work includes installing a new roof and mezzanine. Mechanical upgrades comprise replacing HVAC equipment with a new roof-mounted air handling unit and terminal boxes. The estimated price range is $2-5 million. Pursuant to applicable laws, this will be a total set-aside contract for Service-Disabled Veteran-Owned Small Businesses. The North American Industry Classification Code is 236220. Proposals are due by May 7, 2021 for the anticipated 330-day project completion period. The solicitation and site visit details are provided.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B
C
D
F
G
E
1 2 3 4 5 6 72.11.1 2.9 3.9
C.6
B.4
12.5
13.4 13.5
11.5
REMOVE EXISTING
ELECTRIC UNIT
HEATER.
REMOVE EXISTING
ELECTRIC UNIT
HEATER.
REMOVE EXISTING
ELECTRIC UNIT
HEATER.
REMOVE EXISTING
ELECTRIC UNIT
HEATER.
EXISTING ELECTRIC
UNIT HEATER TO
REMAIN.
EXISTING ELECTRIC
UNIT HEATER TO
REMAIN.
REMOVE EXISTING
ELECTRIC UNIT HEATER.
REMOVE EXISTING SIDEWALL
EXHAUST FAN, DUCT THROUGH
WALL, AND EXHAUST GRILLE.
PREPARE EXISTING 16X16
OPENING FOR NEW FAN AND
DUCTWORK INSTALLATION.
REMOVE EXISTING
ELECTRIC UNIT HEATER.
x
14x1614x1214x8
8x8
SG-E
14x6/210
SG-E
16x10/370
SG-E
16x10/370
SG-E
16x10/370 SG-E
16x10/360
20x16 20x12
12x12
SG-E
14x8/300
SG-E
14x8/300
REMOVE EXISTING HEAT
PUMP UNIT, ACCESSORIES,
TRIM, AND ALL ASSOCIATED
DUCTWORK.
RELOCATE EXISTING HEAT PUMP
CONDENSING UNIT IN PHASE 1 AND
MAINTAIN OPERATION DURING
INSTALLATION OF NEW HVAC
SYSTEM. REFER TO M102 FOR NEW
LOCATION. AFTER NEW HVAC
SYSTEM IS FULLY OPERATIONAL,
REMOVE CONDENSING UNIT AND
ALL ACCESSORIES, REFRIGERANT
PIPING, TRIM, ETC. IN ITS ENTIRETY.
RG-E
22x10/555
17x10
8x8
RG-E
8x6/210
26x10
26x12
12x12
30x10
RG-E
18x18/625
RG-E
18x12/325
26x8 10x8
24x8
SG-E
18x18/325
12x12 SG-E
21x12/625
REMOVE EXISTING
DUCT THRU ROOF
TO EXHAUST FAN
IN PHASE 1.
HP-E
HP-E
18"CWS
18"CWR
8"CWS
8"CWR
REMOVE PORTION OF
EXISTING CHILLED WATER
SUPPLY AND RETURN PIPING
IN PREPARATION FOR NEW
TAPS. PREPARE FOR NEW
CONNECTION.
COORDINATE WORK TO KEEP
THIS UNIT IN OPERATION UNTIL
WHSE-AHU-1 IS INSTALLED AND
OPERATIONAL.
RG-E
RG-E
22x10/555
RG-E RG-E RG-E
SG-ESG-E
SG-E
SG-E
REMOVE EXISTING REFRIGERATION
PIPING IN ITS ENTIRETY. COORDINATE
PHASING TO KEEP UNIT OPERATING
UNTIL NEW WHSE-AHU-1 IS IN
OPERATION.
18"CWS UP
18"CWR UP
1"LWS
1"LWR
CUT AND CAP EXISTING LWS &
LWR PIPING AFTER WHSE-AHU-1
SYSTEM IS FULLY OPERATIONAL.
1"LWS
1"LWR
1"LWS
1"LWR
1"LWS
1"LWR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Calvin rchitects, P.C.L 3705 North 200th Street
Elkhorn, Nebraska 68022
Phone: 402.291.6941 Fax: 402.291.9193
AH. INZ
Incandescence Life Safety, Inc.
3575 Ringsby Court, #408, Denver, CO, 80216
Phone:(720) 722-3010
589A4-20-158
IMEG Corp.
15 Sunnen Drive, Suite 104
St. Louis, MO 63143
Phone:(314) 951-2534
BID SET RENOVATE WAREHOUSE FOR
PANDEMIC PREPAREDNESS
HARRY S. TRUMAN MEM. VETERANS HOSPITAL
800 HOSPITAL DR., COLUMBIA MO 65201
Dwg. # of 94
C R e v it L o c a l F ile s \M
E P
T
.1
V A
T ru m a n W a re h o u s e
C
R u s s e ll.
J .A rn e s o n
.r v t
/2
/2
:1
:1
P
M
MD101
FIRST FLOOR PLAN - MECHANICAL
DEMOLITION
JASSNE ANUSHA03/24/2021
N O R
HT
1/8" = 1'-0"
FIRST FLOOR PLAN - MECHANICAL DEMOLITION
SHEET NOTES:
1. REFER TO ARCHITECTURAL PHASING
DRAWINGS PH101, PH102, AND PH103 FOR
ADDITIONAL INFORMATION.
KEYNOTES:
1. REMOVE EXISTING HEAT PUMP, ACCESSORIES,
TRIM, HANGERS, BRACKETS, ALL ASSOCIATED
DUCTWORK ETC. IN ITS ENTIRETY AS PART OF
PHASE 1. REMOVE WATER SOURCE PIPING
BACK TO MAINS AND CAP AS PART OF PHASE
1.
2. EXISTING WATER SOURCE LOOP PIPING
LOCATION.
3. RE-ROUTE WATER SOURCE LOOP PIPING AS
SHOWN FOR TEMPORARY OPERATION OF
WSHP IN ROOM W03 UNTIL NEW WSHE-AHU-1
SYSTEM IS FULLY OPERATIONAL.
4. REMOVE EXISTING DUCTWORK SYSTEM IN ITS
ENTIRETY AS PART OF PHASE 1. PROVIDE
TEMPORARY DUCTWORK WITH HORIZONTAL
DISCHARGE TO MAINTAIN TEMPERATURE
CONTROL OF ROOM W03 UNTIL WSHE-AHU-1
SYSTEM IS FULLY OPERATIONAL.
5. REMOVE EXISTING HEAT PUMP, ACCESSORIES,
WATER PUMP, ASSOCIATED PIPING, ETC. IN ITS
ENTIRETY AFTER NEW WSHE-AHU-1 SYSTEM IS
FULLY OPERATIONAL.
Revisions: Date:
BID SET 03/24/2021
ADDENDUM NO. 1 4/29/2021
atast Text Box
AMENDMENT #3
atast Text Box 05/07/2021 atast Snapshot