MD101 Amendment 3.pdf

PDF 333 KB Posted

Attached to
Z2DA--Renovate Warehouse for Pandemic Preparedness PN: 589A4-20-158
Solicitation number
36C25521R0075
Issued by

About this file

This document outlines a federal contract opportunity to renovate a warehouse for pandemic preparedness at a Veterans Affairs medical center. The project involves raising approximately 6,000 square feet of roof and adding 3,800 square feet of mezzanine storage space. Renovations will be phased to allow for continuous warehouse use. Scope includes upgrading building systems to current codes for energy efficiency, HVAC, data cabling, electrical distribution, and lighting. Structural work includes installing a new roof and mezzanine. Mechanical upgrades comprise replacing HVAC equipment with a new roof-mounted air handling unit and terminal boxes. The estimated price range is $2-5 million. Pursuant to applicable laws, this will be a total set-aside contract for Service-Disabled Veteran-Owned Small Businesses. The North American Industry Classification Code is 236220. Proposals are due by May 7, 2021 for the anticipated 330-day project completion period. The solicitation and site visit details are provided.

View the file

Other files

File Type Posted
AD102 Amendment 3.pdf PDF
M-301 Amendment 3.pdf PDF
EL101 Amendment 3.pdf PDF
EP101 Amendment 3.pdf PDF
S-501 Amendment 3.pdf PDF
AF101 Amendment 3.pdf PDF
PD101 Amendment 3.pdf PDF
M-102 Amendment 3.pdf PDF
M-101 Amendment 3.pdf PDF
AE101 Amendment 3.pdf PDF
AE401 Amendment 3.pdf PDF
M-500 Amendment 3.pdf PDF
P-101 Amendment 3.pdf PDF
S-301 Amendment 3.pdf PDF
PH101 Amendment 3.pdf PDF
AF502 Amendment 3.pdf PDF
ED101 Amendment 3.pdf PDF
11 00 00 Beam Scale Cut Sheet - Amendment 3.pdf PDF
AC102 Amendment 3.pdf PDF
31 62 00 Driven or Drilled Micropiles - Amendment 3.pdf PDF
36C25521R0075 0003.docx DOCX document
01 35 26 pgs 12-13 - Amendment 3.pdf PDF
AD101 Amendment 3.pdf PDF
PH103 Amendment 3.pdf PDF
S-001 Amendment 3.pdf PDF
00 01 10 pg 4 - Amendment 3.pdf PDF
ATTENDANCE ROSTER.pdf PDF
36C25521R0075 0002.docx DOCX document
589A4-20-158 GeoTech Report.pdf PDF
36C25521R0075 0001.docx DOCX document
Drawings 589A4-20-158 VOL 3- 1 page.pdf PDF
36C25521R0075_1.docx DOCX document
Drawings -589A4-20-158 VOL 2- 2 pages.pdf PDF
Drawings-589A4-20-158 VOL 4-1 page.pdf PDF
S02-Specifications 589A4-20-158- Volume 1 -630 pages.pdf PDF
S02-Specifications 589A4-20-158 - Volume 2 Divs 21-48- 848 pages.pdf PDF
Drawings 589A4-20-158 VOL 1- 90 pages.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B

C

D

F

G

E

1 2 3 4 5 6 72.11.1 2.9 3.9

C.6

B.4

12.5

13.4 13.5

11.5

REMOVE EXISTING

ELECTRIC UNIT

HEATER.

REMOVE EXISTING

ELECTRIC UNIT

HEATER.

REMOVE EXISTING

ELECTRIC UNIT

HEATER.

REMOVE EXISTING

ELECTRIC UNIT

HEATER.

EXISTING ELECTRIC

UNIT HEATER TO

REMAIN.

EXISTING ELECTRIC

UNIT HEATER TO

REMAIN.

REMOVE EXISTING

ELECTRIC UNIT HEATER.

REMOVE EXISTING SIDEWALL

EXHAUST FAN, DUCT THROUGH

WALL, AND EXHAUST GRILLE.

PREPARE EXISTING 16X16

OPENING FOR NEW FAN AND

DUCTWORK INSTALLATION.

REMOVE EXISTING

ELECTRIC UNIT HEATER.

x

14x1614x1214x8

8x8

SG-E

14x6/210

SG-E

16x10/370

SG-E

16x10/370

SG-E

16x10/370 SG-E

16x10/360

20x16 20x12

12x12

SG-E

14x8/300

SG-E

14x8/300

REMOVE EXISTING HEAT

PUMP UNIT, ACCESSORIES,

TRIM, AND ALL ASSOCIATED

DUCTWORK.

RELOCATE EXISTING HEAT PUMP

CONDENSING UNIT IN PHASE 1 AND

MAINTAIN OPERATION DURING

INSTALLATION OF NEW HVAC

SYSTEM. REFER TO M102 FOR NEW

LOCATION. AFTER NEW HVAC

SYSTEM IS FULLY OPERATIONAL,

REMOVE CONDENSING UNIT AND

ALL ACCESSORIES, REFRIGERANT

PIPING, TRIM, ETC. IN ITS ENTIRETY.

RG-E

22x10/555

17x10

8x8

RG-E

8x6/210

26x10

26x12

12x12

30x10

RG-E

18x18/625

RG-E

18x12/325

26x8 10x8

24x8

SG-E

18x18/325

12x12 SG-E

21x12/625

REMOVE EXISTING

DUCT THRU ROOF

TO EXHAUST FAN

IN PHASE 1.

HP-E

HP-E

18"CWS

18"CWR

8"CWS

8"CWR

REMOVE PORTION OF

EXISTING CHILLED WATER

SUPPLY AND RETURN PIPING

IN PREPARATION FOR NEW

TAPS. PREPARE FOR NEW

CONNECTION.

COORDINATE WORK TO KEEP

THIS UNIT IN OPERATION UNTIL

WHSE-AHU-1 IS INSTALLED AND

OPERATIONAL.

RG-E

RG-E

22x10/555

RG-E RG-E RG-E

SG-ESG-E

SG-E

SG-E

REMOVE EXISTING REFRIGERATION

PIPING IN ITS ENTIRETY. COORDINATE

PHASING TO KEEP UNIT OPERATING

UNTIL NEW WHSE-AHU-1 IS IN

OPERATION.

18"CWS UP

18"CWR UP

1"LWS

1"LWR

CUT AND CAP EXISTING LWS &

LWR PIPING AFTER WHSE-AHU-1

SYSTEM IS FULLY OPERATIONAL.

1"LWS

1"LWR

1"LWS

1"LWR

1"LWS

1"LWR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

Incandescence Life Safety, Inc.

3575 Ringsby Court, #408, Denver, CO, 80216

Phone:(720) 722-3010

589A4-20-158

IMEG Corp.

15 Sunnen Drive, Suite 104

St. Louis, MO 63143

Phone:(314) 951-2534

BID SET RENOVATE WAREHOUSE FOR

PANDEMIC PREPAREDNESS

HARRY S. TRUMAN MEM. VETERANS HOSPITAL

800 HOSPITAL DR., COLUMBIA MO 65201

Dwg. # of 94

C R e v it L o c a l F ile s \M

E P

T

.1

V A

T ru m a n W a re h o u s e

C

R u s s e ll.

J .A rn e s o n

.r v t

/2

/2

:1

:1

P

M

MD101

FIRST FLOOR PLAN - MECHANICAL

DEMOLITION

JASSNE ANUSHA03/24/2021

N O R

HT

1/8" = 1'-0"

FIRST FLOOR PLAN - MECHANICAL DEMOLITION

SHEET NOTES:

1. REFER TO ARCHITECTURAL PHASING

DRAWINGS PH101, PH102, AND PH103 FOR

ADDITIONAL INFORMATION.

KEYNOTES:

1. REMOVE EXISTING HEAT PUMP, ACCESSORIES,

TRIM, HANGERS, BRACKETS, ALL ASSOCIATED

DUCTWORK ETC. IN ITS ENTIRETY AS PART OF

PHASE 1. REMOVE WATER SOURCE PIPING

BACK TO MAINS AND CAP AS PART OF PHASE

1.

2. EXISTING WATER SOURCE LOOP PIPING

LOCATION.

3. RE-ROUTE WATER SOURCE LOOP PIPING AS

SHOWN FOR TEMPORARY OPERATION OF

WSHP IN ROOM W03 UNTIL NEW WSHE-AHU-1

SYSTEM IS FULLY OPERATIONAL.

4. REMOVE EXISTING DUCTWORK SYSTEM IN ITS

ENTIRETY AS PART OF PHASE 1. PROVIDE

TEMPORARY DUCTWORK WITH HORIZONTAL

DISCHARGE TO MAINTAIN TEMPERATURE

CONTROL OF ROOM W03 UNTIL WSHE-AHU-1

SYSTEM IS FULLY OPERATIONAL.

5. REMOVE EXISTING HEAT PUMP, ACCESSORIES,

WATER PUMP, ASSOCIATED PIPING, ETC. IN ITS

ENTIRETY AFTER NEW WSHE-AHU-1 SYSTEM IS

FULLY OPERATIONAL.

Revisions: Date:

BID SET 03/24/2021

ADDENDUM NO. 1 4/29/2021

atast Text Box

AMENDMENT #3

atast Text Box 05/07/2021 atast Snapshot

File details come from the government source that posted it. Updated .