This presolicitation notice describes a renovation construction project for the Department of Veterans Affairs. The scope of work involves renovating an existing 12,500 square foot pre-engineered metal building warehouse to raise approximately 6,000 square feet of roof and add 3,800 square feet of mezzanine/upper level storage space. Renovations include upgrading the building envelope, HVAC system, data cabling, electrical distribution, and lighting. A 1,500 square foot controlled-access room will also be rebuilt for drug and controlled substance storage. The estimated price range for completion is $2,000,000 to $5,000,000. The solicitation is set aside as a total small business set aside for Service-Disabled Veteran-Owned Small Businesses. The North American Industry Classification Code is 236220. The proposal due date is on or about May 7, 2021. Award will be made using Best Value Lowest Price Technical Acceptable source selection.

View the file

Other files

File Type Posted
MD101 Amendment 3.pdf PDF
M-301 Amendment 3.pdf PDF
EL101 Amendment 3.pdf PDF
EP101 Amendment 3.pdf PDF
S-501 Amendment 3.pdf PDF
AF101 Amendment 3.pdf PDF
PD101 Amendment 3.pdf PDF
M-102 Amendment 3.pdf PDF
M-101 Amendment 3.pdf PDF
AE101 Amendment 3.pdf PDF
AE401 Amendment 3.pdf PDF
M-500 Amendment 3.pdf PDF
P-101 Amendment 3.pdf PDF
S-301 Amendment 3.pdf PDF
PH101 Amendment 3.pdf PDF
AF502 Amendment 3.pdf PDF
ED101 Amendment 3.pdf PDF
11 00 00 Beam Scale Cut Sheet - Amendment 3.pdf PDF
AC102 Amendment 3.pdf PDF
31 62 00 Driven or Drilled Micropiles - Amendment 3.pdf PDF
36C25521R0075 0003.docx DOCX document
01 35 26 pgs 12-13 - Amendment 3.pdf PDF
AD101 Amendment 3.pdf PDF
PH103 Amendment 3.pdf PDF
S-001 Amendment 3.pdf PDF
00 01 10 pg 4 - Amendment 3.pdf PDF
ATTENDANCE ROSTER.pdf PDF
36C25521R0075 0002.docx DOCX document
589A4-20-158 GeoTech Report.pdf PDF
36C25521R0075 0001.docx DOCX document
Drawings 589A4-20-158 VOL 3- 1 page.pdf PDF
36C25521R0075_1.docx DOCX document
Drawings -589A4-20-158 VOL 2- 2 pages.pdf PDF
Drawings-589A4-20-158 VOL 4-1 page.pdf PDF
S02-Specifications 589A4-20-158- Volume 1 -630 pages.pdf PDF
S02-Specifications 589A4-20-158 - Volume 2 Divs 21-48- 848 pages.pdf PDF
Drawings 589A4-20-158 VOL 1- 90 pages.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EE

A

B

C

D

F

G

E

1 2 3 4 5 6 7

'-4

'-0

'-0

'-4

25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0"

'-4

'-0

'-0

'-4

1'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0"

2.11.1 2.9

3.9

C.6

B.4

AE301

AE303

AE310

C8

S

Rb Ra

12.5

13.4

13.5

S.9

9.1

10.4

T

13.2

U

R"

10.2

9.8

8.9

DD CC.6 CC BB AA Z Y U.5VWW.3W.4X

11.5

S L O

P E

/1

E

X

IS

T

CHASE

C00Z

DS

DS DS

DS

NEW AHU -

SEE MECH.

DSDS

DS DS

REMOVE AND

REPLACE

REMOVE

AND

REPLACE

REMOVE AND REPLACE REMOVE AND REPLACE

EXISTING A/C UNIT -

SEE MECH FOR RELOCATION

AE501

B5

SHADED AREA NOT IN SCOPE OF WORK

SHADED

AREA

NOT IN

SCOPE

OF

WORK

SHADED AREA

NOT IN SCOPE

OF WORK

1. DASHED BOLD LINES INDICATE EXTEND OF DEMOLITION INCLUDING

THE FOLLOWING - CONTRACTOR TO DISPOSE AS DIRECTED BY THE

COR:

* INTERIOR PARTITIONS (REMOVED TO STRUCTURE)

* CEILINGS NOT DESIGNATED FOR REMOVAL AND REINSTALLATION,

INCLUDING CEILING SUSPENSION SYSTEM, MISC. STEEL

SUPPORTS FOR SUSPENDED EQUIPMENT, SUSPENDED

EQUIPMENT, LIGHT FIXTURES, DIFFUSERS AND GRILLES, ETC.

* FLOOR FINISHES (TO CONCRETE) INCLUDING CARPET, VCT,

SHEET VINYL AND OTHER RESILIENT FLOORING; CERAMIC TILE,

QUARRY TILE, BRICK PAVERS, ETC.

* DOORS AND FRAMES (UNLESS NOTED OTHERWISE IN DOOR

SCHEDULE)

* WINDOW GLAZING AND FRAMES (UNLESS NOTED OTHERWISE)

* BRICK AND BACK-UP WALL SYSTEM

* PLUMBING FIXTURES (SEE PLUMBING DEMOLITION DRAWINGS)

2. REFER TO FIRE PROTECTION, PLUMBING, ELECTRICAL AND

TECHNOLOLGY DEMOLITION DRAWINGS FOR RELATED DEMOLITION

WORK.

3. ITEMS LISTED BELOW SHOWN WITH DASHED LINES ARE TO BE

SALVAGED AND RETURNED TO THE VA UNLESS NOTED OTHERWISE -

COORDINATE W/ COR FOR FINAL DETERMINATION OF ITEMS TO BE

SALVAGED AND RETURNED TO THE VA OR TO DISPOSED OF BY THE

CONTRACTOR:

* CABINETWORK, SHELVING, BASES

* TOILET PARTITIONS AND TOILET ACCESSORIES

* TACK BOARDS, MARKER BOARDS, PEGBOARDS, DISPLAY BOARDS

(TO BE SALVAGED, STORED AND REINSTALLED - SEE INTERIOR

ELEVATIONS)

* OFFICE EQUIPMENT, FURNITURE, APPLIANCES, PERSONNEL

LOCKERS, CLOCKS

4. REFER TO PLUMBING, MECHANICAL, ELECTRICAL AND TECHNOLOGY

DRAWINGS FOR DEMOLITION OF MECH/ELECT/TECH WORK NOT

SHOWN ON ARCHITECTURAL DRAWINGS.

5. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS.

DISCREPANCIES, WHEN FOUND, SHALL BE BROUGHT TO THE

ATTENTION OF THE COR FOR FURTHER ACTION.

6. ALL LIGHT OR HALFTONE LINES INDICATE EXISTING TO REMAIN.

COORDINATE AND VERIFY REQUIREMENTS FOR PROTECTION OF

ITEMS DURING DEMOLITION AND CONSTRUCTION W/ COR.

7. SEE SPECIFICATIONS SECTION 02 41 00 FOR DEMOLITION, CUTTING

AND PATCHING.

8. SEE ROOM FINISH SCHEDULE, MECHANICAL PLANS, AND ELECTRICAL

PLANS FOR EXTENT OF NEW CEILING CONSTRUCTION OR CEILING

PATCHING IN EXISTING AREAS.

9. SEE ROOM FINISH SCHEDULE FOR EXTENTS OF NEW FLOORING

MATERIAL AND TRANSITIONS IN EXISTING AREAS.

10. SEE ROOM FINISH SCHEDULE FOR EXTENT OF NEW WALL COVERING

MATERIAL IN EXISTING AREAS. WHERE NEW FINISHES ARE

REQUIRED, REMOVE EXISTING WALL FINISHES, (TEXRURED PLASTIC

COATING, VINYL WALL COVERING, PANELING, BASE, ETC.).

11. CONTRACTOR TO VERIFY ALL WALL CONSTRUCTION & FINISHES

NOTED FOR REMOVAL. TAKE INTO ACCOUNT ANY DISCREPANCY AND

MAKE PROPER ADJUSTMENT TO ACCOMPLISH REQUIRED

CONSTRUCTION & FINISHES. IF STRUCTURAL INTEGRITY IS

VIOLATED, CONTACT ARCHITECT. COORDINATE PHASING WITH

OWNER.

12. COORDINATE REMOVAL AND STORAGE OF FURNITURE & EXISTING

EQUIPMENT WITH OWNER.

13. REFER TO RENOVATION DRAWINGS FOR RELOCATION OF EXISTING

EQUIPMENT. REFER TO EQUIPMENT SCHEDULE FOR DESIGNATION

RESPONSIBILTY FOR ITEMS PROVIDED BY VA OR CONTRACTOR.

14. SAW CUT EDGES OF EXISTING FLOOR SLAB FOR REMOVAL AND

INSTALLATION OF UTILITIES. REFER TO MECHANICAL AND

ELECTRICAL DRAWINGS.

15. REMOVE FURRING OR GWB ONLY WHERE REQUIRED TO COMPLETE

CONSTRUCTION. PATCH AND MATCH WALLS AS REQUIRED TO

COMPLETE AND MATCH EXISTING CONDITIONS, UNLESS AN

ALTERNATIVE MATERIAL AND FINISH IS INDICATED.

16. REMOVE CEILINGS ONLY AS REQUIRED FOR NEW CONSTRUCTION.

REINSTALL, REPLACE OR PATCH AS REQUIRED. SEE REFLECTED

CEILING PLAN FOR ADDITIONAL INFORMATION.

17. INFILL ABANDONED FPMET WALL PENETRATIONS TO MATCH EXIST

CONSTRUCTION. COORDINATE WTH MECH/ELECT.

18. REMOVE EXIST WALL-MTD. SIGNAGE & RETURN TO VA. COORDINATE

REMOVAL WITH COR. SEE SIGNAGE GENERAL NOTES SHEET AE502

FOR REMOVAL OF EXISTING EMERGENCY AND SAFETY SIGNAGE.

19. SEE "TEMPORARY BARRIERS AND ENCLOSURES" NOTES ON SHEET

G-002 AND SECTION 01 56 00 "TEMPORARY BARRIERS AND

ENCLOSURES" FOR INFORMATION RELATED TO TEMPORARY

ENCLOSURES, TEMPOARARY CONSTRUCTION BARRIERS AND

PROTECTION OF EXISTING BUILDING, UTILITIES AND RELATED ITEMS.

20. SEE PHASING PLAN SHEETS FOR INFORMATION RELATED TO

TEMPORARY BARRIERS NOT SHOWN IN DEMOLITION PLAN.

DEMOLITION

GENERAL NOTES:

PHASING GENERAL NOTES:

PHASING TO BE DEVELOPED TO MINIMIZE DISRUPTION OF

OWNER-RELATED ACTIVITIES WITHIN THE PROJECT AREA.

REFER TO PHASING PLANS PH101 THRU PH103 FOR

ADDITIONAL INFORMATION.

BRIEF PHASING DESCRIPTION:

A. PHASE 1 - DEMOLITION AND INSTALLATION OF WEST

WAREHOUSE NEW ROOF SUPERSTRUCTURE,

MODIFICATION OF EXISTING EAST WAREHOUSE ROOF

AND BUILDING STRUCTURE; LIMITED DEMOLITION

EAST WAREHOUSE OF INTERIOR ROOMS W07-W08-

W09; CONSTRUCT HVAC FROM BLDG. 1 TO

WAREHOUSE.

B. PHASE 2 - DEMOLITION OF WEST WAREHOUSE

EXISTING ROOF/FRAMING, CONSTRUCTION OF WEST

WAREHOUSE UPPER EXTERIOR WALL ENCLOSURE;

LIMITED DEMOLITION OF WEST WAREHOUSE INTERIOR

ROOM W03A.

C. PHASE 3 - CONSTRUCTION OF NEW MEZZANINE

FLOOR AND DRUG STORAGE ROOM W03A;

CONSTRUCTION OF NEW OFFICE/TOILET W08-W09;

NEW EXTERIOR WALL INSULATION AND FINISHES.

PHASING NOTES:

BLDG 14 -

WAREHOUSE

KEY PLAN

AREA 'G'

AREA 'C' AREA 'D'

AREA 'B' AREA 'A'

AREA 'E'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

Incandescence Life Safety, Inc.

3575 Ringsby Court, #408, Denver, CO, 80216

Phone:(720) 722-3010

589A4-20-158

IMEG Corp.

15 Sunnen Drive, Suite 104

St. Louis, MO 63143

Phone:(314) 951-2534

BID SET RENOVATE WAREHOUSE FOR

PANDEMIC PREPAREDNESS

HARRY S. TRUMAN MEM. VETERANS HOSPITAL

800 HOSPITAL DR., COLUMBIA MO 65201

Dwg. # of 94

C

L H

D C

\H o m e

\t fi e s e lm a n \R e v it M o d e ls \R

-2

-2

A

-2

-1

R e n o v a te W a re h o u s e tf ie s e lm a n A

G

Y .r v t

/6

/2

:5

:3

P M

AD102

ROOF PLAN - DEMOLITION

AHT TJF03/24/2021

N O R

HT

1/8" = 1'-0"1

ROOF PLAN - DEMOLITION

KEYNOTE LEGEND -

DEMOLITION

KEY

VALUE KEYNOTE TEXT

1 REMOVE DOOR AND FRAME. SEE PHASING

PLAN

2 REMOVE PLUMBING AND FIXTURES

INDICATED. REFER TO MECHANICAL

DRAWINGS.

3 REMOVE WALL PRIOR TO ROOF DEMOLITION -

SEE PHASE 2.

4 REMOVE EXIST ROOF AND FRAME. SEE

PHASE 2.

5 EXIST ROOF TO REMAIN.

6 REMOVE GUTTER (PHASE 2).

7 GUTTER TO REMAIN.

8 REMOVE IN-FLOOR SCALE AND RELATED

EQUIPMENT. INFILL EXISTING PIT WITH

COMPACTED GRANULAR FILL & CONC. SEE

STRUCTURAL.

9 REMOVE ACCESS-CONTROLLED DOOR. SEE

ELECTRICAL & TECHNOLOGY DEMO DRAWING

FOR ADDITIONAL INFO. RE: CONTROLS &

ALARM SALVAGE AND REUSE.

10 REMOVE CONCRETE DECK OVER CMU

PARTITION. SEE PHASE 1.

11 REMOVE EXIST ACCESS CONTROL

KEYPAD-CARD READER SALVAGE AND REUSE

FOR W01. SEE DEMO KEYNOTE 24.

12 REMOVE EXIST WINDOW AND WALL INFILL

FOR NEW COUNTERTOP/WINDOW/WALL

INFILL. SEE ENLARGED FLOOR PLAN AND

INTERIOR ELEVATIONS.

13 ROOM TO BE VACATED BY VA PRIOR TO

START OF PHASE 1.

14 AREA TO BE PARTIALLY VACATED FOR WORK

BY VA PRIOR TO WORK FOR NEW

CONSTRUCTION. GC TO COORDINATE W/ COR

FOR INSTALLATION OF TEMPORARY

CONSTRUCTION PARTITIONS IN ROOM

DURING WORK.

16 EXIST FURNITURE, STORAGE RACKS,

SHELVING & EQUIP. TO BE REMOVED BY VA

PRIOR TO CONST. SALVAGE, STORE AND

COORDINATE W/ COR FOR REUSE.

17 REMOVE PORTION OF CMU WALL AND

PROVIDE TEMPORARY SUPPORT AS

REQUIRED FOR NEW WORK - SEE STRUCT.

FOR NEW LINTELS, SEE DOOR SCHEDULE

FOR OPENINGS.

18 REMOVE EXIST GWB FOR ACCESS TO

EXTERIOR WALL FOR NEW SPRAY FOAM

INSULATION INSTALLATION.

19 REMOVE PORTION OF EXISTING SUSPENDED

ACCUSTICAL CEILING FOR WORK ABOVE

CEILING. SEE RCP AND MECH/ELECT/TECH.

20 EXIST ACCESS CONTROL KEYPAD-CARD

READER TO REMOVE & REPLACE - SEE

ELECT/TECH.

21 EXIST OVERHEAD WALL-MOUNTED

MIRROR-REFLECTOR TO REMAIN.

22 FIRE EXTINGUSHER AND MOUNTING BRACKET

TO REMAIN.

23 ACCESS-CONTROLLED DOOR. SEE

ELECTRICAL & TECHNOLOGY DEMO

DRAWINGS FOR ADDITIONAL INFO. RE:

CONTROLS & ALARM.

24 PREP FOR RELOCATION OF ACCESS

CONTROL HARDWARE FROM W06 TO W01.

25 REWORK HM DOOR FRAME FOR NEW

ELECTRIC STRIKE.

26 EXIST SECURITY PANEL TO REMOVE &

RELOCATE - SEE ELECT/TECH.

27 EXIST ACCESS CONTROL CARD READER TO

REPLACE w/ PUSH BUTTON - SEE

ELECT/TECH.

28 REPLACE ACCESS CONTROL KEYPAD-CARD

READER - SEE HW & ELECT/TECH.

29 EXIST ACCESS CONTROL PAD TO REMOVE &

REPLACE AS PART OF CAGE REMOVAL - SEE

ELECT/TECH.

30 ACCESS CONTROL & SECURITY CONTROL

PADS TO REMOVE & REINSTALL - SEE

ELECT/TECH.

31 DEMO EXIST CONC FLOOR AND PREP FOR

NEW COLUMN & EXIST STRUCT DEMO.

32 EXIST LOCKERS. VA TO REMOVE AND STORE

FOR REINSTALLATION BY GC IN NEW STAFF

LOUNGE W04A.

33 EXIST TABLE. VA TO REMOVE AND STORE

FOR REINSTALLATION IN NEW STAFF LOUNGE

W04A.

34 EXIST REFRIGERATOR/FREEZER. VA TO

REMOVE AND STORE FOR REINSTALLATION IN

NEW STAFF LOUNGE W04A.

35 REMOVE EXIST TOILET ACC'YS. SALVAGE &

STORE FOR REUSE IN NEW STAFF TOILET

W08.

36 EXIST HVAC UNIT - SEE MECH.

37 EXIST WIRE MESH CAGE - DISASSEMBLE AND

STORE FOR REINSTALLATION AT END OF

PHASE 3.

38 SEE MEP DRAWINGS FOR WORK IN ROOM

OUTSIDE OF WAREHOUSE.

39 EXIST ROOF-MTD. HVAC EQUP. TO REMOVE -

SEE MECH.

40 SEE STRUCT. FOR WORK RELATED TO

ADDITION OF PURLINS.

X

BLDG 14 -

WAREHOUSE

KEY PLAN

AREA 'G'

AREA 'C' AREA 'D'

AREA 'B' AREA 'A'

AREA 'E'

ROOF FAN TO

DEMO/REPLACE

2323Revisions: Date:

Amendment 3 5-7-211

Sheets
AD102 - ROOF PLAN - DEMOLITION

File details come from the government source that posted it. Updated .