This document outlines a federal contract opportunity to renovate a warehouse for pandemic preparedness at a Veterans Affairs medical center. The project includes raising part of the warehouse roof and adding mezzanine storage space. Renovations will upgrade the building envelope, HVAC system, data cabling, electrical distribution, and lighting. A controlled-access drug storage room will also be rebuilt.
The solicitation number is 36C25521R0075. As a total SDVOSB set-aside, the project NAICS code is 236220 with an estimated value between $2-5 million. The performance period is up to 330 days from notice to proceed. The Department of Veterans Affairs Veterans Health Administration will evaluate proposals using LPTA and award without discussions. Interested parties must register in SAM and VIP and monitor amendments on SAM. An organized site visit will be scheduled. Proposals are due on or about May 7, 2021. Renovations will be conducted in three phases to allow continued warehouse use. Scope of work includes architectural, structural, fire protection, mechanical, plumbing, electrical, and technology components.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
FD
1. DASHED BOLD LINES INDICATE EXTEND OF DEMOLITION INCLUDING
THE FOLLOWING - CONTRACTOR TO DISPOSE AS DIRECTED BY THE
COR:
* INTERIOR PARTITIONS (REMOVED TO STRUCTURE)
* CEILINGS NOT DESIGNATED FOR REMOVAL AND REINSTALLATION,
INCLUDING CEILING SUSPENSION SYSTEM, MISC. STEEL
SUPPORTS FOR SUSPENDED EQUIPMENT, SUSPENDED
EQUIPMENT, LIGHT FIXTURES, DIFFUSERS AND GRILLES, ETC.
* FLOOR FINISHES (TO CONCRETE) INCLUDING CARPET, VCT,
SHEET VINYL AND OTHER RESILIENT FLOORING; CERAMIC TILE,
QUARRY TILE, BRICK PAVERS, ETC.
* DOORS AND FRAMES (UNLESS NOTED OTHERWISE IN DOOR
SCHEDULE)
* WINDOW GLAZING AND FRAMES (UNLESS NOTED OTHERWISE)
* BRICK AND BACK-UP WALL SYSTEM
* PLUMBING FIXTURES (SEE PLUMBING DEMOLITION DRAWINGS)
2. REFER TO FIRE PROTECTION, PLUMBING, ELECTRICAL AND
TECHNOLOLGY DEMOLITION DRAWINGS FOR RELATED DEMOLITION
WORK.
3. ITEMS LISTED BELOW SHOWN WITH DASHED LINES ARE TO BE
SALVAGED AND RETURNED TO THE VA UNLESS NOTED OTHERWISE -
COORDINATE W/ COR FOR FINAL DETERMINATION OF ITEMS TO BE
SALVAGED AND RETURNED TO THE VA OR TO DISPOSED OF BY THE
CONTRACTOR:
* CABINETWORK, SHELVING, BASES
* TOILET PARTITIONS AND TOILET ACCESSORIES
* TACK BOARDS, MARKER BOARDS, PEGBOARDS, DISPLAY BOARDS
(TO BE SALVAGED, STORED AND REINSTALLED - SEE INTERIOR
ELEVATIONS)
* OFFICE EQUIPMENT, FURNITURE, APPLIANCES, PERSONNEL
LOCKERS, CLOCKS
4. REFER TO PLUMBING, MECHANICAL, ELECTRICAL AND TECHNOLOGY
DRAWINGS FOR DEMOLITION OF MECH/ELECT/TECH WORK NOT
SHOWN ON ARCHITECTURAL DRAWINGS.
5. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS.
DISCREPANCIES, WHEN FOUND, SHALL BE BROUGHT TO THE
ATTENTION OF THE COR FOR FURTHER ACTION.
6. ALL LIGHT OR HALFTONE LINES INDICATE EXISTING TO REMAIN.
COORDINATE AND VERIFY REQUIREMENTS FOR PROTECTION OF
ITEMS DURING DEMOLITION AND CONSTRUCTION W/ COR.
7. SEE SPECIFICATIONS SECTION 02 41 00 FOR DEMOLITION, CUTTING
AND PATCHING.
8. SEE ROOM FINISH SCHEDULE, MECHANICAL PLANS, AND ELECTRICAL
PLANS FOR EXTENT OF NEW CEILING CONSTRUCTION OR CEILING
PATCHING IN EXISTING AREAS.
9. SEE ROOM FINISH SCHEDULE FOR EXTENTS OF NEW FLOORING
MATERIAL AND TRANSITIONS IN EXISTING AREAS.
10. SEE ROOM FINISH SCHEDULE FOR EXTENT OF NEW WALL COVERING
MATERIAL IN EXISTING AREAS. WHERE NEW FINISHES ARE
REQUIRED, REMOVE EXISTING WALL FINISHES, (TEXRURED PLASTIC
COATING, VINYL WALL COVERING, PANELING, BASE, ETC.).
11. CONTRACTOR TO VERIFY ALL WALL CONSTRUCTION & FINISHES
NOTED FOR REMOVAL. TAKE INTO ACCOUNT ANY DISCREPANCY AND
MAKE PROPER ADJUSTMENT TO ACCOMPLISH REQUIRED
CONSTRUCTION & FINISHES. IF STRUCTURAL INTEGRITY IS
VIOLATED, CONTACT ARCHITECT. COORDINATE PHASING WITH
OWNER.
12. COORDINATE REMOVAL AND STORAGE OF FURNITURE & EXISTING
EQUIPMENT WITH OWNER.
13. REFER TO RENOVATION DRAWINGS FOR RELOCATION OF EXISTING
EQUIPMENT. REFER TO EQUIPMENT SCHEDULE FOR DESIGNATION
RESPONSIBILTY FOR ITEMS PROVIDED BY VA OR CONTRACTOR.
14. SAW CUT EDGES OF EXISTING FLOOR SLAB FOR REMOVAL AND
INSTALLATION OF UTILITIES. REFER TO MECHANICAL AND
ELECTRICAL DRAWINGS.
15. REMOVE FURRING OR GWB ONLY WHERE REQUIRED TO COMPLETE
CONSTRUCTION. PATCH AND MATCH WALLS AS REQUIRED TO
COMPLETE AND MATCH EXISTING CONDITIONS, UNLESS AN
ALTERNATIVE MATERIAL AND FINISH IS INDICATED.
16. REMOVE CEILINGS ONLY AS REQUIRED FOR NEW CONSTRUCTION.
REINSTALL, REPLACE OR PATCH AS REQUIRED. SEE REFLECTED
CEILING PLAN FOR ADDITIONAL INFORMATION.
17. INFILL ABANDONED FPMET WALL PENETRATIONS TO MATCH EXIST
CONSTRUCTION. COORDINATE WTH MECH/ELECT.
18. REMOVE EXIST WALL-MTD. SIGNAGE & RETURN TO VA. COORDINATE
REMOVAL WITH COR. SEE SIGNAGE GENERAL NOTES SHEET AE502
FOR REMOVAL OF EXISTING EMERGENCY AND SAFETY SIGNAGE.
19. SEE "TEMPORARY BARRIERS AND ENCLOSURES" NOTES ON SHEET
G-002 AND SECTION 01 56 00 "TEMPORARY BARRIERS AND
ENCLOSURES" FOR INFORMATION RELATED TO TEMPORARY
ENCLOSURES, TEMPOARARY CONSTRUCTION BARRIERS AND
PROTECTION OF EXISTING BUILDING, UTILITIES AND RELATED ITEMS.
20. SEE PHASING PLAN SHEETS FOR INFORMATION RELATED TO
TEMPORARY BARRIERS NOT SHOWN IN DEMOLITION PLAN.
DEMOLITION
GENERAL NOTES:
A
B
C
D
F
G
E
1 2 3 4 5 6 7
151'-11 15/16"
'-8
'-0
'-4
'-0
'-0
'-4
'-0
1'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 11 15/16"
'-0
'-4
'-0
'-0
'-4
'-0
1'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 11 15/16"
AE201
AE201
AE201 2
AE2013
2.11.1 2.9
3.9
C.6
B.4
AE301
STAFF
LOUNGE
(EXISTING)
W07
DRUG
CACHE-STORAGE
W03A
BULK
ITEMS
STORAGE
W03B
BULK
ITEMS
STORAGE
W03
PROSTHETICS
STORAGE
W04
STERILE
CONSUMABLES
(SOFT
GOODS)
STORAGE
W05
OIT
CLOSET
W05BCORRIDOR
WC03
RECEIVING
DOCK
W02
CORRIDOR
WC01A
VETERANS
CANTEEN
SERVICE
(VCS)
STORAGE
W01
CORRIDOR
CBC2
AE303
25'-2 11/16" 49'-4 3/4" 12'-5 9/16" 23'-7 11/16" 14'-0 7/8" 24'-5 5/8"
'-6
'-0
/4
'-0
'-1
/8
'-7
/8
'-0
'-1
/8
17'-0 1/2" 8'-4" 5'-8 1/8"
DF
17 17
'-7
/8
'-5
/8
'-5
/8
'-1
'-7
/2
'-5
/8
'-1
/4
AE302
AE303
PROSTHETICS
STOR
(EXISTING)
EW04A
RECEIVING/ISSUE
W10C
RECEIVING/ISSUE
W10B
RECEIVING/ISSUE
W10A
EQUIPMENT
PREP
STAGING
(EXISTING)
EW05A
CORRIDOR
WC02
STORAGE
(EXISTING)
EW06
STAFF
TOILET
(EXISTING)
EW08
CORRIDOR
WC01
AE503 C3
S
Rb Ra
12.5
13.4
13.5
S.9
9.1
10.4
T
13.2
U
U
R"
10.2
9.8
8.9
DD CC.6 CC BB AA Z Y U.5VWW.3W.4X
11.5
AE311
F1
AE311
F5
AE311
F3
CORRIDOR
CBC2
C013
AE310
F7
SHEET
METAL
SHOP
C013A
SHEET
METAL
SHOP
C013
CHASE
C00Z
RELIEF
AIR
AREAWAY
G00Y
CHILLED
WATER/PIPING
AREAWAY
G00X
UNEXCAVATED
UNEX
CORRIDOR
CBG2
CORRIDOR
CBG1B
FRESH
AIR
AREAWAY
G001A
MECHANICAL
ROOM
G001
CORRIDOR
CBG1A
CORRIDOR
G012
ELECT
ROOM
G013
BULK
STORAGE
G047
CLEAN
RECEIVING
BREAKOUT
G048
STORAGE
W10
MECHANICAL
ROOM
C012
FE
EXISTING
MANHOLE -
SEWER
EXISTING
MANHOLE -
ELECT.
EXISTING MANHOLE -
STORM SEWER
MANHOLE FOR
SEWER
DSDS
DS DS
DS DS
DS DS
FDC SIAMESE
CONNECTION
722.82723.85
719.80 719.69 719.76
719.50
721.90
719.34
719.93
FH
WV
720.00
719.29
ECJ
ECJ
ECJ
ECJ
CORRIDOR
WC04
REMOVE AND
REPLACE
REMOVE
AND
REPLACE
REMOVE AND REPLACE REMOVE AND REPLACE
ALCOVE
(EXISTING)
EWC01B
DESK COPIER
4 4
14 16
CORRIDOR
CBG1
33 33 32
W
S S
S S
S S
S S
SSS
S
SS SS
SS
W
S
S
SS
CW
CW
C W
SS
SS SS
S
UGE
UGE UGE
SS
UGE
UGE
UGE
S
S
S
S
SS
SS SS
S S
S S
S S
W
UGE
W
CUT, CAP & REMOVE
PORTION OF UGE
OUTSIDE OF BLDG - SEE
ELEC DEMO
EXISTING SHOWER/EYE-WASH
31 31
31 31 31 31
SHADED AREA NOT IN SCOPE OF WORK
SHADED
AREA
NOT IN
SCOPE
OF
WORK
SHADED AREA
NOT IN SCOPE
OF WORK
PHASING GENERAL NOTES:
PHASING TO BE DEVELOPED TO MINIMIZE DISRUPTION OF
OWNER-RELATED ACTIVITIES WITHIN THE PROJECT AREA.
REFER TO PHASING PLANS PH101 THRU PH103 FOR
ADDITIONAL INFORMATION.
BRIEF PHASING DESCRIPTION:
A. PHASE 1 - DEMOLITION AND INSTALLATION OF WEST
WAREHOUSE NEW ROOF SUPERSTRUCTURE,
MODIFICATION OF EXISTING EAST WAREHOUSE ROOF
AND BUILDING STRUCTURE; LIMITED DEMOLITION
EAST WAREHOUSE OF INTERIOR ROOMS W07-W08-
W09; CONSTRUCT HVAC FROM BLDG. 1 TO
WAREHOUSE.
B. PHASE 2 - DEMOLITION OF WEST WAREHOUSE
EXISTING ROOF/FRAMING, CONSTRUCTION OF WEST
WAREHOUSE UPPER EXTERIOR WALL ENCLOSURE;
LIMITED DEMOLITION OF WEST WAREHOUSE INTERIOR
ROOM W03A.
C. PHASE 3 - CONSTRUCTION OF NEW MEZZANINE
FLOOR AND DRUG STORAGE ROOM W03A;
CONSTRUCTION OF NEW OFFICE/TOILET W08-W09;
NEW EXTERIOR WALL INSULATION AND FINISHES.
PHASING NOTES:
LEGEND
EXIST
EXIST /
DEMOLITION
BLDG 14 -
WAREHOUSE
KEY PLAN
AREA 'G'
AREA 'C' AREA 'D'
AREA 'B' AREA 'A'
AREA 'E'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Calvin rchitects, P.C.L 3705 North 200th Street
Elkhorn, Nebraska 68022
Phone: 402.291.6941 Fax: 402.291.9193
AH. INZ
Incandescence Life Safety, Inc.
3575 Ringsby Court, #408, Denver, CO, 80216
Phone:(720) 722-3010
589A4-20-158
IMEG Corp.
15 Sunnen Drive, Suite 104
St. Louis, MO 63143
Phone:(314) 951-2534
BID SET RENOVATE WAREHOUSE FOR
PANDEMIC PREPAREDNESS
HARRY S. TRUMAN MEM. VETERANS HOSPITAL
800 HOSPITAL DR., COLUMBIA MO 65201
Dwg. # of 94
C
L H
D C
\H o m e
\t fi e s e lm a n \R e v it M o d e ls \R
-2
-2
A
-2
-1
R e n o v a te W a re h o u s e tf ie s e lm a n A
G
Y .r v t
/6
/2
:5
:5
P M
AD101
FLOOR PLAN - DEMOLITION
AHT RJR/TJF03/24/2021
KEYNOTE LEGEND -
DEMOLITION
KEY
VALUE KEYNOTE TEXT
1 REMOVE DOOR AND FRAME. SEE PHASING
PLAN
2 REMOVE PLUMBING AND FIXTURES
INDICATED. REFER TO MECHANICAL
DRAWINGS.
3 REMOVE WALL PRIOR TO ROOF DEMOLITION -
SEE PHASE 2.
4 REMOVE EXIST ROOF AND FRAME. SEE
PHASE 2.
5 EXIST ROOF TO REMAIN.
6 REMOVE GUTTER (PHASE 2).
7 GUTTER TO REMAIN.
8 REMOVE IN-FLOOR SCALE AND RELATED
EQUIPMENT. INFILL EXISTING PIT WITH
COMPACTED GRANULAR FILL & CONC. SEE
STRUCTURAL.
9 REMOVE ACCESS-CONTROLLED DOOR. SEE
ELECTRICAL & TECHNOLOGY DEMO DRAWING
FOR ADDITIONAL INFO. RE: CONTROLS &
ALARM SALVAGE AND REUSE.
10 REMOVE CONCRETE DECK OVER CMU
PARTITION. SEE PHASE 1.
11 REMOVE EXIST ACCESS CONTROL
KEYPAD-CARD READER SALVAGE AND REUSE
FOR W01. SEE DEMO KEYNOTE 24.
12 REMOVE EXIST WINDOW AND WALL INFILL
FOR NEW COUNTERTOP/WINDOW/WALL
INFILL. SEE ENLARGED FLOOR PLAN AND
INTERIOR ELEVATIONS.
13 ROOM TO BE VACATED BY VA PRIOR TO
START OF PHASE 1.
14 AREA TO BE PARTIALLY VACATED FOR WORK
BY VA PRIOR TO WORK FOR NEW
CONSTRUCTION. GC TO COORDINATE W/ COR
FOR INSTALLATION OF TEMPORARY
CONSTRUCTION PARTITIONS IN ROOM
DURING WORK.
16 EXIST FURNITURE, STORAGE RACKS,
SHELVING & EQUIP. TO BE REMOVED BY VA
PRIOR TO CONST. SALVAGE, STORE AND
COORDINATE W/ COR FOR REUSE.
17 REMOVE PORTION OF CMU WALL AND
PROVIDE TEMPORARY SUPPORT AS
REQUIRED FOR NEW WORK - SEE STRUCT.
FOR NEW LINTELS, SEE DOOR SCHEDULE
FOR OPENINGS.
18 REMOVE EXIST GWB FOR ACCESS TO
EXTERIOR WALL FOR NEW SPRAY FOAM
INSULATION INSTALLATION.
19 REMOVE PORTION OF EXISTING SUSPENDED
ACCUSTICAL CEILING FOR WORK ABOVE
CEILING. SEE RCP AND MECH/ELECT/TECH.
20 EXIST ACCESS CONTROL KEYPAD-CARD
READER TO REMOVE & REPLACE - SEE
ELECT/TECH.
21 EXIST OVERHEAD WALL-MOUNTED
MIRROR-REFLECTOR TO REMAIN.
22 FIRE EXTINGUSHER AND MOUNTING BRACKET
TO REMAIN.
23 ACCESS-CONTROLLED DOOR. SEE
ELECTRICAL & TECHNOLOGY DEMO
DRAWINGS FOR ADDITIONAL INFO. RE:
CONTROLS & ALARM.
24 PREP FOR RELOCATION OF ACCESS
CONTROL HARDWARE FROM W06 TO W01.
25 REWORK HM DOOR FRAME FOR NEW
ELECTRIC STRIKE.
26 EXIST SECURITY PANEL TO REMOVE &
RELOCATE - SEE ELECT/TECH.
27 EXIST ACCESS CONTROL CARD READER TO
REPLACE w/ PUSH BUTTON - SEE
ELECT/TECH.
28 REPLACE ACCESS CONTROL KEYPAD-CARD
READER - SEE HW & ELECT/TECH.
29 EXIST ACCESS CONTROL PAD TO REMOVE &
REPLACE AS PART OF CAGE REMOVAL - SEE
ELECT/TECH.
30 ACCESS CONTROL & SECURITY CONTROL
PADS TO REMOVE & REINSTALL - SEE
ELECT/TECH.
31 DEMO EXIST CONC FLOOR AND PREP FOR
NEW COLUMN & EXIST STRUCT DEMO.
32 EXIST LOCKERS. VA TO REMOVE AND STORE
FOR REINSTALLATION BY GC IN NEW STAFF
LOUNGE W04A.
33 EXIST TABLE. VA TO REMOVE AND STORE
FOR REINSTALLATION IN NEW STAFF LOUNGE
W04A.
34 EXIST REFRIGERATOR/FREEZER. VA TO
REMOVE AND STORE FOR REINSTALLATION IN
NEW STAFF LOUNGE W04A.
35 REMOVE EXIST TOILET ACC'YS. SALVAGE &
STORE FOR REUSE IN NEW STAFF TOILET
W08.
36 EXIST HVAC UNIT - SEE MECH.
37 EXIST WIRE MESH CAGE - DISASSEMBLE AND
STORE FOR REINSTALLATION AT END OF
PHASE 3.
38 SEE MEP DRAWINGS FOR WORK IN ROOM
OUTSIDE OF WAREHOUSE.
39 EXIST ROOF-MTD. HVAC EQUP. TO REMOVE -
SEE MECH.
40 SEE STRUCT. FOR WORK RELATED TO
ADDITION OF PURLINS.
N O R
HT
1/8" = 1'-0"1
FLOOR PLAN - DEMOLITION
X
2222Revisions: Date:
Amendment 3 5-7-21
41 CONTRACTOR TO DISASSEMBLE AND
STORE NARCOTICS CAGE ENCLOSURE FOR
REINSTALLATION AS PART OF PHASE 3
WORK. SEE ELECTRICAL AND TECH FOR
ADDITIONAL ITEMS RELATED TO CAGE.
| Sheets |
| AD101 - FLOOR PLAN - DEMOLITION |
File details come from the government source that posted it. Updated .