This solicitation package describes a renovation project for a Department of Veterans Affairs warehouse facility. The project involves raising approximately 6,000 square feet of roof and adding 3,800 square feet of mezzanine storage space. Key aspects include a three-phased schedule to allow continued warehouse operations, architectural work for interior and exterior renovations, structural work for the new roof and mezzanine, fire protection system upgrades, new HVAC equipment, plumbing work including a new restroom, electrical system upgrades including new panels and lighting, and technology infrastructure revisions. The estimated price range is $2-5 million. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses and follow the Best Value Lowest Price Technical Acceptable process. The North American Industry Classification Code is 236220. Proposals will be due in May 2021 following an April solicitation release and scheduled site visit.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
PHASING GENERAL NOTES:
PHASING TO BE DEVELOPED TO MINIMIZE DISRUPTION OF
OWNER-RELATED ACTIVITIES WITHIN THE PROJECT AREA.
REFER TO PHASING PLANS PH101 THRU PH103 FOR
ADDITIONAL INFORMATION.
BRIEF PHASING DESCRIPTION:
A. PHASE 1 - DEMOLITION AND INSTALLATION OF WEST
WAREHOUSE NEW ROOF SUPERSTRUCTURE,
MODIFICATION OF EXISTING EAST WAREHOUSE ROOF
AND BUILDING STRUCTURE; LIMITED DEMOLITION
EAST WAREHOUSE OF INTERIOR ROOMS W07-W08-
W09; CONSTRUCT HVAC FROM BLDG. 1 TO
WAREHOUSE.
B. PHASE 2 - DEMOLITION OF WEST WAREHOUSE
EXISTING ROOF/FRAMING, CONSTRUCTION OF WEST
WAREHOUSE UPPER EXTERIOR WALL ENCLOSURE;
LIMITED DEMOLITION OF WEST WAREHOUSE INTERIOR
ROOM W03A.
C. PHASE 3 - CONSTRUCTION OF NEW MEZZANINE
FLOOR AND DRUG STORAGE ROOM W03A;
CONSTRUCTION OF NEW OFFICE/TOILET W08-W09;
NEW EXTERIOR WALL INSULATION AND FINISHES.
PHASING NOTES:
PHASE 1
PHASE 2
PHASE 3
OUTSIDE
WORK
AREA
A
B
C
D
F
G
E
1 2 3 4 5 6 7
2.11.1 2.9 3.9
C.6
B.4
S Ra R
12.5
13.4
13.5
S.9T
13.2
U
R' 11.5
Q P
DRUG
CACHE/STORAGE
W03A
BULK/UNIT
STORAGE
W03B
BULK/UNIT
STORAGE
W03
PROSTHETICS
STORAGE
W04A
PROSTHETICS
STORAGE
W04
EQUIPMENT
PREP
STAGING
W05A
STERILE
CONSUMABLES
(SOFT
GOODS)
STORAGE
W05
OIT
W05B
STORAGE
W06
VCS
STORAGE
W01
CORRIDOR
WC01
CORRIDOR
WC02
CORRIDOR
WC03
SUPERVISOR
OFFICE
W09
STAFF
TLT
W08
BREAK
ROOM
W07
RECEIVING
DOCK
W02
CORRIDOR
WC01A
RECEIVE/ISSUE
W10B
RECEIVE/ISSUE
W10C
RECEIVE/ISSUE
W10A
CORRIODR
CBC2
STORAGE
W10
RELIEF
AIR
AREAWAY
G00Y
STORAGE
C014
MECHANICAL
C011
CHILLED
WATER
PIPING
AREAWAY
G00X
CORRIDOR
CBG1
CHASE
C00Z
CORRIDOR
CBC3
CORRIDOR
CBC3B
HOSPITAL
LOADING
DOCK
CBC3A
ROOM TO BE
PARTIALLY
AVAILABLE FOR
USE DURING PH 1
ROOM TO BE VACATED
FOR CONST DURING PH 1
OVERHEAD WORK FOR
PURLIN INSTALLATION
BETW EXIST BLDG
FRAMES GRIDS 4-5
AFTER-HOURS PH 1
OVERHEAD WORK FOR
PURLIN INSTALLATION
BETW EXIST BLDG
FRAMES ON GRIDS 4-5
AFTER-HOURS PH 1
TEMP FLOOR
SCALE LOC'N
PH 1-3
AREA TO BE AVAILABLE FOR USE DURING PH 1
EXTENTS OF
OFFICE/TOILET/
BREAK RM
DEMO PH 1
AREA TO BE AVAILABLE FOR
USE DURING PH 1 - REMOVE
PORTIONS OF RACKS FOR
CONTR ACCESS FOR DEMO
WORK & NEW PIER/COLUMN
INSTALLATION AFTER-HOURS
AREA TO BE AVAILABLE FOR USE DURING PH 1 -
DEMO WORK & NEW PIER/COLUMN
INSTALLATION AFTER-HOURS
OVERHEAD MECH WORK
PH 1 - SEE MECH
FURRING-INSUL PH 1
LATE AFTER MEP WORK
FURRING-INSUL
PH 1 LATE
STRUCT BRACING
TO INSTALL AFTER
PEMB BLDG
FRAME REMOVAL
PH 2
R A
M P
D N
R A
M P
D N
KEEP CLEAR AT ALL TIMES
ABOVE-
CEILING
WORK
PH 1
ABOVE-
CEILING
WORK PH 1
AFTER-
HOURS
DESK COPIER
W
S S
S S
S S
SSS
S
SS SS
S S
SS
CW
CW
C W
C W
SS
SS SS
S
UGE
UGE UGE UGE
SS
UGE
UGE
UGE
S
S
S
S
SS
SS SS
S S
S S
S S
W
UGE
W
ESTABLISH EXTENTS AND
COORDINATE LOCATION OF
TEMPORARY CONSTRUCTION
PARTITOIN W/ COR THIS ROOM
23 2626
4 4 4
4 4
13 14
23 23 FEC
FE
FE
FE
A
B
C
D
F
G
E
1 2 3 4 5 6 7 2.1
1.1 2.9
3.9
C.6
B.4
12.5
13.4 13.5
S.9TU
11.5
AREA OF OVERHEAD
WORK BELOW FOR
INSTALLATION OF NEW
PURLINS - PH 1
AREA OF WORK
BELOW FOR
INSTALLATION OF
NEW STRUCTURAL
FRAMING AND ROOF -
PH 1
18 18
18 18 18
18 18 18
25 25
25 25 25
25 25 25
PHASE 1 SHEET NOTES:
1. ROOM / CEILING TO DEMOLISH, INCLUDING HVAC.
2. EXISTING PLUMBING FIXTURES TO REMOVE. SEE MECH.
3. EXISTING PLUMBING RISERS AND CHASE TO REMAIN PH 1 - TO BE
REMOVED PH 3.
4. NEW COLUMN TO BE INSTALLED PH 1 - SEE STRUCT.
5. EXIST PALLET RACK TO DISSASEMBLE & RELOCATE OR PLACE
INTO STORAGE DURING PH 1 FOR NEW COLUMN INSTALLATION.
6. GC TO PROVIDE NEW FLOOR SCALE AND INDICATOR. LOCATION
TO BE DETERMINED BY COR. CONTRACTOR TO PROVIDE POWER
FOR TEMPORARY SCALE LOCATION AND INSTALLATION OF
INDICATOR. SEE ELECTRICAL DRAWINGS.
7. EXISTING FLOOR SCALE AND RELATED EQUIPMENT TO REMOVE
AFTER NEW FLOOR SCALE IS OPERATIONAL.
8. EXISTING ROOM TO BE OCCUPIED DURING PH 1 CONSTRUCTION.
9. EXISTING LOADING DOCK AREA TO BE IN USE DURING PH 1
CONSTRUCTION.
10. DRUG CACHE W03A TO BE IN USE DURING PH 1 CONSTRUCTION.
11. PALLET RACK TO BE DISASSEMBLED AND MOVED INTO STORAGE
BY VA DURING PH 1 CONSTRUCTION.
12. OPEN AREA OF EAST WAREHOUSE BY AT END OF PH 1 FOR VA
USE.
13. EXISTING NARCOTICS STORAGE WIRE CAGE TO REMAIN IN USE
DURING PH 1. TO BE REMOVED AT START OF PH 2 DEMOLITION.
14. VA TO ARRANGE FOR RELOCATION OF NARCOTICS STORAGE
SAFE, FURNITURE AND EQUIPMENT PRIOR TO END OF PH 1.
15. EXISTING GWB/METAL STUD WALL TO REMAIN DURING PH 1
CONSTRUCTION. TO BE REMOVED AT START OF PH 2
DEMOLITION.
16. EXISTING PEMB BUILDING FRAME TO REMAIN DURING PH 1 - SEE
STRUCT.
17. DEMOLISH PORTIONS OF EXISTING FLOOR FOR NEW CONC
PIERS/PIER CAPS AFTER PALLET RACKS HAVE BEEN REMOVED.
PREP FOR NEW COLUMN BASES AND PATCH CONCRETE FLOOR
PRIOR TO NEW COLUMN ERECTION.
PHASE 1
SHEET NOTES:
18. CUT EXISTING ROOF FOR NEW COLUMNS TO PENETRATE ROOF.
SEAL PENETRATIONS THROUGH ROOF AS SOON AS COLUMNS
ARE INSTALLED AND SET - SEE STRUCT.
19. EXISTING PEMB ROOF/INSULATIONS/PURLINS TO REMAIN IN
PLACE DURING PH 1 - TO BE REMOVED IN PH 2.
20. LOCATION OF EXISITNG UNDERFLOOR ELECTRICAL CONDUIT -
CONFIRM LOCATIONS PRIOR TO EXCAVATION FOR NEW COLUMN
PIERS AND FOOTINGS.
21. LOCATION OF EXISTING UNDERGROUND SEWER LINE - CONFIRM
LOCATIONS PRIOR TO EXCAVATION FOR NEW COLUMN PIERS
AND FOOTINGS.
22. AREA OF NEW ROOF PURLIN INSERTION AT EAST WAREHOUSE -
SEE STRUCT.
23. NEW HVAC WALL PENETRATIONS - SEE MECH. FOR ADD'L
PENETRATIONS & DEMO'D PENETRATIONS TO BE INFILLED AT
INTERIOR WALLS.
24. CONSTRUCT TEMPORARY 1-HR CONSTRUCTION BARRIER FOR
SEPARATION OF EAST AND WEST HALVES OF WAREHOUSE AT
END OF PH 1. SEE PH 2 PLAN.
25. CONTRACTOR TO INSTALL WEATHER-TIGHT PROTECTIVE
ENCLOSURES TO SEAL PENETRATIONS THROUGH EXISTING
ROOF BY NEW STRUCTURE. MATERIALS AND METHOD OF
ENCLOSURE TO BE REVIEWED AND APPROVED BY COR AT
LEAST ONE WEEK PRIOR TO START OF WORK TO CUT OPEN
ROOF FOR STEEL ERECTION. SEE SHEET G-002 FOR TEMPORARY
BARRIERS & ENCLOSURES GENERAL INFORMATION.
26. ROOM TO BE VACATED BEGINNING PHASE 1 AND DEMOLISHED
AFTER-HOURS PHASE 1 - FENCE OFF DURING REG BUS HRS
UNTIL DEMO WORK COMPLATED.
27. NEW FURRING-INSUL LATE AFTER MEP WORK.
28. NEW FURRING-INSUL LATER AFTER-HOURS WORK.
29. EXTEND OIT CLOSET WALLS TO B.O. ROOF.
30. SEE MECH FOR WORK THIS AREA. SEE MECH DRAWINGS FOR
TEMPORARY RELOCATION OF EXISTING HEAT PUMP
CONDENSING UNIT.
31. SEE MECH FOR WORK IN MECHANICAL ROOM.
32. SEE MECH FOR EXH. FAN REPLACEMENT.
33. USE HOSPITAL LOADING DOCK AT BLDG. 1 DURING PERIODS
WHEN USE OF W02 MAY BE INTERRUPTED DURING
CONSTRUCTION. COORDINATE DATES/TIMES W/ COR.
X
BLDG 14 -
WAREHOUSE
KEY PLAN
AREA 'G'
AREA 'C' AREA 'D'
AREA 'B' AREA 'A'
AREA 'E'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Calvin rchitects, P.C.L 3705 North 200th Street
Elkhorn, Nebraska 68022
Phone: 402.291.6941 Fax: 402.291.9193
AH. INZ
Incandescence Life Safety, Inc.
3575 Ringsby Court, #408, Denver, CO, 80216
Phone:(720) 722-3010
589A4-20-158
IMEG Corp.
15 Sunnen Drive, Suite 104
St. Louis, MO 63143
Phone:(314) 951-2534
BID SET RENOVATE WAREHOUSE FOR
PANDEMIC PREPAREDNESS
HARRY S. TRUMAN MEM. VETERANS HOSPITAL
800 HOSPITAL DR., COLUMBIA MO 65201
Dwg. # of 94
C
L H
D C
\H o m e
\t fi e s e lm a n \R e v it M o d e ls \R
-2
-2
A
-2
-1
R e n o v a te W a re h o u s e tf ie s e lm a n A
G
Y .r v t
/6
/2
:0
:0
P M
PH101
PHASING PLAN - PHASE 1
AHT TJF03/24/2021
N O R
HT
1/8" = 1'-0"2
FLOOR PLAN - PHASE 1
N O R
HT
1/8" = 1'-0"1
ROOF - DEMOLITION PLAN - PHASE 1
8Revisions: Date:
Amendment 3 5-7-21
| Sheets |
| PH101 - PHASING PLAN - PHASE 1 |
File details come from the government source that posted it. Updated .