This solicitation package seeks proposals for a construction project to renovate an existing warehouse building at the Harry S. Truman Memorial Veterans Hospital in Columbia, Missouri. The scope of work includes raising approximately 6,000 square feet of roof, adding 3,800 square feet of mezzanine storage space, and interior renovations to upgrade building systems and accommodate revised use of space. Proposed construction is to be conducted in three phases to allow continued use of the facility. Proposals are due by May 7, 2021. Award will be made using Best Value Lowest Price Technically Acceptable procedures to a Service-Disabled Veteran-Owned Small Business. The estimated price range for the project is $2,000,000 to $5,000,000 and work must be completed within 330 calendar days of notice to proceed.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B
C
D
F
G
E
1 2 3 4 5 6 72.11.1 2.9 3.9
C.6
B.4
12.5
13.4 13.5
11.5
BULK ITEMS STORAGE
W03
PROSTHETICS STORAGE
W04
STERILE CONSUMABLES (SOFT
GOODS) STORAGE
W05
RECEIVING BREAKOUT & INSPECTION
(NEW)
W06
CORRIDOR
WC03
VETERANS CANTEEN SERVICE (VCS)
STORAGE
W01
CORRIDOR
CBC2CORRIDOR
WC01A
RECEIVING DOCK
W02
LOGICAL UNIT OF MEASURE (LUM)
STAGING ROOM (NEW_
W05A
OIT CLOSET
W05B
BULK ITEMS STORAGE
W03B
DRUG CACHE-STORAGE
W03A
STAFF TOILET (NEW)
W08
SUPERVISOR OFFICE (NEW)
W09
CORRIDOR
CBG1
CORRIDOR
WC01
STAFF LOUNGE (NEW)
W04A
CORRIDOR
WC02
MATERIAL LIFT LOBBY
W03C
RECEIVING/ISSUE
W10C
RECEIVING/ISSUE
W10B
RECEIVING/ISSUE
W10A
EQUIPMENT PREP/ STAGING (NEW)
W07
STORAGE
W10
RELIEF AIR AREAWAY
G00Y
CHILLED WATER/PIPING AREAWAY
G00X
UNEXCAVATED
UNEX
STAIR
WS01
MAT'L LIFT
WE01
CORRIDOR
WC04
CORRIDOR
CBG1
NARCOTICS STORAGE CAGE
W03A1
3/4"CW
FD-E
2"CW
2"
EXISTING EMERGENCY
SHOWER WITH EYE/FACE
WASH TO REMAIN.
EXISTING MIXING VALVE
TO REMAIN
HB-E
2"SAN DN & 1 1/2" V UP
2"SAN DN & 1 1/2" V UP
4" SAN DN &
2" V UP
FCO-E
3/4"HW
3/4"HWC
1"CW
3/4"HWC
3/4"HW
1"CW
P-103
P-418
ICE/WATER MACHINE
4" VTR
3/4"CW
PROVIDE NEW
PIPING IN PHASE 2.
2"CW
PROVIDE VALVED AND
CAPPED TAP IN PHASE 2.
PROVIDE VALVED AND
CAPPED TAP IN PHASE 2.
PROVIDE CW, HW, HWC PIPING AS SHOWN
IN PHASE 3. UNDER BID ITEM #2 DEDUCT
ALTERNATE, DO NOT EXTEND CW, HW,
HWC PIPING BEYOND THE VALVED AND
CAPPED LOCATIONS SHOWN.
P-812
/4
"C W
NEW PIPING TO BE
COMPLETED IN PHASE 2.
2" CW UP
2"CW UP
PROVIDE BACKFLOW
PREVENTER(BFP-2) IN
CW PIPING UPSTREAM
OF ICE MACHINE.
DO NOT PROVIDE
UNDER BID ITEM #2.
BFP-2
3/4"D
3/4" MAKEUP WATER TO
REHEAT SYSTEM REFER TO
M-101 FOR CONTINUATION.
TERMINATE 3/4"D TO
NEAREST FLOOR DRAIN.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Calvin rchitects, P.C.L 3705 North 200th Street
Elkhorn, Nebraska 68022
Phone: 402.291.6941 Fax: 402.291.9193
AH. INZ
Incandescence Life Safety, Inc.
3575 Ringsby Court, #408, Denver, CO, 80216
Phone:(720) 722-3010
589A4-20-158
IMEG Corp.
15 Sunnen Drive, Suite 104
St. Louis, MO 63143
Phone:(314) 951-2534
BID SET RENOVATE WAREHOUSE FOR
PANDEMIC PREPAREDNESS
HARRY S. TRUMAN MEM. VETERANS HOSPITAL
800 HOSPITAL DR., COLUMBIA MO 65201
Dwg. # of 94
C R e v it L o c a l F ile s \M
E P
T
.1
V A
T ru m a n W a re h o u s e
C
R u s s e ll.
J .A rn e s o n
.r v t
/2
/2
:1
:2
P
M
P-101
FIRST FLOOR PLAN - PLUMBING
GORPAT ANUSHA03/24/2021
N O R
HT
1/8" = 1'-0"
FIRST FLOOR PLAN - PLUMBING
PROVIDE BACKFLOW
PREVENTER IN CW PIPING
UPSTREAM OF TAP TO CLEAN
STEAM GENERATOR.
CLEAN STEAM
GENERATOR. REFER
TO M-101.
1" CW TO HEATING WATER
SYSTEM MAKEUP. REFER
TO M-100.
3/4" CW TO WHSE-SSHX-1
CLEAN STEAM GENERATOR.
TERMINATE OVERFLOW
DRAIN TO NEAREST FLOOR
DRAIN.,
TERMINATE BACK FLOR
PREVENTER DRAIN TO
NEAREST FLOOR DRAIN.,
SHEET NOTES:
1. REFER TO ARCHITECTURAL PHASING
DRAWINGS PH101, PH102, AND PH103 FOR
ADDITIONAL INFORMATION.
Revisions: Date:
BID SET 03/24/2021
ADDENDUM NO. 1 4/29/2021
KEYNOTES:
1. PLUMBING FIXTURE NOT PROVIDED UNDER BID
ITEM #2 DEDUCT ALTERNATE
2. WORK NOT PROVIDED UNDER BID ITEM #2
DEDUCT ALTERNATE.
3. UNDER BID ITEM #2 DEDUCT ALTERNATE, CAP
EXISTING VENT PIPING BELOW ROOF AND
SEAL WATERTIGHT.
4. EQUIPMENT NOT PROVIDED UNDER BID ITEM
#2 DEDUCT ALTERNATE.
atast Text Box
AMENDMENT #3
atast Text Box 05/07/2021 atast Snapshot