CN-370000-HW686-DC004C.pdf
PDF 2 MB Posted
- Contract number
- HW686
- Issued by
- Florida
About this file
This is a Task Assignment (TA) document issued under Contract HW686 between the State of Florida Department of Environmental Protection (FDEP) and Professional Service Industries, Inc. (Intertek-PSI). The task assignment authorizes PSI to conduct 12 months of operation and maintenance services for the Westwood Cleaners remediation site located at 4513 Gunn Highway, Tampa, Florida (ERIC_4706). The project involves oversight of a Soil Vapor Extraction (SVE) system that has been operating at the site since December 2019 to address tetrachloroethene (PCE) contamination from historical drycleaning operations.
The total task assignment value is $61,835.33, comprised of $45,995.33 in fixed unit rate charges and $15,840.00 in cost reimbursement for utilities plus an $480.00 handling fee. Services include 297 labor hours distributed across eight subtasks: project management ($3,890.15), four quarters of monthly operations and maintenance with quarterly email summaries ($8,915.27, $7,430.26, $8,216.27, and $7,430.26 respectively), two Remedial Action System Status Reports ($4,816.56 each), and utility costs for 12 months ($16,320.00). Deliverables are scheduled between July 2023 and May 2024, with quarterly O&M summaries due on July 20, October 20, January 20, and April 20, with RASS reports due October 30, 2023 and April 30, 2024. The contract is effective through August 12, 2024.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW686
DC004C Completion August 12, 2024
This Task Assignment authorizes Professional Service Industries, Inc. (PSI) to conduct 12 months of operation and maintenance in accordance with the PSI scope of work, cost estimate, and schedule received onFebruary 28th 2023.
Skylar Schwed 850-245-8795 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Professional Service Industries, Inc. (Intertek-PSI)
Professional Service Industries, Inc. (Intertek-PSI)
Nana G. Westmark 813-886-1075
ERIC_4706
4513 Gunn Highway Tampa, Florida, 33624
Westwood Cleaners
✔ $ 45,995.33 ✔ $ 15,840.00
$ 61,835.33
Scope of Work
Nana Westmark
Senior Geologist / Principal Consultant
Nana G Westmark Digitally signed by Nana G Westmark Date: 2023.03.29 11:58:04 -04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2023.03.29 11:13:39 -04'00'
N/A
Murphy_SL Highlight
Murphy_SL Highlight
Murphy_SL Highlight
Murphy_SL Highlight
Murphy_SL Highlight
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number: HW686 Task Assignment #: DC004C
Deliverables:
Deliverable Deliverable Due Date Q1 - Quarterly operation and maintenance (O&M) email submittal including field documentation, laboratory reports, and tables - Subtask 2
7/20/2023
Q2 - Quarterly operation and maintenance (O&M) email submittal including field documentation, laboratory reports, and tables - Subtask 3
10/20/2023
Remedial Action Status Report - Subtask 4 10/30/2023
Q3 - Quarterly operation and maintenance (O&M) email submittal including field documentation, laboratory reports, and tables - Subtask 5
1/20/2024
Q4 - Quarterly operation and maintenance (O&M) email submittal including field documentation, laboratory reports, and tables - Subtask 6
4/20/2024
Annual Remedial Action Status Report & PM Subtasks 1&7 4/30/2024
Subtask 8 utility invoices for 12 months; Utilities (Cost Plus Fixed Fee) = not to exceed $15,840; Utilities Handling Fee = $480 5/12/2024
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced Q1 and Q2 - Quarterly O&M email submittals including field documentation, laboratory reports, and tables - Subtasks 2 and 3; AND Remedial Action Status Report - Subtask 4
$21,162.09
Q3 and Q4 - Quarterly O&M email submittals including field documentation, laboratory reports, and tables - Subtasks 5 and 6; AND Remedial Action Status Report - Subtask 7 AND PM
$24,353.24
FDEP receipt of utility invoices for 12 months; Utilities (Cost Plus Fixed Fee) = not to exceed $15,840; Utilities Handling Fee = $480 - Subtask 8
$16,320.00
TOTAL COST $61,835.33
BWC TAFORM 01_18
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
To: HW686 Contract Negotiation File Westwood Cleaners 4513 Gunn Highway, Tampa
From: Skylar Schwed, Project Manager Date: March 27, 2023 Subject: Negotiation Summary
HW686 DC004C
This Task Assignment authorizes Professional Service Industries, Inc. (PSI) to conduct 12 months of operation and maintenance in accordance with the PSI scope of work, cost estimate, and schedule received on February 28th, 2023.
PSI confirmed on February 28th, 2023 that an Access Agreement with the current real property owner of the Westwood Cleaners (ERIC_4706) site has been executed.
The original Task Assignment totaled $61,835.33 with 297 labor hours but after negotiations and corrections with contractor costs are reflected as below:
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $61,835.33 with 297 labor hours.
PSI may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTIMATEContractor: Professional Service Industries, Inc. (Intertek-PSI)
Date: 2/28/2023
Task #: SubTask 1 Project Management SubTask 6 4th Qtr Monthly O&M
Site: Westwood Cleaners ERIC_4706 SubTask 2 1st Qtr Monthly O&M SubTask 7 RASS
Activity/Phase: SubTask 3 2nd Qtr Monthly O&M SubTask 8 Utilities
Project Manager: Nana Westmark SubTask 4 RASS SubTask 9 Groundwater Monitoring
SubTask 5 3rd Qtr Monthly O&M SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$56.99 Project Manager 25 24.7 $64.90 Principal Consultant, DC 0 0 0 0 0 0 0 0 0 0 $60.00 Senior Engineer, MR 22 3 3 5 3 3 5 0 0 0 $56.99 Senior Geologist, NW 0 0 0 0 0 0 0 0 0 0 $40.87 Project Engineer, MK 0 0 0 0 0 0 0 0 0 0 $34.62 Certified Industrial Hygientist 0 0 0 0 0 0 0 0 0 0 $56.50 Certified Hazardous Materials Manager 0 0 0 0 0 0 0 0 0 0 $57.69 Senior Geologist, MR 0 0 0 0 0 0 0 0 0 0 $48.08 Project Manager 0 0 0 0 0 0 0 0 0 0 $43.27 Project Engineer, JN 140 19 19 32 19 19 32 0 0 0 $37.00 Project Geologist, SAM 0 0 0 0 0 0 0 0 0 0 $29.77 Project Scientist, RF 0 0 0 0 0 0 0 0 0 0 $33.74 Project Scientist, SB 0 0 0 0 0 0 0 0 0 0 $25.00 Staff Scientist, QH 0 0 0 0 0 0 0 0 0 0 $29.86 GIS Specialist, DG 4 0 0 2 0 0 2 0 0 0 $24.04 Staff Scientist, OG 0 0 0 0 0 0 0 0 0 0 $28.85 Staff Scientist, RP 0 0 0 0 0 0 0 0 0 0 $31.51 Remediation Coordinator, RH 106 27 26 0 27 26 0 0 0 0 $30.91 Environmental Specialist, CC 0 0 0 0 0 0 0 0 0 0 $22.06 Environmental Specialis, MZ 0 0 0 0 0 0 0 0 0 0 $21.26 Environmental Specialist, DK 0 0 0 0 0 0 0 0 0 0 $20.81 Administrative Assistant, BM 0 0 0 0 0 0 0 0 0 0 $15.50 Secretary 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 297 25 49 48 39 49 48 39 0 0 0
Direct Labor $12,246.15 $1,408.85 $1,852.90 $1,821.39 $1,744.36 $1,852.90 $1,821.39 $1,744.36 $0.00 $0.00 $0.00
Overhead 151.02% $18,494.13 $2,127.65 $2,798.25 $2,750.66 $2,634.33 $2,798.25 $2,750.66 $2,634.33 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $30,740.28 $3,536.50 $4,651.15 $4,572.05 $4,378.69 $4,651.15 $4,572.05 $4,378.69 $0.00 $0.00 $0.00
REV: 02/03 CEF PSI-Intertek Page 1
Task #: SubTask 1 Project Management SubTask 6 4th Qtr Monthly O&M
Site: Westwood Cleaners ERIC_4706 SubTask 2 1st Qtr Monthly O&M SubTask 7 RASS
Activity/Phase: SubTask 3 2nd Qtr Monthly O&M SubTask 8 Utilities
Project Manager: Nana Westmark SubTask 4 RASS SubTask 9 Groundwater Monitoring
SubTask 5 3rd Qtr Monthly O&M SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Travel Vehicle Rental $1,440.00 $360.00 $360.00 $0.00 $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,440.00 $360.00 $360.00 $0.00 $360.00 $360.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) Well Materials $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $15,840.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $15,840.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $15,840.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $15,840.00 $0.00 $0.00 Handling Fee $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $480.00 $0.00 $0.00 Total Subcontractor Cost $16,320.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $16,320.00 $0.00 $0.00
Laboratory Analytical Costs $3,961.00 $1,864.00 $466.00 $0.00 $1,165.00 $466.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $600.00 $150.00 $150.00 $0.00 $150.00 $150.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $4,561.00 $2,014.00 $616.00 $0.00 $1,315.00 $616.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $480.00 $120.00 $120.00 $0.00 $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $5,220.00 $1,305.00 $1,305.00 $0.00 $1,305.00 $1,305.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $5,700.00 $1,425.00 $1,425.00 $0.00 $1,425.00 $1,425.00 $0.00 $0.00 $0.00 $0.00
Subtotal $58,761.28 $3,536.50 $8,450.15 $6,973.05 $4,378.69 $7,751.15 $6,973.05 $4,378.69 $16,320.00 $0.00 $0.00 Completion Fee $3,074.05 $353.65 $465.12 $457.21 $437.87 $465.12 $457.21 $437.87 $0.00 $0.00 $0.00
Total Estimated Cost $61,835.33 $3,890.15 $8,915.27 $7,430.26 $4,816.56 $8,216.27 $7,430.26 $4,816.56 $16,320.00 $0.00 $0.00
REV: 02/03 CEF PSI-Intertek Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Westwood Cleaners ERIC_4706 SubTask 2 1st Qtr Monthly O&M
DATE: 2/28/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, M Rothenburg System evaluation (1 hr/month), 3 Total hours: 3
Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 Quarterly email summary to FDEP 4
Total hours: 19 Remediation Coordinator, R Hanson Monthly
Field preparation 1 Mobilization 1 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Monthly Field preparation 1 Mobilization 1 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Monthly Field preparation 1 Mobilization 1 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Additional hours to collect vapor analytical samples 3
Total hours: 27
TOTAL LABOR 49
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Equipment Van / Truck $120.00 day 3 $360.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$200.00 8 $1,600.00
Summa cannisters $33.00 8 $264.00 $1,864.00
Shipping, large, overnight $150.00 1 $150.00
TOTAL LAB $2,014.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00
$1,305.00 Expendables $40.00 day 3 $120.00
TOTAL EQUIPMENT $1,425.00
EQUIPMENT PROCUREMENT RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
TO-15 (VOCs) (Qtr infl and eff, + 6 SVE air samples)
FINAL --7/24/96
Page 4 Westwood ERIC_4705 0552-394104
SubTask 3 2nd Qtr Monthly O&M
DATE: 2/28/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 3
Total hours: 3
Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 Quarterly email summary to FDEP 4
Total hours: 19 Remediation Coordinator, R HansonMonthly
Field preparation 1 Mobilization 1 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Monthly Field preparation 1 Mobilization 1 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Monthly Field preparation 1 Mobilization 1 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Additional hours to collect vapor analytical samples 2
Total hours: 26
TOTAL LABOR 48
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Equipment Van / Truck $120.00 day 3 $360.00
$0.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
$0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
$0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TO-15 (VOCs) (infl and eff per Qtr) $200.00 2 $400.00
Summa cannisters $33.00 2 $66.00 $466.00
Shipping, large, overnight $150.00 1 $150.00
TOTAL LAB $616.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00
$1,305.00 Expendables $40.00 day 3 $120.00
TOTAL EQUIPMENT $1,425.00
Page 5 Westwood ERIC_4705 0552-394104
SubTask 4 RASS
DATE: 2/28/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, M Rothenburg Evaluate data 2 Review Final RASS 2 Sign and Seal RASS 1
Total hours: 5
Project Engineer, J Newell Data reduction/evaluation 12 Preparation of remediation report 8 Create figures 4 Report - Prepare final tables and figure 8
Total hours: 32
CADD / GIS Specialist, D Grove Prepare figures for RASS 2
TOTAL LABOR 39
VEHICLE TYPE RATE UNIT USEAGE
$0.00
$0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
$0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00 $0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL EQUIPMENT $0.00
Page 6 Westwood ERIC_4705 0552-394104
SubTask 5 3rd Qtr Monthly O&M
DATE: 2/28/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 3
Total hours: 3
Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 Quarterly email summary to FDEP 4
Total hours: 19
Remediation Coordinator, R Hanson Monthly Field preparation 1 Mobilization 1 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Monthly Field preparation 1 Mobilization 1 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Monthly Field preparation 1 Mobilization 1 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Additional hours to collect vapor analytical samples 3
Total hours: 27
TOTAL LABOR 49
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Equipment Van / Truck $120.00 day 3 $360.00
$0.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
$0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
$0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$200.00 5 $1,000.00
Summa cannisters $33.00 5 $165.00 $1,165.00
Shipping, large, overnight $150.00 1 $150.00
TOTAL LAB $1,315.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00
$1,305.00 Expendables $40.00 day 3 $120.00
TOTAL EQUIPMENT $1,425.00
TO-15 (VOCs) (infl and eff, + 3 SVE air samples)
Page 7 Westwood ERIC_4705 0552-394104
SubTask 6 4th Qtr Monthly O&M
DATE: 2/28/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 3
Total hours: 3
Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 Quarterly email summary to FDEP 4
Total hours: 19
Remediation Coordinator, R Hanson Monthly Field preparation 1 Mobilization 1 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Monthly Field preparation 1 Mobilization 1 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Monthly Field preparation 1 Mobilization 1 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Additional hours to collect vapor analytical samples 2
Total hours: 26
TOTAL LABOR 48
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Equipment Van / Truck $120.00 day 3 $360.00
$0.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
$0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
$0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TO-15 (VOCs) (infl and eff per Qtr,) $200.00 2 $400.00
Summa cannisters $33.00 2 $66.00 $466.00
Shipping, large , overnight $150.00 1 $150.00
TOTAL LAB $616.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00
$1,305.00 Expendables $40.00 day 3 $120.00
TOTAL EQUIPMENT $1,425.00
Page 8 Westwood ERIC_4705 0552-394104
SubTask 7 RASS
DATE: 2/28/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, M Rothenburg Evaluate data 2 Review Final RASS Report 2 Sign and Seal RASS 1
Total hours: 5
Project Engineer, J Newell Data reduction/evaluation 12 Preparation of remediation report 8 Create Final figures 4 Report - Prepare final tables and figure 8
Total hours: 32
CADD / GIS Specialist, D Grove Prepare figures for RASS 2
TOTAL LABOR 39
VEHICLE TYPE RATE UNIT USEAGE
$0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00 $0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL EQUIPMENT $0.00
Page 9 Westwood ERIC_4705 0552-394104
SubTask 8 Utilities
DATE: 2/28/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
TOTAL LABOR
VEHICLE TYPE RATE UNIT USEAGE
$0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Duke Energy Electric $1,200.00 Month 12 $14,400.00
Century Link Phone $120.00 Month 12 $1,440.00 $15,840.00
Handling fee Electric $20.00 Month 12 $240.00 Handling fee phone $20.00 Month 12 $240.00
$480.00
$0.00 $0.00 $0.00
TOTAL $16,320.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL EQUIPMENT $0.00
Page 10 Westwood ERIC_4705 0552-394104
PSI Proposal: 0552-394104 February 28, 2023
Professional Service Industries, Inc.
5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634
Phone: (813) 886-1075 Fax: (813) 249-4916 www.intertek.com/building
Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
Attention: Ms. Skylar Schwed, Contract Manager
Environmental Specialist III Email: Skylar.Schwed@FloridaDEP.gov
Re: Proposal for 12 Months O&M / RASS Report Westwood Cleaners
4513 Gunn Highway Tampa, Florida, 33624 Facility ID No. 29950774, ERIC_4706
Dear Ms. Schwed:
Professional Service Industries, Inc. (PSI), an Intertek company, is pleased to provide the proposal contained herein to provide twelve months of remediation system Operation & Maintenance (O&M) services, quarterly email summaries of system operations, and documentation of the remediation system performance with the development of two Remedial Action System Status Reports, for the former Westwood Cleaners located at 4513 Gunn Highway, Tampa, Florida.
Included with this proposal is a brief discussion of project history to date, proposed scope of work, cost estimate and a proposed schedule for completion.
PROJECT BACKGROUND
The Westwood Cleaners operated from 1984 to 2003 and occupied a tenant space on the east portion of a multi-tenant commercial shopping center in Tampa, Florida. The cleaners operated one tetrachloroethene (PCE) drycleaning machine and the facility has two floor drains. Based on results from the Site Screening activities in May 1997 showing PCE in the soil at a concentration of 700,000 micrograms per kilogram (µg/kg), the drycleaner business was accepted into the Drycleaning Solvent Cleanup Program. The soil sample was collected near the backdoor of the drycleaner building.
The former Westwood Cleaners tenant space is currently a martial arts studio, Carrollwood Tae Kwon Do, that trains students typically on weekday afternoons. The business has been remodeled mailto:Skylar.Schwed@FloridaDEP.gov
FDEP – Westwood Cleaners, O&M, RASS with an elevated bamboo floor for the martial arts training. No drycleaning equipment remains at the former drycleaners.
A Site Assessment / Interim Source Removal Plan was prepared by PSI for the FDEP and was submitted August 29, 2018, and subsequently approved by the FDEP on May 20, 2019. Of note is the very high PCE concentration detected in the shallow well installed next to the former dryclean machine at 64,000 ug/L in February 2018, 12,000 ug/L in April 2020, and 9,300 ug/L in March 2021. The Interim Source Removal (ISR) Plan consisted of addressing the contaminant mass such that additional contaminant contribution to the surrounding soil and groundwater is minimized using Soil Vapor Extraction (SVE) technology.
An SVE system was installed in October through December 2019 at the Westwood Cleaners facility, with start-up in December 2019.
The system has been operating since December 2019. As outlined in the most recent FDEP comments, it was recommended to continue O&M operations. Additionally, it was recommended by the FDEP to develop a Remedial Alternatives Evaluation (RAE) to address the high concentrations of VOH compounds at the site. A RAE Scope of Work was submitted in February 2023 and included updating the groundwater monitoring along with various remediation parameters. We anticipate initiating work for the RAE upon authorization of a Task Assignment.
Therefore, the proposal contained herein for the O&M does not include groundwater sampling and analysis.
PROPOSED SCOPE OF WORK
The proposal contained herein consists of utilities service and twelve-monthly O&M events with two report deliverables for the existing SVE system, quarterly email summaries, and reporting.
The results will be used to confirm system operations and evaluate mass recovery rates as compared to remedial design. Specifically, the proposed scope of work consists of the following subtasks:
1. Project Management
This scope is provided for in the template worksheets.
2. Three Months of O&M (First Quarter)
Operations and Maintenance will be conducted on the SVE system. The work will be conducted as follows:
a. Mobilization to the site on a monthly basis.
b. Collect monthly vacuum and air flow readings from the SVE wells.
c. Collect monthly PID readings from SVE wells and system effluent.
d. Optimize system performance and recollect system readings as necessary to confirm enhanced system operation. Based on FDEP’s recommendation, we will continue to operate SVE001, SVE002, and SVE003, and leave closed the SVE wells outside, SVE004, SVE005, and SVE006.
e. Collect quarterly system influent and effluent samples, and samples from the three operating SVE wells for analysis by Method TO-15. The FDEP engineering group comments recommended collecting all SVE samples for the first quarter.
f. Document system readings in the site-specific O&M checklist.
g. Quarterly update via email to the FDEP on system operation.
The Level of Effort is detailed in Subtask 2.
3. Three Months of O&M (Second Quarter)
O&M will be conducted once a month for three months as specified above. Air samples will be collected from the influent and effluent and analyzed by TO-15. A summary of system conditions will be submitted via email to the FDEP each quarter.
The Level of Effort is detailed in Subtask 3.
4. Semi-Annual RASS Report
A Semi-Annual Remedial Action System Status Report will be developed which will include an evaluation of the collected information and data. The report will detail and summarize the monthly O&M information, along with summary tables, figures and a graphical depiction of the system performance. Vapor sampling results will be submitted in the RASS report. The report will be prepared in accordance with the Technical Worksheets or similar guidance documents, developed by the FDEP Drycleaning Solvent Cleanup Program.
Conclusions and recommendations will be made, which will include a summary of modifications made to the system to enhance the recovery rates or decrease system time to achieve targeted goals. The report will incorporate specific recommendations and provide opinions based on professional experience in order to achieve the most efficient cleanup endpoints. We understand that the Department’s goal is to achieve aggressive contaminant reduction in an efficient and cost-effective method.
The Level of Effort is detailed in Subtask 4.
5. Three Months of O&M (Third Quarter)
O&M will be conducted once a month for three months as specified above. Air samples will be collected from the influent and effluent and three of the SVE wells at the end of the third quarter of the year and analyzed by TO-15. A summary of system conditions will be submitted quarterly via email to the FDEP.
The Level of Effort is detailed in Subtask 5.
6. Three Months of O&M (Fourth Quarter)
O&M will be conducted once a month for three months as specified above. Air samples will be collected from the influent and effluent and analyzed by TO-15. A summary of system conditions will be submitted quarterly via email to the FDEP.
The Level of Effort is detailed in Subtask 6.
7. Annual RASS Report
An Annual Remedial Action System Status Report will be developed which will include an evaluation of the collected information and data for the entire year. The report will detail and summarize the monthly O&M information, along with summary tables, figures and a graphical depiction of the system performance as well as groundwater sampling and analysis. Vapor sampling results will be submitted in the RASS report. The report will be prepared in accordance with the Technical Worksheets or similar guidance documents, developed by the FDEP Drycleaning Solvent Cleanup Program.
Conclusions and recommendations will be made, which will include a summary of modifications made to the system to enhance the recovery rates or decrease system time to achieve targeted goals. The report will incorporate specific recommendations and provide opinions based on professional experience in order to achieve the most efficient cleanup endpoints. We understand that the Department’s goal is to achieve aggressive contaminant reduction in an efficient and cost-effective method.
The Level of Effort is detailed in Subtask 7.
8. Utilities for remediation system operation
PSI used the previous utility costs from this system as well as similar equipment at other sites as a basis for the utility costs, as detailed in Level of Effort Subtask 5. We are currently running the system at 100% due to the martial arts facility occupying the former dryclean tenant space.
The Level of Effort for utilities is detailed in Subtask 8.
A deliverable schedule is presented below.
Westwood Cleaners ERIC_4706 Task Proposed
Cost Schedule / Deliverable
SubTask 1 Project Management
$3,890.15 May 30, 2024
SubTask 2 1st Qtr Monthly O&M
$8,915.27 July 20, 2023 - Email Summary of 1st Qtr O&M (April, May, June)
SubTask 3 2nd Qtr Monthly O&M
$7,430.26 October 20, 2023 - Email Summary of O&M 2nd Qtr (July, Aug, Sept)
SubTask 4 RASS $4,816.56 October 30, 2023 - RASS (for 1st and 2 Qtr) SubTask 5 3rd Qtr Monthly
O&M $8,216.27 January 20, 2024 - Email Summary of 3rd O&M
(Oct, Nov, Dec) SubTask 6 4th Qtr Monthly
O&M $7,430.26 April 20, 2024 - Email Summary of 4th Qtr O&M
(Jan, Feb, March) SubTask 7 RASS $4,816.56 April 30, 2024 - RASS SubTask 8 Utilities $16,320.00 May 30, 2024 - Utility Invoices
Total Estimate Cost: $61,835.33
COST ESTIMATE AND SCHEDULE
The estimated cost to perform the O&M for twelve months along with two RASS report deliverables and quarterly email summaries is shown on the attached Cost Estimate. All PSI services will be conducted in accordance with the terms and conditions contained within DEP Contract No. HW 686, Waste Cleanup Program Services, dated December 21, 2021. The services will be completed on a monthly basis upon authorization.
The O&M will start in April 2023 and continue for 12 months until March 2024 with the quarterly brief summaries as a deliverable. One RASS report will be submitted at the end of October 2023 (for the months April through September 2023) and the Annual RASS report will be submitted at the end of April 2024 (months October 2023 through March 2024).
PSI appreciates the opportunity to be of service to the FDEP. If you have any questions, please feel free to contact us at (813) 886-1075.
Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC.
Joshua S. Newell, PE Nana Westmark, PG, CHMM Project Engineer Senior Geologist / Contract Manager
Enclosure: Cost Estimate Level of Effort
Z:\552-Env\FDEP HW 686 Drycleaning, Main Contract\0552-3462 Westwood\Proposals\2023-2024 O&M Proposal\Westwood ERIC_4706 0552-394104.docx
From: Nana Westmark To: Schwed, Skylar L Subject: Westwood Cleaners ERIC_4705 CE / LOE for SVE O&M Date: Tuesday, February 28, 2023 10:32:10 AM Attachments: image001.png
Westwood ERIC_4706 0552-394104.pdf Westwood ERIC_4705 0552-394104.xlsx
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Good Morning Skylar – PSI is pleased to submit the Scope of Work / Cost Estimate / Level of Effort to continue operations for the SVE system at Westwood, Tampa. We did not include groundwater monitoring as we usually do, as the monitoring has been included in the Westwood RAE that we previously submitted (actually, we are waiting to finalize that after you and I get a few things ironed out).
Also, you’ll note that the utilities are higher than last year. Robert had suggested we run the system 100% duty cycle which increased the power costs. Its almost double what it used to be.
Please contact us with any questions!
Kind Regards, Nana Westmark, PG, CHMM Senior Geologist / Principal Consultant Building & Construction Intertek-PSI
Direct 813 – 886 – 1075 Ext 219 Mobile 813 - 267 - 2519 Office 813 – 886 – 1075 Email Nana.Westmark@intertek.com Skype Nana.Westmark.Intertek www.intertek.com/building [gcc02.safelinks.protection.outlook.com] [gcc02.safelinks.protection.outlook.com]
Intertek-PSI 5801 Benjamin Center Drive, Suite 112 Tampa, Florida 33634 mailto:nana.westmark@intertek.com mailto:Nana.Westmark@intertek.com https://secure-web.cisco.com/1kc_adyFgXQclIYR3vAnrSg-Rj5jhJE_U6M6vRJG-0sPFDpUVjWvofVPVlJCZan9KdwoQIIyXqFlJLd9ENOdOJZFVYxsEV-7wi7EJL5HCbMYVzw7J8L9BETSqaTi4RUSRGjcQfqyQVLlmHmhAwL8xv7tDYmMwpwZvvH_KfsV-45WCKt8gRVrra79BUUbnklVPcdndtRgyvQp6eBXHEdm1zYAYGJ3B-EYvBKhDJKkYtXraQGj_hYU-4_TZt4q3OIEKavg0_YAWLeYUkygQfLrkLtX4fDfCwffyqW-WX04XQW1VMWwqx54VSLbXr6azgRAj/https%3A%2F%2Furldefense.com%2Fv3%2F__https%3A%2Fgcc02.safelinks.protection.outlook.com%2F%3Furl%3Dhttps%2A3A%2A2F%2A2Furldefense.com%2A2Fv3%2A2F__https%2A3A%2A2Fgcc02.safelinks.protection.outlook.com%2A2F%2A3Furl%2A3Dhttp%2A3A%2A2F%2A2Fwww.intertek.com%2A2Fbuilding%2A26data%2A3D04%2A7C01%2A7C%2A7Ce6e60d91fd384023f38108d9fc50956c%2A7Cf82250c421b643ada0095dbf5b6ad62d%2A7C0%2A7C0%2A7C637818245314857152%2A7CUnknown%2A7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%2A3D%2A7C3000%2A26sdata%2A3DvRbGaonR2CbnFAS0Dca4ptkjW7icXh66E0j0%2A2Fp%2A2BJ13I%2A3D%2A26reserved%2A3D0__%2A3BJSUlJSUlJSUlJSUlJSUlJSUl%21%21Ie6nUkZk%218l7e3Y_9sJi7T5snTt9AB9T_Ax7YUUjuMGVVA-7CA4KCgIJ_Ne3ClV4iOvUZ8FSSn-xc%2A24%26data%3D04%2A7C01%2A7C%2A7Cc4fcae041bcf49265f2808d9fc6ec1a8%2A7Cf82250c421b643ada0095dbf5b6ad62d%2A7C0%2A7C0%2A7C637818374916215896%2A7CUnknown%2A7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%2A3D%2A7C3000%26sdata%3DdPp%2A2BTVIDjNbYdwX0119sREuLath0qcAcEMHjGoPCymU%2A3D%26reserved%3D0__%3BJSUlJSUlJSUlJSoqKiolJSoqKioqKioqKioqJSUqKiolJSUlJSUlJSUlJSUlJSUlJQ%21%21Ie6nUkZk%2195zq0GPNR51LtfeZmnlqP7itfu4z7831lpWaoMqh49FmYhrXRV39llJQruqRDrG0SAP6%24 https://secure-web.cisco.com/1kc_adyFgXQclIYR3vAnrSg-Rj5jhJE_U6M6vRJG-0sPFDpUVjWvofVPVlJCZan9KdwoQIIyXqFlJLd9ENOdOJZFVYxsEV-7wi7EJL5HCbMYVzw7J8L9BETSqaTi4RUSRGjcQfqyQVLlmHmhAwL8xv7tDYmMwpwZvvH_KfsV-45WCKt8gRVrra79BUUbnklVPcdndtRgyvQp6eBXHEdm1zYAYGJ3B-EYvBKhDJKkYtXraQGj_hYU-4_TZt4q3OIEKavg0_YAWLeYUkygQfLrkLtX4fDfCwffyqW-WX04XQW1VMWwqx54VSLbXr6azgRAj/https%3A%2F%2Furldefense.com%2Fv3%2F__https%3A%2Fgcc02.safelinks.protection.outlook.com%2F%3Furl%3Dhttps%2A3A%2A2F%2A2Furldefense.com%2A2Fv3%2A2F__https%2A3A%2A2Fgcc02.safelinks.protection.outlook.com%2A2F%2A3Furl%2A3Dhttp%2A3A%2A2F%2A2Fwww.intertek.com%2A2Fbuilding%2A26data%2A3D04%2A7C01%2A7C%2A7Ce6e60d91fd384023f38108d9fc50956c%2A7Cf82250c421b643ada0095dbf5b6ad62d%2A7C0%2A7C0%2A7C637818245314857152%2A7CUnknown%2A7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%2A3D%2A7C3000%2A26sdata%2A3DvRbGaonR2CbnFAS0Dca4ptkjW7icXh66E0j0%2A2Fp%2A2BJ13I%2A3D%2A26reserved%2A3D0__%2A3BJSUlJSUlJSUlJSUlJSUlJSUl%21%21Ie6nUkZk%218l7e3Y_9sJi7T5snTt9AB9T_Ax7YUUjuMGVVA-7CA4KCgIJ_Ne3ClV4iOvUZ8FSSn-xc%2A24%26data%3D04%2A7C01%2A7C%2A7Cc4fcae041bcf49265f2808d9fc6ec1a8%2A7Cf82250c421b643ada0095dbf5b6ad62d%2A7C0%2A7C0%2A7C637818374916215896%2A7CUnknown%2A7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%2A3D%2A7C3000%26sdata%3DdPp%2A2BTVIDjNbYdwX0119sREuLath0qcAcEMHjGoPCymU%2A3D%26reserved%3D0__%3BJSUlJSUlJSUlJSoqKiolJSoqKioqKioqKioqJSUqKiolJSUlJSUlJSUlJSUlJSUlJQ%21%21Ie6nUkZk%2195zq0GPNR51LtfeZmnlqP7itfu4z7831lpWaoMqh49FmYhrXRV39llJQruqRDrG0SAP6%24
Professional Service Industries, Inc.
5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634
Phone: (813) 886-1075 Fax: (813) 249-4916
Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
Attention: Ms. Skylar Schwed, Contract Manager
Environmental Specialist III Email: Skylar.Schwed@FloridaDEP.gov
Re: Proposal for 12 Months O&M / RASS Report Westwood Cleaners
4513 Gunn Highway Tampa, Florida, 33624 Facility ID No. 29950774, ERIC_4706
Dear Ms. Schwed:
Professional Service Industries, Inc. (PSI), an Intertek company, is pleased to provide the proposal contained herein to provide twelve months of remediation system Operation & Maintenance (O&M) services, quarterly email summaries of system operations, and documentation of the remediation system performance with the development of two Remedial Action System Status Reports, for the former Westwood Cleaners located at 4513 Gunn Highway, Tampa, Florida.
Included with this proposal is a brief discussion of project history to date, proposed scope of work, cost estimate and a proposed schedule for completion.
PROJECT BACKGROUND
The Westwood Cleaners operated from 1984 to 2003 and occupied a tenant space on the east portion of a multi-tenant commercial shopping center in Tampa, Florida. The cleaners operated one tetrachloroethene (PCE) drycleaning machine and the facility has two floor drains. Based on results from the Site Screening activities in May 1997 showing PCE in the soil at a concentration of 700,000 micrograms per kilogram (µg/kg), the drycleaner business was accepted into the Drycleaning Solvent Cleanup Program. The soil sample was collected near the backdoor of the drycleaner building.
The former Westwood Cleaners tenant space is currently a martial arts studio, Carrollwood Tae Kwon Do, that trains students typically on weekday afternoons. The business has been remodeled with an elevated bamboo floor for the martial arts training. No drycleaning equipment remains at the former drycleaners.
A Site Assessment / Interim Source Removal Plan was prepared by PSI for the FDEP and was submitted August 29, 2018, and subsequently approved by the FDEP on May 20, 2019. Of note is the very high PCE concentration detected in the shallow well installed next to the former dryclean machine at 64,000 ug/L in February 2018, 12,000 ug/L in April 2020, and 9,300 ug/L in March 2021. The Interim Source Removal (ISR) Plan consisted of addressing the contaminant mass such that additional contaminant contribution to the surrounding soil and groundwater is minimized using Soil Vapor Extraction (SVE) technology.
An SVE system was installed in October through December 2019 at the Westwood Cleaners facility, with start-up in December 2019.
The system has been operating since December 2019. As outlined in the most recent FDEP comments, it was recommended to continue O&M operations. Additionally, it was recommended by the FDEP to develop a Remedial Alternatives Evaluation (RAE) to address the high concentrations of VOH compounds at the site. A RAE Scope of Work was submitted in February 2023 and included updating the groundwater monitoring along with various remediation parameters. We anticipate initiating work for the RAE upon authorization of a Task Assignment.
Therefore, the proposal contained herein for the O&M does not include groundwater sampling and analysis.
PROPOSED SCOPE OF WORK
The proposal contained herein consists of utilities service and twelve-monthly O&M events with two report deliverables for the existing SVE system, quarterly email summaries, and reporting.
The results will be used to confirm system operations and evaluate mass recovery rates as compared to remedial design. Specifically, the proposed scope of work consists of the following subtasks:
1. Project Management
This scope is provided for in the template worksheets.
2. Three Months of O&M (First Quarter)
Operations and Maintenance will be conducted on the SVE system. The work will be conducted as follows:
a. Mobilization to the site on a monthly basis.
b. Collect monthly vacuum and air flow readings from the SVE wells.
c. Collect monthly PID readings from SVE wells and system effluent.
d. Optimize system performance and recollect system readings as necessary to confirm enhanced system operation. Based on FDEP’s recommendation, we will continue to operate SVE001, SVE002, and SVE003, and leave closed the SVE wells outside, SVE004, SVE005, and SVE006.
e. Collect quarterly system influent and effluent samples, and samples from the three operating SVE wells for analysis by Method TO-15. The FDEP engineering group comments recommended collecting all SVE samples for the first quarter.
f. Document system readings in the site-specific O&M checklist.
g. Quarterly update via email to the FDEP on system operation.
The Level of Effort is detailed in Subtask 2.
3. Three Months of O&M (Second Quarter)
O&M will be conducted once a month for three months as specified above. Air samples will be collected from the influent and effluent and analyzed by TO-15. A summary of system conditions will be submitted via email to the FDEP each quarter.
The Level of Effort is detailed in Subtask 3.
4. Semi-Annual RASS Report
A Semi-Annual Remedial Action System Status Report will be developed which will include an evaluation of the collected information and data. The report will detail and summarize the monthly O&M information, along with summary tables, figures and a graphical depiction of the system performance. Vapor sampling results will be submitted in the RASS report. The report will be prepared in accordance with the Technical Worksheets or similar guidance documents, developed by the FDEP Drycleaning Solvent Cleanup Program.
Conclusions and recommendations will be made, which will include a summary of modifications made to the system to enhance the recovery rates or decrease system time to achieve targeted goals. The report will incorporate specific recommendations and provide opinions based on professional experience in order to achieve the most efficient cleanup endpoints. We understand that the Department’s goal is to achieve aggressive contaminant reduction in an efficient and cost-effective method.
The Level of Effort is detailed in Subtask 4.
5. Three Months of O&M (Third Quarter)
O&M will be conducted once a month for three months as specified above. Air samples will be collected from the influent and effluent and three of the SVE wells at the end of the third quarter of the year and analyzed by TO-15. A summary of system conditions will be submitted quarterly via email to the FDEP.
The Level of Effort is detailed in Subtask 5.
6. Three Months of O&M (Fourth Quarter)
O&M will be conducted once a month for three months as specified above. Air samples will be collected from the influent and effluent and analyzed by TO-15. A summary of system conditions will be submitted quarterly via email to the FDEP.
The Level of Effort is detailed in Subtask 6.
7. Annual RASS Report
An Annual Remedial Action System Status Report will be developed which will include an evaluation of the collected information and data for the entire year. The report will detail and summarize the monthly O&M information, along with summary tables, figures and a graphical depiction of the system performance as well as groundwater sampling and analysis. Vapor sampling results will be submitted in the RASS report. The report will be prepared in accordance with the Technical Worksheets or similar guidance documents, developed by the FDEP Drycleaning Solvent Cleanup Program.
Conclusions and recommendations will be made, which will include a summary of modifications made to the system to enhance the recovery rates or decrease system time to achieve targeted goals. The report will incorporate specific recommendations and provide opinions based on professional experience in order to achieve the most efficient cleanup endpoints. We understand that the Department’s goal is to achieve aggressive contaminant reduction in an efficient and cost-effective method.
The Level of Effort is detailed in Subtask 7.
8. Utilities for remediation system operation
PSI used the previous utility costs from this system as well as similar equipment at other sites as a basis for the utility costs, as detailed in Level of Effort Subtask 5. We are currently running the system at 100% due to the martial arts facility occupying the former dryclean tenant space.
The Level of Effort for utilities is detailed in Subtask 8.
A deliverable schedule is presented below.
Westwood Cleaners ERIC_4706 Task Proposed
Cost Schedule / Deliverable
SubTask 1 Project Management
$3,890.15 May 30, 2024
SubTask 2 1st Qtr Monthly O&M
$8,915.27 July 20, 2023 - Email Summary of 1st Qtr O&M (April, May, June)
SubTask 3 2nd Qtr Monthly
$7,430.26 October 20, 2023 - Email Summary of O&M 2nd Qtr (July, Aug, Sept)
SubTask 4 RASS $4,816.56 October 30, 2023 - RASS (for 1st and 2 Qtr) SubTask 5 3rd Qtr Monthly
$8,216.27 January 20, 2024 - Email Summary of 3rd O&M
(Oct, Nov, Dec) SubTask 6 4th Qtr Monthly
$7,430.26 April 20, 2024 - Email Summary of 4th Qtr O&M
(Jan, Feb, March) SubTask 7 RASS $4,816.56 April 30, 2024 - RASS SubTask 8 Utilities $16,320.00 May 30, 2024 - Utility Invoices
Total Estimate Cost: $61,835.33
COST ESTIMATE AND SCHEDULE
The estimated cost to perform the O&M for twelve months along with two RASS report deliverables and quarterly email summaries is shown on the attached Cost Estimate. All PSI services will be conducted in accordance with the terms and conditions contained within DEP Contract No. HW 686, Waste Cleanup Program Services, dated December 21, 2021. The services will be completed on a monthly basis upon authorization.
The O&M will start in April 2023 and continue for 12 months until March 2024 with the quarterly brief summaries as a deliverable. One RASS report will be submitted at the end of October 2023 (for the months April through September 2023) and the Annual RASS report will be submitted at the end of April 2024 (months October 2023 through March 2024).
PSI appreciates the opportunity to be of service to the FDEP. If you have any questions, please feel free to contact us at (813) 886-1075.
Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC.
Joshua S. Newell, PE Nana Westmark, PG, CHMM Project Engineer Senior Geologist / Contract Manager
Enclosure: Cost Estimate Level of Effort
Z:\552-Env\FDEP HW 686 Drycleaning, Main Contract\0552-3462 Westwood\Proposals\2023-2024 O&M Proposal\Westwood ERIC_4706 0552-394104.docx
Task #: SubTask 1 Project Management SubTask 6 4th Qtr Monthly O&M
Site: Westwood Cleaners ERIC_4706 SubTask 2 1st Qtr Monthly O&M SubTask 7 RASS
Activity/Phase: SubTask 3 2nd Qtr Monthly O&M SubTask 8 Utilities
Project Manager: Nana Westmark SubTask 4 RASS SubTask 9 Groundwater Monitoring
SubTask 5 3rd Qtr Monthly O&M SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$56.99 Project Manager 25 24.7 $64.90 Principal Consultant, DC 0 0 0 0 0 0 0 0 0 0 $60.00 Senior Engineer, MR 22 3 3 5 3 3 5 0 0 0 $56.99 Senior Geologist, NW 0 0 0 0 0 0 0 0 0 0 $40.87 Project Engineer, MK 0 0 0 0 0 0 0 0 0 0 $34.62 Certified Industrial Hygientist 0 0 0 0 0 0 0 0 0 0 $56.50 Certified Hazardous Materials Manager 0 0 0 0 0 0 0 0 0 0 $57.69 Senior Geologist, MR 0 0 0 0 0 0 0 0 0 0 $48.08 Project Manager 0 0 0 0 0 0 0 0 0 0 $43.27 Project Engineer, JN 140 19 19 32 19 19 32 0 0 0 $37.00 Project Geologist, SAM 0 0 0 0 0 0 0 0 0 0 $29.77 Project Scientist, RF 0 0 0 0 0 0 0 0 0 0 $33.74 Project Scientist, SB 0 0 0 0 0 0 0 0 0 0 $25.00 Staff Scientist, QH 0 0 0 0 0 0 0 0 0 0 $29.86 GIS Specialist, DG 4 0 0 2 0 0 2 0 0 0 $24.04 Staff Scientist, OG 0 0 0 0 0 0 0 0 0 0 $28.85 Staff Scientist, RP 0 0 0 0 0 0 0 0 0 0 $31.51 Remediation Coordinator, RH 106 27 26 0 27 26 0 0 0 0 $30.91 Environmental Specialist, CC 0 0 0 0 0 0 0 0 0 0 $22.06 Environmental Specialis, MZ 0 0 0 0 0 0 0 0 0 0 $21.26 Environmental Specialist, DK 0 0 0 0 0 0 0 0 0 0 $20.81 Administrative Assistant, BM 0 0 0 0 0 0 0 0 0 0 $15.50 Secretary 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 297 25 49 48 39 49 48 39 0 0 0
Direct Labor $12,246.15 $1,408.85 $1,852.90…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .