CN-370000-HW686-DC003E.pdf

PDF 4 MB Posted

Attached to
Master Agreement FL|HW686|26652fe61cf76d14a6798f2369f5dddb
Contract number
HW686
Issued by
Florida

About this file

Document Summary

This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) under Contract Number HW686 with Intertek PSI (Professional Service Industries, Inc.), a contractor specializing in environmental remediation services. The assignment was executed on March 20, 2024, with an effective completion date of July 31, 2025, and authorizes work at the Pugh's Dry Cleaners facility located at 215 South Bay Street, Lake County, Florida (ERIC_4814). The FDEP Project Manager is Mubeen Darjj, and the Contractor's Project Manager is Nana Westmark.

The contract establishes a total Task Assignment value of $87,213.28, composed of a Fixed Unit Rate of $76,493.28 and a Cost Reimbursement of $10,720.00 for utilities. Services include site remediation activities consisting of twelve months of Operation and Maintenance (O&M) for an existing Soil Vapor Extraction (SVE) system, two Remedial Action System Status (RASS) reports, quarterly email summaries, groundwater monitoring, and system repairs. Deliverables are structured across nine subtasks with specific due dates, including monthly O&M activities beginning July 2024, a semi-annual RASS report due October 30, 2024, a final RASS report with groundwater data due April 30, 2025, and utility invoices due May 30, 2025. The cost reimbursement of $10,720 covers utilities (electricity and phone service) from December 2023 through March 2025, with a handling fee of $640.

View the file

Other files

File Type Posted
CN-370000-HW686-DC001D.pdf PDF
CN-370000-HW686-DC002A.pdf PDF
CN-370000-HW686-DC002F.pdf PDF
CN-370000-HW686-DC002G.pdf PDF
CN-370000-HW686-DC002H.pdf PDF
CN-370000-HW686-DC003A.pdf PDF
CN-370000-HW686-DC003B.pdf PDF
CN-370000-HW686-DC003G.pdf PDF
CN-370000-HW686-DC004C.pdf PDF
CN-370000-HW686-DC004E.pdf PDF
CN-370000-HW686-DC007A.pdf PDF
CN-370000-HW686-DC007C.pdf PDF
CN-370000-HW686-DC007D.pdf PDF
CN-370000-HW686-DC009C.pdf PDF
CN-370000-HW686-DC009E.pdf PDF
CN-370000-HW686-DC010C.pdf PDF
CN-370000-HW686-DC011A.pdf PDF
CN-370000-HW686-DC012B.pdf PDF
CN-370000-HW686-DC013A.pdf PDF
CN-370000-HW686-DC014A.pdf PDF
CN-370000-HW686-DC016A.pdf PDF
CN-370000-HW686-DC018A.pdf PDF
CN-370000-HW686-DC019B.pdf PDF
CN-370000-HW686-DC01ACO4.pdf PDF
CN-370000-HW686-DC020C.pdf PDF
CN-370000-HW686-DC023A.pdf PDF
CN-370000-HW686-DC024A.pdf PDF
CN-370000-HW686-DC025A.pdf PDF
CN-370000-HW686-DC026B.pdf PDF
CN-370000-HW686-DC028A.pdf PDF
CN-370000-HW686-DC03DCO2.pdf PDF
CN-370000-HW686-DC04ECO1.pdf PDF
CN-370000-HW686-DC07BCO1.pdf PDF
CN-370000-HW686-DC07BCO3.pdf PDF
CN-370000-HW686-DC09DCO1.pdf PDF
CN-370000-HW686-DC11BCO1.pdf PDF
CN-370000-HW686-DC13BCO1.pdf PDF
CN-370000-HW686-DC14BCO3.pdf PDF
CN-370000-HW686-DC14DCO1.pdf PDF
CN-370000-HW686-DC15BCO1.pdf PDF
CN-370000-HW686-DC15DCO1.pdf PDF
CN-370000-HW686-DC16BCO1.pdf PDF
CN-370000-HW686-DC18CCO1.pdf PDF
CN-370000-HW686-DC21BCO1.pdf PDF
CN-370000-HW686-DC27BCO1.pdf PDF
CN-370000-HW686-FIL10.pdf PDF
CN-370000-HW686-FIL6.pdf PDF
CN-370000-HW686-FIL9.pdf PDF
CN-370000-HW686-HW002A.pdf PDF
CN-370000-HW686-HW011A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F D

E P

C O

S T

E S

T

IM

A T

E Co nt ra ct or

Pr of es si on al S er vi ce In du st rie s, In c.

(I nt er te k-

PS

I)

D at e:

3/ 5/

Ta sk

Su bT as k

Pr oj ec t M an ag em en t

Su bT as k

4t h Q tr M on th ly O

M

Si te

Pu gh 's

D ry cl ea ne rs

E

RI

C_

Su bT as k

1s t Q tr M on th ly O

M w /S ys te m R ep ai rs Su bT as k

RA

SS

Ac tiv ity /P ha se

Su bT as k

2n d

Q tr

M on th ly

O

M Su bT as k

U til iti es

Pr oj ec t M an ag er

N an a W es tm ar k

Su bT as k

RA

SS

Su bT as k

G ro un dw at er

M on ito rin g

Su bT as k

3r d Q tr M on th ly O

M

Su bT as k

To ta ls

La bo r R at e

Ca te go ry

$5 8.

Pr oj ec t M an ag er

.2

$6 4.

Pr in ci pa l C on su lta nt

, D C

$6 0.

Se ni or

E ng in ee r, M

R

$5

8.

Se ni or G eo lo gi st

, N W

$6 2.

Se ni or

E ng in ee r, G

R

$3

4.

Ce rt ifi ed

In du st ria l H yg ie nt is t

$5 6.

Ce rt ifi ed H az ar do us

M at er ia ls M an ag er

$6

0.

Se ni or G eo lo gi st

, M R

$5 8.

Pr oj ec t M an ag er

$4 8.

Pr oj ec t E ng in ee r, JN

$3

7.

Pr oj ec t G eo lo gi st

, S

AM

$3 9.

Pr oj ec t S ci en tis t, SL

$3 3.

Pr oj ec t S ci en tis t, SB

$4 0.

Pr oj ec t S ci en tis t, JD

$3

4.

G

IS

S pe ci al is t, D G

$2 5.

St af f S ci en tis t, M M

$2 8.

St af f S ci en tis t, RP

$3

1.

Re m ed ia tio n

Co or di na to r, RH

$3

0.

En vi ro nm en ta l S pe ci al is t, CC

$2

2.

En vi ro nm en ta l S pe ci al is , M

Z

$2

8.

En vi ro nm en ta l S pe ci al is t, D K

$2 0.

Ad m in is tr at iv e As si st an t, BM

$1

5.

Se cr et ar y

$0

.0

$0 .0

$0

.0

$0 .0

To ta l H ou rs

D ire ct L ab or

$2

0, 0.

$2 ,4

.4

$4

,5

.2

$2 ,6

.9

$1

,9

.0

$2 ,6

.1

$2

,6

.9

$2 ,4

.2

$0

.0

$1 ,5

.0

$0

.0

O ve rh ea d

1.

$3

1, 3.

$3 ,6

.1

$6

,8

.2

$4 ,0

.2

$2

,8

.5

$3 ,9

.8

$4

,0

.2

$3 ,7

.6

$0

.0

$2 ,4

.3

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or

$5

2, 3.

$6 ,0

.6

$1

1, 9.

$6 ,7

.2

$4

,7

.5

$6 ,5

.0

$6

,7

.2

$6 ,2

.9

$0

.0

$4 ,0

.4

$0

.0

R E V

C E F

P S I I n t e r t e k

P a g e

F

E P

C O

S T

E S

T

IM

A T

E Co nt ra ct or

Pr of es si on al S er vi ce In du st rie s, In c.

(I nt er te k-

PS

I)

D at e:

3/ 5/

Ta sk

Su bT as k

Pr oj ec t M an ag em en t

Su bT as k

4t h Q tr M on th ly O

M

Si te

Pu gh 's

D ry cl ea ne rs

E

RI

C_

Su bT as k

1s t Q tr M on th ly O

M w /S ys te m R ep ai rs Su bT as k

RA

SS

Ac tiv ity /P ha se

Su bT as k

2n d

Q tr

M on th ly

O

M Su bT as k

U til iti es

Pr oj ec t M an ag er

N an a W es tm ar k

Su bT as k

RA

SS

Su bT as k

G ro un dw at er

M on ito rin g

Su bT as k

3r d Q tr M on th ly O

M

Su bT as k

To ta ls

Tr av el Ve hi cl e Re nt al

$1 ,8

.0

$4

.0

$3

.0

$0

.0

$3

.0

$3

.0

$0 .0

$0

.0

$2

.0

$0 .0

M ile ag e Co st s

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ai r F ar e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pe r d ie m

H ot el

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$1 ,8

.0

$4

.0

$3

.0

$0

.0

$3

.0

$3

.0

$0 .0

$0

.0

$2

.0

$0 .0

Su bc on tr ac to r

(E qu ip m en t P ro cu re m en t)

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pr oc ur em en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r

(S er vi ce s Pr oc ur em en t) ril lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su rv ey in g

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$1

.0

$0

.0

U til iti es

$1 0, 0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$1

0, 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tr ac to r S ub to ta l $1

0, 5.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1 0, 0.

$1

.0

$0

.0

H an dl in g Fe e $6

.5

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$6

.0

$1

2.

$0 .0

To ta l S ub co nt ra ct or

C os t $1

1, 7.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1 1, 0.

$1

.5

$0

.0

La bo ra to ry

An al yt ic al C os ts

$7 ,2

.0

$4

.0

$2

,0

.0

$0 .0

$4

.0

$2

,0

.0

$0 .0

$0

.0

$2 ,0

.0

$0

.0

Fa st

T ur na ro un d

Ch ar ge s

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Sa m pl e

Sh ip pi ng

$7

.0

$1

.0

$1

.0

$0 .0

$1

.0

$1

.0

$0

.0

$0 .0

$1

.0

$0

.0

To ta l L ab or at or y

$7 ,9

.0

$6

.0

$2

,2

.0

$0 .0

$6

.0

$2

,2

.0

$0 .0

$0

.0

$2 ,2

.0

$0

.0

Fi el d Ex pe ns es

Pe rs on al

P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ex pe nd ab le s

$6

.0

$2

.0

$1

.0

$0 .0

$1

.0

$1

.0

$0

.0

$0 .0

$8

0.

$0 .0

Eq ui pm en t (

D ril lin g re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( An al yt ic al re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t (

ID

W re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

O th er

$7 ,6

.0

$2

,1

.0

$1 ,3

.0

$0

.0

$1 ,3

.0

$1

,3

.0

$0 .0

$0

.0

$1 ,5

.0

$0

.0

To ta l F ie ld E xp en se s

$8 ,2

.0

$2

,3

.0

$1 ,4

.0

$0

.0

$1 ,4

.0

$1

,4

.0

$0 .0

$0

.0

$1 ,5

.0

$0

.0

Su bt ot al

$8 1, 6.

$6

,0

.6

$1 4, 0.

$1

0, 4.

$4 ,7

.5

$8

,9

.0

$1 0, 4.

$6

,2

.9

$1 1, 0.

$8

,2

.9

$0 .0

Co m pl et io n Fe e $5

,2

.3

$6

.5

$1 ,1

.9

$6

.2

$4

.9

$6

.7

$6

.2

$6

.5

$0

.0

$4

.1

$0 .0

To ta l E st im at ed C os t

$8 7, 3.

$6

,6

.1

$1 6, 0.

$1

1, 8.

$5 ,2

.5

$9

,5

.7

$1 1, 8.

$6

,8

.4

$1 1, 0.

$8

,6

.0

$0 .0

R E V

C E F

P S I I n t e r t e k

P a g e

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Pugh's Drycleaners ERIC_4814 SubTask 2 1st Qtr Monthly O&M w/System Repairs

DATE: 3/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg System evaluation (1 hr/month), 3

Total hours: 3

Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6

Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6

O&M checklists (1 hr/month) 3

Research, order, and obtain new motor starter, power supply, intrensic relays, and blower bearings 8

Review and submit quarterly deliverable 4

Total hours: 27

Project Scientist, J Daugherty Monthly

Field preparation 1

Mobilization 5

Conduct O&M, optimize performance 2

Collect vacuum influence / vacuum flow measurements 1

Collect vapor samples for PID screening 1

Monthly preparation, recording of system data to ongoing operational tables 1

O&M checklists (1 hr/month) 1

Mobilizations (2) - Remove blower, then return to reinstall blower and parts. 10

Install motor starter, power supply, and intrinsic relays 2

Disassemble blower from system 5

Rebuild blower with new bearings 16

Re-install blower into the SVE system 5

Monthly

Field preparation 1

Mobilization 5

Conduct O&M, optimize performance 2

Collect vacuum influence / vacuum flow measurements 1

Collect vapor samples for PID screening 1

Monthly preparation, recording of system data to ongoing operational tables 1

O&M checklists (1 hr/month) 1

Monthly

Field preparation 1

Mobilization 5

Conduct O&M, optimize performance 2

Collect vacuum influence / vacuum flow measurements 1

Collect vapor samples for PID screening 1

Monthly preparation, recording of system data to ongoing operational tables 1

O&M checklists (1 hr/month) 1

Additional hours to collect vapor analytical samples 1

Total hours: 75

TOTAL LABOR 105

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $480.00 week 1 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$200.00 2 $400.00

Summa cannisters $33.00 2 $66.00

$466.00

Shipping, large, overnight $150.00 1 $150.00

TOTAL LAB $616.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 5 $1,800.00

Construction/O&M supplies $75.00 day 5 $375.00

$2,175.00

Expendables $40.00 day 5 $200.00

TOTAL EQUIPMENT $2,375.00

TO-15 (VOCs) (Qtr infl and eff)

FINAL --7/24/96

Page 3 Copy of Pugh's ERIC_4814 0552-419229

SubTask 3 2nd Qtr Monthly O&M

DATE: 3/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 3

Total hours: 3

Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 review and submit quarterly deliverable 4

Total hours: 19

Project Scientist, J Daugherty Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Additional hours to collect vapor analytical samples 3

Total hours: 39

TOTAL LABOR 61

VEHICLE TYPE RATE UNIT USEAGE

$0.00 Equipment Van / Truck $120.00 day 3 $360.00

$0.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 (VOCs) (infl and eff per Qtr, 7 SVE wells) $200.00 9 $1,800.00

Summa cannisters $33.00 9 $297.00 $2,097.00

Shipping, large, overnight $150.00 1 $150.00

TOTAL LAB $2,247.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00

$1,305.00 Expendables $40.00 day 3 $120.00

TOTAL EQUIPMENT $1,425.00

Page 4 Copy of Pugh's ERIC_4814 0552-419229

SubTask 4 RASS

DATE: 3/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg Evaluate data 2

Review Final RASS 2

Sign and Seal RASS 1

Total hours: 5

Project Engineer, J Newell Data reduction/evaluation 12

Preparation of remediation report 8

Create figures 4

Report - Prepare final tables and figure 8

Total hours: 32

CADD / GIS Specialist, D Grove Prepare figures for RASS 2

TOTAL LABOR 39

VEHICLE TYPE RATE UNIT USEAGE

$0.00

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00

$0.00

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

$0.00

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL EQUIPMENT $0.00

Page 5 Copy of Pugh's ERIC_4814 0552-419229

SubTask 5 3rd Qtr Monthly O&M

DATE: 3/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 3

Total hours: 3

Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6

Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6

O&M checklists (1 hr/month) 3 review and submit quarterly deliverable 4

Total hours: 19

Project Scientist, J Daugherty Monthly

Field preparation 1

Mobilization 5

Conduct O&M, optimize performance 2

Collect vacuum influence / vacuum flow measurements 1

Collect vapor samples for PID screening 1

Monthly preparation, recording of system data to ongoing operational tables 1

O&M checklists (1 hr/month) 1

Monthly

Field preparation 1

Mobilization 5

Conduct O&M, optimize performance 2

Collect vacuum influence / vacuum flow measurements 1

Collect vapor samples for PID screening 1

Monthly preparation, recording of system data to ongoing operational tables 1

O&M checklists (1 hr/month) 1

Monthly

Field preparation 1

Mobilization 5

Conduct O&M, optimize performance 2

Collect vacuum influence / vacuum flow measurements 1

Collect vapor samples for PID screening 1

Monthly preparation, recording of system data to ongoing operational tables 1

O&M checklists (1 hr/month) 1

Additional hours to collect vapor analytical samples 1

Total hours: 37

TOTAL LABOR 59

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 3 $360.00

$0.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

$0.00

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$200.00 2 $400.00

Summa cannisters $33.00 2 $66.00

$466.00

Shipping, large, overnight $150.00 1 $150.00

TOTAL LAB $616.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00

Construction/O&M supplies $75.00 day 3 $225.00

$1,305.00

Expendables $40.00 day 3 $120.00

TOTAL EQUIPMENT $1,425.00

TO-15 (VOCs) (infl and eff)

Page 6 Copy of Pugh's ERIC_4814 0552-419229

SubTask 6 4th Qtr Monthly O&M

DATE: 3/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 3

Total hours: 3

Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6

Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6

O&M checklists (1 hr/month) 3 review and submit quarterly deliverable 4

Total hours: 19

Project Scientist, J Daugherty Monthly

Field preparation 1

Mobilization 5

Conduct O&M, optimize performance 2

Collect vacuum influence / vacuum flow measurements 1

Collect vapor samples for PID screening 1

Monthly preparation, recording of system data to ongoing operational tables 1

O&M checklists (1 hr/month) 1

Monthly

Field preparation 1

Mobilization 5

Conduct O&M, optimize performance 2

Collect vacuum influence / vacuum flow measurements 1

Collect vapor samples for PID screening 1

Monthly preparation, recording of system data to ongoing operational tables 1

O&M checklists (1 hr/month) 1

Monthly

Field preparation 1

Mobilization 5

Conduct O&M, optimize performance 2

Collect vacuum influence / vacuum flow measurements 1

Collect vapor samples for PID screening 1

Monthly preparation, recording of system data to ongoing operational tables 1

O&M checklists (1 hr/month) 1

Additional hours to collect vapor analytical samples 3

Total hours: 39

TOTAL LABOR 61

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 3 $360.00

$0.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

$0.00

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 (VOCs) (infl and eff per Qtr, 7 SVE wells) $200.00 9 $1,800.00

Summa cannisters $33.00 9 $297.00

$2,097.00

Shipping, large , overnight $150.00 1 $150.00

TOTAL LAB $2,247.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00

Construction/O&M supplies $75.00 day 3 $225.00

$1,305.00

Expendables $40.00 day 3 $120.00

TOTAL EQUIPMENT $1,425.00

Page 7 Copy of Pugh's ERIC_4814 0552-419229

SubTask 7 RASS

DATE: 3/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg Evaluate data 2

Review Final RASS/ Groundwater Report 5

Sign and Seal RASS 1

Total hours: 8

Project Engineer, J Newell Data reduction/evaluation 12

Preparation of remediation/ groundwater monitoring report 12

Create Final figures 4

Report - Prepare final tables and figure 8

Total hours: 36

CADD / GIS Specialist, D Grove Prepare figures for RASS, Groundwater 8

TOTAL LABOR 52

VEHICLE TYPE RATE UNIT USEAGE

$0.00

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00

$0.00

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

$0.00

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL EQUIPMENT $0.00

Page 8 Copy of Pugh's ERIC_4814 0552-419229

SubTask 8 Utilities

DATE: 3/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

TOTAL LABOR

VEHICLE TYPE RATE UNIT USEAGE

$0.00

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00

$0.00

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Duke Energy Electric December 2023 - March 2025 $550.00 Month 16 $8,800.00

Century Link Phone December 2023 - March 2025 $120.00 Month 16 $1,920.00

$10,720.00

Handling fee Electric December 2023 - March 2025 $20.00 Month 16 $320.00

Handling fee phone December 2023 - March 2025 $20.00 Month 16 $320.00

$640.00

$0.00

$0.00

$0.00

TOTAL $11,360.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL EQUIPMENT $0.00

Page 9 Copy of Pugh's ERIC_4814 0552-419229

SubTask 9 Groundwater Monitoring

DATE: 3/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist, N Westmark Technical Oversight 3

Project Scientist, J Daugherty Field preparation 1

Travel (2 roundtrips for gw sampling) 10

Collect groundwater samples 1 shallow wells @ 1 hour each 1

3 deep well @ 2 hours each 6

Documentation of groundwater sampling & measurements 2 stage IDW drum 1

Total hours: 21

Staff Scientist, M Matar

Travel (2 roundtrips for gw sampling) 10 Collect groundwater samples

7 intermediate wells @ 1.5 hr each 11 pickup, drop off sample kits 1

Total hours: 22

TOTAL LABOR 46

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 2 $240.00

$0.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00 $0.00

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

$0.00 Petrotech Southeast, Inc. IDW transport & disposal 1 $125.00 $125.00

$0.00

$0.00

TOTAL $125.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

$0.00

EPA Method 8260 $73.00 11 1 $876.00 Sulfate, EPA Method 300.0 $21.00 3 $63.00

TDS by EPA Method 2011 $16.00 3 $48.00

Iron by EPA Method 6020, ICP / MS $15.00 3 $45.00 Sodium by EPA Method 6020, ICP / MS $15.00 3 $45.00

Manganese by EPA Method 6020, ICP / MS $15.00 3 $45.00

TRPH by FL-PRO $88.00 11 $968.00 $2,090.00 $0.00

Sample Shipping, Large, Overnight $150.00 1 $150.00

$0.00

$0.00

TOTAL LAB $2,240.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00

Shallow Groundwater Sampling Kit $290.00 day 2 $580.00

Deep Groundwater Sampling Kit $415.00 day 2 $830.00 Drum for IDW $100.00 each 1 $1,410.00 $100.00

$1,510.00

Expendables $40.00 day 2 $80.00

TOTAL EQUIPMENT $1,590.00

Page 10 Copy of Pugh's ERIC_4814 0552-419229

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: DC003D Contract File

FROM: Ben Grubbs, Contract Manager

DATE: March 13, 2024

SUBJECT: Negotiation Summary Task Assignment

HW686

Intertek PSI will conduct site remediation activities at Pugh’s Dry Cleaners (ERIC_4814), as detailed in the March 5, 2024 proposal. There is a cost reimbursement of $10,720 (utilities). Activities will include maintenance and operation, groundwater monitoring, and a RASS report.

Total task amount is $87,333.28. PSI’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable is due June 30, 2025.

File details come from the government source that posted it. Updated .