CN-370000-HW686-DC13BCO1.pdf

PDF 4 MB Posted

Attached to
Master Agreement FL|HW686|26652fe61cf76d14a6798f2369f5dddb
Contract number
HW686
Issued by
Florida

About this file

This document is a Task Assignment Change Order (TACO) issued by the State of Florida Department of Environmental Protection (FDEP) to Professional Service Industries, Inc. (Intertek-PSI) for site assessment activities at Palm Dry Cleaners located at 14616 Livingston Avenue, Lutz, Hillsborough County, Florida. The change order amends Task Assignment DC013B under Contract HW686, with project identification number ERIC_4721. The FDEP project manager is Kelly Crain, and the contractor's project manager is Nana G. Westmark. The change order was executed on September 29, 2023, by FDEP and October 2, 2023, by the contractor.

The change order authorizes an overall reduction in costs for Subtask 3 (Assessment activities) due to reduced subcontractor and analytical costs, despite an increase in MAGS well installation equipment expenses. The amended total task value decreased from $107,250.07 to $103,743.24, representing a cost reduction of $3,506.83. The compensation structure is on a fixed unit rate basis. Deliverables include GPR field notes and survey results due April 25, 2023; field logs and lab results due September 15, 2023; and project management and site assessment report due October 30, 2023. Invoice amounts allocated to these deliverables are $14,184.55, $72,221.21, and $17,337.48, respectively. The task assignment completion date is January 20, 2024. No changes were made to the completion date or primary attachments, with only Attachment 1 being replaced to reflect the cost adjustments.

View the file

Other files

File Type Posted
CN-370000-HW686-DC001D.pdf PDF
CN-370000-HW686-DC002A.pdf PDF
CN-370000-HW686-DC002F.pdf PDF
CN-370000-HW686-DC002G.pdf PDF
CN-370000-HW686-DC002H.pdf PDF
CN-370000-HW686-DC003A.pdf PDF
CN-370000-HW686-DC003B.pdf PDF
CN-370000-HW686-DC003E.pdf PDF
CN-370000-HW686-DC003G.pdf PDF
CN-370000-HW686-DC004C.pdf PDF
CN-370000-HW686-DC004E.pdf PDF
CN-370000-HW686-DC007A.pdf PDF
CN-370000-HW686-DC007C.pdf PDF
CN-370000-HW686-DC007D.pdf PDF
CN-370000-HW686-DC009C.pdf PDF
CN-370000-HW686-DC009E.pdf PDF
CN-370000-HW686-DC010C.pdf PDF
CN-370000-HW686-DC011A.pdf PDF
CN-370000-HW686-DC012B.pdf PDF
CN-370000-HW686-DC013A.pdf PDF
CN-370000-HW686-DC014A.pdf PDF
CN-370000-HW686-DC016A.pdf PDF
CN-370000-HW686-DC018A.pdf PDF
CN-370000-HW686-DC019B.pdf PDF
CN-370000-HW686-DC01ACO4.pdf PDF
CN-370000-HW686-DC020C.pdf PDF
CN-370000-HW686-DC023A.pdf PDF
CN-370000-HW686-DC024A.pdf PDF
CN-370000-HW686-DC025A.pdf PDF
CN-370000-HW686-DC026B.pdf PDF
CN-370000-HW686-DC028A.pdf PDF
CN-370000-HW686-DC03DCO2.pdf PDF
CN-370000-HW686-DC04ECO1.pdf PDF
CN-370000-HW686-DC07BCO1.pdf PDF
CN-370000-HW686-DC07BCO3.pdf PDF
CN-370000-HW686-DC09DCO1.pdf PDF
CN-370000-HW686-DC11BCO1.pdf PDF
CN-370000-HW686-DC14BCO3.pdf PDF
CN-370000-HW686-DC14DCO1.pdf PDF
CN-370000-HW686-DC15BCO1.pdf PDF
CN-370000-HW686-DC15DCO1.pdf PDF
CN-370000-HW686-DC16BCO1.pdf PDF
CN-370000-HW686-DC18CCO1.pdf PDF
CN-370000-HW686-DC21BCO1.pdf PDF
CN-370000-HW686-DC27BCO1.pdf PDF
CN-370000-HW686-FIL10.pdf PDF
CN-370000-HW686-FIL6.pdf PDF
CN-370000-HW686-FIL9.pdf PDF
CN-370000-HW686-HW002A.pdf PDF
CN-370000-HW686-HW011A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. ☐ There are no changes to the TA compensation.

☐ The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO ☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. ☐ There are no changes to the TA Expiration Date.

☐ The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. ☐ There are no changes to the Attachments.

☐ Attachment ___ is replaced with Attachment -____.

7. ☐ No Additional Changes.

☐ Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

DC013B 1 HW686

This Task Assignment Change Order authorizes an overall reduction in costs for Subtask 3 due to reduced subcontractor costs.

Kelly Crain (850)245-8953 Contractor Contractor

Contractor Contractor

Contractor

Professional Service Industries, Inc. (Intertek-PSI) Nana G. Westmark 813-886-1075

ERIC_4721

Palm Drycleaners

✔ $ 103,743.24 $ 107,250.07

$ 103,743.24 $ 107,250.07 ✔ Completion

Completion 0

✔ 1 1 1

Professional Service Industries, Inc. (Intertek-PSI)

Nana Westmark

Senior Geologist / Principal Consultant

Nana G Westmark Digitally signed by Nana G Westmark Date: 2023.10.02 07:23:26 -04'00'

Teresa Booeshaghi

Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2023.09.29 13:56:23 -04'00'

9/29/2023

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01_18

Contract Number:

Task Assignment #:

Change Order #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW686

DC013B

$ 103,743.24

Subtask 2 GPR Field Notes, Survey Notes & Lab Results of Well Sampling- Received

Subtask 3 Field Logs AND Lab Results- Received

Subtasks 1 & 4 Project Management AND Site Assessment Report which include IDW manifests

Subtask 2 GPR Field Notes, Survey Notes & Lab Results of Well Sampling

Subtasks 1 & 4 Project Management AND Site Assessment Report which include IDW manifests

Subtask 3 Field Logs AND Lab Results

04/25/2023

09/15/2023

10/30/2023

$ 72,221.21

$ 14,184.55

$ 17,337.48

Printed on recycled paper.

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

To:

From:

Date:

HW686 Contract Negotiation File Palm Cleaners

ERIC_4721

Kelly Crain Project Manager September 28, 2023

Subject: Negotiation Summary

HW686 DC013B-1

This Task Assignment Change Order authorizes an overall decrease in cost to Subtask 3. Costs for MAGS well installation equipment was increased, and subcontractor and analytical costs were decreased, resulting in a total overall decrease.

The cost decrease related to this change order is $3,506.83.

The FDEP project manager agrees to the scope of work and final cost associated with this Task Assignment Change Order. The final cost for this Task Assignment Change Order is $103,743.24.

PSI may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Change Order Notification Form.

FDEP COST ESTIMATE

Contractor: Professional Service Industries, Inc. (Intertek-PSI)

Date: 9/18/2023

Task #: DC013B-CO-1 SubTask 1 Project Management SubTask 6

Site: Palm Cleaners ERIC_4721 SubTask 2 GPR, Survey, Existing Well Sampling SubTask 7

Activity/Phase: Site Assessment SubTask 3 Assessment SubTask 8

Project Manager: Nana Westmark SubTask 4 Data Evaluation / Report SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$56.99 Project Manager 30.6 30.6 $0.00 Principal Consultant 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$60.00 Senior Engineer, MR 3.0 0.0 3.0 0.0 0.0 0 0 0 0 0 $56.99 Senior Geologist, NW 38.0 2.0 10.0 26.0 0.0 0 0 0 0 0 $57.69 Senior Scientist, MR 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Certified Industrial Hygientist 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $0.00 Certified Hazardous Materials Manager 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $0.00 Florida Licensed Asbestos Consultant 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $0.00 Project Manager 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$43.27 Project Engineer, JN 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $43.27 Project Engineer, IK 37.0 0.0 17.0 20.0 0.0 0 0 0 0 0 $40.87 Project Engineer, MK 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $37.00 Project Geologist, SAM 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $33.74 Project Scientist, SB 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $28.51 Project Scientist, AH 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $29.77 Project Scientist, RF 159.5 8.5 111.5 39.5 0.0 0 0 0 0 0

$0.00 QA Officer 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $31.51 Remediation Specialist, RH 52.5 0.0 52.5 0.0 0.0 0 0 0 0 0 $29.86 GIS / CAD Specialist, DG 16.0 0.0 0.0 16.0 0.0 0 0 0 0 0 $25.00 Staff Scientist, MM 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $25.00 Staff Geologist, QH 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $24.00 Staff Scientist, OG 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $30.91 Environmental Specialist, CC 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $22.06 Environmental Specialist, MZ 114.5 16.0 98.5 0.0 0.0 0 0 0 0 0 $20.81 Administrative Assistant, BM 4.0 0.0 0.0 4.0 0.0 0 0 0 0 0

Total Hours 455.1 30.6 26.5 292.5 105.5 0.0 0 0 0 0 0

Direct Labor $15,182.78 $1,746.69 $719.99 $8,632.04 $4,084.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 151.02% $22,929.04 $2,637.85 $1,087.33 $13,036.11 $6,167.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $38,111.82 $4,384.54 $1,807.32 $21,668.15 $10,251.81 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF PSI Intertek Page 1

FDEP COST ESTIMATE

Date: 9/18/2023

Task #: DC013B-CO-1 SubTask 1 Project Management SubTask 6

Site: Palm Cleaners ERIC_4721 SubTask 2 GPR, Survey, Existing Well Sampling SubTask 7

Activity/Phase: Site Assessment SubTask 3 Assessment SubTask 8

Project Manager: Nana Westmark SubTask 4 Data Evaluation / Report SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Travel

Vehicle Rental $3,120.00 $480.00 $2,640.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $3,120.00 $480.00 $2,640.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

MAGS well materials $1,027.76 $0.00 $1,027.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $1,027.76 $0.00 $1,027.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $102.78 $0.00 $102.78 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $1,130.54 $0.00 $1,130.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $14,917.00 $0.00 $14,917.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 SurvTech Solutions, Inc. $6,995.00 $6,995.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $1,125.00 $0.00 $0.00 $1,125.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 GeoTek $1,500.00 $1,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $24,537.00 $8,495.00 $14,917.00 $1,125.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $2,453.70 $849.50 $1,491.70 $112.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $26,990.70 $9,344.50 $16,408.70 $1,237.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $23,374.00 $1,197.00 $22,177.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $150.00 $0.00 $150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $23,524.00 $1,197.00 $22,327.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $760.00 $80.00 $680.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $6,295.00 $1,095.00 $5,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $7,055.00 $1,175.00 $5,880.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $99,932.06 $4,384.54 $14,003.82 $70,054.39 $11,489.31 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $3,811.18 $438.45 $180.73 $2,166.82 $1,025.18 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $103,743.24 $4,822.99 $14,184.55 $72,221.21 $12,514.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$107,250.07 $4,822.99 $14,184.55 $75,728.04 $12,514.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 from delta -3506.84 0 0 -3506.84 0 math $3,506.83 0 0 3506.83 0 rounding reconcile -$0.01 0 0 -0.01 0

REV: 02/03 CEF PSI Intertek Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Palm Cleaners ERIC_4721 SubTask 2 GPR, Survey, Existing Well Sampling

DATE: 9/18/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist Tenant, owner notification 1 Technical oversight 1

Total Hours: 2 Project Scientist, R Fetter Field event preparation 1

Travel, roundtrip 1.5 GPR oversight 3 Specific Boundary Survey oversight 3

Total Hours: 8.5

Environmental Specialist, M Zilske Field event preparation 1 Travel, roundtrip 1.5 Existing monitoring well sampling

5 shallow, 1 hr each 5 3 intermediate, 1.5 hr each 4.5 1 deep, 2 hrs each 2

Pick-up, drop off sample kits 1 Stage IDW drum from existing well purging 1

Total Hours: 16

TOTAL LABOR 26.5

VEHICLE TYPE RATE UNIT USEAGE

Equipment Van / Truck, GPR oversight $120.00 day 1 $120.00 Equipment Van / Truck, boundary survey oversight $120.00 day 1 $120.00 Equipment Van / Truck, monitoring well sampling $120.00 day 2 $240.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

GeoTek Ground penetrating radar 1 $1,500.00 $1,500.00 SurvTech Solutions, Inc. Specific purpose boundary survey 1 $6,995.00 $6,995.00

$0.00 $0.00

TOTAL $8,495.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

Halocarbons by EPA Method 8260 $73.00 9 $657.00

Aromatics by EPA Method 8260 $60.00 9 $540.00

TOTAL LAB $1,197.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00

Shallow Groundwater Sampling Kit $290.00 day 2 $580.00 Deep groundwater sampling kit $415.00 day 1 $415.00 55--gallon drum $100.00 each 1 $100.00

$1,095.00 Expendables $40.00 day 2 $80.00

$0.00 $0.00 $0.00

TOTAL EQUIPMENT $1,175.00

FINAL --7/24/96

Page 3 DC013B-CO-1

SubTask 3 Assessment

DATE: 9/18/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Lithologic Profile Senior Geologist, N Westmark Technical Oversight 3

Notification to tenant, owner 1 Hours: 4

Project Scientist, R Fetter Field event preparation 1 Travel, (1.5 hr per roundtrip) 3 Lithologic profile to ~50 ft 16 Stage IDW drums 1

Hours: 21

Interior Soil Borings, Soil Sampling

Project Scientist, R Fetter Field event preparation 1

Travel, (1.5 hr per roundtrip) 3

Provide documentation of soil borings logs, soil classification 4

Collect soil samples to 10 feet bls at 2 locations 7.5

Prepare SPLP samples for potential analyses 2

Prepare Chain of custody 0

Hours: 17.5 Remediation Specialist, R Hanson Travel, (1.5 hr per roundtrip) 3

Set-up equipment, visqueen inside building 3

Core through concrete inside building 0

Collect soil samples to 10 feet bls at 2 locations 7.5

Prepare SPLP samples for potential analyses 2

Stage IDW drums 1

Prepare Chain of custody 1

Hours: 17.5

Environmental Specialist, M Zilske Travel, (1.5 hr per roundtrip) 3

Set-up equipment, visqueen inside building 0

Core through concrete inside building 5

Collect soil samples to 10 feet bls at 2 locations 7.5

Prepare SPLP samples for potential analyses 2

Hours: 17.5

MAGS Well Installation Remediation Specialist, R Hanson Travel, (1.5 hr per roundtrip) 3

Set-up equipment, visqueen inside building 1 Install MAGS wells 13

Hours: 17

Environmental Specialist, M Zilske Travel, (1.5 hr per roundtrip) 3 Set-up equipment, visqueen inside building 1 Install MAGS wells 13

Hours: 17

Page 4 DC013B-CO-1

MAGS Testing Senior Engineer, M Rothenburg Technical Assistance 3

Hours: 3

Environmental Specialist, M Zilske Travel, (1.5 hr per roundtrip) 3 Set up existing system for MAGS 3 Well head assembly set-up 1 Operate MAGS event (1 hrs - 7 points) 7 Collect measurements from other wells 3 Dismantle MAGS equipment 1

Hours: 18

Remediation Specialist, R Hanson Travel, (1.5 hr per roundtrip) 3 Set up existing system for MAGS 3

Well head assembly set-up 1

Operate MAGS event (1 hrs - 7 points) 7

Site Restoration outside building 3

Dismantle MAGS equipment 1 Hours: 18

Project Engineer, I King Travel, (1.5 hr per roundtrip) 3 Technical review of data during testing 3 Collect vacuum and flow readings (1 hrs / point - 7 points) 7 Written documentation of data collection 4

Hours: 17

Groundwater Screenpoint Sampling Senior Geologist, N Westmark Screenpoint evaluation and selection 2

Project Scientist, R Fetter Field event preparation 1 Travel, roundtrip 3 Groundwater screenpoint sampling, 3 depths 20 Sample kit pick-up, drop-off 2

Hours: 26

Exterior Soil Borings Project Scientist, R Fetter Field event preparation 1

Travel, (1.5 hr per roundtrip) 1.5 Soil boring installation oversight 12 Sample kit pick-up, drop-off 2

Hours: 16.5

Environmental Specialist, M Zilske Travel, roundtrip 1.5 Soil sampling 12 Sample kit pick-up, drop-off 2

Hours: 15.5

Equipment area breakdown and cleanup will occur following completed tasks (including decon areas, removal of traffic barricades, backfill of all open voids occurring from soil borings with clean sand; patching of concrete and asphalt locations leaving the site in as close to the original condition as possible.)

Page 5 DC013B-CO-1

Monitoring Well Installation Oversight Senior Geologist, N Westmark Technical Oversight 4

Project Scientist, R Fetter Field event preparation 1 Travel (1.5 hr per roundtrip) 4.5 Monitoring well installation oversight 23 Stage IDW drums 2

Hours: 30.5

Monitoring Well Sampling Environmental Specialist, M Zilske Field event preparation 1

Travel, (1.5 hr per roundtrip) 3 Groundwater well sampling 3 shallow wells (1 hr per shallow well) 3 4 intermediate wells (1.5 hrs per intermediate well) 6 4 deep wells (2 hrs per deep well) 8 Stage IDW drums 1 Sample kit pick-up, drop-off 2

Hours: 24

Monitoring Well Abandonment (MW-4 existing) Environmental Specialist, M Zilske Field event preparation 1

Travel, (1.5 hr per roundtrip) 1.5 Oversight of well abandonment 4

Hours: 6.5

Summary of Total Hours M Rothenburg 3

N Westmark 10

I King 17

R Fetter 111.5

R Hanson 52.5

M Zilske 98.5

292.5

TOTAL LABOR 292.5

Page 6 DC013B-CO-1

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Lithologic Profile Equipment Van / Truck 1 person, 2 day $120.00 day 2 $240.00

Interior Soil Borings, Soil Sampling Equipment Van / Truck 3 persons, 2 days $120.00 day 4 $480.00 (2 people in one truck, one person in 2nd truck)

MAGS Well Installation Equipment Van / Truck 2 persons, 2 days $120.00 day 2 $240.00

MAGS Testing Equipment Van / Truck 3 persons, 2 days $120.00 day 4 $480.00 (2 people in one truck, one person in 2nd truck)

Groundwater Screenpoint Sampling Equipment Van / Truck 1 person, 2 day $120.00 day 2 $240.00

Exterior Soil Borings Equipment Van / Truck 2 persons, 2 days $120.00 day 2 $240.00

Monitoring Well Installation Oversight Equipment Van / Truck 1 person, 3 days $120.00 day 3 $360.00

Monitoring Well Sampling Equipment Van / Truck 1 persons, 2 days $120.00 day 2 $240.00

Monitoring Well Abandonment Equipment Van / Truck 1 persons, 1 day $120.00 day 1 $120.00

$0.00

TOTAL VEHICLE $2,640.00

PER DIEM RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

Page 7 DC013B-CO-1

SUBCONTRACTOR COSTS

NAME PURPOSE COST TOTALS

ATI Drilling 1 $14,917.00 $14,917.00

$0.00

TOTAL $14,917.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

$0.00

Halocarbons by EPA Method 8260 22 water and 115 soil samples

47 78 $73.00 126 $9,198.00

Aromatics by EPA Method 8260 22 water and 115 soil samples

47 78 $60.00 126 $7,560.00

TRPH $88.00 9 $792.00

SPLP Extraction by EPA Method 1311 / 1312 $45.00 36 $1,620.00

ENCORE samples $16.00 86 $1,376.00

$0.00 TO-15 (VOCs) $200.00 7 no change $1,400.00

Summa cannisters $33.00 7 no change $231.00

$22,177.00 Shipping, large, overnight (Summa) $150.00 1 no change $150.00

$22,177.00

$0.00

TOTAL LAB $22,327.00

RATE COSTING UNIT USEAGE TOTALS

MAGS Well Supplies

Home Depot $225.98 per invoice $225.98

Atlantic Supply $801.78 per invoice $801.78

$1,027.76 lithologic profile, screening, direct push, well installation

EQUIPMENT PROCUREMENT

TOTAL EQUIPMENT PROCUREMENT

Page 8 DC013B-CO-1

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00

Lithologic Profile Monitoring Well Installation Kit $325.00 day 1 $325.00 Expendables $40.00 day 2 $80.00

Interior Soil Borings, Soil Sampling Soil Sampling through concrete kit $235.00 day 2 $470.00 Expendables $40.00 day 2 $80.00

MAGS Well Installation Soil Assessment Kit $175.00 day 2 $350.00 Expendables $40.00 day 2 $80.00

MAGS Testing Construction Pilot Test Kit $360.00 day 2 $720.00 Portable Generator $70.00 day 2 $140.00 Regen Blower $180.00 day 2 $360.00 GPS $175.00 day 2 $350.00 Expendables $40.00 day 2 $80.00

Groundwater Screenpoint Sampling Shallow Groundwater Monitoring Kit $290.00 day 2 $580.00 Expendables $40.00 day 2 $80.00

Exterior Soil Borings Soil Assessment Kit $175.00 day 2 $350.00 Expendables $40.00 day 2 $80.00

Monitoring Well Installation Oversight Monitoring Well Installation Kit $325.00 day 3 $975.00 Expendables $40.00 day 2 $80.00

Monitoring Well Sampling Shallow Groundwater Monitoring Kit $290.00 day 2 $580.00 Expendables $40.00 day 2 $80.00

Monitoring Well Abandonment Expendables $40.00 day 1 $40.00

TOTAL EQUIPMENT $5,200.00

Page 9 DC013B-CO-1

SubTask 4 Data Evaluation / Report

DATE: 9/18/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist, N Westmark Evaluate Data in report text, raw data, tables, figures 22 Prepare recommendations 3

Sign and seal documents 1 Total Hours: 26

Project Engineer, I King Prepare tables, develop MAGS results 20

Project Scientist, R Fetter Evaluate raw data 12

Develop Report 15

Provide data for map development 12

Submit ADaPT 0.5 Total Hours: 39.5

GIS/CADD Specialist, D Grove Developing drawings for evaluation and reporting 16

Administrative Assistant, B Meynardie Compile documents for report 4

TOTAL LABOR 105.5

VEHICLE TYPE RATE UNIT USEAGE

$0.00

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

Petrotech Southeast IDW transport and disposal 9 $125.00 $1,125.00 $0.00

TOTAL $1,125.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 $0.00 $0.00 $0.00

TOTAL EQUIPMENT $0.00

Page 10 DC013B-CO-1

FDEP COST ESTI MATE

Date: 9/18/2023

Task #: DC013B SubTask 1 Project Management SubTask 6

Site: Palm Cleaners ERIC_4721 SubTask 2 GPR, Survey, Existing Well Sampling SubTask 7

Activity/Phase: Site Assessment SubTask 3 Assessment SubTask 8

Project Manager: Nana Westmark SubTask 4 Data Evaluation / Report SubTask 9

SubTask 5 Actual Total SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$56.99 Project Manager 0.0 0.0 $0.00 Principal Consultant 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$60.00 Senior Engineer, MR 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $56.99 Senior Geologist, NW 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $57.69 Senior Scientist, MR 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Certified Industrial Hygientist 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $0.00 Certified Hazardous Materials Manager 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $0.00 Florida Licensed Asbestos Consultant 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $0.00 Project Manager 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$43.27 Project Engineer, JN 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $43.27 Project Engineer, IK 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $40.87 Project Engineer, MK 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $37.00 Project Geologist, SAM 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $33.74 Project Scientist, SB 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $28.51 Project Scientist, AH 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $29.77 Project Scientist, RF 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 QA Officer 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $31.51 Remediation Specialist, RH 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $29.86 GIS / CAD Specialist, DG 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $25.00 Staff Scientist, MM 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $25.00 Staff Geologist, QH 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $24.00 Staff Scientist, OG 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $30.91 Environmental Specialist, CC 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $22.06 Environmental Specialist, MZ 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $20.81 Administrative Assistant, BM 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

Total Hours 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

Direct Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 151.02% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Date: 9/18/2023

Task #: DC013B SubTask 1 Project Management SubTask 6

Site: Palm Cleaners ERIC_4721 SubTask 2 GPR, Survey, Existing Well Sampling SubTask 7

Activity/Phase: Site Assessment SubTask 3 Assessment SubTask 8

Project Manager: Nana Westmark SubTask 4 Data Evaluation / Report SubTask 9

SubTask 5 Actual Total SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Travel

Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

MAGS well materials $496.33 $0.00 $496.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $496.33 $0.00 $496.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $49.63 $0.00 $49.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $545.96 $0.00 $545.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) ($2,898.00) $0.00 ($2,898.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 SurvTech Solutions, Inc. $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 GeoTek $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal ($2,898.00) $0.00 ($2,898.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee ($289.80) $0.00 ($289.80) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost ($3,187.80) $0.00 ($3,187.80) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs ($865.00) $0.00 ($865.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory ($865.00) $0.00 ($865.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal ($3,506.84) $0.00 $0.00 ($3,506.84) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost ($3,506.84) $0.00 $0.00 ($3,506.84) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

SubTask 2 GPR, Survey, Existing Well Sampling

DATE: 9/18/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist Tenant, owner notification 0 Technical oversight 0

Total Hours: 0 Project Scientist, R Fetter Field event preparation 0

Travel, roundtrip 0 GPR oversight 0 Specific Boundary Survey oversight 0

Total Hours: 0

Environmental Specialist, M Zilske Field event preparation 0 Travel, roundtrip 0 Existing monitoring well sampling

5 shallow, 1 hr each 0 3 intermediate, 1.5 hr each 0 1 deep, 2 hrs each 0

Pick-up, drop off sample kits 0 Stage IDW drum from existing well purging 0

Total Hours: 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Equipment Van / Truck, GPR oversight $120.00 day 0 $0.00 Equipment Van / Truck, boundary survey oversight $120.00 day 0 $0.00 Equipment Van / Truck, monitoring well sampling $120.00 day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

GeoTek Ground penetrating radar 0 $1,500.00 $0.00 SurvTech Solutions, Inc. Specific purpose boundary survey 0 $6,995.00 $0.00

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

Halocarbons by EPA Method 8260 $73.00 0 $0.00

Aromatics by EPA Method 8260 $60.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00

Shallow Groundwater Sampling Kit $290.00 day 0 $0.00 Deep groundwater sampling kit $415.00 day 0 $0.00 55--gallon drum $100.00 each 0 $0.00

$0.00 Expendables $40.00 day 0 $0.00

$0.00 $0.00 $0.00

TOTAL EQUIPMENT $0.00

Page 3 Copy of Delta DC013B

SubTask 3 Assessment

DATE: 9/18/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Lithologic Profile Senior Geologist, N Westmark Technical Oversight 0

Notification to tenant, owner 0 Hours: 0

Project Scientist, R Fetter Field event preparation 0 Travel, (1.5 hr per roundtrip) 0 Lithologic profile to ~50 ft 0 Stage IDW drums 0

Hours: 0

Interior Soil Borings, Soil Sampling

Project Scientist, R Fetter Field event preparation 0

Travel, (1.5 hr per roundtrip) 0

Provide documentation of soil borings logs, soil classification 0

Collect soil samples to 10 feet bls at 2 locations 0

Prepare SPLP samples for potential analyses 0

Prepare Chain of custody 0

Hours: 0 Remediation Specialist, R Hanson Travel, (1.5 hr per roundtrip) 0

Set-up equipment, visqueen inside building 0

Core through concrete inside building 0

Collect soil samples to 10 feet bls at 2 locations 0

Prepare SPLP samples for potential analyses 0

Stage IDW drums 0

Prepare Chain of custody 0

Hours: 0

Environmental Specialist, M Zilske Travel, (1.5 hr per roundtrip) 0

Set-up equipment, visqueen inside building 0

Core through concrete inside building 0

Collect soil samples to 10 feet bls at 2 locations 0

Prepare SPLP samples for potential analyses 0

Hours: 0

MAGS Well Installation Remediation Specialist, R Hanson Travel, (1.5 hr per roundtrip) 0

Set-up equipment, visqueen inside building 0 Install MAGS wells 0

Hours: 0

Environmental Specialist, M Zilske Travel, (1.5 hr per roundtrip) 0 Set-up equipment, visqueen inside building 0 Install MAGS wells 0

Hours: 0

Page 4 Copy of Delta DC013B

MAGS Testing Senior Engineer, M Rothenburg Technical Assistance 0

Hours: 0

Environmental Specialist, M Zilske Travel, (1.5 hr per roundtrip) 0 Set up existing system for MAGS 0 Well head assembly set-up 0 Operate MAGS event (1 hrs - 7 points) 0 Collect measurements from other wells 0 Dismantle MAGS equipment 0

Hours: 0

Remediation Specialist, R Hanson Travel, (1.5 hr per roundtrip) 0 Set up existing system for MAGS 0

Well head assembly set-up 0

Operate MAGS event (1 hrs - 7 points) 0

Site Restoration outside building 0

Dismantle MAGS equipment 0

Project Engineer, I King Travel, (1.5 hr per roundtrip) 0 Technical review of data during testing 0 Collect vacuum and flow readings (1 hrs / point - 7 points) 0 Written documentation of data collection 0

Hours: 0

Groundwater Screenpoint Sampling Senior Geologist, N Westmark Screenpoint evaluation and selection 0

Project Scientist, R Fetter Field event preparation 0 Travel, roundtrip 0 Groundwater screenpoint sampling, 3 depths 0 Sample kit pick-up, drop-off 0

Hours: 0

Exterior Soil Borings Project Scientist, R Fetter Field event preparation 0

Travel, (1.5 hr per roundtrip) 0 Soil boring installation oversight 0 Sample kit pick-up, drop-off 0

Hours: 0

Environmental Specialist, M Zilske Travel, roundtrip 0 Soil sampling 0 Sample kit pick-up, drop-off 0

Hours: 0

Equipment area breakdown and cleanup will occur following completed tasks (including decon areas, removal of traffic barricades, backfill of all open voids occurring from soil borings with clean sand; patching of concrete and asphalt locations leaving the site in as close to the original condition as possible.)

Page 5 Copy of Delta DC013B

Monitoring Well Installation Oversight Senior Geologist, N Westmark Technical Oversight 0

Project Scientist, R Fetter Field event preparation 0 Travel (1.5 hr per roundtrip) 0 Monitoring well installation oversight 0 Stage IDW drums 0

Hours: 0.0

Monitoring Well Sampling Environmental Specialist, M Zilske Field event preparation 0

Travel, (1.5 hr per roundtrip) 0 Groundwater well sampling 0 3 shallow wells (1 hr per shallow well) 0 4 intermediate wells (1.5 hrs per intermediate well) 0 4 deep wells (2 hrs per deep well) 0 Stage IDW drums 0 Sample kit pick-up, drop-off 0

Hours: 0

Monitoring Well Abandonment (MW-4 existing) Environmental Specialist, M Zilske Field event preparation 0

Travel, (1.5 hr per roundtrip) 0 Oversight of well abandonment 0

Summary of Total Hours M Rothenburg 0

N Westmark 0

I King 0

R Fetter 0.0

R Hanson 0

M Zilske 0

TOTAL LABOR 0.0

Page 6 Copy of Delta DC013B

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Lithologic Profile Equipment Van / Truck 1 person, 2 day $120.00 day 0 $0.00

Interior Soil Borings, Soil Sampling Equipment Van / Truck 3 persons, 2 days $120.00 day 0 $0.00 (2 people in one truck, one person in 2nd truck)

MAGS Well Installation Equipment Van / Truck 2 persons, 2 days $120.00 day 0 $0.00

MAGS Testing Equipment Van / Truck 3 persons, 2 days $120.00 day 0 $0.00 (2 people in one truck, one person in 2nd truck)

Groundwater Screenpoint Sampling Equipment Van / Truck 1 person, 2 day $120.00 day 0 $0.00

Exterior Soil Borings Equipment Van / Truck 2 persons, 2 days $120.00 day 0 $0.00

Monitoring Well Installation Oversight Equipment Van / Truck 1 person, 3 days $120.00 day 0 $0.00

Monitoring Well Sampling Equipment Van / Truck 1 persons, 2 days $120.00 day 0 $0.00

Monitoring Well Abandonment Equipment Van / Truck 1 persons, 1 day $120.00 day 0 $0.00

$0.00

TOTAL VEHICLE $0.00

PER DIEM RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

Page 7 Copy of Delta DC013B

SUBCONTRACTOR COSTS

NAME PURPOSE COST TOTALS

ATI Drilling 1 -$17,815.00 ($17,815.00) 1 $14,917.00 $14,917.00

$0.00

TOTAL ($2,898.00)

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

$0.00

Halocarbons by EPA Method 8260 $73.00 -137 ($10,001.00) 22 water and 115 soil samples

47 78 $73.00 126 $9,198.00

Aromatics by EPA Method 8260 $60.00 -137 ($8,220.00) 22 water and 115 soil samples

47 78 $60.00 126 $7,560.00

TRPH $88.00 9 $792.00

SPLP Extraction by EPA Method 1311 / 1312 $45.00 -30 ($1,350.00) $45.00 36 $1,620.00

ENCORE samples $16.00 -115 ($1,840.00) $16.00 86 $1,376.00

$0.00 TO-15 (VOCs) $200.00 7 no change $0.00

Summa cannisters $33.00 7 no change $0.00

-$865.00 Shipping, large, overnight (Summa) $150.00 1 no change $0.00

23,192.00$ $20,546.00

$0.00

TOTAL LAB ($865.00)

RATE COSTING UNIT USEAGE TOTALS

MAGS Well Supplies

PVC cement $7.96 each -3 ($23.88)

PVC well screen, 2 inch 5 ft screen, 10 or 20 slot $40.00 each -7 ($280.00)

PVC casing, 5 ft lengths for riser $20.95 each -7 ($146.65)

2 in PVC cap $4.54 each -7 ($31.78)

2 inch PVC SCH 40 adaptor $2.61 each -7 ($18.27) concrete mix $6.47 each -2 ($12.94) sand $5.97 each -3 ($17.91)

Home Depot $225.98 per invoice $225.98

Atlantic Supply $801.78 per invoice $801.78

$496.33 lithologic profile, screening, direct push, well installation

EQUIPMENT PROCUREMENT

TOTAL EQUIPMENT PROCUREMENT

Page 8 Copy of Delta DC013B

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00

Lithologic Profile Monitoring Well Installation Kit $325.00 day 0 $0.00 Expendables $40.00 day 0 $0.00

Interior Soil Borings, Soil Sampling Soil Sampling through concrete kit $235.00 day 0 $0.00 Expendables $40.00 day 0 $0.00

MAGS Well Installation Soil Assessment Kit $175.00 day 0 $0.00 Expendables $40.00 day 0 $0.00

MAGS Testing Construction Pilot Test Kit $360.00 day 0 $0.00 Portable Generator $70.00 day 0 $0.00 Regen Blower $180.00 day 0 $0.00 GPS $175.00 day 0 $0.00 Expendables $40.00 day 0 $0.00

Groundwater Screenpoint Sampling Shallow Groundwater Monitoring Kit $290.00 day 0 $0.00 Expendables $40.00 day 0 $0.00

Exterior Soil Borings Soil Assessment Kit $175.00 day 0 $0.00 Expendables $40.00 day 0 $0.00

Monitoring Well Installation Oversight Monitoring Well Installation Kit $325.00 day 0 $0.00 Expendables $40.00 day 0 $0.00

Monitoring Well Sampling Shallow Groundwater Monitoring Kit $290.00 day 0 $0.00 Expendables $40.00 day 0 $0.00

Monitoring Well Abandonment Expendables $40.00 day 0 $0.00

TOTAL EQUIPMENT $0.00

TOtAL EXPENDAABLE $0.00

Page 9 Copy of Delta DC013B

SubTask 4 Data Evaluation / Report

DATE: 9/18/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist, N Westmark Evaluate Data in report text, raw data, tables, figures 0 Prepare recommendations 0

Sign and seal documents 0 Total Hours: 0

Project Engineer, I King Prepare tables, develop MAGS results 0

Project Scientist, R Fetter Evaluate raw data 0

Develop Report 0

Provide data for map development 0

Submit ADaPT 0 Total Hours: 0

GIS/CADD Specialist, D Grove Developing drawings for evaluation and reporting 0

Administrative Assistant, B Meynardie Compile documents for report 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

$0.00

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

Petrotech Southeast IDW transport and disposal 0 $125.00 $0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 $0.00 $0.00 $0.00

TOTAL EQUIPMENT $0.00

Page 10 Copy of Delta DC013B

Date: 12/19/2022

Task #: DC013B SubTask 1 Project Management SubTask 6

Site: Palm Cleaners ERIC_4721 SubTask 2 GPR, Survey, Existing Well Sampling SubTask 7

Activity/Phase: Site Assessment SubTask 3 Assessment SubTask 8

Project Manager: Nana Westmark SubTask 4 Data Evaluation / Report SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$56.99 Project Manager 30.6 30.6 $0.00 Principal Consultant 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$60.00 Senior Engineer, MR 3.0 0.0 3.0 0.0 0.0 0 0 0 0 0 $56.99 Senior Geologist, NW 38.0 2.0 10.0 26.0 0.0 0 0 0 0 0 $57.69 Senior Scientist, MR 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Certified Industrial Hygientist 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $0.00 Certified Hazardous Materials Manager 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $0.00 Florida Licensed Asbestos Consultant 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $0.00 Project Manager 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$43.27 Project Engineer, JN 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $43.27 Project Engineer, IK 37.0 0.0 17.0 20.0 0.0 0 0 0 0 0 $40.87 Project Engineer, MK 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $37.00 Project Geologist, SAM 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $33.74 Project Scientist, SB 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $28.51 Project Scientist, AH 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $29.77 Project Scientist, RF 159.5 8.5 111.5 39.5 0.0 0 0 0 0 0

$0.00 QA Officer 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $31.51 Remediation Specialist, RH 52.5 0.0 52.5 0.0 0.0 0 0 0 0 0 $29.86 GIS / CAD Specialist, DG 16.0 0.0 0.0 16.0 0.0 0 0 0 0 0

$0.00 Staff Engineer 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $0.00 Staff Geologist 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$24.95 Staff Scientist, BW 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $30.91 Environmental Specialist, CC 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 $22.06 Environmental Specialist, MZ 114.5 16.0 98.5 0.0 0.0 0 0 0 0 0 $20.81 Administrative Assistant, BM 4.0 0.0 0.0 4.0 0.0 0 0 0 0 0

Total Hours 455.1 30.6 26.5 292.5 105.5 0.0 0 0 0 0 0

Direct Labor $15,182.78 $1,746.69 $719.99 $8,632.04 $4,084.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 151.02% $22,929.04 $2,637.85 $1,087.33 $13,036.11 $6,167.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $38,111.82 $4,384.54 $1,807.32 $21,668.15 $10,251.81 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Date: 12/19/2022

Task #: DC013B SubTask 1 Project Management SubTask 6

Site: Palm Cleaners ERIC_4721 SubTask 2 GPR, Survey, Existing Well Sampling SubTask 7

Activity/Phase: Site Assessment SubTask 3 Assessment SubTask 8

Project Manager: Nana Westmark SubTask 4 Data Evaluation / Report SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Travel

Vehicle Rental $3,120.00 $480.00 $2,640.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $3,120.00 $480.00 $2,640.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

MAGS well materials $531.43 $0.00 $531.43 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $531.43 $0.00 $531.43 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $53.14 $0.00 $53.14 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $584.57 $0.00 $584.57 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $17,815.00 $0.00 $17,815.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 SurvTech Solutions, Inc. $6,995.00 $6,995.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $1,125.00 $0.00 $0.00 $1,125.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 GeoTek $1,500.00 $1,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $27,435.00 $8,495.00 $17,815.00 $1,125.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $2,743.50 $849.50 $1,781.50 $112.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $30,178.50 $9,344.50 $19,596.50 $1,237.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $24,239.00 $1,197.00 $23,042.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $150.00 $0.00 $150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $24,389.00 $1,197.00 $23,192.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $760.00 $80.00 $680.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $6,295.00 $1,095.00 $5,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $7,055.00 $1,175.00 $5,880.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $103,438.89 $4,384.54 $14,003.82 $73,561.22 $11,489.31 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $3,811.18 $438.45 $180.73 $2,166.82 $1,025.18 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $107,250.07 $4,822.99 $14,184.55 $75,728.04 $12,514.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

From: Nana Westmark To: Crain, Kelly Subject: Palm Cleaners ERIC_4721 DC013B Change Order request, subtask 3 Date: Wednesday, September 20, 2023 9:20:05 AM Attachments: image001.png

DC013B.xlsx Delta DC013B.xlsx DC013B-CO-1.xlsx The Home Depot for MAGS.pdf Atlantic Supply for MAGS.pdf 05523687 ATI DRILL INV 8186 -DC.pdf 05523687 ATI Inv 8150 4-11-23.pdf

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Good Morning Kelly – Hope you are doing well.

PSI respectfully requests a Change Order for DC013B, Palm Cleaners ERIC_4721 for subtask 3, (assessment work).

You have provided an approval for the work, but we came in under budget.

Please see attached:

original DC013B for $107,250.07 Delta for $3506.84 CO-1 for $103,743.24 ATI (drillers) 2 invoices Home Depot invoice for MAGS supplies Atlantic Supply invoice for MAGS supplies

Please contact me with any questions.

(BTW – I’m in Tallahassee right now and will be stopping by the FDEP building to drop off keys to Collier Hogan this morning. Feel free to contact me on my mobile 813- 267-2519.)

Kind Regards, Nana Westmark, PG, CHMM Senior Geologist / Principal Consultant Building & Construction Intertek-PSI

Please Note: My email address is now: Nana.Westmark@intertek.com.

Direct 813 – 886 – 1075 Ext 219 Mobile 813 - 267 - 2519 Office 813 – 886 – 1075 Email Nana.Westmark@intertek.com Skype Nana.Westmark.Intertek www.intertek.com/building [gcc02.safelinks.protection.outlook.com] [gcc02.safelinks.protection.outlook.com] mailto:nana.westmark@intertek.com mailto:Kelly.Crain@dep.state.fl.us mailto:Nana.Westmark@intertek.com mailto:Nana.Westmark@intertek.com https://secure-web.cisco.com/1zkJZpoT6Kk5L7ZI1YHZMGiY1lXH52D5tSgxBkJbz2cRSUgHJEf2qArlVDbqXAPI59uSHxc3_vZgzw4HQRKMF0q3rTCdUAZi5wl7d0x0Z4pWjw2Ax1HJmPA_Kkyr95CJt90skHFt4ZB0VPxABnjbl_GdHbb1ZvLoxsgs4Nyfx1zNO8rE9m4EGhDaoOOhRRWsBCYfa5905a8H_xKeCKsSJBNFCA79zu2Dsm0ourZpnsvXkTLligoMMtpddIVpg60d1N495sivE6n8NhotX8e95XcedvPNG898W2wGRMA4B0z8ujqUoTiPnsupnkImmcHse/https%3A%2F%2Furldefense.com%2Fv3%2F__https%3A%2Fgcc02.safelinks.protection.outlook.com%2F%3Furl%3Dhttps%2A3A%2A2F%2A2Furldefense.com%2A2Fv3%2A2F__https%2A3A%2A2Fgcc02.safelinks.protection.outlook.com%2A2F%2A3Furl%2A3Dhttp%2A3A%2A2F%2A2Fwww.intertek.com%2A2Fbuilding%2A26data%2A3D04%2A7C01%2A7C%2A7Ce6e60d91fd384023f38108d9fc50956c%2A7Cf82250c421b643ada0095dbf5b6ad62d%2A7C0%2A7C0%2A7C637818245314857152%2A7CUnknown%2A7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%2A3D%2A7C3000%2A26sdata%2A3DvRbGaonR2CbnFAS0Dca4ptkjW7icXh66E0j0%2A2Fp%2A2BJ13I%2A3D%2A26reserved%2A3D0__%2A3BJSUlJSUlJSUlJSUlJSUlJSUl%21%21Ie6nUkZk%218l7e3Y_9sJi7T5snTt9AB9T_Ax7YUUjuMGVVA-7CA4KCgIJ_Ne3ClV4iOvUZ8FSSn-xc%2A24%26data%3D04%2A7C01%2A7C%2A7Cc4fcae041bcf49265f2808d9fc6ec1a8%2A7Cf82250c421b643ada0095dbf5b6ad62d%2A7C0%2A7C0%2A7C637818374916215896%2A7CUnknown%2A7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%2A3D%2A7C3000%26sdata%3DdPp%2A2BTVIDjNbYdwX0119sREuLath0qcAcEMHjGoPCymU%2A3D%26reserved%3D0__%3BJSUlJSUlJSUlJSoqKiolJSoqKioqKioqKioqJSUqKiolJSUlJSUlJSUlJSUlJSUlJQ%21%21Ie6nUkZk%2195zq0GPNR51LtfeZmnlqP7itfu4z7831lpWaoMqh49FmYhrXRV39llJQruqRDrG0SAP6%24

Cost Estimate

Contractor: Professional Service Industries, Inc. (Intertek-PSI)

Date: 12/19/22

Task #: DC013B SubTask 1 Project Management SubTask 6

Site: Palm Cleaners ERIC_4721 SubTask 2 GPR, Survey, Existing Well Sampling SubTask 7

Activity/Phase: Site Assessment SubTask 3 Assessment SubTask 8

Project Manager: Nana Westmark SubTask 4 Data Evaluation / Report SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category

$56.99 Project Manager 30.6 30.6

$0.00 Principal Consultant 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$60.00 Senior Engineer, MR 3.0 0.0 3.0 0.0 0.0 0 0 0 0 0

$56.99 Senior Geologist, NW 38.0 2.0 10.0 26.0 0.0 0 0 0 0 0

$57.69 Senior Scientist, MR 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Certified Industrial Hygientist 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Certified Hazardous Materials Manager 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Florida Licensed Asbestos Consultant 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Project Manager 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$43.27 Project Engineer, JN 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$43.27 Project Engineer, IK 37.0 0.0 17.0 20.0 0.0 0 0 0 0 0

$40.87 Project Engineer, MK 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$37.00 Project Geologist, SAM 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$33.74 Project Scientist, SB 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$28.51 Project Scientist, AH 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$29.77 Project Scientist, RF 159.5 8.5 111.5 39.5 0.0 0 0 0 0 0

$0.00 QA Officer 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$31.51 Remediation Specialist, RH 52.5 0.0 52.5 0.0 0.0 0 0 0 0 0

$29.86 GIS / CAD Specialist, DG 16.0 0.0 0.0 16.0 0.0 0 0 0 0 0

$0.00 Staff Engineer 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Staff Geologist 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$24.95 Staff Scientist, BW 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$30.91 Environmental Specialist, CC 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$22.06 Environmental Specialist, MZ 114.5 16.0 98.5 0.0 0.0 0 0 0 0 0

$20.81 Administrative Assistant, BM 4.0 0.0 0.0 4.0 0.0 0 0 0 0 0

$0.00 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0

Total Hours 455.1 30.6 26.5 292.5 105.5 0.0 0 0 0 0 0

Direct Labor $15,182.78 $1,746.69 $719.99 $8,632.04 $4,084.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 151.02% $22,929.04 $2,637.85 $1,087.33 $13,036.11 $6,167.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $38,111.82 $4,384.54 $1,807.32 $21,668.15 $10,251.81 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $3,120.00 $480.00 $2,640.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $3,120.00 $480.00 $2,640.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

MAGS well materials $531.43 $0.00 $531.43 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $531.43 $0.00 $531.43 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $53.14 $0.00 $53.14 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $584.57 $0.00 $584.57 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $17,815.00 $0.00 $17,815.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

SurvTech Solutions, Inc.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .