Task Assignment Summary
This Task Assignment (TA) Number DC015B is a contract vehicle executed between the State of Florida Department of Environmental Protection (FDEP) and Environmental Consulting and Technology, Inc. (ECT) under Master Contract Number HW682. The agreement is effective upon the last date signed and includes authorization for ECT to perform confirmatory sampling work at the Loretto Cleaners site located in Jacksonville, Duval County, Florida. The FDEP Project Manager is Karlee Fowler (850-245-8944), and ECT's Project Manager is Mark A. Culbreth (813-289-9338). The underlying contract and attached Scope of Work are incorporated by reference and govern the terms and conditions of this task assignment.
ECT will perform confirmatory sampling at Loretto Cleaners on a fixed unit rate basis, including MAGS (Modified Active Gas Sampling) testing at four interior vapor wells and groundwater sampling from one interior monitoring well to determine if the site meets no further action criteria under Florida Rule 62-780.680(1). The total task assignment value is $10,534.88 for 62 total labor hours, with a completion date of December 12, 2025. Deliverables include a Confirmation Sampling Report due August 29, 2025 ($8,981.53) and a Project Management IDW Manifest due October 31, 2025 ($1,553.35). The scope encompasses three subtasks: Project Management (13% of direct labor), MAGS and Groundwater Assessment (including analytical testing and SVE step testing), and Remedial Waste Disposal through subcontractor services, with the lowest quote of $125.00 from Erwin Remediation selected for IDW transportation and disposal.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW682
DC015B Completion December 12, 2025
This Task Assignment authorizes ECT to perform confirmatory sampling at Loretto Cleaners, to include MAGS testing and groundwater sampling as described in the attached proposal.
Karlee Fowler 850 245-8944 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor
Contractor Mark A. Culbreth Contractor 813-289-9338
ERIC_4628
Jacksonville, Duval County, Florida
Loretto Cleaners
Contractor Contractor
✔ $ 10,534.88
$ 10,534.88
Scope of Work
Environmental Consulting and Technology, Inc. (ECT Contractor Mark A. Culbreth
Contract Manager Digitally signed by Mark Culbreth Date: 2025.06.13 13:37:27-04'00'Mark Culbreth
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2025.06.13 11:48:04 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Confirmation Sampling Report (Subtask 2) 08/29/2025
Project Management, IDW Manifest (Subtask 1, Subtask 3) 10/31/2025
FDEP Approval of Confirmation Sampling Report (Subtask 2) $ 8,981.53
FDEP Approval of Project Management, IDW Manifest (Subtask 1, Subtask 3) $ 1,553.35
$ 10,534.88
HW682
DC015B
Printed on recycled paper.
FFLORIDAA DEPARTMENTT OF
EEnvironmentall Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ronn DeSantis Governor
From:
Date:
To: HW Contract Negotiation File
ERIC_
, Project Manager
Subject: Negotiation Summary
HW
This Task Assignment is $ labor hours.
FDEP COST ESTIMATEContractor: Environmental Consulting & Technology, Inc.
Date: 6/12/2025
Task #: SubTask 1 Project Management
Site: American Drive-In Cleane SubTask 2 MAGS & Groundwater Assess
Activity/Phase: Supplemental Assessmen SubTask 3 IDW
Project Manager: Mark Culbreth SubTask 4
SubTask 5
Totals 1 2 3 Labor Rate Category
$85.85 Project Manager 4 3.5 $85.85 Senior Principal Scientist (MC) 5 5.0 0.0 $56.32 Senior Engineer / Scientist (DP) 20 17.0 3.0 $29.30 GIS Analyst / Graphics (JV) 4 4.0 0.0 $25.48 Associate Engineer / Scientist (JP) 19 19.0 0.0 $34.81 Administrative (BJ) 5 5.0 0.0
Total Hours 57 3.5 50.0 3.0
Direct Labor $2,634.05 $303.03 $2,162.06 $168.96
Overhead 125.30% $3,300.47 $379.70 $2,709.06 $211.71 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 Fringe 47.40% $1,248.55 $143.64 $1,024.82 $80.09 Total Labor $7,183.07 $826.37 $5,895.94 $460.76
Travel Vehicle Rental $240.00 $240.00 $0.00 Per diem + Hotel $222.00 $222.00 $0.00 Total Travel $462.00 $462.00 $0.00
Subcontractor (Equipment Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Erwin Remediation $125.00 $0.00 $125.00 Subcontractor Subtotal $125.00 $0.00 $125.00 Handling Fee $12.50 $0.00 $12.50 Total Subcontractor Cost $137.50 $0.00 $137.50
Laboratory Analytical Costs $946.00 $946.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 Sample Shipping $140.00 $140.00 $0.00 Total Laboratory $1,086.00 $1,086.00 $0.00
Field Expenses Expendables $40.00 $40.00 $0.00 Shallow Groundwater Sampling Kit $290.00 $290.00 $0.00 MAGS Investigation Kit $500.00 $500.00 $0.00 DOT 55-Gallon Drum $100.00 $100.00 $0.00 Ice $18.00 $18.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $948.00 $948.00 $0.00
Subtotal $9,816.57 $826.37 $8,391.94 $598.26 Completion Fee $718.31 $82.64 $589.59 $46.08
Total Estimated Cost $10,534.88 $909.01 $8,981.53 $644.34
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : American Drive-In Cleaners SUBTASK 2: MAGS & Groundwater Assessment
DATE: 5/13/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations to prepare final confirmation sampling repo 5 Total Hours 5
D. Phillips Sr. Scientist Verification of property ownership, notify RPO of field activities & confirm site access 2 PE oversite of MAGS Event, check MAGS data 3 QA/QC lab data, update HASP, and prepare draft Annual NAM Report 12
Total Hours 17 J. Von Borstel GIS Analyst/Graphics Prepare figures for report 4
Total Hours 4 J. Penia Associate Scientist Prep for field work 2
Roundtrip mobilization from Tampa office to Site 7 Open 6 wells and collect DTW measurements 1 Collect groundwater sample from MW007 1 MAGS testing at four wells 7 Drum IDW and collect sample 1
Total Hours 19 B. Jarvis Administrative Prepare tables for report, document production 5
Total Hours 5
TOTAL LABOR 50
VEHICLE TYPE RATE UNIT USEAGE
Truck J. Penia $120.00 Day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
J. Penia Per Diem $36.00 Day 2 $72.00 J. Penia Hotel $150.00 Day 1 $150.00
TOTAL PER DIEM $222.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units Shipping $70.00 2 $140.00 EPA Method 8260 for VOHs GW $73.00 1 $73.00 EPA Method 8260 for VOHs IDW $73.00 1 $73.00 EPS Method TO-15 Volatiles Soil Vapor $200.00 4 $800.00
TOTAL LAB $1,086.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 event 1 $40.00 Shallow Groundwater Sampling Kit $290.00 day 1 $290.00 MAGS Investigation Kit $500.00 day 1 $500.00 DOT 55-Gallon Drum $100.00 each 1 $100.00 Ice $6.00 each 3 $18.00
TOTAL EQUIPMEN $948.00
SITE : American Drive-In Cleaners
SUBTASK 3: IDW
DATE: 5/13/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D. Phillips Sr. Scientist IDW Hazardous classification and scheduling T&D. 3 Total Hours 3
TOTAL LABOR 3
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation IDW T&D $125.00 $125.00
TOTAL $125.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMEN $0.00
ectinc.com
SUBCONTRACTOR QUOTES – IDW DISPOSAL
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562 (850) 292-6511
To: Mr. Leif Layton Environmental Consulting & Technology 1715 North Westshore Boulevard, Suite 175 Tampa, FL 33607
April 9, 2025
Re: Non-Hazardous Drum Disposal – 4178 Herschel Street – Jacksonville, FL
Mr. Layton:
The price for transportation and disposal (T&D) of one (1) 55-gallon drum of non-hazardous water located at your site in Jacksonville, FL will be $125.00 per drum/total.
Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc.
This quote is valid for 90 days.
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: Robert@ErwinRemediation.com Phone: (850) 466-2358
March 31, 2025 Environmental Consulting & Technology, Inc.
Leif Layton Subject: Waste Disposal & Transportation Quotation #2025-0100
Dear Leif Layton, On behalf of Perma-Fix Environmental Services, Inc. (Perma-Fix of Florida), I would like to thank you for the opportunity to provide you with this estimate outlining the costs associated with the transportation and disposal project from your client. Pricing is contingent upon review and plant approval of the signed Perma-Fix of Florida Waste Material Profile form. Perma-Fix will provide documentation as needed to process the waste.
Disposal Quantity Unit Price Est. Total
Non-haz IDW water 1 x 55 gal drum $350 $350
Disposal Subtotal $350
Transportation* Quantity Unit Price Est. Total
Stop Fee 1 $75 $75
Transportation, no fuel surcharge 1 $40/drum $355*
Transportation Subtotal $430
Other Fees Quantity Unit Price Est. Total
Administrative/Insurance Fee $780 25% $195
Profile Fee (annual) 1 $30 $30
Other Fees Subtotal $225
ESTIMATED TOTAL: $1,005
Included in Scope of Work:
Terms and conditions in Perma-Fix Waste Transportation & Disposal Agreement, Rev. 1 dated October 2020, apply upon acceptance/signature of this quote.
Demurrage: One hour free loading. $125.00 per hour thereafter.
No-Load Charge:Stop + LTL Fees (includes cancellation with less than 48 hours’ notice).
Current pricing is subject to change after 30 days.
Minimum Transportation Fee is $355.00 for areas normally serviced by PFF in Florida.
Profiles are subject to review & approval.
We look forward to being of service to you. If you have any questions or if I can be of further assistance, please call me at (770) 524-2014.
Sincerely, Eunice Hong
Eunice Hong
Technical Sales Manager
Email: ehong@perma-fix.com
Mobile: (770) 524-2014
Quote Approval:
Signature:
Name, Printed:
Date:
*All pricing is subject to final profile review and approval.
1408 North Westshore Blvd, Ste 115, Tampa, FL 33607 ectinc.com 813.289.9338
April 30, 2025 ECT No. P25RA-5392
Ms. Karlee Fowler, P.G.
Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Re: Proposal for Loretto Cleaners Supplemental Sampling 11701-1 San Jose Boulevard Jacksonville, Florida
ERIC_4628
Contract No. HW682
Dear Ms. Fowler:
On April 14, 2023, Environmental Consulting & Technology, Inc. (ECT) submitted to the Florida Department of Environmental Protection (FDEP), the Annual Natural Attenuation Monitoring (NAM) Report for Loretto Cleaners. The results documented that target volatile organic halogens (VOHs) were not detected in groundwater samples at concentrations exceeding their respective groundwater cleanup target level (GCTLs). Based on the groundwater analytical results, ECT recommended confirmation groundwater sampling and conducting a Modified Active Gas Sampling (MAGS) test to evaluate whether the data supported closure of the site under Rule 62-780.680(1) No Further Action under Risk Management Option (RMO) I.
ECT was issued Task Assignment (TA) No. DC015A on June 6, 2023, to perform confirmation sampling and MAGS) to evaluate whether Loretto Cleaners meets the criteria for site closure. The groundwater analytical results for the June 2023 sampling document that the three groundwater samples collected did not contain target analytes at concentrations greater than their GCTLs. The August 2023 MAGS event identified vapor samples collected from MAGS wells MAGS005 and MAGS006 at concentrations greater than 1 milligram per cubic meter (mg/m3). Based on the results for the assessment, ECT recommended:
Modifying MAGS wells MAGS001R, MAGS003R, and MAGS004R by adding a 1-foot schedule 40 polyvinyl chloride (PVC) casing and cutting the bottom two feet of screen to ensure that the screen is above the water table.
Covering the grassy area where MAGS wells MAGS003 and MAGS004 are installed with 6-mil plastic sheeting to cut off potential short-circuiting.
Performing a MAGS test to verify the design parameters to complete a Soil Vapor Extraction
(SVE) RAP.
Preparing a RAP to install and operate an SVE system.
Although two consecutive groundwater sampling events have confirmed that the chlorinated ethenes are not present in groundwater at concentrations exceeding their GCTLs, ECT recommended continuing annual NAM sampling at the site during the period that an SVE system is operating.
Loretto Cleaners May 13, 2025
ECT has prepared this scope of work to perform the confirmation groundwater sampling and MAGS test. Should these data confirm that the groundwater quality data meet the no further action criteria, and the MAGs test results indicate that there is not a residual mass of chlorinated solvents in the vadose zone, ECT will prepare a Confirmation Sampling Report including a No Further Action Proposal recommending closure under RMO I. Should the data not support closure under RMO I, the Confirmation Sampling Report will recommend continued NAM.
SubTask 1 Project Management
This Sub Task consists of calculated project management labor, based upon 13% of the direct labor costs in this proposal, and includes fringe, overhead, other direct costs (ODCs) and completion fees.
SubTask 2 MAGS and Groundwater Sampling
ECT proposes collecting depth-to-water (DTW) measurements at monitoring wells MW001, MW002, MW004, MW005, MW007, and MW008 and collecting groundwater samples from the interior monitoring well MW007. The groundwater sample will be analyzed for VOHs using United States Environmental Protection Agency (EPA) Method 8260. The scope of work is detailed in the attached Level of Effort Worksheet.
Additionally, to evaluate whether there is a residual mass of chlorinated solvents in the vadose zone a MAGS test will be performed. MAGS testing will be perform don interior wells MAGS002, MAGS005, MAGS006, and MAGS007RA. The testing will include an SVE step test to determine SVE remediation system design parameters.
The groundwater and MAGS analytical data will be presented in the Confirmation Sampling Report and include recommendations for further actions based on the new data. A summary of SubTask 2 activities is included in Table 1.
Table 1. SubTask 2 Activities Summary Employee/Resource Activity Time
Sr. Principal Scientist Develop conclusions and recommendations to prepare final confirmation sampling report 5 hours
Sr. Engineer Verification of property ownership, notify RPO of field activities & confirm site access 2 hours
Sr. Engineer PE oversite of MAGS Event, check MAGS data 3 hours
Sr. Engineer QA/QC lab data, update HASP, and prepare draft Annual NAM Report 12 hours
GIS Analyst Prepare figures for report 4 hours Associate Scientist Prep for field work 2 hour Associate Scientist Roundtrip mobilization from Tampa office to Site 7 hours Associate Scientist Open 6 wells and collect DTW measurements 1 hour Associate Scientist Collect groundwater sample from MW007 1 hour Associate Scientist MAGS testing at four wells 7 hours Associate Scientist Drum IDW and collect sample 1 hours Associate Scientist Truck 2 days Associate Scientist Per diem 2 days Associate Scientist Hotel 1 day Administrative Prepare tables for report, document production 5 hours
SubTask 3 Scope of Work
The scope of work for SubTask 3 consists of transportation and disposal (T&D) disposal of IDW. ECT proposes that the waste manifest be submitted as the SubTask 3 deliverable. Quotes for T&D of the IDW are summarized as follows. ECT has included 3 hours of a senior engineer rate to characterize the waste, coordinate the T&D of the IDW drum, and provided the manifest to the FDEP. The IDW contractor quotes are included in Attachment 1.
Subcontractor Cost Erwin Remediation $125.00 Crystal Clean $292.92 PermaFix $1,005.00
Deliverable
A summary of cost and deliverables due dates with each SubTask is provided in Table 3.
Table 3. Deliverable and Invoice Schedule SubTasks Deliverable Deliverable Date Invoice Amount
2 Confirmation Sampling Report 30 June 2025 $8,981.53 3 IDW Manifest 31 July 2025 $644.34 1 Project Management Final Invoicing 30 August 2025 $909.01
Total $10,534.88
Please let us know if you have any questions regarding this proposal.
Sincerely, ENVIRONMENTAL CONSULTING & TECHNOLOGY, INC.
Leif E. Layton, Ph.D., P.E. Hunter M. Hicks, P.E.
Engineer Director of Operations
LEL:HMH/caw
Attachments
File details come from the government source that posted it. Updated .