This document package consists of a Task Assignment (TA) and Task Assignment Change Order (TACO) between the State of Florida Department of Environmental Protection (FDEP) and Environmental Consulting and Technology, Inc. (ECT) for work at the Town and Country Cleaners site in Gainesville, Alachua County, Florida. The underlying contract is HW682, with the task assignment numbered DC002A. Project management is conducted by Ginger Shirah for FDEP and Mark A. Culbreth for ECT, with the work location at 1005 NW 76th Boulevard, Gainesville, FL 32608, identified as project ERIC_3985.

The contract authorizes ECT to perform Soil Vapor Extraction (SVE) system electrical testing and SVE verification testing according to a scope of work and cost proposal submitted on February 7, 2023. The original Task Assignment value was $16,131.95 with a completion date of August 4, 2023. The TACO, executed July 20, 2023, reduces the total contract value to $14,894.45—a cost decrease of $1,237.50—due to the electrical subcontractor being unavailable and deemed unnecessary to complete the work. The amended contract comprises 74 total labor hours distributed across three subtasks: Subtask 1 (Project Management, 4.5 hours), Subtask 2 (SVE System Electrical Testing, 31 hours), and Subtask 3 (SVE System Verification Testing, 38.5 hours). Invoice payment is structured upon FDEP approval, with $6,067.35 due upon approval of the SVE System Analysis Field Notes and $8,827.10 due upon approval of the SVE Verification Testing Report and Project Management deliverables.

View the file

Other files

File Type Posted
CN-370000-GC914-T9CO2.pdf PDF
CN-370000-GC914.pdf PDF
CN-370000-HW682-DC001A.pdf PDF
CN-370000-HW682-DC001D.pdf PDF
CN-370000-HW682-DC006C.pdf PDF
CN-370000-HW682-DC007A.pdf PDF
CN-370000-HW682-DC008A.pdf PDF
CN-370000-HW682-DC008E.pdf PDF
CN-370000-HW682-DC011A.pdf PDF
CN-370000-HW682-DC012A.pdf PDF
CN-370000-HW682-DC012C.pdf PDF
CN-370000-HW682-DC013B.pdf PDF
CN-370000-HW682-DC014A.pdf PDF
CN-370000-HW682-DC017A.pdf PDF
CN-370000-HW682-DC018A.pdf PDF
CN-370000-HW682-DC018B.pdf PDF
CN-370000-HW682-DC019C.pdf PDF
CN-370000-HW682-DC020A.pdf PDF
CN-370000-HW682-DC020B.pdf PDF
CN-370000-HW682-DC023A.pdf PDF
CN-370000-HW682-DC027B.pdf PDF
CN-370000-HW682-DC03BCO1.pdf PDF
CN-370000-HW682-DC04BCO1.pdf PDF
CN-370000-HW682-DC04BCO6.pdf PDF
CN-370000-HW682-DC05BCO1.pdf PDF
CN-370000-HW682-DC05BCO4.pdf PDF
CN-370000-HW682-DC05BCO5.pdf PDF
CN-370000-HW682-DC06ACO1.pdf PDF
CN-370000-HW682-DC08BCO1.pdf PDF
CN-370000-HW682-DC09ACO4.pdf PDF
CN-370000-HW682-DC11AC10.pdf PDF
CN-370000-HW682-DC11AC11.pdf PDF
CN-370000-HW682-DC11ACO2.pdf PDF
CN-370000-HW682-DC11ACO7.pdf PDF
CN-370000-HW682-DC11ACO8.pdf PDF
CN-370000-HW682-DC13BCO2.pdf PDF
CN-370000-HW682-DC13BCO5.pdf PDF
CN-370000-HW682-DC13BCO6.pdf PDF
CN-370000-HW682-DC14BCO3.pdf PDF
CN-370000-HW682-DC14BCO5.pdf PDF
CN-370000-HW682-DC15BCO1.pdf PDF
CN-370000-HW682-DC17ACO1.pdf PDF
CN-370000-HW682-DC18ACO1.pdf PDF
CN-370000-HW682-DC19BCO1.pdf PDF
CN-370000-HW682-DC21ACO2.pdf PDF
CN-370000-HW682-DC24ACO2.pdf PDF
CN-370000-HW682-DC24ACO3.pdf PDF
CN-370000-HW682-DC24ACO4.pdf PDF
CN-370000-HW682-DC25ACO3.pdf PDF
CN-370000-HW682-DC26AC02.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. ☐ There are no changes to the TA compensation.

☐ The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO ☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. ☐ There are no changes to the TA Expiration Date.

☐ The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. ☐ There are no changes to the Attachments.

☐ Attachment ___ is replaced with Attachment -____.

7. ☐ No Additional Changes.

☐ Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

DC002A 01 HW682

This Task Assignment Change Order authorizes a reduction in subcontractor costs due to the electrical subcontractor being unavailable to complete the work.

Ginger Shirah 850-245-8899 Contractor Contractor

Contractor Contractor

Contractor

Environmental Consulting and Technology, Inc. (ECT) Mark A. Culbreth 813-289-9338

ERIC_3985

Town and Country Cleaners

✔ $ 14,894.45 $ 16,131.95

$ 14,894.45 $ 16,131.95 ✔ Completion

Completion 0

✔ 1 1 1

Mark A. Culbreth

Vice President

July 20, 2023

Digitally signed by Mark Culbreth Date: 2023.07.20 16:11:59-04'00'Mark Culbreth Kelly Crain Digitally signed by Kelly Crain

Date: 2023.07.20 15:29:55 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01_18

Contract Number:

Task Assignment #:

Change Order #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW682

DC002A

$ 14,894.45

SVE System Analysis Field Notes (Subtask 2)

SVE Verification Testing Report and PM (Subtask 3 and 1)

FDEP Approval of SVE System Analysis Field Notes (Subtask 2)

FDEP Approval of SVE Verification Testing Report and PM (Subtask 3 and 1)

05/03/2023

06/23/2023

$ 8,827.10

$ 6,067.35

Printed on recycled paper.

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

From:

Date:

To: HW682 Contract Negotiation File Town and Country Cleaners Gainesville, Alachua County

ERIC_3985

Ginger Shirah, Project Manager July 19, 2023

Subject: Negotiation Summary

HW682 DC002A-01

This Task Assignment Change Order authorizes a reduction in subcontractor costs in Subtask 2 due to the electrical subcontractor being unavailable and not necessary to complete the work.

These changes result in overall cost decrease of $1,237.50. The FDEP project manager agrees to the scope of work and final cost associated with this Task Assignment which is $14,894.45 with 74 total labor hours.

FDEP COST ESTIMATE

Contractor: Environmental Consulting & Technology, Inc.

Date: 7/14/2023

Task #: DC002A SubTask 1 Project Management

Site: Town & Country Cleaners SubTask 2 SVE System Electrical Testing

Activity/Phase: SubTask 3 SVE System Verification Testing

Project Manager: Mark Culbreth SubTask 4

SubTask 5

Totals 1 2 3

Labor Rate Category

$80.12 Project Manager 5 4.5 $80.12 Senior Principal Scientist (MC) 2 0 2

$52.89 Senior Engineer / Scientist (GS) 34 18 16

$26.54 GIS Analyst / Graphics (JV) 6 0 6

$22.44 Technician (BC) 22 13 8.5

$31.45 Administrative (BJ) 6 0 6

Total Hours 74 4.5 31.0 38.5

Direct Labor $3,151.46 $362.56 $1,243.74 $1,545.16

Overhead 125.30% $3,948.79 $454.29 $1,558.41 $1,936.09

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00

Fringe 47.40% $1,493.79 $171.85 $589.53 $732.41

Total Labor $8,594.04 $988.70 $3,391.68 $4,213.66

Travel

Vehicle Rental $240.00 $120.00 $120.00

Per diem + Hotel $414.00 $414.00 $0.00

Total Travel $654.00 $534.00 $120.00

Subcontractor (Equipment Procurement)

Generator Rental $2,200.00 $1,100.00 $1,100.00

Diesel Fueling $350.00 $175.00 $175.00

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

Subcontractor Subtotal $2,550.00 $1,275.00 $1,275.00

Procurement Fee $255.00 $127.50 $127.50

Total Subcontractor Cost $2,805.00 $1,402.50 $1,402.50

Subcontractor (Services Procurement)

Subcontractor Subtotal $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00

Laboratory

Analytical Costs $1,200.00 $0.00 $1,200.00

Sample Shipping $52.00 $0.00 $52.00

Total Laboratory $1,252.00 $0.00 $1,252.00

Field Expenses

Expendables $80.00 $40.00 $40.00

Construction/O&M/Pilot Test Kit $360.00 $360.00 $0.00

Soil Vapor Sampling Kit $290.00 $0.00 $290.00

Total Field Expenses $730.00 $400.00 $330.00

Subtotal $14,035.04 $988.70 $5,728.18 $7,318.16

Completion Fee $859.41 $98.87 $339.17 $421.37

Total Estimated Cost $14,894.45 $1,087.57 $6,067.35 $7,739.53

Cost from Prior CEF: $16,131.95 Manual Entry

Cost from Delta CEF; ($1,237.50) Manual Entry

Cost (Prior + Delta): $14,894.45 Auto-Calculated

Rounding Error: $0.00 Auto-Calculated

Final Total Cost: $14,894.45 Auto-Calculated

Soil Vapor Extraction Verification Testing

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Town and Country Cleaners SUBTASK 2: SVE System Electrical Testing

DATE: 7/14/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Verify and Notify RPO of field activities 2 Prepare Health and Safety Plan 2 Round trip Mobilize to Gainesville 5 Troubleshooting System 8 Prepare memorandum 1

Total hours 18

J. Von Borstel GIS Analyst Recreate Figures Total hours 0

B. Carrick Technician Prepare for the SVE event 0.5 Round trip Mobilize to Gainesville 4 Setup, opening and closing calibration of equipment 0.5 Troubleshooting System for SVE operation 8

Total hours 13

TOTAL LABOR 31

VEHICLE TYPE RATE UNIT USEAGE

G. Sattler Rental Truck $120.00 day 1 $120.00 B. Carrick Rental Truck

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem B. Carrick $36.00 day 2 $72.00 Hotel B. Carrick $135.00 day 1 $135.00

Per Diem G. Sattler $36.00 day 2 $72.00 Hotel G. Sattler $135.00 day 1 $135.00

TOTAL PER DIEM $414.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Equipment with Experience Generator Rental $1,100.00 1 $1,100.00 Equipment with Experience Diesel Fuel $175.00 1 $175.00

TOTAL $1,275.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 1 $40.00 Construction/O&M/Pilot Test Kit $360.00 Day 1 $360.00

TOTAL EQUIPMENT $400.00

FINAL --7/24/96

SUBTASK 3: SVE System Verification Testing

DATE: 7/14/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Sr. Principal ScienDevelop conclusions and recommendations to prepare final SVE System Verification Test Report 2

Total hours 2 G. Sattler System Verification test and collect SVE well Samples 8

Prepare SVE Verification Resting Report 8 Total hours 16

J. Von Borstel GIS Analyst Update Figure 6

Total hours 6 B. Carrick Technician Prepare for the SVE event 0.5

System Verification test and collect SVE well Samples 8 Total hours 8.5

B. Jarvis Administrative Recreate Tables and report production 6 Total hours 6

TOTAL LABOR 38.5

VEHICLE TYPE RATE UNIT USEAGE

B. Carrick Rental Truck $120.00 day 1 $120.00 G. Sattler

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

Equipment with Experience Generator Rental $1,100.00 1 $1,100.00 Equipment with Experience Diesel Fuel $175.00 1 $175.00

TOTAL $1,275.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 $200.00 6 $1,200.00

Sample Shipping $52.00 1 $52.00

TOTAL LAB $1,252.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 1 $40.00 Soil Vapor Sampling Kit $290.00 Day 1 $290.00

TOTAL EQUIPMENT $330.00

Date: 7/14/2023

Task #: DC002A SubTask 1 Project Management

Site: Town & Country Cleaners SubTask 2 SVE System Electrical Testing

Activity/Phase: SubTask 3 SVE System Verification Testing

Project Manager: Mark Culbreth SubTask 4

SubTask 5

Totals 1 2 3 4 5 6

Labor Rate Category

$80.12 Project Manager 0 0.0 $80.12 Senior Principal Scientist (MC) 0 0 0 0 0 0

$52.89 Senior Engineer / Scientist (GS) 0 0 0 0 0 0

$26.54 GIS Analyst / Graphics (JV) 0 0 0 0 0 0

$22.44 Technician (BC) 0 0 0 0 0 0

$31.45 Administrative (BJ) 0 0 0 0 0 0

Total Hours 0 0.0 0.0 0.0 0 0 0

Direct Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 125.30% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 47.40% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

Generator Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Diesel Fueling $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Electrical Control Panel Subcontractor ($1,125.00) ($1,125.00) $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal ($1,125.00) ($1,125.00) $0.00 $0.00 $0.00 $0.00

Procurement Fee ($112.50) ($112.50) $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost ($1,237.50) ($1,237.50) $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Construction/O&M/Pilot Test Kit $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Soil Vapor Sampling Kit $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal ($1,237.50) $0.00 ($1,237.50) $0.00 $0.00 $0.00 $0.00

Completion Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost ($1,237.50) $0.00 ($1,237.50) $0.00 $0.00 $0.00 $0.00

Cost from Prior CEF: Manual Entry

Cost from Delta CEF; Manual Entry

Cost (Prior + Delta): $0.00 Auto-Calculated

Rounding Error: ($1,237.50) Auto-Calculated

Final Total Cost: ($1,237.50) Auto-Calculated

LEVEL OF EFFORT/EXPENSE WORKSHEET

SUBTASK 2: SVE System Electrical Testing

DATE: 7/14/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Verify and Notify RPO of field activities 0 Prepare Health and Safety Plan 0 Round trip Mobilize to Gainesville 0 Troubleshooting System 0 Prepare memorandum 0

Total hours 0

J. Von Borstel GIS Analyst Recreate Figures Total hours 0

B. Carrick Technician Prepare for the SVE event 0 Round trip Mobilize to Gainesville 0 Setup, opening and closing calibration of equipment 0 Troubleshooting System for SVE operation 0

Total hours 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

G. Sattler Rental Truck $120.00 day 0 $0.00 B. Carrick Rental Truck

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem B. Carrick $36.00 day 0 $0.00 Hotel B. Carrick $135.00 day 0 $0.00

Per Diem G. Sattler $36.00 day 0 $0.00 Hotel G. Sattler $135.00 day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Equipment with Experience Generator Rental $1,100.00 0 $0.00 Equipment with Experience Diesel Fuel $175.00 0 $0.00 Electrical Control Panel SubcontractoSystem Troubleshooting $1,125.00 (1) ($1,125.00)

TOTAL ($1,125.00)

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 0 $0.00 Construction/O&M/Pilot Test Kit $360.00 Day 0 $0.00

TOTAL EQUIPMENT $0.00

FINAL --7/24/96

Date: 14-Jul-23

Task #: DC002A SubTask 1 Project Management

Site: Town & Country Cleaners SubTask 2 SVE System Electrical Testing

Activity/Phase: SubTask 3 SVE System Verification Testing

Project Manager: Mark Culbreth SubTask 4

SubTask 5

Totals 1 2 3 4

Labor Rate Category

$80.12 Project Manager 4.5 4.5 $80.12 Senior Principal Scientist (MC) 2 0.0 2.0 0

$52.89 Senior Engineer / Scientist (GS) 34 18.0 16.0 0

$26.54 GIS Analyst / Graphics (JV) 6 0.0 6.0 0

$22.44 Technician (BC) 21.5 13.0 8.5 0

$31.45 Administrative (BJ) 6 0.0 6.0 0

Total Hours 74.5 5 31.0 38.5 0

Direct Labor $3,151.46 $362.56 $1,243.74 $1,545.16 $0.00

Overhead 125.30% $3,948.79 $454.29 $1,558.41 $1,936.09 $0.00

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 47.40% $1,493.79 $171.85 $589.53 $732.41 $0.00

Total Labor $8,594.04 $988.70 $3,391.68 $4,213.66 $0.00

Travel

Vehicle Rental $240.00 $120.00 $120.00 $0.00

Per diem + Hotel $414.00 $414.00 $0.00 $0.00

Total Travel $654.00 $534.00 $120.00 $0.00

Subcontractor (Equipment Procurement)

Generator Rental $2,200.00 $1,100.00 $1,100.00 $0.00

Diesel Fueling $350.00 $175.00 $175.00 $0.00

Electrical Control Panel Subcontractor $1,125.00 $1,125.00 $0.00 $0.00

Subcontractor Subtotal $3,675.00 $2,400.00 $1,275.00 $0.00

Procurement Fee $367.50 $240.00 $127.50 $0.00

Total Subcontractor Cost $4,042.50 $2,640.00 $1,402.50 $0.00

Subcontractor (Services Procurement)

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $1,200.00 $0.00 $1,200.00 $0.00

Sample Shipping $52.00 $0.00 $52.00 $0.00

Total Laboratory $1,252.00 $0.00 $1,252.00 $0.00

Field Expenses

Expendables $80.00 $40.00 $40.00 $0.00

Construction/O&M/Pilot Test Kit $360.00 $360.00 $0.00 $0.00

Soil Vapor Sampling Kit $290.00 $0.00 $290.00 $0.00

Total Field Expenses $730.00 $400.00 $330.00 $0.00

Subtotal $15,272.54 $988.70 $6,965.68 $7,318.16 $0.00

Completion Fee $859.41 $98.87 $339.17 $421.37 $0.00

Total Estimated Cost $16,131.95 $1,087.57 $7,304.85 $7,739.53 $0.00

REV: 02/03 CEF ECT Page 1

Shirah, Ginger K

From: Gregory Sattler <gsattler@ectinc.com> Sent: Friday, July 14, 2023 1:23 PM To: Shirah, Ginger K Subject: Town & Country Cleaners ERIC_3985 TACO Attachments: Town & Country ERIC_3985_HW682 TACO.xlsx

Follow Up Flag: Follow up Flag Status: Flagged

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Good a ernoon Ginger, A ached is the Town & Country Cleaners TACO. I am using Ben’s new template but it is not calcula ng correctly. The TACO should be adjusted to $14,774.45 not the TACO calcula on of $13,423.97. The rounding cell seems to be taking more than required.

Best Regards, Gregory Sattler, P.E.

Senior Remediation Engineer| Site Assessment & Remediation

Environmental Consulting & Technology, Inc.

3751 Maguire Boulevard | Suite 234 | Orlando, Florida 32803

C: 321.245.2124 | gsattler@ectinc.com

Follow us:

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW682

DC002A Completion August 4, 2023

ECT will perform a Soil Vapor Extraction (SVE) system electrical testing and SVE Verification Testing in accordance with the scope of work and cost proposal submitted on February 7, 2023.

Kelly Crain 850-245-8953 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor

Contractor Mark A. Culbreth Contractor 813-289-9338

ERIC_3985

1005 NW 76th Blvd. Gainesville, FL 32608

Town & Country Cleaners

Contractor Contractor

✔ $ 16,131.95

$ 16,131.95

Select One

Environmental Consulting and Technology, Inc. (ECT Contractor Mark A. Culbreth

Contract Manager Digitally signed by Mark Culbreth DN: CN=Mark Culbreth, E=mculbreth@ectinc.com Reason: I am approving this document Location: your signing location here Date: 2023.02.20 08:44:25-05'00' Foxit PhantomPDF Version: 10.1.6

Mark Culbreth Kelly Crain Digitally signed by Kelly Crain Date: 2023.02.20 08:39:36 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

SVE System Analysis Memo (Subtask 2) 05/03/2023

SVE Verification Testing Report and PM (Subtask 3 and 1) 06/23/2023

FDEP Approval of SVE System Analysis Memo (Subtask 2) $ 7,304.85

FDEP Approval of SVE Verification Testing Report and PM (Subtask 3 and 1) $ 8,827.10

$ 16,131.95