- Contract number
- HW682
- Issued by
- Florida
About this file
This is a Task Assignment (TA) document under Contract Number HW682 between the State of Florida Department of Environmental Protection (FDEP) and Environmental Consulting and Technology, Inc. (ECT). The task assignment was executed on June 20, 2023, with a completion date of January 29, 2024, and authorizes ECT to conduct annual groundwater sampling activities at the Jonfor Cleaners site located at 11700-1 San Jose Boulevard, Jacksonville, Florida (Duval County). The Department Project Manager is Ginger Shirah, and the Contractor's Project Manager is Mark A. Culbreth. The underlying master contract HW682 provides the governing terms and conditions for this task assignment work.
ECT will perform groundwater monitoring activities including depth-to-water measurements and sample collection from 14 monitoring wells and 4 injection wells for volatile organic halogen (VOH) analysis using USEPA Method 8260, prepare an Annual Natural Attenuation Monitoring (NAM) Report, and manage investigative derived wastes (IDW) containing PFAS-impacted purge water. The total task assignment value is $10,887.28 on a fixed unit rate basis, with invoice payments structured as follows: $9,407.55 upon approval of the Annual NAM Report (due October 28, 2023) and $1,479.73 upon approval of the IDW Manifest and Project Management deliverables (due December 28, 2023). The cost breakdown includes 62 hours of labor across multiple staff categories, vehicle rental, per diem and hotel expenses, laboratory analytical costs of $1,387.00, field equipment and expendables totaling $1,156.00, and subcontractor costs of $517.00 for IDW transportation and disposal through Erwin Remediation, with a completion fee added to the subtotal.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW682
DC008B Completion January 29, 2024
This Task Assignment authorizes ECT to to conduct annual groundwater sampling activities at the Jonfor Cleaners site located in Jacksonville, Florida. All work will be conducted in accordance with the scope of work and cost proposal submitted on June 7, 2023.
Ginger Shirah 850-245-8899 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Environmental Consulting and Technology, Inc. (ECT)
Environmental Consulting and Technology, Inc. (ECT)
Mark A. Culbreth 813-289-9338
ERIC_4542
11700-1 San Jose Blvd., Jacksonville, Duval County, FL
Jonfor Cleaners
✔ $ 10,887.28
$ 10,887.28
Select One
Mark A. Culbreth
Contract Manager
6/20/2023
Digitally signed by Mark Culbreth Date: 2023.06.20 15:37:21-04'00'Mark Culbreth Kelly Crain Digitally signed by Kelly Crain
Date: 2023.06.20 15:29:16 -04'00'
N/A
Task Assignment Notification/Change Order
Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Annual NAM Report (Subtask 2) 10/28/2023
IDW Manifest; Project Management (Subtasks 1 & 3) 12/28/2023
Approval of Annual NAM Report (Subtask 2) $ 9,407.55
Approval of IDW Manifest; Project Management (Subtasks 1 & 3) $ 1,479.73
$ 10,887.28
HW682
DC008B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO:
FROM:
SUBJECT:
DATE:
HW682 Contract File Jonfor Cleaners
ERIC_4542
Ginger Shirah, Project Manager Negotiation Summary Task Assignment DC008B June 13, 2023
This Task Assignment authorizes ECT to conduct groundwater sampling in accordance with the Scope of Work dated June 7, 2023. ECT will collect samples from (14) monitor wells and (4) injection wells for VOH analysis including: IW001R, IW002, IW003R, IW004, IW006, IW008, IW009R, IW010R, IW011, IW012, IW015, IW016, IW017 and IW018; and injection wells I004, I006, I009, and I012. ECT will provide a Groundwater Monitoring Report summarizing all of the results and include conclusions and recommendations for future site activities.
ECT obtained a signed site access agreement on June 2, 2023.
The final costs associated with this Task Assignment are $10,887.28 with 66 labor hours. ECT may invoice according to the attached schedule.
FDEP COST ESTIMATE
Contractor: Environmental Consulting & Technology, Inc.
Date: 6-Jun-23
Task #: SubTask 1 Project Management
Site: Jonfor Cleaners SubTask 2 Annual NAM Report
Activity/Phase: SubTask 3 IDW Manifest
Project Manager: Mark Culbreth SubTask 4
SubTask 5
Totals 1 2 3
Labor Rate Category
$80.12 Project Manager 3.35 3.35 $80.12 Senior Principal Scientist (MC) 2 2.0 0
$52.89 Senior Engineer / Scientist (GS) 12 11.0 1
$34.02 Sr. Associate Engineer / Scientist (KM) 3 3.0 0.0
$26.54 GIS Analyst / Graphics (JV) 6 6.0 0.0
$22.44 Technician (BC) 28 28.0 0.0
$31.45 Administrative (BJ) 12 12.0 0.0
Total Hours 66.35 3.35 62.0 1.0
Direct Labor $2,329.99 $268.05 $2,009.05 $52.89
Overhead 125.30% $2,919.48 $335.87 $2,517.34 $66.27
Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00
Fringe 47.40% $1,104.42 $127.06 $952.29 $25.07
Total Labor $6,353.89 $730.98 $5,478.68 $144.23
Travel
Vehicle Rental $360.00 $360.00 $0.00
Per diem + Hotel $408.00 $408.00 $0.00
Total Travel $768.00 $768.00 $0.00
Subcontractor (Equipment Procurement)
Total Subcontractor Cost $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Erwin Remediation IDW T&D $470.00 $0.00 $470.00
Subcontractor Subtotal $470.00 $0.00 $470.00
Handling Fee $47.00 $0.00 $47.00
Total Subcontractor Cost $517.00 $0.00 $517.00
Laboratory
Analytical Costs $1,387.00 $1,387.00 $0.00
Sample Shipping $70.00 $70.00 $0.00
Total Laboratory $1,457.00 $1,457.00 $0.00
Field Expenses
Expendables $120.00 $120.00 $0.00
Equipment (Shallow Groundwater Sampling K $870.00 $870.00 $0.00
Equipment (Metal Detector) $40.00 $40.00 $0.00
Equipment (IDW related) $100.00 $100.00 $0.00
Equipment (Ice) $26.00 $26.00 $0.00
Total Field Expenses $1,156.00 $1,156.00 $0.00
Subtotal $10,251.89 $730.98 $8,859.68 $661.23
Completion Fee $635.39 $73.10 $547.87 $14.42
Total Estimated Cost $10,887.28 $804.08 $9,407.55 $675.65
Quarterly Groundwater Sampling & SVE Verifi
REV: 08/22 PRAC ECT Page 1
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Jonfor Cleaners SUBTASK:2 (Annual NAM Report)
DATE: 6/6/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations to prepare final Quarterly NAM Report 2 Total hour 2
G. Sattler Senior Engineer Verification of property ownership, notify RPO of field activities 1 Prepare Health and Safety Plan 2
Prepare draft Quarterly NAM report 8 Total hour 11
K. Morrison Associate Sr. Scientis Obtain Site Access 3 Total hour 3
J. Von Borstel GIS Analyst Recreate figures 6 Total hour 6
B. Carrick Technician Prep for field work and acquire a DOT 55 gallon Drum 1 Round-Trip Mobilize to Jacksonville from Orlando for the groundwater sampling even 5 Open Well and collect DTW at 18 wells 2 Quarterly groundwater sampling 18 wells 20
Total hour 28 B. Jarvis Administrative Recreate tables and report production 12
Total hour 12
TOTAL LABOR 62
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $120.00 day 3 $360.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
Per Diem B. Carrick $36.00 day 3 $108.00 Hotel B. Carrick $150.00 day 2 $300.00
TOTAL PER DIEM $408.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT(s)
$0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC UNIT(S)
USEPA Method 8260 for VOHs $73.00 18 $1,314.00 IDW USEPA Method 8260 for VOHs $73.00 1 $73.00 Sample Shipping $70.00 1 $70.00
TOTAL LAB $1,457.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 3 $120.00 Shallow Groundwater Sampling Kit $290.00 Day 3 $870.00 Metal Detector $40.00 Day 1 $40.00 DOT 55 gallon drum $100.00 each 1 $100.00 Ice $6.50 each 4 $26.00
TOTAL EQUIPMENT $1,156.00
FINAL --7/24/96
SUBTASK:2 (Annual NAM Report)
DATE: 6/6/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations to prepare final Quarterly NAM Report 2 Total hour 2
G. Sattler Senior Engineer Verification of property ownership, notify RPO of field activities 1 Prepare Health and Safety Plan 2
Prepare draft Quarterly NAM report 8 Total hour 11
K. Morrison Associate Sr. Scientis Obtain Site Access 3 Total hour 3
J. Von Borstel GIS Analyst Recreate figures 6 Total hour 6
B. Carrick Technician Prep for field work and acquire a DOT 55 gallon Drum 1 Round-Trip Mobilize to Jacksonville from Orlando for the groundwater sampling even 5 Open Well and collect DTW at 18 wells 2 Quarterly groundwater sampling 18 wells 20
Total hour 28 B. Jarvis Administrative Recreate tables and report production 12
Total hour 12
TOTAL LABOR 62
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $120.00 day 3 $360.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
Per Diem B. Carrick $36.00 day 3 $108.00 Hotel B. Carrick $150.00 day 2 $300.00
TOTAL PER DIEM $408.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT(s)
$0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC UNIT(S)
USEPA Method 8260 for VOHs $73.00 18 $1,314.00 IDW USEPA Method 8260 for VOHs $73.00 1 $73.00 Sample Shipping $70.00 1 $70.00
TOTAL LAB $1,457.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 3 $120.00 Shallow Groundwater Sampling Kit $290.00 Day 3 $870.00 Metal Detector $40.00 Day 1 $40.00 DOT 55 gallon drum $100.00 each 1 $100.00 Ice $6.50 each 4 $26.00
TOTAL EQUIPMENT $1,156.00
SUBTASK:3 (IDW Manifest)
DATE: 6/6/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Verify IDW hazard classification and verify disposal company will accept. 1 Total Hour 1
TOTAL LABOR 1
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT(s)
Erwin Remediation PFAS IDW T&D $480.00 1 $480.00
TOTAL $480.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC UNIT(S)
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
1408 North Westshore Blvd, Ste 115, Tampa, FL 33607 ectinc.com 813.289.9338
June 7, 2023
ECT No. P23RA-0081
Ms. Ginger Sharah
Florida Department of Environmental Protection
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Re: Proposal for Jonfor Cleaners
Annual Natural Attenuation Report
11700-1 San Jose Boulevard
Jacksonville, Florida 32223
Facility ID: ERIC_4542
Contract No. HW682
Dear Ms. Shirah:
Environmental Consulting & Technology, Inc. (ECT) has prepared this scope of work to perform the annual natural attenuation monitoring and to prepare the Annual Natural Attenuation Monitoring
(NAM) Report for the Jonfor Cleaners in Jacksonville, Florida.
SubTask 1 Project Management
Based on the below scope of work the project management costs for the proposed work are 2.8 hours.
The project management cost is calculated on the attached Cost Estimate spreadsheet.
SubTask 2 Scope of Work
ECT proposes to conduct the tasks necessary to complete the annual NAM. The monitoring program consists of measuring depth-to-water (DTW) and collecting groundwater samples at 14 monitoring wells and 4 injection wells. Due to known PFAS impacts at the site, all purge water from the groundwater sampling event will be contained in a 55-gallon drum for disposal as PFAS impacted investigative derived wastes (IDW). Water levels will be measured and groundwater samples collected at monitoring wells IW001R, IW002, IW003R, IW004, IW006, IW008, IW009R, IW010R, IW011, IW012, IW015, IW016, IW017 and IW018; and injection wells I004, I006, I009, and I012. All groundwater samples will be analyzed for the volatile organic halogens (VOHs) by United States Environmental
Protection Agency (USEPA) Method 8260. The scope of work is detailed in the attached Level of Effort
Worksheet.
Because this site is new to ECT, we are requesting additional time to generate base maps and other related figures as well as to recreate tables. In addition, ECT is requesting time to prepare a Health and Safety Plan for this site. Future monitoring activities will rely on this Health and Safety Plan so it is anticipated that this plan will need to be prepared only once. Additionally, in the previous Task
Assignment ECT attempted to obtain site access without success and that time has been included in this proposal.
Once that data has been compiled, the Quarterly NAM Report will subsequently be prepared and provided to the FDEP Project Manager.
Ms. Ginger Shirah FDEP
Jonfor Cleaners ERIC_4542
June 7, 2023 ectinc.com
SubTask 2 Cost
ECT proposes to perform the Task 2 scope of work for a cost of $9,248.90 in accordance with the Level of Effort and Cost Estimate Form spreadsheets attached to this proposal. A summary of SubTask 2 is provided on Table 1.
Table 1. SubTask 2 Activities Summary
Employee/Resource Activity Time
Sr. Principal
Scientist
Develop conclusions and recommendations for the
Groundwater Monitoring Report 2 hours
Sr. Engineer Notify RPO of field activities 1 hour
Sr. Engineer HASP 2 hours
Sr. Engineer Prepare draft Groundwater Monitoring Report 8 hours
Associate Sr.
Scientist Associate Sr. Scientist 3 hours
GIS Analyst Update and Create figures 6 hours
Technician Prep for field work and obtain an IDW Drum 1 hour
Technician Round Trip Mob Orlando to Jacksonville 5 hours
Technician Open MWs and Measure DTW 2 hours
Technician Groundwater Sampling 20 hours
Technician Truck for Groundwater Sampling 3 days
Technician Per Diem 3 days
Technician Hotel 2 days
Administrative Recreate & update 33 hours
Actual spreadsheets are being provided concurrently with this proposal. Subcontractor quotes are also provided with this proposal.
Task 3 IDW Deliverable
Given recent the turnaround time to the transport and disposal of IDW, ECT is making the IDW waste manifest a separate SubTask. This cost includes disposal of one drum of PFAS impacted purge water from the groundwater sampling event. Quotes were obtained for disposal of the IDW transport and disposal. These quotes are summarized below and are provided as an attachment to this proposal.
Based on these quotes, Erwin Remediation will be subcontracted to dispose of IDW.
Ms. Ginger Shirah FDEP
Jonfor Cleaners ERIC_4542
June 7, 2023 ectinc.com
Subcontractor Cost
Erwin Remediation $480.00
HEPACO $935.00
Universal Environmental
Solutions
No Bid
The cost for SubTask 3 also includes an hour to verify that the IDW has been classified correctly for proper disposal. The total cost of SubTask 3 is $686.65
A summary of the deliverables and invoice schedule is provided in Table 2.
Table 2 Deliverable and Invoice Schedule:
SubTask Deliverable Deliverable Date
Invoice
Amount
2 Annual NAM Report 28 October 2023 $9,248.90
3 Waste Manifest 28 Decmber2023 $686.65
1 Project Management Final Invoicing 29 January 2024 $783.46
Total $10,719.01
Please let us know if you have any questions regarding this proposal.
Sincerely, ENVIRONMENTAL CONSULTING & TECHNOLOGY, INC.
Gregory L. Sattler, P.E. Mark A. Culbreth, P.G
Senior Engineer Principal Scientist
GLS:MAC/baj
Attachments
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To:
Mr. Gregory Sattler
Environmental Consulting & Technology, Inc.
3751 Maguire Blvd, Suite 234
Orlando, FL 32803
October 18, 2022
Re: Non-Hazardous Drum Disposal of PFOS/PFAS Impacted Materials
Mr. Sattler:
The price for the transportation and disposal (T&D) of drums of non-hazardous PFOS/PFAS soil, mud and water is listed below.
Description Rate Unit
Profile Fee (Charged once per site) $ 350.00 Per Site
T&D - Non-Haz PFOS/PFAS Impacted Soil $ 120.00 Per Drum
T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 130.00 Per Drum
The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
This quote is valid for 90 days.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
mailto:Remediation@Gmail.com
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
October 19, 2022
Gregory Sattler
ECT
Senior Remediation Engineer
3751 Maguire Boulevard Suite 234
Orlando, Florida 32803
Subject: ASSESMENT WASTE DISPOSAL
Greg, Thank you for the opportunity to provide this proposal for the opportunity.
HEPACO is the premier environmental contractor with coverage over 45 regional offices. We specialize in emergency response, industrial services, remediation, and waste services. HEPACO serves a multitude of customers including transportation companies, energy companies, environmental consultants, industrial facilities, terminals, environmental service companies, general contractors, property owners, and many other public and private-sector clients.
HEPACO, with its well-rounded and cross-trained staff, can effectively and efficiently complete this project and appreciates the opportunity. We stand firmly behind our work and always strives to deliver exceptional value and a high level of service at reasonable pricing.
Scope of Work
HEPACO will provide the following:
T&D for assessment drums
1 truck 1 Operator
Assumptions
HEPACO assumes the following:
All waste soil and water deemed Non-Hazardous. PFAS water will be identified through Analysis.
Client is responsible for all testing and analysis. PFAS analytics will be provided before pickup.
Drums for pickup will be accessible and sealed with no damage. Damaged containers will be overpacked.
Drums will be from assessment activity containing soil or water.
Price
HEPACO’s price for this project is $935. A pricing itemization is provided in Attachment A. The pricing is a line-item quote. Volumes and time will vary per pickup due to the site locations needs.
HEPACO Basic Conditions:
This proposal is contingent upon credit approval and valid for thirty days
For any additional work beyond the original scope of work, time and material rates will apply.
Except for minimums, billing will be based on actual quantities at unit costs (see Attachment A).
A four-hour minimum will apply to all unit costs quoted by the hour
Unit costs quoted by the day will be billed at the full day rate for any work on site. There will be no partial billing for partial workdays.
Unit costs quoted by the day apply up to eight hours per day. After eight hours per day, the day rate will be pro-rated for additional hours.
Unit costs are based on a non-union work force, no prevailing wages, no overtime work, and no performance bond.
Additional costs related to unexpected, concealed, or unknown conditions or any delays at the project site shall be incurred by customer.
HEPACO will not be held responsible if underground or above ground structures, cables, conduits, site features, property, materials, or equipment are destroyed, damaged, or rendered inoperable during the project.
Pricing is based on current fuel prices. If fuel prices increase, additional charges may apply
Again, thank you for the opportunity and we look forward to completing this project.
Sincerely, Kevin Hamilton
Kevin Hamilton
HEPACO Account Manager
Item # Unit Cost Line Item Cost
145.00$ 145.00$
165.00$ 165.00$
165.00$ 165.00$
375.00$ 375.00$
85.00$ 85.00$
Additional Pricing
425.00$
935.00$ Estimated Total
2.0
1.0 Overpack Service for damaged 55 gallon drums 1 Each
PFAS (RCRA) Water Drums per 55 gallon drum
5.0 PFAS Drums Transport Fee
3.0
6.0 Energy Fee is currently 12.5% of invoice
7.0
Each
Each
4.0
Estimated
Quantity
Units
Soil NON-Hazardous per 55 gallon drum
Hour
DM
DM
DM
1.0
2.0
Transportation and 1 Driver/Technician
Water NON-Hazardous per 55 gallon drum.
Description
Gregory Sattler
From: Ed Kinley <ekinley@uestampa.com>
Sent: Wednesday, October 19, 2022 3:36 PM
To: Gregory Sattler
Cc: Eric Ceballos
Subject: FDEP IDW Drum Trans. & Disposal
Hello Greg. Thank you for your call. UES has supported other Environmental Consultants with FDEP IDW drum management in the past.
Unfortunately, we cannot currently provide this service. Our operation is undergoing expansion and we cannot hold your waste drums. We hope to have a Solid Waste Solidification facility constructed in the near future. We have a Permit to Construct from the City of Tampa & are waiting on our Operations Permit from the FDEP.
Once this facility is completed we will have a turnkey operation. We currently can manage Non Hazardous Wastewaters at our Pretreatment Wastewater Facility. Soils and sludges will be managed at the Solidification Building.
I’ve copied our Business Development Mgr., Eric Ceballos, who will contact you in the near future to discuss all of our capabilities.
Regards, Ed Kinley
Ed Kinley, President (813)390-0659