CN-370000-HW682-DC002A.pdf

PDF 1007 KB Posted

Attached to
Master Agreement FL|HW682|8fccc28dda898687f0dd3c309f3a996b
Contract number
HW682
Issued by
Florida

About this file

Summary

This is a Task Assignment (TA) Document DC-002A issued under Contract HW682 between the State of Florida Department of Environmental Protection (FDEP) and Environmental Consulting and Technology, Inc. (ECT). The Task Assignment was effective February 20, 2023, with a completion date of August 4, 2023, and authorizes ECT to perform Soil Vapor Extraction (SVE) system electrical testing and SVE Verification Testing at the Town & Country Cleaners facility located at 1005 NW 76th Boulevard, Gainesville, Florida 32608 (Project Number ERIC_3985). The Department Project Manager is Kelly Crain, and the Contractor's Project Manager is Mark A. Culbreth.

The total Task Assignment value is $16,131.95 on a Fixed Unit Rate basis. The contract consists of three subtasks: SubTask 1 (Project Management) at $1,087.57; SubTask 2 (SVE System Electrical Testing and Analysis Memo) at $7,304.85, due May 3, 2023; and SubTask 3 (SVE Verification Testing Report) at $7,739.53, due June 23, 2023. Invoicing is contingent upon FDEP approval of deliverables. The scope includes system electrical evaluation by a licensed electrician, generator-powered SVE verification testing with soil vapor sample collection, preparation of a system analysis memorandum and verification testing report, and recommendations for repair or replacement. Subcontractor costs include generator rental ($2,200.00), electrical control panel services ($1,125.00), diesel fueling ($350.00), laboratory analysis ($1,200.00), and field supplies.

View the file

Other files

File Type Posted
CN-370000-GC914-T9CO2.pdf PDF
CN-370000-GC914.pdf PDF
CN-370000-HW682-DC001A.pdf PDF
CN-370000-HW682-DC001D.pdf PDF
CN-370000-HW682-DC006C.pdf PDF
CN-370000-HW682-DC007A.pdf PDF
CN-370000-HW682-DC008A.pdf PDF
CN-370000-HW682-DC008E.pdf PDF
CN-370000-HW682-DC011A.pdf PDF
CN-370000-HW682-DC012A.pdf PDF
CN-370000-HW682-DC012C.pdf PDF
CN-370000-HW682-DC013B.pdf PDF
CN-370000-HW682-DC014A.pdf PDF
CN-370000-HW682-DC017A.pdf PDF
CN-370000-HW682-DC018A.pdf PDF
CN-370000-HW682-DC018B.pdf PDF
CN-370000-HW682-DC019C.pdf PDF
CN-370000-HW682-DC020A.pdf PDF
CN-370000-HW682-DC020B.pdf PDF
CN-370000-HW682-DC023A.pdf PDF
CN-370000-HW682-DC027B.pdf PDF
CN-370000-HW682-DC03BCO1.pdf PDF
CN-370000-HW682-DC04BCO1.pdf PDF
CN-370000-HW682-DC04BCO6.pdf PDF
CN-370000-HW682-DC05BCO1.pdf PDF
CN-370000-HW682-DC05BCO4.pdf PDF
CN-370000-HW682-DC05BCO5.pdf PDF
CN-370000-HW682-DC06ACO1.pdf PDF
CN-370000-HW682-DC08BCO1.pdf PDF
CN-370000-HW682-DC09ACO4.pdf PDF
CN-370000-HW682-DC11AC10.pdf PDF
CN-370000-HW682-DC11AC11.pdf PDF
CN-370000-HW682-DC11ACO2.pdf PDF
CN-370000-HW682-DC11ACO7.pdf PDF
CN-370000-HW682-DC11ACO8.pdf PDF
CN-370000-HW682-DC13BCO2.pdf PDF
CN-370000-HW682-DC13BCO5.pdf PDF
CN-370000-HW682-DC13BCO6.pdf PDF
CN-370000-HW682-DC14BCO3.pdf PDF
CN-370000-HW682-DC14BCO5.pdf PDF
CN-370000-HW682-DC15BCO1.pdf PDF
CN-370000-HW682-DC17ACO1.pdf PDF
CN-370000-HW682-DC18ACO1.pdf PDF
CN-370000-HW682-DC19BCO1.pdf PDF
CN-370000-HW682-DC21ACO2.pdf PDF
CN-370000-HW682-DC24ACO2.pdf PDF
CN-370000-HW682-DC24ACO3.pdf PDF
CN-370000-HW682-DC24ACO4.pdf PDF
CN-370000-HW682-DC25ACO3.pdf PDF
CN-370000-HW682-DC26AC02.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW682

DC002A Completion August 4, 2023

ECT will perform a Soil Vapor Extraction (SVE) system electrical testing and SVE Verification Testing in accordance with the scope of work and cost proposal submitted on February 7, 2023.

Kelly Crain 850-245-8953 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor

Contractor Mark A. Culbreth Contractor 813-289-9338

ERIC_3985

1005 NW 76th Blvd. Gainesville, FL 32608

Town & Country Cleaners

Contractor Contractor

✔ $ 16,131.95

$ 16,131.95

Select One

Environmental Consulting and Technology, Inc. (ECT Contractor Mark A. Culbreth

Contract Manager Digitally signed by Mark Culbreth DN: CN=Mark Culbreth, E=mculbreth@ectinc.com Reason: I am approving this document Location: your signing location here Date: 2023.02.20 08:44:25-05'00' Foxit PhantomPDF Version: 10.1.6

Mark Culbreth Kelly Crain Digitally signed by Kelly Crain Date: 2023.02.20 08:39:36 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

SVE System Analysis Memo (Subtask 2) 05/03/2023

SVE Verification Testing Report and PM (Subtask 3 and 1) 06/23/2023

FDEP Approval of SVE System Analysis Memo (Subtask 2) $ 7,304.85

FDEP Approval of SVE Verification Testing Report and PM (Subtask 3 and 1) $ 8,827.10

$ 16,131.95

HW682

DC002A

FFLORIDAA DEPARTMENTT OF

EEnvironmentall Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ronn DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawnn Hamilton Secretary

Memorandum

TO:

FROM:

SUBJECT:

DATE:

HW682 Contract File Cleaners

ERIC_3985

Kelly Crain, Project Manager Negotiation Summary Task Assignment DC-002A February 10, 2022

This Task Assignment authorizes ECT to conduct Soil Vapor Extraction (SVE) system electrical testing and SVE Verification Testing in accordance with the scope of work and cost proposal submitted on February 7, 2023. ECT will perform testing and troubleshooting of the SVE system with a licensed electrician, and if the system is operable will use a generator to perform SVE Verification testing including collection of soil vapor samples after 60-minutes of run-time per well based on the pore volume calculations.

ECT will provide a memorandum summarizing the condition of the system, whether the system is operable and recommendations for repair or replacement. A SVE Verification Testing Report will be prepared detailing the results of the test and recommendations for next steps.

ECT will ensure that the Department has a current site access agreement in place prior to initiating field activities.

The final costs associated with this Task Assignment are $1 . ECT may invoice according to the attached schedule.

FDEP COST ESTIMATEContractor: Environmental Consulting & Technology, Inc.

Date: 7-Feb-23

Task #: SubTask 1 Project Management

Site: Town & Country Cleaners SubTask 2 SVE System Electrical Testing

Activity/Phase: SubTask 3 SVE System Verification Testing

Project Manager: Mark Culbreth SubTask 4

SubTask 5

TTotals 1 2 3 4 Labor Rate Category

$80.12 PProject Manager 4.5 4.5 $80.12 Senior Principal Scientist (MC) 2 0.0 2.0 0 $52.89 Senior Engineer / Scientist (GS) 34 18.0 16.0 0 $26.54 GIS Analyst / Graphics (JV) 6 0.0 6.0 0 $22.44 Technician (BC) 21.5 13.0 8.5 0 $31.45 Administrative (BJ) 6 0.0 6.0 0

Total Hours 74.5 5 31.0 38.5 0

Direct Labor $3,151.46 $362.56 $1,243.74 $1,545.16 $0.00

Overhead 125.30% $3,948.79 $454.29 $1,558.41 $1,936.09 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 47.40% $1,493.79 $171.85 $589.53 $732.41 $0.00 Total Labor $8,594.04 $988.70 $3,391.68 $4,213.66 $0.00

Travel Vehicle Rental $240.00 $120.00 $120.00 $0.00 Per diem + Hotel $414.00 $414.00 $0.00 $0.00 Total Travel $654.00 $534.00 $120.00 $0.00

Subcontractor (Equipment Procurement) Generator Rental $2,200.00 $1,100.00 $1,100.00 $0.00 Diesel Fueling $350.00 $175.00 $175.00 $0.00 Electrical Control Panel Subcontractor $1,125.00 $1,125.00 $0.00 $0.00 Subcontractor Subtotal $3,675.00 $2,400.00 $1,275.00 $0.00 Procurement Fee $367.50 $240.00 $127.50 $0.00 Total Subcontractor Cost $4,042.50 $2,640.00 $1,402.50 $0.00

Subcontractor (Services Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $1,200.00 $0.00 $1,200.00 $0.00 Sample Shipping $52.00 $0.00 $52.00 $0.00 Total Laboratory $1,252.00 $0.00 $1,252.00 $0.00

Field Expenses Expendables $80.00 $40.00 $40.00 $0.00 Construction/O&M/Pilot Test Kit $360.00 $360.00 $0.00 $0.00 Soil Vapor Sampling Kit $290.00 $0.00 $290.00 $0.00 Total Field Expenses $730.00 $400.00 $330.00 $0.00

Subtotal $15,272.54 $988.70 $6,965.68 $7,318.16 $0.00 Completion Fee $859.41 $98.87 $339.17 $421.37 $0.00

Total Estimated Cost $16,131.95 $1,087.57 $7,304.85 $7,739.53 $0.00

Soil Vapor Extraction Verification Testing

REV: 02/03 CEF ECT Page 1

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Town & County Cleaners SUBTASK SVE System Electrical Testing

DATE: 2/7/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Verify and Notify RPO of field activities 2 Prepare Health and Safety Plan 2 Round trip Mobilize to Gainesville 5 Troubleshooting System 8 Prepare memorandum 1

Total hours 18 Total hours 0

B. Carrick Technician Prepare for the SVE event 0.5 Round trip Mobilize to Gainesville 4 Setup, opening and closing calibration of equipment 0.5 Troubleshooting System for SVE operation 8

Total hours 13

TOTAL LABOR 31

VEHICLE TYPE RATE UNIT USEAGE

G. Sattler Rental Truck $120.00 day 1 $120.00 B. Carrick Rental Truck

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem B. Carrick $36.00 day 2 $72.00 Hotel B. Carrick $135.00 day 1 $135.00

Per Diem G. Sattler $36.00 day 2 $72.00 Hotel G. Sattler $135.00 day 1 $135.00

TOTAL PER DIEM $414.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT

Equipment with Experience Generator Rental $1,100.00 1 $1,100.00 Equipment with Experience Diesel Fuel $175.00 1 $175.00 Electrical Control Panel Subcontractor System Troubleshooting $1,125.00 1 $1,125.00

TOTAL $2,400.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 1 $40.00 Construction/O&M/Pilot Test Kit $360.00 Day 1 $360.00

TOTAL EQUIPMENT $400.00

FINAL --7/24/96

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Town & County Cleaners SUBTASK:SVE System Verification Testing

DATE: 2/7/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations to prepare final SVE System Verification Test Report 2 Total hours 2

G. Sattler System Verification test and collect SVE well Samples 8 Prepare SVE Verification Resting Report 8

Total hours 16 J. Von Borstel GIS Analyst Update Figure 6

Total hours 6 B. Carrick Technician Prepare for the SVE event 0.5

System Verification test and collect SVE well Samples 8 Total hours 8.5

B. Jarvis Administrative Recreate Tables and report production 6 Total hours 6

TOTAL LABOR 38.5

VEHICLE TYPE RATE UNIT USEAGE

B. Carrick Rental Truck $120.00 day 1 $120.00 G. Sattler

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Equipment with Experience Generator Rental $1,100.00 $1,100.00 Equipment with Experience Diesel Fuel $175.00 $175.00

TOTAL $1,275.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 $200.00 6 $1,200.00

Sample Shipping $52.00 1 $52.00

TOTAL LAB $1,252.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 1 $40.00 Soil Vapor Sampling Kit $290.00 Day 1 $290.00

TOTAL EQUIPMENT $330.00

FINAL --7/24/96

5315 56th Commerce Park Blvd.

Tampa, FL 33610

Phone (813) 413-7760 eWe – Your Partner in Remediation Fax (813) 413-7761

- 1 - EWE-2346

January 4, 2023

Ms. Greg Sattler, P.E.

Environmental Consulting Technologies, Inc.

3660 Maguire Blvd., Suite 234 Orlando, FL 32803 VIA Email

RE: 8 Hr SVE Episodic Event Town & Country Cleaners 1005 NW 76th Boulevard Gainesville, FL

EWE-2346

Dear Ms. Sattler:

Equipment with Experience (EWE) is pleased to submit this proposal to provide the generator and wires for the 8 Hr SVE Episodic Event at the above-referenced location. EWE proposes to provide the generator and services as per information provided by Environmental Consulting Technologies, Inc. The cost to provide this equipment/service is detailed on the attached Proposal.

Equipment and services to be provided:

20 KW Generator/Fuel and operation (wires to control panel) Transportation, setup, well connections, and operation

If there are questions or comments concerning the above, please call Tom Twitmyer at (813) 413-7760. If you would like to proceed with scheduling the above referenced work please sign and return one copy of the proposal to EWE. EWE thanks you for this opportunity to be of service; we look forward to working with you in the future.

Sincerely, Equipment with Experience, LLC

Thomas F. Twitmyer, P.G.

Attachments: Proposal, Standard Terms/Conditions

- 2 - EWE-2346

PROPOSAL

8 Hr SVE Episodic Event

Environmental Consulting Technologies, Inc.

Town & Country Cleaners 1005 NW 76th Boulevard

Gainesville, FL

Please initial and return to the attention of: Thomas Twitmyer – Tomt@ewithe.net

APPROVED ITEM DESCRIPTION RATES UNIT QUANTITY COST

3 phase wires $150 /job 1 $150

Transportation and operation $450 /job 1 $450

Power Supply 55 KW three phase generator $500 /job 1 $500

TOTAL ESTIMATED COSTS $1,100

NOTES:

Estimate valid for 90 days

DATE SERVICES NEEDED: PROPOSAL PREPARED: 1/4/2023

START TIME: ESTIMATED HOURS ON SITE:

PURCHASE ORDER NO.: EWE JOB NO.: EWE -2346

PAYMENT TERMS: Net 30 Days APPROVED COST

BILLING INFORMATION: Officer* Date *Signature Acts as Notice to Proceed at Contract Price

Payment Remitted to: ATTENTION: Ms. Greg Sattler , P.E.

Equipment with Experience, LLC Environmental Consulting Technologies, Inc.

5315 56th Commerce Park Blvd 3660 Maguire Blvd., Suite 234 Tampa, FL 33610 Orlando, FL 32803

PHONE: (407) 367-3064

FAX:

Email: gsattler@ectinc.com

Thomas F. Twitmyer, EWE Environmental Consulting Technologies, Inc.

- 3 - EWE-2346

Standard Terms/Conditions ACCEPTANCE: This proposal is an invitation for an offer and will become a binding contract when accepted.

LIMITATION OF PROPOSAL: The prices and terms quoted in this proposal are subject to acceptance by the Purchaser within a period of (30) calendar days from the date hereon.

EXCLUSIONS: This proposal is based solely and completely on specifications submitted to Equipment with Experience, Inc. (EWE) at the time of the writing of the proposal. General plans and specification not actually submitted shall not apply. This proposal, together with all annexed specifications, when accepted, shall be the complete agreement between the parties; and any alternations or unusual and undisclosed conditions or deviations from the above specifications involving extra costs shall be agreed upon in writing by both parties and shall become an additional charge over and above the proposal price set forth herein. Delays or impossibility of performance by EWE because of reasons beyond the control of EWE shall relieve us from all liability herein.

TERMS OF PAYMENT: Subject to the payment terms described in the General Conditions section in the proposal. We reserve the right to cancel the contract or cease work if payments thereon are not received when due. 1.5% per month shall be charged on all unpaid balances.

TAXES: The Purchaser shall pay any local, state or federal sales, excise or use tax imposed on the equipment in addition to the prices quoted.

WARRANTY LIMITATION: There are no warranties that extend beyond the warranties herein after expressed.

WARRANTIES: All work shall be done in a workmanlike manner according to standard practices. We agree to pass on to the Purchaser such warranties, if any, as may be extended by the manufacturer for material supplied. Labor for replacing defective materials shall not be provided by us unless it is specifically spelled out in the proposal. We shall not be responsible for materials damaged, lost or stolen after delivery, through no fault of ours, or for failure to deliver and perform because of reasons beyond our control.

EXCLUSIVE REMEDIES: Remedies are limited to the repair or replacement at FOB point of delivery. Consequential damages are excluded. In no event shall EWE be responsible for consequential damages of any such defective material or workmanship including, but not limited to, the Purchaser's loss of material or profits, increased expenses of operation, downtime or reconstruction of the work, and in no event shall EWE ' obligation under this warranty exceed the original contract price of the defective item.

DISCLAIMER: EWE will not be responsible for damage to equipment or materials through improper installation, storage, improper services, or through attempts to operate it in excess of its rated capacity or recommended use, intentional or otherwise, by parties other than EWE or its authorized representatives.

CONDITIONS OF SALE: Prices quoted are those now in effect. Seller reserves the right to bill at the prices in effect at the time of shipment if the proposal is not accepted in writing within thirty (30) days, unless a longer term of validity is in writing on the proposal.

LIMITATIONS OF LIABILITY

A. Neither Seller nor its suppliers of any tier will be liable to Purchaser, whether in contract, in tort (including negligence and strict liability), under any warranty or otherwise, for any special, indirect, incidental, or consequential loss or damage whatsoever, or for loss of or to the plant, loss of use of equipment or power system, cost of capital, loss of profits or revenue or the loss of use thereof, cost of environmental damage or clean-up, or claims of customers of Purchaser. The remedies set forth herein are exclusive, and the total cumulative liability of seller and it suppliers under any purchase order or any act or omission in connection therewith or related thereto, whether in contract, in tort (including negligence and strict liability), under any warranty, or otherwise, will be limited to the price of the contract.

B. The provisions of this Article shall survive termination, cancellation or expiration of the purchase order and shall apply, notwithstanding any other provisions of this Agreement or any related document thereto, to the fullest extent permitted by law. Prior to the transfer of any equipment or material furnished or for which work is furnished hereunder from the project site (except temporarily for repair work or permanently for disposal), or the transfer of any interest therein or in the plant, Purchaser shall obtain for Seller written assurances from the transferee of limitation of and protection against liability following the proposed transfer at least equivalent to that afforded seller and its suppliers under the purchase order.

REFERENCE: REF. NO. TERMS: DATE:

Gainesville, FL 4454-23 Net 30 1/4/2023

ITEM RATE QUANTITY TOTAL

Generator Rental to operate SVE system 500.00 Day 1 $500.00 Cord to connect generator to the trailer 50.00 ls 1 $50.00 Delivery & Pick up of generator 750.00 ls 1 $750.00

Total cost for rental $1,300.00 Does not include fuel, fueling or servicing

Fuel estimated at 2 gallons an hour

This price will remain firm for ninety days from the proposal date.

We appreciate the opportunity of offering this proposal and trust we may be favored with your most valued business.

ECT Kenneth P. Richard Company Name Sales Representative

Petroleum Resources & Development, Inc.

Signature Date

Title

(321) 986-6036

PR&D Quote # 4454-23

Petroleum Resources & Development, Inc.

2460 N Courtenay Pkwy, Suite 212

Merritt Island, Florida 32953

(321) 986-6026

U1INVPDF

This is not an invoice Please do not pay from this document

RENTAL QUOTE

POWER & HVAC

Page: 1

RENTAL ITEMS:

_____ ___________ _______________________________________ _____________________________________________ _______________ Qty Equipment Description Minimum Day Week 4 Week Estimated Amt.

1 2403137 GENERATOR 30-39 KVA TIER 4 299.64 599.27 1,648.00 299.64

1 241/7275 CABLE 6/4 50 AMP 50' 47.95 47.95 59.93 164.80 47.95

BARE END

Rental Subtotal: 347.59

SALES/MISCELLANEOUS ITEMS:

_______ ______________________________________________________________ _____________ _________________ _______________ Qty Item Price Unit of Measure Extended Amt.

1 ENVIRONMENTAL SERVICE CHARGE [ENV/MCI] 5.990 EACH 5.99

1 DELIVERY CHARGE 694.560 EACH 694.56

1 PICKUP CHARGE 694.560 EACH 694.56

Sales/Misc Subtotal: 1,395.11

Agreement Subtotal: 1,742.70 Tax: 26.52 Estimated Total: 1,769.22

COMMENTS/NOTES:

CONTACT: GREG SATTLER

CELL#: 321-245-2124

DLV/PKU LOC SELECTED BY MAP PIN OPTION

GAINSEVILLE

1005 NW 76TH BLVD

GAINESVILLE FL 32608

Office: 352-332-0444 Cell: 321-245-2124

ENVIRONMENTAL CONSULTING &

7027 SW 24TH AVE

GAINESVILLE FL 32607-3704

BRANCH G80

5856 MINING TER

JACKSONVILLE FL 32257-3233

904-731-5545

904-731-5255 FAX

# 214240970

J o b

S i t e

J o b

S i b

S i b

S i b

S i b

S i b

S i b

S i b

S i b

S i b

S i b

S i b

S i b

S i b

S i b

S i

Customer # :

Quote Date :

Estimated Out :

Estimated In :

UR Job Loc :

UR Job # :

Customer Job ID:

P.O. # :

Ordered By :

Written By :

Salesperson :

2005009 12/20/22

01/05/23 03:00 PM

01/06/23 03:00 PM

1005 NW 76TH BLVD, G

TBD

GREG SATTLER

KEVIN CHMELA

KEVIN CHMELA

This proposal may be withdrawn if not accepted within 30 days. The above referenced Rental Protection Plan, environmental, and tax charges are estimates and are subject to change.

NOTICE: This is not a rental agreement. The rental of equipment and any items listed above is subject to availability and subject to the terms and conditions of the Rental and Service Agreement, which are available at https://www.unitedrentals.com/legal/rental-service-terms-US and which are incorporated herein by reference. A COPY OF THE RENTAL AND SERVICE

AGREEMENT TERMS ARE AVAILABLE IN PAPER FORM UPON REQUEST.

Partnership for A Cleaner Tomorrow

495 Oak Road Ocala, FL 34472 Phone (800) 277-3279 Fax (352) 680-9278

Mr. Greg Sattler, PE January 13, 2023 Sr. Remediation Engineer ECT, Inc.

3751 Maguire Boulevard, Suite 234 Orlando, FL 32803

RE: Electrical Evaluation and Startup Procedures Quote - Proposal # AP011323-01

Town & Country Cleaners - 1005 NW 75th Boulevard, Gainesville, Florida 32608

Dear Mr. Sattler, ESD Waste2Water is pleased to submit the following cost estimate for the above referenced project, per your Request for Quote. The general scope of services and associated costs are summarized below.

Electrical evaluation of the existing Control Panel and SVE System.

Assist with developing the electrical startup procedures for the referenced SVE System.

Price includes mobilization, truck, tools and 6 hours of on-site support from one ESD’s Qualified Field Services Technicians, that has experience with troubleshooting control panels and SVE electrical components.

PROJECT COST $1,125.00

Exceptions, Clarifications, General Terms and Conditions Proposal pricing is valid for 30 days from date of proposal.

Payment terms: Net 30 Days and will be Invoiced upon completion.

Pricing is limited to only those services describe herein and based on 6 Hours of On-Site support.

Any additional time or materials/components requested and required, will be billed on a time-and-materials basis, and will be pre-approved by ECT.

Pricing does not include any sales tax, if applicable.

No permitting services or costs are included.

Greg, Thank You for the opportunity to provide you with this cost proposal. Please call/reply with any questions, comments or requests. If agreeable, please sign below and return at your convenience.

Best Regards, Alan K. Pierce

Authorized and Approved by ECT, Inc.

Authorized By: _____________________________ Date: __________________ Signature

Name: _____________________________________ P.O. #: __________________ Print

Gregory Sattler

From: abpelectric1@verizon.net Sent: Wednesday, January 18, 2023 2:25 PM To: Gregory Sattler Subject: RE: Town & Country Cleaners Electrical System Evaluation

Good afternoon Greg, Thank you for the opportunity to bid on your project. At this time I will need to decline bidding on this project due to our very busy schedule and time constraints. Please keep ABP in mind for future projects.

Thank you for your understanding.

Sincerely, Brad Plough 8717 Park Byrd Road Lakeland, FL 33810 863-816-7313 Office 863-581-7879 Cell 863-853-2694 Fax abpelectric1@verizon.net

From: Gregory Sattler <gsattler@ectinc.com> Sent: Thursday, January 12, 2023 4:52 PM To: Brad Plough (ABPelectric1@verizon.net) <abpelectric1@verizon.net> Subject: Town & Country Cleaners Electrical System Evaluation

Good evening Brad, ECT is requesting quotes for electrical evaluation and electrical startup procedures for a soil vapor extraction system owned by the Florida Department of Environmental Protection (FDEP) Waste Cleanup Division. The site is known as Town & Country Cleaners (D496), located at 1005 NW 75th Boulevard, Gainesville, Florida 32608. ECT has assumed responsibility for the system for the FDEP from a previous consultant. The system and control panel have been exposed to the elements and some water intrusion has been identified. ECT will provide a 3-phase generator to power the system to determine whether it is operable in the current state or whether repairs will be required. In your quote, please include mobilization and 6 hours for a technician that has experience with troubleshooting control panels and SVE electrical components.

ECT would like to perform the electrical evaluation, troubleshooting, and minor repairs to operate the SVE system the following day.

Attached are photos of the system. If you have any additional questions, you may contact me at the below information.

Best Regards, Gregory Sattler, P.E.

Senior Remediation Engineer| Site Assessment & Remediation

Environmental Consulting & Technology, Inc.

3751 Maguire Boulevard | Suite 234 | Orlando, Florida 32803 C: 321.245.2124 | gsattler@ectinc.com

Follow us:

File details come from the government source that posted it. Updated .