This document is a Task Assignment (TA) Change Order (TACO #1) issued by the State of Florida Department of Environmental Protection (FDEP) to Environmental Consulting and Technology, Inc. (ECT) for environmental assessment services at the Aldos Cleaners site located in Boca Raton, Palm Beach County, Florida. The contract is identified as HW682 with Task Assignment number DC014B and Project number ERIC_5188. The FDEP Project Manager is Karlee Fowler, and ECT's Project Manager is Mark A. Culbreth. This change order reconciles an overall cost decrease caused by scope changes to Subtasks 2, 3, and 4, and includes WCD 1, which authorized changes in the drilling scope as well as a change in drillers from GPI to Earth Tech Drilling due to availability that resulted in decreased drilling costs.
The amended contract value is reduced from $94,523.44 to $78,203.45, representing a total decrease of $16,319.99. The task involves initial soil and groundwater site assessment activities including utility clearance, soil sampling, direct push technology (DPT) sampling, monitoring well installation and sampling, multi-level air sampling (MAGS), and transport and disposal of investigation-derived waste (IDW). The work is structured in eight subtasks with specific deliverables and invoicing milestones extending through February 14, 2025. The total labor hours authorized are 239 hours. All terms and conditions of the original Task Assignment remain in effect, with this change order effective upon the last date of signature by both ECT and FDEP on September 18, 2024.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
DC014B 1 HW682
Karlee Fowler 850-245-8944 Environmental Consulting and Technology, Inc. (ECT)
Mark A. Culbreth 813-289-9338
ERIC_5188
Aldos Cleaners
$ 78,203.45 $ 94,523.44
$ 78,203.45 $ 94,523.44
05/14/2025 05/14/2025 0
1 1 2
Environmental Consulting & Technology, Inc
Mark Culbreth
Contract Manager
09/10/2024
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2024.09.18 14:29:27 -04'00'
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
From:
Date:
To: HW Contract Negotiation File
ERIC_
, Project Manager , 202
Subject: Negotiation Summary
HW
This Task Assignment is with labor hours.
F D
E P
C O
S T
E S
T
IM
A T
E
S en io r
P ri nc ip al S ci en tis t
(M C
S en io r
E ng in ee r
S ci en tis t (G
S
S en io r
E ng in ee r
S ci en tis t (D
P
G
IS
A na ly st
G ra ph ic s
(J V
A ss oc ia te E ng in ee r
S ci en tis t
(J P
T ec hn ic ia n
(B C
A dm in is tr at iv e
(B J)
S oi l A ss es sm en t
K it
M on ito ri ng w el l I ns ta ll K it
S ha llo w
G ro un dw at er
S am pl in g K it
Ic e
T ot al S ur ve y S ta tio n
D ee p G ro un dw at er S am pl in g
K it
M A
G S
K it
A ir
S am pl in g C an is te rs
P a g e
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Aldos Cleaners (Original + TACO 1) SUBTASK 2: HASP & Utility Clearance
DATE: 7/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Prepare Health and Safety Plan 2
Verification of property ownership, notify RPO of field activities 1
Total Hours 3
D Phillips Senior Scientist Round trip Mobilization between Orlando and the site in Boca Raton 8
Utility clearance 4
Total Hours 12
TOTAL LABOR 15
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $120.00 day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNITS
GeoView Private Utility Location $900.00 1 $900.00
TOTAL $900.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 1 $40.00
TOTAL EQUIPMENT $40.00
FINAL --7/24/96
SUBTASK 3: Soil Sampling with DPT & Groundwater Sampling
DATE: 7/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer SPLP evaluation 1
SPLP and well placement correspondence and meetings with the FDEP 1.5
Total Hours 2.5
D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 8
Soil Borings and DPT Sampling 45
Depth to water measurement at 5 wells and piezomters 1
Groundwater sampling two wells 2
Total Hours 56
B. Jarvis Administrative Create tables and data entry 2
Total Hours 2
TOTAL LABOR 60.5
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $480.00 week 1 $480.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel D Phillips $150.00 day 4 $600.00
Per Diem D Phillips $36.00 day 5 $180.00
TOTAL PER DIEM $780.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Groundwater Protection DPT Soil & Groundwater Sampling $14,426.00 1 $14,426.00
TOTAL $14,426.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC UNITS
USEPA Method 8260 Full list Soil SBs $110.00 21 $2,310.00
SPLP Extractions $45.00 0 $0.00
USEPA Method 8260 for Full list Groundwater DPT $110.00 29 $3,190.00
USEPA Method 8260 Full list Grab samples from 2 MW's $110.00 2 $220.00
USEPA Method 8260 for SPLP $110.00 0 $0.00
Encore Samplers $16.00 21 $336.00
Shipping Samples $70.00 5 $350.00
TOTAL LAB $6,406.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 5 $200.00
Soil Assessment Kit $700.00 week 1 $700.00
Monitoring well Install Kit $325.00 day 2 $650.00
Shallow Groundwater Sampling Kit $290.00 day 1 $290.00
Ice $6.50 each 10 $65.00
Total Survey Station $50.00 day 1 $50.00
TOTAL EQUIPMENT $1,955.00
SUBTASK 4: Well Installation & Groundwater Sampling
DATE: 7/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 8
Oversight of well installations 10
Total Hours 18
J. Penia 8
Open Well and collect DTW at 9 wells 1 Groundwater Sampling (4 piezometer, 5 shallow wells) 9 Groundwater Sampling deep well 0 Containerizieng purge water 1
Total Hours 19 B. Jarvis Administrative Create tables and data entry 2
Total Hours 2
TOTAL LABOR 39
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck DP $120.00 day 2 $240.00 Rental Truck DP $480.00 week 0 $0.00 Rental Truck JP $120.00 day 2 $240.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel D Phillips $150.00 day 1 $150.00 Per Diem D Phillips $36.00 day 2 $72.00
Hotel J. Penia $150.00 day 1 $150.00 Per Diem J. Penia $36.00 day 2 $72.00
TOTAL PER DIEM $444.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNITS
GPI Well install 0 $0.00
Earth Tech Drilling Well install 1 $5,150.00
TOTAL $5,150.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units
IDW USEPA Method 8260 for VOHs Soil $73.00 1 $73.00 IDW USEPA Method 6020 or 6010 for RCRA 4 Metals Soil $56.00 1 $56.00 IDW USEPA Method 8260 for VOHs Purge water $73.00 1 $73.00 USEPA Method 8260 Full list amples from MW's $110.00 9 $990.00 Shipping Samples $70.00 1 $70.00
TOTAL LAB $1,262.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 4 $160.00 Monitoring well Install Kit $1,300.00 week 0 $0.00 Monitoring well Install Kit $325.00 day 1 $325.00 Shallow Groundwater Sampling Kit $290.00 day 2 $580.00 Ice $6.50 each 4 $26.00 Total Survey Station $50.00 day 0 $0.00 Deep Groundwater Sampling Kit $415.00 day 0 $0.00 Generator $70.00 day 0 $0.00
TOTAL EQUIPMENT $1,091.00
$5,150.00
Engineer/Scienti st
Round trip Mobilization from Tampa to the site in Boca Raton
$10,125.00
SUBTASK 5: MAGS
DATE: 7/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer P.E. oversight of MGAS events (Provide SOW, guidance, and answer field question) 3
Check MAGS data. 3 Total Hours 6
J. Penia Round trip Mobilization from Tampa to the site in Boca Raton 9 Preform MAGS Testing 8
Total Hours 17 B. Carrick Technician Round trip Mobilization from Tampa to the site in Boca Raton 8
Preform MAGS Testing 8
Total Hours 16 B. Jarvis Administrative Update tables 2
Total 2
TOTAL LABOR 41
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck J. Penia $120.00 day 2 $240.00 Rental Truck B. Carrick $120.00 day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel J. Penia $150.00 day 1 $150.00 Per Diem J. Penia $36.00 day 2 $72.00
Hotel B. Carrick $150.00 day 1 $150.00 Per Diem B. Carrick $36.00 day 2 $72.00
TOTAL PER DIEM $444.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units
USEPA Method TO-15 for VOHs $200.00 6 $1,200.00 Sampling Shipping Overnight $70.00 2 $140.00
TOTAL LAB $1,340.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 1 $40.00 MAGS Kit $325.00 Day 1 $500.00 Air Sampling Canisters $33.00 Day 6 $198.00
TOTAL EQUIPMENT $738.00
Associate Scientist
SUBTASK 6: Professional Land Survey
DATE: 7/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Coordinate and schedule with Surveyor 1
Total Hours 1 J. Penia Technician Round trip Mobilize from Tampa to the site in Boca Raton 9
PLS Oversight and aid in location of wells 4
Total Hours 13
TOTAL LABOR 14
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck J. Penia $132.00 day 1 $132.00
TOTAL VEHICLE $132.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel JP $36.00 day 2 $72.00 Per Diem JP $150.00 day 1 $150.00
TOTAL PER DIEM $222.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Southeastern Professional Land Survey $3,500.00 1 $3,500.00
TOTAL $3,500.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
325 TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 1 $40.00
TOTAL EQUIPMENT $40.00
SUBTASK 7: IDW Management
DATE: 7/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Characterization of waste to profile soil & water IDW drums for transportation and disposal 1
Schedule IDW transport and disposal 1 Total 2
TOTAL LABOR 2
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation IDW T&D Soil $125.00 8 $1,000.00 Erwin Remediation IDW T&D Water $110.00 4 $440.00
TOTAL $1,440.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
SUBTASK 8: SAR Preparation
DATE: 7/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
M. Culbreth Sr. Principal ScientistDevelop conclusions, recommendations, and prepare final Assessment Report 2
Total 2
G Sattler Senior Engineer Prepare the draft SAR site background, SOW, soil, groundwater sections 30 Total 30
D. Phillips Senior Scientist Prepare draft SAR lithological section, create draft figures to be submitted for AutoCAD generation 6 QA/QC of analytical data 2
Total 8
J. Von Borstel GIS Analyst Revise and Update Figures 8 Total 8
B. Jarvis Administrative Update tables, Document Preparation & Publishing 4 Total 4
TOTAL LABOR 52
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
SITE : Aldos Cleaners (TACO 1)
DATE: 7/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
M. Culbreth Sr. Principal ScientistDevelop conclusions, recommendations, and prepare final Assessment Report 0
Total 0
G Sattler Senior Engineer Prepare the draft SAR site background, SOW, soil, groundwater sections 0 Total 0
D. Phillips Senior Scientist Prepare draft SAR lithological section, create draft figures to be submitted for AutoCAD generation 0 QA/QC of analytical data 0
Total 0
J. Von Borstel GIS Analyst Revise and Update Figures 0 Total 0
B. Jarvis Administrative Update tables, Document Preparation & Publishing 0 Total 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
E P
C O S T
E S T I M A T E
S en io r
P ri nc ip al S ci en tis t
(M C
S en io r
E ng in ee r
S ci en tis t (G
S
S en io r
E ng in ee r
S ci en tis t (D
P
G
IS
A na ly st
G ra ph ic s
(J V
A ss oc ia te E ng in ee r
S ci en tis t
(J P
T ec hn ic ia n
(B C
A dm in is tr at iv e
(B J)
S oi l A ss es sm en t
K it
M on ito ri ng w el l I ns ta ll K it
S ha llo w
G ro un dw at er
S am pl in g K it
Ic e
T ot al S ur ve y S ta tio n
D ee p G ro un dw at er S am pl in g
K it
M A
G S
K it
A ir
S am pl in g C an is te rs
P a g
SUBTASK 2: HASP & Utility Clearance
DATE: 7/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Prepare Health and Safety Plan 0
Verification of property ownership, notify RPO of field activities 0
Total Hours 0
D Phillips Senior Scientist Round trip Mobilization between Orlando and the site in Boca Raton 0
Utility clearance 0
Total Hours 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $120.00 day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNITS
GeoView Private Utility Location ($400.00) 1 ($400.00)
TOTAL ($400.00)
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 0 $0.00
TOTAL EQUIPMENT $0.00
DATE: 7/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer SPLP evaluation 0
SPLP and well placement correspondence and meetings with the FDEP 0
Total Hours 0
D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 0
Soil Borings and DPT Sampling 0
Depth to water measurement at 5 wells and piezomters 0
Groundwater sampling two wells 0
Total Hours 0
B. Jarvis Administrative Create tables and data entry 0
Total Hours 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $480.00 week 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel D Phillips $150.00 day 0 $0.00
Per Diem D Phillips $36.00 day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Groundwater Protection DPT Soil & Groundwater Sampling $449.00 1 $449.00
TOTAL $449.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC UNITS
USEPA Method 8260 Full list Soil SBs $110.00 -11 ($1,210.00)
SPLP Extractions $45.00 -18 ($810.00)
USEPA Method 8260 for Full list Groundwater DPT $110.00 -4 ($440.00)
USEPA Method 8260 Full list Grab samples from 2 MW's $110.00 0 $0.00
USEPA Method 8260 for SPLP $110.00 -18 ($1,980.00)
Encore Samplers $16.00 -11 ($176.00)
Shipping Samples $70.00 0 $0.00
TOTAL LAB ($4,616.00)
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 0 $0.00
Soil Assessment Kit $700.00 week 0 $0.00
Monitoring well Install Kit $325.00 day 0 $0.00
Shallow Groundwater Sampling Kit $290.00 day 0 $0.00
Ice $6.50 each 0 $0.00
Total Survey Station $50.00 day 0 $0.00
DATE: 7/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 0
Oversight of well installations -15
Total Hours -15
J. Penia -1
Open Well and collect DTW at 9 wells -1 Groundwater Sampling (4 piezometer, 5 shallow wells) -4 Groundwater Sampling deep well -1.5 Containerizieng purge water 0
Total Hours -7.5 B. Jarvis Administrative Create tables and data entry 0
Total Hours 0
TOTAL LABOR -22.5
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck DP $120.00 day 2 $240.00 Rental Truck DP $480.00 week -1 ($480.00) Rental Truck JP $120.00 day -1 ($120.00)
TOTAL VEHICLE ($360.00)
PER DIEM STAFF RATE UNIT USEAGE
Hotel D Phillips $150.00 day -2 ($300.00) Per Diem D Phillips $36.00 day -2 ($72.00)
Hotel J. Penia $150.00 day -1 ($150.00) Per Diem J. Penia $36.00 day -1 ($36.00)
TOTAL PER DIEM ($558.00)
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNITS
GPI Well install 1 ($10,125.00)
Earth Tech Drilling Well install 1 $5,150.00
TOTAL ($4,975.00)
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units
IDW USEPA Method 8260 for VOHs Soil $73.00 0 $0.00 IDW USEPA Method 6020 or 6010 for RCRA 4 Metals Soil $56.00 0 $0.00 IDW USEPA Method 8260 for VOHs Purge water $73.00 0 $0.00 USEPA Method 8260 Full list amples from MW's $110.00 -4 ($440.00) Shipping Samples $70.00 0 $0.00
TOTAL LAB ($440.00)
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day -1 ($40.00) Monitoring well Install Kit $1,300.00 week -1 ($1,300.00) Monitoring well Install Kit $325.00 day 1 $325.00 Shallow Groundwater Sampling Kit $290.00 day 0 $0.00 Ice $6.50 each 0 $0.00 Total Survey Station $50.00 day -1 ($50.00) Deep Groundwater Sampling Kit $415.00 day -1 ($415.00) Generator $70.00 day -1 ($70.00)
TOTAL EQUIPMENT ($1,550.00)
$5,150.00
Engineer/Scienti st
Round trip Mobilization from Tampa to the site in Boca Raton
-$10,125.00
DATE: 7/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer P.E. oversight of MGAS events (Provide SOW, guidance, and answer field question) 0
Check MAGS data. 0 Total Hours 0
J. Penia Round trip Mobilization from Tampa to the site in Boca Raton 0 Preform MAGS Testing 0
Total Hours 0 B. Carrick Technician Round trip Mobilization from Tampa to the site in Boca Raton 0
Preform MAGS Testing 0
Total Hours 0 B. Jarvis Administrative Update tables 0
Total 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck J. Penia $120.00 day 0 $0.00 Rental Truck B. Carrick $120.00 day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel J. Penia $150.00 day 0 $0.00 Per Diem J. Penia $36.00 day 0 $0.00
Hotel B. Carrick $150.00 day 0 $0.00 Per Diem B. Carrick $36.00 day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units
USEPA Method TO-15 for VOHs $200.00 0 $0.00 Sampling Shipping Overnight $70.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00 MAGS Kit $325.00 Day 0 $0.00 Air Sampling Canisters $33.00 Day 0 $0.00
TOTAL EQUIPMENT $0.00
DATE: 7/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Coordinate and schedule with Surveyor 0
Total Hours 0 J. Penia Technician Round trip Mobilize from Tampa to the site in Boca Raton 0
PLS Oversight and aid in location of wells 0
Total Hours 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck J. Penia $132.00 day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel JP $36.00 day 0 $0.00 Per Diem JP $150.00 day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Southeastern Professional Land Survey $3,500.00 0 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
325 TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 0 $0.00
DATE: 7/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Characterization of waste to profile soil & water IDW drums for transportation and disposal 0
Schedule IDW transport and disposal 0 Total 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation IDW T&D Soil $125.00 0 $0.00 Erwin Remediation IDW T&D Water $110.00 0 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
E P
C O
S T
E S
T
IM
A T
E
S en io r
P ri nc ip al S ci en tis t
(M C
S en io r
E ng in ee r
S ci en tis t (G
S
S en io r
E ng in ee r
S ci en tis t (D
P
G
IS
A na ly st
G ra ph ic s
(J V
A ss oc ia te E ng in ee r
S ci en tis t
(J P
T ec hn ic ia n
(B C
A dm in is tr at iv e
(B J)
S oi l A ss es sm en t
K it
M on ito ri ng w el l I ns ta ll K it
S ha llo w
G ro un dw at er
S am pl in g K it
Ic e
T ot al S ur ve y S ta tio n
D ee p G ro un dw at er S am pl in g
K it
M A
G S
K it
A ir
S am pl in g C an is te rs
P a g
SITE : Aldos Cleaners SUBTASK 2: HASP & Utility Clearance
DATE: 6/22/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Prepare Health and Safety Plan 2
Verification of property ownership, notify RPO of field activities 1
Total Hours 3
D Phillips Senior Scientist Round trip Mobilization between Orlando and the site in Boca Raton 8
Utility clearance 4
Total Hours 12
TOTAL LABOR 15
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $120.00 day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNITS
GeoView Private Utility Location $1,300.00 1 $1,300.00
TOTAL $1,300.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 1 $40.00
TOTAL EQUIPMENT $40.00
DATE: 6/22/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer SPLP evaluation 1
SPLP and well placement correspondence and meetings with the FDEP 1.5
Total Hours 2.5
D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 8
Soil Borings and DPT Sampling 45
Depth to water measurement at 5 wells and piezomters 1
Groundwater sampling two wells 2
Total Hours 56
B. Jarvis Administrative Create tables and data entry 2
Total Hours 2
TOTAL LABOR 60.5
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $480.00 week 1 $480.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel D Phillips $150.00 day 4 $600.00
Per Diem D Phillips $36.00 day 5 $180.00
TOTAL PER DIEM $780.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Groundwater Protection DPT Soil & Groundwater Sampling $13,977.00 1 $13,977.00
TOTAL $13,977.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC UNITS
USEPA Method 8260 Full list Soil SBs $110.00 32 $3,520.00
SPLP Extractions $45.00 18 $810.00
USEPA Method 8260 for Full list Groundwater DPT $110.00 33 $3,630.00
USEPA Method 8260 Full list Grab samples from 2 MW's $110.00 2 $220.00
USEPA Method 8260 for SPLP $110.00 18 $1,980.00
Encore Samplers $16.00 32 $512.00
Shipping Samples $70.00 5 $350.00
TOTAL LAB $11,022.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 5 $200.00
Soil Assessment Kit $700.00 Week 1 $700.00
Monitoring well Install Kit $325.00 Day 2 $650.00
Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00
Ice $6.50 each 10 $65.00
Total Survey Station $50.00 day 1 $50.00
TOTAL EQUIPMENT $1,955.00
DATE: 6/22/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 8
Oversight of well installations 25
Total Hours 33
J. Penia 9
Open Well and collect DTW at 14 wells 2 Groundwater Sampling (4 piezometer, 9 shallow & intermediate wells) 13 Groundwater Sampling deep well 1.5 Containerizieng purge water 1
Total Hours 26.5 B. Jarvis Administrative Create tables and data entry 2
Total Hours 2
TOTAL LABOR 61.5
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck DP $480.00 week 1 $480.00 Rental Truck JP $120.00 day 3 $360.00
TOTAL VEHICLE $840.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel D Phillips $150.00 day 3 $450.00 Per Diem D Phillips $36.00 day 4 $144.00
Hotel J. Penia $150.00 day 2 $300.00 Per Diem J. Penia $36.00 day 3 $108.00
TOTAL PER DIEM $1,002.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNITS
Groundwater Protection Well install 1 $10,125.00
TOTAL $10,125.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units
IDW USEPA Method 8260 for VOHs Soil $73.00 1 $73.00 IDW USEPA Method 6020 or 6010 for RCRA 4 Metals Soil $56.00 1 $56.00 IDW USEPA Method 8260 for VOHs Purge water $73.00 1 $73.00 USEPA Method 8260 Full list amples from MW's $110.00 13 $1,430.00 Shipping Samples $70.00 1 $70.00
TOTAL LAB $1,702.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 5 $200.00 Monitoring well Install Kit $1,300.00 Week 1 $1,300.00 Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00 Ice $6.50 each 4 $26.00 Total Survey Station $50.00 day 1 $50.00 Deep Groundwater Sampling Kit $415.00 Day 1 $415.00 Generator $70.00 Day 1 $70.00
TOTAL EQUIPMENT $2,641.00
$10,125.00
Engineer/Scienti st
Round trip Mobilization from Orlando to the site in Boca Raton
DATE: 6/22/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer P.E. oversight of MGAS events (Provide SOW, guidance, and answer field question) 3
Check MAGS data. 3 Total Hours 6
J. Penia Round trip Mobilization from Tampa to the site in Boca Raton 9 Preform MAGS Testing 8
Total Hours 17 B. Carrick Technician Round trip Mobilization from Tampa to the site in Boca Raton 8
Preform MAGS Testing 8
Total Hours 16 B. Jarvis Administrative Update tables 2
Total 2
TOTAL LABOR 41
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck J. Penia $120.00 day 2 $240.00 Rental Truck B. Carrick $120.00 day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel J. Penia $150.00 day 1 $150.00 Per Diem J. Penia $36.00 day 2 $72.00
Hotel B. Carrick $150.00 day 1 $150.00 Per Diem B. Carrick $36.00 day 2 $72.00
TOTAL PER DIEM $444.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units
USEPA Method TO-15 for VOHs $200.00 6 $1,200.00 Sampling Shipping Overnight $70.00 2 $140.00
TOTAL LAB $1,340.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 1 $40.00 MAGS Kit $500.00 Day 1 $500.00 Air Sampling Canisters $33.00 Day 6 $198.00
TOTAL EQUIPMENT $738.00
DATE: 6/22/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Coordinate and schedule with Surveyor 1
Total Hours 1 J. Penia Technician Round trip Mobilize from Tampa to the site in Boca Raton 9
PLS Oversight and aid in location of wells 4
Total Hours 13
TOTAL LABOR 14
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck J. Penia $132.00 day 1 $132.00
TOTAL VEHICLE $132.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel JP $36.00 day 2 $72.00 Per Diem JP $150.00 day 1 $150.00
TOTAL PER DIEM $222.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Southeastern Professional Land Survey $3,500.00 1 $3,500.00
TOTAL $3,500.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 1 $40.00
TOTAL EQUIPMENT $40.00
DATE: 6/22/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Characterization of waste to profile soil & water IDW drums for transportation and disposal 1
Schedule IDW transport and disposal 1 Total 2
TOTAL LABOR 2
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation IDW T&D Soil $125.00 8 $1,000.00 Erwin Remediation IDW T&D Water $110.00 4 $440.00
TOTAL $1,440.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
DATE: 6/22/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
M. Culbreth Sr. Principal ScientistDevelop conclusions, recommendations, and prepare final Assessment Report 2
Total 2
G Sattler Senior Engineer Prepare the draft SAR site background, SOW, soil, groundwater sections 30 Total 30
D. Phillips Senior Scientist Prepare draft SAR lithological section, create draft figures to be submitted for AutoCAD generation 6 QA/QC of analytical data 2
Total 8
J. Von Borstel GIS Analyst Revise and Update Figures 8 Total 8
B. Jarvis Administrative Update tables, Document Preparation & Publishing 4 Total 4
TOTAL LABOR 52
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
Contract No. HW685
Additional work is not authorized without prior FDEP approval as indicated by an approved Work Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Work Change DirectiveForm
ATTACHMENT 6
Site Name: Site ID #:
Contract #:
Task Assignment #:
Contractor:
Work Change Directive #:
� Reason for Work Change Directive :
� Description of Work Change Directive :
� Attachments (if applicable, listdocuments supportingchange):
� Costs (if negotiated unitcosts, provide information below):
Maximum Estimated Increase in Task Amount:
Authorized ContractorSignature:
Authorized FDEPSignature:
FDEP SupervisorApproval:
(if applicable)
Aldos Cleaners ERIC_5188
HW ECT, Inc.
DC014B 1
Additional materials costs for 4 MWs added to the first mobilization by the DEP were not included in the SA Proposal. Also, the additional costs for the driller to provide mats to place under the drill rig to protect brick pavers in shopping plaza quad, where 3 DPT groundwater sampling points are proposed.
Additional drilling firm costs, as described above.
Drilling firm original quote and revised quote.
$2,010in cost + subcontractor markup fee @ 10%
$ 2,211.00
Daniel S. Phillips Digitally signed by Daniel S.
Phillips Date: 2024.05.29 14:15:51 -04'00'
Karlee Fowler Digitally signed by Karlee Fowler Date: 2024.05.30 08:55:38 -04'00'
Mubeen Darji, P.E.
Digitally signed by Mubeen Darji, P.E.
Date: 2024.05.30 10:05:04 -04'00'
REVISED DATE: 7/7/2023
ESTIMATE #: 723008
Project Description:
ID QTY Unit Rate TOTAL
1 1 ls 1,000.00$ 1,000.00$
2 4 night 300.00$ 1,200.00$
3 4 day 1,700.00$ 6,800.00$
3a 1 1/2 day 1,250.00$ 1,250.00$
4 1 ls 600.00$ 600.00$
5 12 each 15.00$ 180.00$
6 2 each 10.00$ 20.00$
7 44 each 3.00$ 132.00$
8 4 each 100.00$ 400.00$
9 32 foot 20.00$ 640.00$
10 30 foot 4.00$ 120.00$
11 2 each 175.00$ 350.00$
12 3 each 150.00$ 450.00$
13 1 each 150.00$ 150.00$
14 2 each 150.00$ 300.00$
15 2 each 75.00$ Included
16 55 gallon drums (Soil) (Estimated) 2 each 65.00$ 130.00$
17 55 gallon drums (Water) (Estimated) 2 each 65.00$ 130.00$
18 Permits: Broward County ($75 First Well + $50 Each Additional) 1 each 125.00$ 125.00$
Completion: Subtotal 13,977.00$
Todd Hodgson
TOTAL 13,977.00$
Partner
(11) DPT GW Borings to ~44' with GW Grabs at 4 Intervals 10-14', 20-24', 30-34' and 40-44' (No Soil Sampling)
Materials: GW Sampling Points (Per Sample)
Boca Raton, Florida
Donut Pad w/3" Brass Completion (Indoor MW)
(1) DPT Litho Boring to ~50' (or refusal) w/Macrocore Sampling to Depth/Refusal
Materials: 2" x 8' PVC Well Installation (VEW Wells)
420 M Indoor Rig w/Core Drill and Generator (Interior Wells)
Outdoor Work
(1) 2" x 8' VEW w/7' of .010 Slot Screen, 2' x 2' Pad w/8" BD Completion (Installed at HA Location)
Indoor Work
(1) Hand Auger Boring to 6' with Soil Grabs at 1', 2', 4' and 6' (1 will become VMP)
(7) Hand Auger Borings to 6' with Soil Grabs at 2', 4' and 6'. (2) Backfill w/Concrete Patch.
(3) 2" x 8' VEW w/7' of .010 Slot Screen, Donut Pad w/5" BD Completion (Installed at HA Locations)
DPT Rig and Crew
Materials: Grout Borehole w/Concrete Patch (Litho and GW Profiling Borings)
Per Diem (2 man crew)
Materials: 1" PVC Well Installation (MW Wells-Indoors)
2' x 2' Concrete Pad w/8" BD Completion (Outdoor VEW)
Materials: (2) 1" x 5' PVC .010 Prepack Screen, 3" Expendable Points
Well Development (up to 1/2 hour w/Pump)
Materials: HDPE Tubing (Per 500' Roll)
DPT Soil and GW Sampling w/Well Installation- Mob 1
If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.
All Locations must be Accessible with Track Mounted DPT (Outside) or DPT Dolly Rig (inside).
THANK YOU FOR YOUR BUSINESS!
Todd Hodgson
DPT Rig and Crew
"Actual quantities used and days on site will be invoiced"
4 to 4.5 days
DESCRIPTION
Mobilization (Includes 420M Indoor Rig)
Utility Locates on Private Property is the responsibility of the client Borehole Clearance to 5� bgs beyond 20 minutes will require a change order for additional time and cost.
(2) 1" x 15' MW w/10' of .010 Prepack, Donut Pad w/3" Brass Completion (Indoor DPT Rig @ HA Locations)
(813) 549-4369
Materials: Backfill w/Concrete Patch (Indoor Borings)
Donut Pad w/5" BD Completion (Indoor VEW)
PROJECT
Aldos Cleaners 5970 SW 18th Street
Damages to utilities on private property during borehole clearance are the responsibility of the client
1408 North Westshore Blvd, Ste 115
CUSTOMER
ECT
Gregory Sattler, P.E.
Tampa, Florida 33607
2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586
REVISED DATE: 5/26/2024
ESTIMATE #: 723008-1
Project Description:
ID QTY Unit Rate TOTAL
1 1 each 1,000.00$ 1,000.00$
1a 0 each 1,000.00$ -$
2 4 night 300.00$ 1,200.00$
3 4 day 1,700.00$ 6,800.00$
3a 1 1/2 day 1,250.00$ 1,250.00$
4 1 each 600.00$ 600.00$
5 8 each 15.00$ 120.00$
6 2 each 10.00$ 20.00$
7 44 each 3.00$ 132.00$
8 4 each 100.00$ 400.00$
9 32 foot 20.00$ 640.00$
10 110 foot 4.00$ 440.00$
11 6 each 175.00$ 1,050.00$
12 4 each 150.00$ 600.00$
13 4 each 150.00$ 600.00$
14 2 each 150.00$ 300.00$
15 2 each 75.00$ Included
16 55 gallon drums (Soil) (Estimated) 2 each 65.00$ 130.00$
17 55 gallon drums (Water) (Estimated) 2 each 65.00$ 130.00$
18 Landing Mats (Some Locations may be in stone pavers) 1 each 350.00$ 350.00$
19 Permits: Broward County ($75 First Well + $50 Each Additional) 1 each 225.00$ 225.00$
Completion: Subtotal 15,987.00$
Todd Hodgson
TOTAL 15,987.00$
Partner
PROJECT
Aldos Cleaners 5970 SW 18th Street
Damages to utilities on private property during borehole clearance are the responsibility of the client
1408 North Westshore Blvd, Ste 115
CUSTOMER
ECT
Daniel Phillips
Tampa, Florida 33607 Boca Raton, Florida
If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.
All Locations must be Accessible with Track Mounted DPT (Outside) or DPT Dolly Rig (inside).
THANK YOU FOR YOUR BUSINESS!
Todd Hodgson
DPT Rig and Crew
"Actual quantities used and days on site will be invoiced"
4 to 4 1/2 days depending on Indoor Work
DESCRIPTION
Mobilization (Includes 420M Indoor Rig)
Utility Locates on Private Property is the responsibility of the client Borehole Clearance to 5� bgs beyond 20 minutes will require a change order for additional time and cost.
Materials: Backfill w/Concrete Patch (Indoor Borings)
Donut Pad w/5" BD Completion (Indoor VEW)
Materials: (2) 1" x 5' PVC .010 Prepack Screen, 3" Expendable Points
Well Development (up to 1/2 hour w/Pump)
Materials: HDPE Tubing (Per 500' Roll)
DPT Soil and GW Sampling w/Well Installation- Mob 1
(2) 1" x 15' MW w/10' of .010 Prepack, Donut Pad w/3" Brass Completion (Indoor DPT Rig @ HA Locations)
(813) 549-4369
Outdoor Work
DPT Rig and Crew
(4) 1" x 20' MW w/10' of .010 Prepack, 2' x 2' w/8" BD Completion (Install in 4 of the GW Boring Locations)
Materials: GW Sampling Points (Per Sample)
Donut Pad w/3" Brass Completion (Indoor MW)
(1) DPT Litho Boring to ~50' (or refusal) w/Macrocore Sampling to Depth/Refusal
Materials: 2" x 8' PVC Well Installation (VEW Wells)
420 M Indoor Rig w/Core Drill and Generator (Interior Wells)
(11) DPT GW Borings to ~44' with GW Grabs at 4 Intervals 10-14', 20-24', 30-34' and 40-44' (No Soil Sampling)
Indoor Work
(1) Hand Auger Boring to 6' with Soil Grabs at 1', 2', 4' and 6' (1 will become VMP)
(7) Hand Auger Borings to 6' with Soil Grabs at 2', 4' and 6'. (2) Backfill w/Concrete Patch.
(4) 2" x 8' VEW w/7' of .010 Slot Screen, Donut Pad w/5" BD Completion (Installed at HA Locations)
Materials: Grout Borehole w/Concrete Patch (Litho and GW Profiling Borings)
Per Diem (2 man crew)
Materials: 1" PVC Well Installation
2' x 2' Concrete Pad w/8" BD Completion (Outdoor)
Shift Change
2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586
EARTH TECH DRILLING
2703 NW 19TH STREET, POMPANO BEACH, FL 33069
954.974.2424 FAX:954.974.2423
Date: 7/19/2024
FAC ID#:
PROPOSED SCOPE OF WORK: (2nd Mobilization)
Drum Soil & Development water - 30 Minutes of Dev. Per well - Estimated at (3) Drums
Unit Unit Rate Number of Units
Extended Price
Equipment Type: DPT Track Rig whole day $1,700.00 1 $1,700.00 half day $0.00 each $0.00 each $100.00 8 $800.00 each $135.00 0 $0.00 each $40.00 4 $160.00 each $45.00 0 $0.00 per well $225.00 4 $900.00 daily roundtrip $450.00 1 $450.00 per crew / per night $0.00 each $80.00 3 $240.00 each $60.00 1 $60.00 each $65.00 0 $0.00 each $95.00 2 $190.00 lump sum $150.00 1 $150.00 day $500.00 1 $500.00
TOTAL QUOTE PRICE $5,150.00
Notes:
Project No.: ___________________________
Date: 7/19/2024
MISCELLANEOUS
Mobilization
Per Diem
DOT Approved 55-gal Drum
Well Riser (includes all materials) 2" x 5'
Well Completion (includes 30 Min Dev. 5"-8" B-D MH & locking well cap)
Pre-Packed PVC Well Screen (includes all materials) 2" x 5'
Auger Attachment, 4" Surface Casing
Direct Push Daily Rate 1 - on-site day
Direct Push Half-Day Rate 1 - on-site half day
Pre-Packed PVC Well Screen (includes all materials) 1" x 5'
Well Riser (includes all materials) 1" x 5'
Permits - Install Well
Water Sample
Signature and Title of Person Submitting Quote: Charles Bucher
Concrete Core
Upcharge for 420M Dolly Rig
Days to Complete Scope of Work: 1 Day
Subcontract Company Name: EARTH TECH DRILLING. Inc.
Subcontract Mailing Address: 2703 NW 19th Street, Pompano Beach, FL 33069
ETD Policy: If pea gravel is encountered, borehole advancement is terminated. If client would like to continue borehole advancement, it is at the risk of the consultant, FDEP or property owner.
Plywood
Plywood to cover the pavers on 1 location
DIRECT PUSH TECHNOLOGY
Contractor Name: ECT - Daniel Phillips - 407 509-7684
Site Name: Aldo's Cleaners - 5970 SW 18th Street - Boca Raton, FL
(HAND CLEAR ALL LOCATIONS TO 5' or REFUSAL) - Will bring some water from Shop but an approved water source will be provided by client
(2) MW 1"x15' w/ 10' Pre-Pack Screen & 5" BD Completion
(2) MW 1"x11' w/ 10' Pre-Pack Screen & 5" BD Completion
Dolly Rig, Coredrill & Generator for 2 locations
Monitoring Wells Sparge Wells Horizontal and Vertical Extraction Wells Geotechnical Drilling Direct Push
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor�st �s Project Manager: ontractor�s t�s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
HW682
DC014B Completion May 14, 2025
This Task Assignment authorizes ECT to perform initial soil & groundwater site assessment at Aldos Cleaners. Assessment activities will include utility clearance, soil sampling, DPT sampling, monitoring well installation and sampling, MAGS sampling, and transport and disposal of IDW. ECT will also generate a Site Assessment Report.
Karlee Fowler 850 245-8944 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor
Contractor Mark A. Culbreth Contractor 813-289-9338
ERIC_5188
Boca Raton, Palm Beach County, Florida
Aldos Cleaners
Contractor Contractor
$ 94,523.44
$ 94,523.44
Scope of Work
Environmental Consulting and Technology, Inc. (ECT Contractor
Mark Culbreth
Contract Manager
Jennifer Farrell
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HASP and Utility Survey (Subtask 2) 05/24/2024
Soil & DPT Groundwater Sampling & Interior Well Installation (Subtask 3) 06/28/2024
Exterior Well Installation & Sampling (Subtask 4) 07/26/2024
Soil Vapor Assessment (Subtask 5) 09/13/2024
Professional Land Survey & IDW Management (Subtask 6, Subtask 7) 11/01/2024
Project Management, Site Assessment Report (Subtask 1, Subtask 8) 02/14/2025
FDEP Approval of HASP and Utility Survey (Subtask 2) $ 4,104.62
FDEP Approval of Soil & DPT Groundwater Sampling & Interior Well Installation (Subtask 3) $ 39,496.61
FDEP Approval of Exterior Well Installation & Sampling (Subtask 4) $ 24,783.50
FDEP Approval of Soil Vapor Assessment (Subtask 5) $ 6,361.38
FDEP Approval of Professional Land Survey & IDW Management (Subtask 6, Subtask 7) $ 7,253.87
FDEP Approval of Project Management, Site Assessment Report (Subtask 1, Subtask 8) $ 12,523.46
$ 94,523.44