CN-370000-HW682-DC14BCO1.pdf

PDF 5 MB Posted

Attached to
Master Agreement FL|HW682|8fccc28dda898687f0dd3c309f3a996b
Contract number
HW682
Issued by
Florida

About this file

This document is a Task Assignment (TA) Change Order (TACO #1) issued by the State of Florida Department of Environmental Protection (FDEP) to Environmental Consulting and Technology, Inc. (ECT) for environmental assessment services at the Aldos Cleaners site located in Boca Raton, Palm Beach County, Florida. The contract is identified as HW682 with Task Assignment number DC014B and Project number ERIC_5188. The FDEP Project Manager is Karlee Fowler, and ECT's Project Manager is Mark A. Culbreth. This change order reconciles an overall cost decrease caused by scope changes to Subtasks 2, 3, and 4, and includes WCD 1, which authorized changes in the drilling scope as well as a change in drillers from GPI to Earth Tech Drilling due to availability that resulted in decreased drilling costs.

The amended contract value is reduced from $94,523.44 to $78,203.45, representing a total decrease of $16,319.99. The task involves initial soil and groundwater site assessment activities including utility clearance, soil sampling, direct push technology (DPT) sampling, monitoring well installation and sampling, multi-level air sampling (MAGS), and transport and disposal of investigation-derived waste (IDW). The work is structured in eight subtasks with specific deliverables and invoicing milestones extending through February 14, 2025. The total labor hours authorized are 239 hours. All terms and conditions of the original Task Assignment remain in effect, with this change order effective upon the last date of signature by both ECT and FDEP on September 18, 2024.

View the file

Other files

File Type Posted
CN-370000-GC914-T9CO2.pdf PDF
CN-370000-GC914.pdf PDF
CN-370000-HW682-DC001A.pdf PDF
CN-370000-HW682-DC001D.pdf PDF
CN-370000-HW682-DC006C.pdf PDF
CN-370000-HW682-DC007A.pdf PDF
CN-370000-HW682-DC008A.pdf PDF
CN-370000-HW682-DC008E.pdf PDF
CN-370000-HW682-DC011A.pdf PDF
CN-370000-HW682-DC012A.pdf PDF
CN-370000-HW682-DC012C.pdf PDF
CN-370000-HW682-DC013B.pdf PDF
CN-370000-HW682-DC014A.pdf PDF
CN-370000-HW682-DC017A.pdf PDF
CN-370000-HW682-DC018A.pdf PDF
CN-370000-HW682-DC018B.pdf PDF
CN-370000-HW682-DC019C.pdf PDF
CN-370000-HW682-DC020A.pdf PDF
CN-370000-HW682-DC020B.pdf PDF
CN-370000-HW682-DC023A.pdf PDF
CN-370000-HW682-DC027B.pdf PDF
CN-370000-HW682-DC03BCO1.pdf PDF
CN-370000-HW682-DC04BCO1.pdf PDF
CN-370000-HW682-DC04BCO6.pdf PDF
CN-370000-HW682-DC05BCO1.pdf PDF
CN-370000-HW682-DC05BCO4.pdf PDF
CN-370000-HW682-DC05BCO5.pdf PDF
CN-370000-HW682-DC06ACO1.pdf PDF
CN-370000-HW682-DC08BCO1.pdf PDF
CN-370000-HW682-DC09ACO4.pdf PDF
CN-370000-HW682-DC11AC10.pdf PDF
CN-370000-HW682-DC11AC11.pdf PDF
CN-370000-HW682-DC11ACO2.pdf PDF
CN-370000-HW682-DC11ACO7.pdf PDF
CN-370000-HW682-DC11ACO8.pdf PDF
CN-370000-HW682-DC13BCO2.pdf PDF
CN-370000-HW682-DC13BCO5.pdf PDF
CN-370000-HW682-DC13BCO6.pdf PDF
CN-370000-HW682-DC14BCO3.pdf PDF
CN-370000-HW682-DC14BCO5.pdf PDF
CN-370000-HW682-DC15BCO1.pdf PDF
CN-370000-HW682-DC17ACO1.pdf PDF
CN-370000-HW682-DC18ACO1.pdf PDF
CN-370000-HW682-DC19BCO1.pdf PDF
CN-370000-HW682-DC21ACO2.pdf PDF
CN-370000-HW682-DC24ACO2.pdf PDF
CN-370000-HW682-DC24ACO3.pdf PDF
CN-370000-HW682-DC24ACO4.pdf PDF
CN-370000-HW682-DC25ACO3.pdf PDF
CN-370000-HW682-DC26AC02.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

DC014B 1 HW682

Karlee Fowler 850-245-8944 Environmental Consulting and Technology, Inc. (ECT)

Mark A. Culbreth 813-289-9338

ERIC_5188

Aldos Cleaners

$ 78,203.45 $ 94,523.44

$ 78,203.45 $ 94,523.44

05/14/2025 05/14/2025 0

1 1 2

Environmental Consulting & Technology, Inc

Mark Culbreth

Contract Manager

09/10/2024

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.09.18 14:29:27 -04'00'

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Printed on recycled paper.

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

From:

Date:

To: HW Contract Negotiation File

ERIC_

, Project Manager , 202

Subject: Negotiation Summary

HW

This Task Assignment is with labor hours.

F D

E P

C O

S T

E S

T

IM

A T

E

S en io r

P ri nc ip al S ci en tis t

(M C

S en io r

E ng in ee r

S ci en tis t (G

S

S en io r

E ng in ee r

S ci en tis t (D

P

G

IS

A na ly st

G ra ph ic s

(J V

A ss oc ia te E ng in ee r

S ci en tis t

(J P

T ec hn ic ia n

(B C

A dm in is tr at iv e

(B J)

S oi l A ss es sm en t

K it

M on ito ri ng w el l I ns ta ll K it

S ha llo w

G ro un dw at er

S am pl in g K it

Ic e

T ot al S ur ve y S ta tio n

D ee p G ro un dw at er S am pl in g

K it

M A

G S

K it

A ir

S am pl in g C an is te rs

P a g e

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Aldos Cleaners (Original + TACO 1) SUBTASK 2: HASP & Utility Clearance

DATE: 7/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Prepare Health and Safety Plan 2

Verification of property ownership, notify RPO of field activities 1

Total Hours 3

D Phillips Senior Scientist Round trip Mobilization between Orlando and the site in Boca Raton 8

Utility clearance 4

Total Hours 12

TOTAL LABOR 15

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

GeoView Private Utility Location $900.00 1 $900.00

TOTAL $900.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 1 $40.00

TOTAL EQUIPMENT $40.00

FINAL --7/24/96

SUBTASK 3: Soil Sampling with DPT & Groundwater Sampling

DATE: 7/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer SPLP evaluation 1

SPLP and well placement correspondence and meetings with the FDEP 1.5

Total Hours 2.5

D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 8

Soil Borings and DPT Sampling 45

Depth to water measurement at 5 wells and piezomters 1

Groundwater sampling two wells 2

Total Hours 56

B. Jarvis Administrative Create tables and data entry 2

Total Hours 2

TOTAL LABOR 60.5

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck $480.00 week 1 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel D Phillips $150.00 day 4 $600.00

Per Diem D Phillips $36.00 day 5 $180.00

TOTAL PER DIEM $780.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Groundwater Protection DPT Soil & Groundwater Sampling $14,426.00 1 $14,426.00

TOTAL $14,426.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC UNITS

USEPA Method 8260 Full list Soil SBs $110.00 21 $2,310.00

SPLP Extractions $45.00 0 $0.00

USEPA Method 8260 for Full list Groundwater DPT $110.00 29 $3,190.00

USEPA Method 8260 Full list Grab samples from 2 MW's $110.00 2 $220.00

USEPA Method 8260 for SPLP $110.00 0 $0.00

Encore Samplers $16.00 21 $336.00

Shipping Samples $70.00 5 $350.00

TOTAL LAB $6,406.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 day 5 $200.00

Soil Assessment Kit $700.00 week 1 $700.00

Monitoring well Install Kit $325.00 day 2 $650.00

Shallow Groundwater Sampling Kit $290.00 day 1 $290.00

Ice $6.50 each 10 $65.00

Total Survey Station $50.00 day 1 $50.00

TOTAL EQUIPMENT $1,955.00

SUBTASK 4: Well Installation & Groundwater Sampling

DATE: 7/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 8

Oversight of well installations 10

Total Hours 18

J. Penia 8

Open Well and collect DTW at 9 wells 1 Groundwater Sampling (4 piezometer, 5 shallow wells) 9 Groundwater Sampling deep well 0 Containerizieng purge water 1

Total Hours 19 B. Jarvis Administrative Create tables and data entry 2

Total Hours 2

TOTAL LABOR 39

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck DP $120.00 day 2 $240.00 Rental Truck DP $480.00 week 0 $0.00 Rental Truck JP $120.00 day 2 $240.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel D Phillips $150.00 day 1 $150.00 Per Diem D Phillips $36.00 day 2 $72.00

Hotel J. Penia $150.00 day 1 $150.00 Per Diem J. Penia $36.00 day 2 $72.00

TOTAL PER DIEM $444.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

GPI Well install 0 $0.00

Earth Tech Drilling Well install 1 $5,150.00

TOTAL $5,150.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units

IDW USEPA Method 8260 for VOHs Soil $73.00 1 $73.00 IDW USEPA Method 6020 or 6010 for RCRA 4 Metals Soil $56.00 1 $56.00 IDW USEPA Method 8260 for VOHs Purge water $73.00 1 $73.00 USEPA Method 8260 Full list amples from MW's $110.00 9 $990.00 Shipping Samples $70.00 1 $70.00

TOTAL LAB $1,262.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 day 4 $160.00 Monitoring well Install Kit $1,300.00 week 0 $0.00 Monitoring well Install Kit $325.00 day 1 $325.00 Shallow Groundwater Sampling Kit $290.00 day 2 $580.00 Ice $6.50 each 4 $26.00 Total Survey Station $50.00 day 0 $0.00 Deep Groundwater Sampling Kit $415.00 day 0 $0.00 Generator $70.00 day 0 $0.00

TOTAL EQUIPMENT $1,091.00

$5,150.00

Engineer/Scienti st

Round trip Mobilization from Tampa to the site in Boca Raton

$10,125.00

SUBTASK 5: MAGS

DATE: 7/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer P.E. oversight of MGAS events (Provide SOW, guidance, and answer field question) 3

Check MAGS data. 3 Total Hours 6

J. Penia Round trip Mobilization from Tampa to the site in Boca Raton 9 Preform MAGS Testing 8

Total Hours 17 B. Carrick Technician Round trip Mobilization from Tampa to the site in Boca Raton 8

Preform MAGS Testing 8

Total Hours 16 B. Jarvis Administrative Update tables 2

Total 2

TOTAL LABOR 41

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck J. Penia $120.00 day 2 $240.00 Rental Truck B. Carrick $120.00 day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel J. Penia $150.00 day 1 $150.00 Per Diem J. Penia $36.00 day 2 $72.00

Hotel B. Carrick $150.00 day 1 $150.00 Per Diem B. Carrick $36.00 day 2 $72.00

TOTAL PER DIEM $444.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units

USEPA Method TO-15 for VOHs $200.00 6 $1,200.00 Sampling Shipping Overnight $70.00 2 $140.00

TOTAL LAB $1,340.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 1 $40.00 MAGS Kit $325.00 Day 1 $500.00 Air Sampling Canisters $33.00 Day 6 $198.00

TOTAL EQUIPMENT $738.00

Associate Scientist

SUBTASK 6: Professional Land Survey

DATE: 7/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Coordinate and schedule with Surveyor 1

Total Hours 1 J. Penia Technician Round trip Mobilize from Tampa to the site in Boca Raton 9

PLS Oversight and aid in location of wells 4

Total Hours 13

TOTAL LABOR 14

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck J. Penia $132.00 day 1 $132.00

TOTAL VEHICLE $132.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel JP $36.00 day 2 $72.00 Per Diem JP $150.00 day 1 $150.00

TOTAL PER DIEM $222.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Southeastern Professional Land Survey $3,500.00 1 $3,500.00

TOTAL $3,500.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

325 TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 1 $40.00

TOTAL EQUIPMENT $40.00

SUBTASK 7: IDW Management

DATE: 7/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Characterization of waste to profile soil & water IDW drums for transportation and disposal 1

Schedule IDW transport and disposal 1 Total 2

TOTAL LABOR 2

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW T&D Soil $125.00 8 $1,000.00 Erwin Remediation IDW T&D Water $110.00 4 $440.00

TOTAL $1,440.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

SUBTASK 8: SAR Preparation

DATE: 7/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Sr. Principal ScientistDevelop conclusions, recommendations, and prepare final Assessment Report 2

Total 2

G Sattler Senior Engineer Prepare the draft SAR site background, SOW, soil, groundwater sections 30 Total 30

D. Phillips Senior Scientist Prepare draft SAR lithological section, create draft figures to be submitted for AutoCAD generation 6 QA/QC of analytical data 2

Total 8

J. Von Borstel GIS Analyst Revise and Update Figures 8 Total 8

B. Jarvis Administrative Update tables, Document Preparation & Publishing 4 Total 4

TOTAL LABOR 52

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

SITE : Aldos Cleaners (TACO 1)

DATE: 7/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Sr. Principal ScientistDevelop conclusions, recommendations, and prepare final Assessment Report 0

Total 0

G Sattler Senior Engineer Prepare the draft SAR site background, SOW, soil, groundwater sections 0 Total 0

D. Phillips Senior Scientist Prepare draft SAR lithological section, create draft figures to be submitted for AutoCAD generation 0 QA/QC of analytical data 0

Total 0

J. Von Borstel GIS Analyst Revise and Update Figures 0 Total 0

B. Jarvis Administrative Update tables, Document Preparation & Publishing 0 Total 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

E P

C O S T

E S T I M A T E

S en io r

P ri nc ip al S ci en tis t

(M C

S en io r

E ng in ee r

S ci en tis t (G

S

S en io r

E ng in ee r

S ci en tis t (D

P

G

IS

A na ly st

G ra ph ic s

(J V

A ss oc ia te E ng in ee r

S ci en tis t

(J P

T ec hn ic ia n

(B C

A dm in is tr at iv e

(B J)

S oi l A ss es sm en t

K it

M on ito ri ng w el l I ns ta ll K it

S ha llo w

G ro un dw at er

S am pl in g K it

Ic e

T ot al S ur ve y S ta tio n

D ee p G ro un dw at er S am pl in g

K it

M A

G S

K it

A ir

S am pl in g C an is te rs

P a g

SUBTASK 2: HASP & Utility Clearance

DATE: 7/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Prepare Health and Safety Plan 0

Verification of property ownership, notify RPO of field activities 0

Total Hours 0

D Phillips Senior Scientist Round trip Mobilization between Orlando and the site in Boca Raton 0

Utility clearance 0

Total Hours 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck $120.00 day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

GeoView Private Utility Location ($400.00) 1 ($400.00)

TOTAL ($400.00)

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 0 $0.00

TOTAL EQUIPMENT $0.00

DATE: 7/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer SPLP evaluation 0

SPLP and well placement correspondence and meetings with the FDEP 0

Total Hours 0

D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 0

Soil Borings and DPT Sampling 0

Depth to water measurement at 5 wells and piezomters 0

Groundwater sampling two wells 0

Total Hours 0

B. Jarvis Administrative Create tables and data entry 0

Total Hours 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck $480.00 week 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel D Phillips $150.00 day 0 $0.00

Per Diem D Phillips $36.00 day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Groundwater Protection DPT Soil & Groundwater Sampling $449.00 1 $449.00

TOTAL $449.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC UNITS

USEPA Method 8260 Full list Soil SBs $110.00 -11 ($1,210.00)

SPLP Extractions $45.00 -18 ($810.00)

USEPA Method 8260 for Full list Groundwater DPT $110.00 -4 ($440.00)

USEPA Method 8260 Full list Grab samples from 2 MW's $110.00 0 $0.00

USEPA Method 8260 for SPLP $110.00 -18 ($1,980.00)

Encore Samplers $16.00 -11 ($176.00)

Shipping Samples $70.00 0 $0.00

TOTAL LAB ($4,616.00)

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 day 0 $0.00

Soil Assessment Kit $700.00 week 0 $0.00

Monitoring well Install Kit $325.00 day 0 $0.00

Shallow Groundwater Sampling Kit $290.00 day 0 $0.00

Ice $6.50 each 0 $0.00

Total Survey Station $50.00 day 0 $0.00

DATE: 7/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 0

Oversight of well installations -15

Total Hours -15

J. Penia -1

Open Well and collect DTW at 9 wells -1 Groundwater Sampling (4 piezometer, 5 shallow wells) -4 Groundwater Sampling deep well -1.5 Containerizieng purge water 0

Total Hours -7.5 B. Jarvis Administrative Create tables and data entry 0

Total Hours 0

TOTAL LABOR -22.5

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck DP $120.00 day 2 $240.00 Rental Truck DP $480.00 week -1 ($480.00) Rental Truck JP $120.00 day -1 ($120.00)

TOTAL VEHICLE ($360.00)

PER DIEM STAFF RATE UNIT USEAGE

Hotel D Phillips $150.00 day -2 ($300.00) Per Diem D Phillips $36.00 day -2 ($72.00)

Hotel J. Penia $150.00 day -1 ($150.00) Per Diem J. Penia $36.00 day -1 ($36.00)

TOTAL PER DIEM ($558.00)

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

GPI Well install 1 ($10,125.00)

Earth Tech Drilling Well install 1 $5,150.00

TOTAL ($4,975.00)

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units

IDW USEPA Method 8260 for VOHs Soil $73.00 0 $0.00 IDW USEPA Method 6020 or 6010 for RCRA 4 Metals Soil $56.00 0 $0.00 IDW USEPA Method 8260 for VOHs Purge water $73.00 0 $0.00 USEPA Method 8260 Full list amples from MW's $110.00 -4 ($440.00) Shipping Samples $70.00 0 $0.00

TOTAL LAB ($440.00)

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 day -1 ($40.00) Monitoring well Install Kit $1,300.00 week -1 ($1,300.00) Monitoring well Install Kit $325.00 day 1 $325.00 Shallow Groundwater Sampling Kit $290.00 day 0 $0.00 Ice $6.50 each 0 $0.00 Total Survey Station $50.00 day -1 ($50.00) Deep Groundwater Sampling Kit $415.00 day -1 ($415.00) Generator $70.00 day -1 ($70.00)

TOTAL EQUIPMENT ($1,550.00)

$5,150.00

Engineer/Scienti st

Round trip Mobilization from Tampa to the site in Boca Raton

-$10,125.00

DATE: 7/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer P.E. oversight of MGAS events (Provide SOW, guidance, and answer field question) 0

Check MAGS data. 0 Total Hours 0

J. Penia Round trip Mobilization from Tampa to the site in Boca Raton 0 Preform MAGS Testing 0

Total Hours 0 B. Carrick Technician Round trip Mobilization from Tampa to the site in Boca Raton 0

Preform MAGS Testing 0

Total Hours 0 B. Jarvis Administrative Update tables 0

Total 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck J. Penia $120.00 day 0 $0.00 Rental Truck B. Carrick $120.00 day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel J. Penia $150.00 day 0 $0.00 Per Diem J. Penia $36.00 day 0 $0.00

Hotel B. Carrick $150.00 day 0 $0.00 Per Diem B. Carrick $36.00 day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units

USEPA Method TO-15 for VOHs $200.00 0 $0.00 Sampling Shipping Overnight $70.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 MAGS Kit $325.00 Day 0 $0.00 Air Sampling Canisters $33.00 Day 0 $0.00

TOTAL EQUIPMENT $0.00

DATE: 7/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Coordinate and schedule with Surveyor 0

Total Hours 0 J. Penia Technician Round trip Mobilize from Tampa to the site in Boca Raton 0

PLS Oversight and aid in location of wells 0

Total Hours 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck J. Penia $132.00 day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel JP $36.00 day 0 $0.00 Per Diem JP $150.00 day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Southeastern Professional Land Survey $3,500.00 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

325 TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 0 $0.00

DATE: 7/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Characterization of waste to profile soil & water IDW drums for transportation and disposal 0

Schedule IDW transport and disposal 0 Total 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW T&D Soil $125.00 0 $0.00 Erwin Remediation IDW T&D Water $110.00 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

E P

C O

S T

E S

T

IM

A T

E

S en io r

P ri nc ip al S ci en tis t

(M C

S en io r

E ng in ee r

S ci en tis t (G

S

S en io r

E ng in ee r

S ci en tis t (D

P

G

IS

A na ly st

G ra ph ic s

(J V

A ss oc ia te E ng in ee r

S ci en tis t

(J P

T ec hn ic ia n

(B C

A dm in is tr at iv e

(B J)

S oi l A ss es sm en t

K it

M on ito ri ng w el l I ns ta ll K it

S ha llo w

G ro un dw at er

S am pl in g K it

Ic e

T ot al S ur ve y S ta tio n

D ee p G ro un dw at er S am pl in g

K it

M A

G S

K it

A ir

S am pl in g C an is te rs

P a g

SITE : Aldos Cleaners SUBTASK 2: HASP & Utility Clearance

DATE: 6/22/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Prepare Health and Safety Plan 2

Verification of property ownership, notify RPO of field activities 1

Total Hours 3

D Phillips Senior Scientist Round trip Mobilization between Orlando and the site in Boca Raton 8

Utility clearance 4

Total Hours 12

TOTAL LABOR 15

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

GeoView Private Utility Location $1,300.00 1 $1,300.00

TOTAL $1,300.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 1 $40.00

TOTAL EQUIPMENT $40.00

DATE: 6/22/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer SPLP evaluation 1

SPLP and well placement correspondence and meetings with the FDEP 1.5

Total Hours 2.5

D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 8

Soil Borings and DPT Sampling 45

Depth to water measurement at 5 wells and piezomters 1

Groundwater sampling two wells 2

Total Hours 56

B. Jarvis Administrative Create tables and data entry 2

Total Hours 2

TOTAL LABOR 60.5

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck $480.00 week 1 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel D Phillips $150.00 day 4 $600.00

Per Diem D Phillips $36.00 day 5 $180.00

TOTAL PER DIEM $780.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Groundwater Protection DPT Soil & Groundwater Sampling $13,977.00 1 $13,977.00

TOTAL $13,977.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC UNITS

USEPA Method 8260 Full list Soil SBs $110.00 32 $3,520.00

SPLP Extractions $45.00 18 $810.00

USEPA Method 8260 for Full list Groundwater DPT $110.00 33 $3,630.00

USEPA Method 8260 Full list Grab samples from 2 MW's $110.00 2 $220.00

USEPA Method 8260 for SPLP $110.00 18 $1,980.00

Encore Samplers $16.00 32 $512.00

Shipping Samples $70.00 5 $350.00

TOTAL LAB $11,022.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 5 $200.00

Soil Assessment Kit $700.00 Week 1 $700.00

Monitoring well Install Kit $325.00 Day 2 $650.00

Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00

Ice $6.50 each 10 $65.00

Total Survey Station $50.00 day 1 $50.00

TOTAL EQUIPMENT $1,955.00

DATE: 6/22/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 8

Oversight of well installations 25

Total Hours 33

J. Penia 9

Open Well and collect DTW at 14 wells 2 Groundwater Sampling (4 piezometer, 9 shallow & intermediate wells) 13 Groundwater Sampling deep well 1.5 Containerizieng purge water 1

Total Hours 26.5 B. Jarvis Administrative Create tables and data entry 2

Total Hours 2

TOTAL LABOR 61.5

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck DP $480.00 week 1 $480.00 Rental Truck JP $120.00 day 3 $360.00

TOTAL VEHICLE $840.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel D Phillips $150.00 day 3 $450.00 Per Diem D Phillips $36.00 day 4 $144.00

Hotel J. Penia $150.00 day 2 $300.00 Per Diem J. Penia $36.00 day 3 $108.00

TOTAL PER DIEM $1,002.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

Groundwater Protection Well install 1 $10,125.00

TOTAL $10,125.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units

IDW USEPA Method 8260 for VOHs Soil $73.00 1 $73.00 IDW USEPA Method 6020 or 6010 for RCRA 4 Metals Soil $56.00 1 $56.00 IDW USEPA Method 8260 for VOHs Purge water $73.00 1 $73.00 USEPA Method 8260 Full list amples from MW's $110.00 13 $1,430.00 Shipping Samples $70.00 1 $70.00

TOTAL LAB $1,702.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 5 $200.00 Monitoring well Install Kit $1,300.00 Week 1 $1,300.00 Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00 Ice $6.50 each 4 $26.00 Total Survey Station $50.00 day 1 $50.00 Deep Groundwater Sampling Kit $415.00 Day 1 $415.00 Generator $70.00 Day 1 $70.00

TOTAL EQUIPMENT $2,641.00

$10,125.00

Engineer/Scienti st

Round trip Mobilization from Orlando to the site in Boca Raton

DATE: 6/22/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer P.E. oversight of MGAS events (Provide SOW, guidance, and answer field question) 3

Check MAGS data. 3 Total Hours 6

J. Penia Round trip Mobilization from Tampa to the site in Boca Raton 9 Preform MAGS Testing 8

Total Hours 17 B. Carrick Technician Round trip Mobilization from Tampa to the site in Boca Raton 8

Preform MAGS Testing 8

Total Hours 16 B. Jarvis Administrative Update tables 2

Total 2

TOTAL LABOR 41

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck J. Penia $120.00 day 2 $240.00 Rental Truck B. Carrick $120.00 day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel J. Penia $150.00 day 1 $150.00 Per Diem J. Penia $36.00 day 2 $72.00

Hotel B. Carrick $150.00 day 1 $150.00 Per Diem B. Carrick $36.00 day 2 $72.00

TOTAL PER DIEM $444.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units

USEPA Method TO-15 for VOHs $200.00 6 $1,200.00 Sampling Shipping Overnight $70.00 2 $140.00

TOTAL LAB $1,340.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 1 $40.00 MAGS Kit $500.00 Day 1 $500.00 Air Sampling Canisters $33.00 Day 6 $198.00

TOTAL EQUIPMENT $738.00

DATE: 6/22/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Coordinate and schedule with Surveyor 1

Total Hours 1 J. Penia Technician Round trip Mobilize from Tampa to the site in Boca Raton 9

PLS Oversight and aid in location of wells 4

Total Hours 13

TOTAL LABOR 14

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck J. Penia $132.00 day 1 $132.00

TOTAL VEHICLE $132.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel JP $36.00 day 2 $72.00 Per Diem JP $150.00 day 1 $150.00

TOTAL PER DIEM $222.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Southeastern Professional Land Survey $3,500.00 1 $3,500.00

TOTAL $3,500.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 1 $40.00

TOTAL EQUIPMENT $40.00

DATE: 6/22/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Characterization of waste to profile soil & water IDW drums for transportation and disposal 1

Schedule IDW transport and disposal 1 Total 2

TOTAL LABOR 2

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW T&D Soil $125.00 8 $1,000.00 Erwin Remediation IDW T&D Water $110.00 4 $440.00

TOTAL $1,440.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

DATE: 6/22/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Sr. Principal ScientistDevelop conclusions, recommendations, and prepare final Assessment Report 2

Total 2

G Sattler Senior Engineer Prepare the draft SAR site background, SOW, soil, groundwater sections 30 Total 30

D. Phillips Senior Scientist Prepare draft SAR lithological section, create draft figures to be submitted for AutoCAD generation 6 QA/QC of analytical data 2

Total 8

J. Von Borstel GIS Analyst Revise and Update Figures 8 Total 8

B. Jarvis Administrative Update tables, Document Preparation & Publishing 4 Total 4

TOTAL LABOR 52

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

Contract No. HW685

Additional work is not authorized without prior FDEP approval as indicated by an approved Work Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Work Change DirectiveForm

ATTACHMENT 6

Site Name: Site ID #:

Contract #:

Task Assignment #:

Contractor:

Work Change Directive #:

� Reason for Work Change Directive :

� Description of Work Change Directive :

� Attachments (if applicable, listdocuments supportingchange):

� Costs (if negotiated unitcosts, provide information below):

Maximum Estimated Increase in Task Amount:

Authorized ContractorSignature:

Authorized FDEPSignature:

FDEP SupervisorApproval:

(if applicable)

Aldos Cleaners ERIC_5188

HW ECT, Inc.

DC014B 1

Additional materials costs for 4 MWs added to the first mobilization by the DEP were not included in the SA Proposal. Also, the additional costs for the driller to provide mats to place under the drill rig to protect brick pavers in shopping plaza quad, where 3 DPT groundwater sampling points are proposed.

Additional drilling firm costs, as described above.

Drilling firm original quote and revised quote.

$2,010in cost + subcontractor markup fee @ 10%

$ 2,211.00

Daniel S. Phillips Digitally signed by Daniel S.

Phillips Date: 2024.05.29 14:15:51 -04'00'

Karlee Fowler Digitally signed by Karlee Fowler Date: 2024.05.30 08:55:38 -04'00'

Mubeen Darji, P.E.

Digitally signed by Mubeen Darji, P.E.

Date: 2024.05.30 10:05:04 -04'00'

REVISED DATE: 7/7/2023

ESTIMATE #: 723008

Project Description:

ID QTY Unit Rate TOTAL

1 1 ls 1,000.00$ 1,000.00$

2 4 night 300.00$ 1,200.00$

3 4 day 1,700.00$ 6,800.00$

3a 1 1/2 day 1,250.00$ 1,250.00$

4 1 ls 600.00$ 600.00$

5 12 each 15.00$ 180.00$

6 2 each 10.00$ 20.00$

7 44 each 3.00$ 132.00$

8 4 each 100.00$ 400.00$

9 32 foot 20.00$ 640.00$

10 30 foot 4.00$ 120.00$

11 2 each 175.00$ 350.00$

12 3 each 150.00$ 450.00$

13 1 each 150.00$ 150.00$

14 2 each 150.00$ 300.00$

15 2 each 75.00$ Included

16 55 gallon drums (Soil) (Estimated) 2 each 65.00$ 130.00$

17 55 gallon drums (Water) (Estimated) 2 each 65.00$ 130.00$

18 Permits: Broward County ($75 First Well + $50 Each Additional) 1 each 125.00$ 125.00$

Completion: Subtotal 13,977.00$

Todd Hodgson

TOTAL 13,977.00$

Partner

(11) DPT GW Borings to ~44' with GW Grabs at 4 Intervals 10-14', 20-24', 30-34' and 40-44' (No Soil Sampling)

Materials: GW Sampling Points (Per Sample)

Boca Raton, Florida

Donut Pad w/3" Brass Completion (Indoor MW)

(1) DPT Litho Boring to ~50' (or refusal) w/Macrocore Sampling to Depth/Refusal

Materials: 2" x 8' PVC Well Installation (VEW Wells)

420 M Indoor Rig w/Core Drill and Generator (Interior Wells)

Outdoor Work

(1) 2" x 8' VEW w/7' of .010 Slot Screen, 2' x 2' Pad w/8" BD Completion (Installed at HA Location)

Indoor Work

(1) Hand Auger Boring to 6' with Soil Grabs at 1', 2', 4' and 6' (1 will become VMP)

(7) Hand Auger Borings to 6' with Soil Grabs at 2', 4' and 6'. (2) Backfill w/Concrete Patch.

(3) 2" x 8' VEW w/7' of .010 Slot Screen, Donut Pad w/5" BD Completion (Installed at HA Locations)

DPT Rig and Crew

Materials: Grout Borehole w/Concrete Patch (Litho and GW Profiling Borings)

Per Diem (2 man crew)

Materials: 1" PVC Well Installation (MW Wells-Indoors)

2' x 2' Concrete Pad w/8" BD Completion (Outdoor VEW)

Materials: (2) 1" x 5' PVC .010 Prepack Screen, 3" Expendable Points

Well Development (up to 1/2 hour w/Pump)

Materials: HDPE Tubing (Per 500' Roll)

DPT Soil and GW Sampling w/Well Installation- Mob 1

If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.

All Locations must be Accessible with Track Mounted DPT (Outside) or DPT Dolly Rig (inside).

THANK YOU FOR YOUR BUSINESS!

Todd Hodgson

DPT Rig and Crew

"Actual quantities used and days on site will be invoiced"

4 to 4.5 days

DESCRIPTION

Mobilization (Includes 420M Indoor Rig)

Utility Locates on Private Property is the responsibility of the client Borehole Clearance to 5� bgs beyond 20 minutes will require a change order for additional time and cost.

(2) 1" x 15' MW w/10' of .010 Prepack, Donut Pad w/3" Brass Completion (Indoor DPT Rig @ HA Locations)

(813) 549-4369

Materials: Backfill w/Concrete Patch (Indoor Borings)

Donut Pad w/5" BD Completion (Indoor VEW)

PROJECT

Aldos Cleaners 5970 SW 18th Street

Damages to utilities on private property during borehole clearance are the responsibility of the client

1408 North Westshore Blvd, Ste 115

CUSTOMER

ECT

Gregory Sattler, P.E.

Tampa, Florida 33607

2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586

REVISED DATE: 5/26/2024

ESTIMATE #: 723008-1

Project Description:

ID QTY Unit Rate TOTAL

1 1 each 1,000.00$ 1,000.00$

1a 0 each 1,000.00$ -$

2 4 night 300.00$ 1,200.00$

3 4 day 1,700.00$ 6,800.00$

3a 1 1/2 day 1,250.00$ 1,250.00$

4 1 each 600.00$ 600.00$

5 8 each 15.00$ 120.00$

6 2 each 10.00$ 20.00$

7 44 each 3.00$ 132.00$

8 4 each 100.00$ 400.00$

9 32 foot 20.00$ 640.00$

10 110 foot 4.00$ 440.00$

11 6 each 175.00$ 1,050.00$

12 4 each 150.00$ 600.00$

13 4 each 150.00$ 600.00$

14 2 each 150.00$ 300.00$

15 2 each 75.00$ Included

16 55 gallon drums (Soil) (Estimated) 2 each 65.00$ 130.00$

17 55 gallon drums (Water) (Estimated) 2 each 65.00$ 130.00$

18 Landing Mats (Some Locations may be in stone pavers) 1 each 350.00$ 350.00$

19 Permits: Broward County ($75 First Well + $50 Each Additional) 1 each 225.00$ 225.00$

Completion: Subtotal 15,987.00$

Todd Hodgson

TOTAL 15,987.00$

Partner

PROJECT

Aldos Cleaners 5970 SW 18th Street

Damages to utilities on private property during borehole clearance are the responsibility of the client

1408 North Westshore Blvd, Ste 115

CUSTOMER

ECT

Daniel Phillips

Tampa, Florida 33607 Boca Raton, Florida

If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.

All Locations must be Accessible with Track Mounted DPT (Outside) or DPT Dolly Rig (inside).

THANK YOU FOR YOUR BUSINESS!

Todd Hodgson

DPT Rig and Crew

"Actual quantities used and days on site will be invoiced"

4 to 4 1/2 days depending on Indoor Work

DESCRIPTION

Mobilization (Includes 420M Indoor Rig)

Utility Locates on Private Property is the responsibility of the client Borehole Clearance to 5� bgs beyond 20 minutes will require a change order for additional time and cost.

Materials: Backfill w/Concrete Patch (Indoor Borings)

Donut Pad w/5" BD Completion (Indoor VEW)

Materials: (2) 1" x 5' PVC .010 Prepack Screen, 3" Expendable Points

Well Development (up to 1/2 hour w/Pump)

Materials: HDPE Tubing (Per 500' Roll)

DPT Soil and GW Sampling w/Well Installation- Mob 1

(2) 1" x 15' MW w/10' of .010 Prepack, Donut Pad w/3" Brass Completion (Indoor DPT Rig @ HA Locations)

(813) 549-4369

Outdoor Work

DPT Rig and Crew

(4) 1" x 20' MW w/10' of .010 Prepack, 2' x 2' w/8" BD Completion (Install in 4 of the GW Boring Locations)

Materials: GW Sampling Points (Per Sample)

Donut Pad w/3" Brass Completion (Indoor MW)

(1) DPT Litho Boring to ~50' (or refusal) w/Macrocore Sampling to Depth/Refusal

Materials: 2" x 8' PVC Well Installation (VEW Wells)

420 M Indoor Rig w/Core Drill and Generator (Interior Wells)

(11) DPT GW Borings to ~44' with GW Grabs at 4 Intervals 10-14', 20-24', 30-34' and 40-44' (No Soil Sampling)

Indoor Work

(1) Hand Auger Boring to 6' with Soil Grabs at 1', 2', 4' and 6' (1 will become VMP)

(7) Hand Auger Borings to 6' with Soil Grabs at 2', 4' and 6'. (2) Backfill w/Concrete Patch.

(4) 2" x 8' VEW w/7' of .010 Slot Screen, Donut Pad w/5" BD Completion (Installed at HA Locations)

Materials: Grout Borehole w/Concrete Patch (Litho and GW Profiling Borings)

Per Diem (2 man crew)

Materials: 1" PVC Well Installation

2' x 2' Concrete Pad w/8" BD Completion (Outdoor)

Shift Change

2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586

EARTH TECH DRILLING

2703 NW 19TH STREET, POMPANO BEACH, FL 33069

954.974.2424 FAX:954.974.2423

Date: 7/19/2024

FAC ID#:

PROPOSED SCOPE OF WORK: (2nd Mobilization)

Drum Soil & Development water - 30 Minutes of Dev. Per well - Estimated at (3) Drums

Unit Unit Rate Number of Units

Extended Price

Equipment Type: DPT Track Rig whole day $1,700.00 1 $1,700.00 half day $0.00 each $0.00 each $100.00 8 $800.00 each $135.00 0 $0.00 each $40.00 4 $160.00 each $45.00 0 $0.00 per well $225.00 4 $900.00 daily roundtrip $450.00 1 $450.00 per crew / per night $0.00 each $80.00 3 $240.00 each $60.00 1 $60.00 each $65.00 0 $0.00 each $95.00 2 $190.00 lump sum $150.00 1 $150.00 day $500.00 1 $500.00

TOTAL QUOTE PRICE $5,150.00

Notes:

Project No.: ___________________________

Date: 7/19/2024

MISCELLANEOUS

Mobilization

Per Diem

DOT Approved 55-gal Drum

Well Riser (includes all materials) 2" x 5'

Well Completion (includes 30 Min Dev. 5"-8" B-D MH & locking well cap)

Pre-Packed PVC Well Screen (includes all materials) 2" x 5'

Auger Attachment, 4" Surface Casing

Direct Push Daily Rate 1 - on-site day

Direct Push Half-Day Rate 1 - on-site half day

Pre-Packed PVC Well Screen (includes all materials) 1" x 5'

Well Riser (includes all materials) 1" x 5'

Permits - Install Well

Water Sample

Signature and Title of Person Submitting Quote: Charles Bucher

Concrete Core

Upcharge for 420M Dolly Rig

Days to Complete Scope of Work: 1 Day

Subcontract Company Name: EARTH TECH DRILLING. Inc.

Subcontract Mailing Address: 2703 NW 19th Street, Pompano Beach, FL 33069

ETD Policy: If pea gravel is encountered, borehole advancement is terminated. If client would like to continue borehole advancement, it is at the risk of the consultant, FDEP or property owner.

Plywood

Plywood to cover the pavers on 1 location

DIRECT PUSH TECHNOLOGY

Contractor Name: ECT - Daniel Phillips - 407 509-7684

Site Name: Aldo's Cleaners - 5970 SW 18th Street - Boca Raton, FL

(HAND CLEAR ALL LOCATIONS TO 5' or REFUSAL) - Will bring some water from Shop but an approved water source will be provided by client

(2) MW 1"x15' w/ 10' Pre-Pack Screen & 5" BD Completion

(2) MW 1"x11' w/ 10' Pre-Pack Screen & 5" BD Completion

Dolly Rig, Coredrill & Generator for 2 locations

Monitoring Wells Sparge Wells Horizontal and Vertical Extraction Wells Geotechnical Drilling Direct Push

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor�st �s Project Manager: ontractor�s t�s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW682

DC014B Completion May 14, 2025

This Task Assignment authorizes ECT to perform initial soil & groundwater site assessment at Aldos Cleaners. Assessment activities will include utility clearance, soil sampling, DPT sampling, monitoring well installation and sampling, MAGS sampling, and transport and disposal of IDW. ECT will also generate a Site Assessment Report.

Karlee Fowler 850 245-8944 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor

Contractor Mark A. Culbreth Contractor 813-289-9338

ERIC_5188

Boca Raton, Palm Beach County, Florida

Aldos Cleaners

Contractor Contractor

$ 94,523.44

$ 94,523.44

Scope of Work

Environmental Consulting and Technology, Inc. (ECT Contractor

Mark Culbreth

Contract Manager

Jennifer Farrell

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HASP and Utility Survey (Subtask 2) 05/24/2024

Soil & DPT Groundwater Sampling & Interior Well Installation (Subtask 3) 06/28/2024

Exterior Well Installation & Sampling (Subtask 4) 07/26/2024

Soil Vapor Assessment (Subtask 5) 09/13/2024

Professional Land Survey & IDW Management (Subtask 6, Subtask 7) 11/01/2024

Project Management, Site Assessment Report (Subtask 1, Subtask 8) 02/14/2025

FDEP Approval of HASP and Utility Survey (Subtask 2) $ 4,104.62

FDEP Approval of Soil & DPT Groundwater Sampling & Interior Well Installation (Subtask 3) $ 39,496.61

FDEP Approval of Exterior Well Installation & Sampling (Subtask 4) $ 24,783.50

FDEP Approval of Soil Vapor Assessment (Subtask 5) $ 6,361.38

FDEP Approval of Professional Land Survey & IDW Management (Subtask 6, Subtask 7) $ 7,253.87

FDEP Approval of Project Management, Site Assessment Report (Subtask 1, Subtask 8) $ 12,523.46

$ 94,523.44

HW682

DC014B

File details come from the government source that posted it. Updated .