This is a Task Assignment (TA) under Contract Number HW682 between the State of Florida Department of Environmental Protection (FDEP) and Environmental Consulting and Technology, Inc. (ECT). The TA was executed on April 7, 2022, and establishes the contractual relationship for services to be performed at multiple project locations across Florida, with FDEP represented by Project Manager Melissa Walsh and ECT represented by Project Manager Mark A. Culbreth.

Task Assignment DC001B authorizes ECT to conduct a site review meeting with FDEP and complete associated work according to the attached scope of work dated March 30, 2022. The assignment encompasses two subtasks: Subtask 1 addresses project management with labor hours automatically calculated based on total direct labor hours, and Subtask 2 involves the 2022 Site Review Meeting, for which ECT will send two personnel to attend the Annual Site Review Meeting with FDEP and submit meeting notes. The total TA value is $13,158.47 on a fixed unit rate basis, with the final deliverable due May 31, 2022, and the TA completion date of June 30, 2022. The primary deliverable is Site Review Meeting Notes and Project Management. Labor costs total $11,598.61, with overhead of $5,329.33 at 125.30%, fringe benefits of $2,016.03 at 47.40%, and a completion fee of $1,159.86, plus travel expenses of $400.00 including vehicle rental and per diem costs.

View the file

Other files

File Type Posted
CN-370000-HW682-DC001E.pdf PDF
CN-370000-HW682-DC003C.pdf PDF
CN-370000-HW682-DC004A.pdf PDF
CN-370000-HW682-DC004B.pdf PDF
CN-370000-HW682-DC006A.pdf PDF
CN-370000-HW682-DC009A.pdf PDF
CN-370000-HW682-DC019B.pdf PDF
CN-370000-HW682-DC021B.pdf PDF
CN-370000-HW682-DC022A.pdf PDF
CN-370000-HW682-DC03CCO1.pdf PDF
CN-370000-HW682-DC03CCO4.pdf PDF
CN-370000-HW682-DC04BCO4.pdf PDF
CN-370000-HW682-DC05BCO2.pdf PDF
CN-370000-HW682-DC05BCO3.pdf PDF
CN-370000-HW682-DC05BCO7.pdf PDF
CN-370000-HW682-DC08BCO3.pdf PDF
CN-370000-HW682-DC10BCO2.pdf PDF
CN-370000-HW682-DC10CCO1.pdf PDF
CN-370000-HW682-DC11AC12.pdf PDF
CN-370000-HW682-DC11AC14.pdf PDF
CN-370000-HW682-DC11ACO5.pdf PDF
CN-370000-HW682-DC11ACO9.pdf PDF
CN-370000-HW682-DC14BCO4.pdf PDF
CN-370000-HW682-DC16BCO1.pdf PDF
CN-370000-HW682-DC20ACO2.pdf PDF
CN-370000-HW682-DC20BCO1.pdf PDF
CN-370000-HW682-DC22ACO1.pdf PDF
CN-370000-HW682-DC25ACO1.pdf PDF
CN-370000-HW682-DC25ACO2.pdf PDF
CN-370000-HW682-FIL1.pdf PDF
CN-370000-HW682-FIL4.pdf PDF
CN-370000-HW682-FIL7.pdf PDF
CN-370000-HW682-HW012A.pdf PDF
CN-370000-HW682-HW017A.pdf PDF
CN-370000-GC914-T9CO2 (1).pdf PDF
CN-370000-HW682-DC001F.pdf PDF
CN-370000-HW682-DC002A.pdf PDF
CN-370000-HW682-DC005A.pdf PDF
CN-370000-HW682-DC005B.pdf PDF
CN-370000-HW682-DC007B.pdf PDF
CN-370000-HW682-DC008B.pdf PDF
CN-370000-HW682-DC008D.pdf PDF
CN-370000-HW682-DC010A.pdf PDF
CN-370000-HW682-DC013A.pdf PDF
CN-370000-HW682-DC014B.pdf PDF
CN-370000-HW682-DC015B.pdf PDF
CN-370000-HW682-DC016C.pdf PDF
CN-370000-HW682-DC019A.pdf PDF
CN-370000-HW682-DC01FCO1.pdf PDF
CN-370000-HW682-DC024A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title:

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW682

DC001B Completion June 30, 2022

This Task Assignment authorizes ECT to have a site review meeting conducted with FDEP as schedules allow. Work will be done according to the attached scope of work dated March 30, 2022

Melissa Walsh 850-245-8960 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Environmental Consulting and Technology, Inc. (ECT)

Environmental Consulting and Technology, Inc. (ECT)

Mark A. Culbreth 813-289-9338 Multiple

Multiple

Multiple

$ 0.00 ✔ $ 13,158.47

$ 0.00

$ 13,158.47

Scope of Work

Mark A. Culbreth

ECT Contract Manager

4/7/2022

Digitally signed by Mark Culbreth DN: CN=Mark Culbreth, E=mculbreth@ectinc.com Reason: I am approving this document Location: your signing location here Date: 2022.04.07 10:05:00-04'00' Foxit PhantomPDF Version: 10.1.6

Mark Culbreth

William E. Burns, Jr.

N/A

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2022.04.07 09:35:28 -04'00'

Task Assignment Notification/Change Order

Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Site Review Meeting Notes and Project Management 05/31/2022

Subtasks 1 & 2: Submittal and FDEP approval of Site Review Meeting Notes and Project Management $ 13,158.47

$ 13,158.47

HW682

DC001B

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO:

FROM:

Contract File Contract No. HW682

Melissa A Walsh, Project Manager

SUBJECT: Site Review Meeting Task Assignment #DC001B Meeting

DATE: April 4, 2022

This Task Assignment authorizes ECT to have a site review meeting conducted with FDEP as schedules allow. Work will be done according to the attached scope of work dated March 30, 2022

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: 2022 Site Review Meeting ECT will send two personnel to attend the Annual Site Review Meeting with FDEP and submit meeting notes.

Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the ECT proposal. The final deliverable due date is May 31, 2022, and the completion date for the Task Assignment is June 30, 2022. The final cost for this Task Assignment is $13,158.47.

FDEP COST ESTIMATEContractor: Environmental Consulting & Technology, Inc.

Date:

Task #: SubTask 1 Project Management SubTask 6

Site: ALL SubTask 2 File review and preparation of site summary. SubTask 7

Activity/Phase: Site Review Meeting SubTask 3 Client review meeting SubTask 8

Project Manager: Mark Culbreth SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$80.12 Project Manager 6 6.1 $80.12 Senior Principal Scientist (MC) 18 10.0 8.0 0 0 0 0 0 0 0 $69.75 Principal Scientist (JP) 0 0.0 0.0 0 0 0 0 0 0 0 $42.03 Senior Engineer / Scientist (SM) 19 10.5 8.0 0 0 0 0 0 0 0 $52.89 Senior Engineer / Scientist (GS) 11 10.5 0.0 0 0 0 0 0 0 0 $55.00 Senior Engineer / Scientist (DP) 0 0.0 0.0 0 0 0 0 0 0 0 $60.10 Senior Engineer / Scientist (RP) 0 0.0 0.0 0 0 0 0 0 0 0 $37.13 Staff Engineer / Scientist (LL) 9 9.0 0.0 0 0 0 0 0 0 0 $34.02 Sr. Associate Engineer / Scientist (KM) 10 10.0 0.0 0 0 0 0 0 0 0 $33.66 Sr. Associate Engineer / Scientist (LL) 0 0.0 0.0 0 0 0 0 0 0 0 $26.54 GIS Analyst / Graphics (JV) 0 0.0 0.0 0 0 0 0 0 0 0 $21.54 Associate Engineer / Scientist (JP) 0 0.0 0.0 0 0 0 0 0 0 0 $20.00 Associate Engineer / Scientist (BM) 0 0.0 0.0 0 0 0 0 0 0 0

$0.00 Technician 0 0.0 0.0 0 0 0 0 0 0 0 $31.45 Administrative (BJ) 10 10.0 0.0 0 0 0 0 0 0 0 $24.33 Administrative (LZ) 0 0.0 0.0 0 0 0 0 0 0 0

$0.00 0 0.0 0.0 0 0 0 0 0 0 0 $0.00 0 0.0 0.0 0 0 0 0 0 0 0 $0.00 0 0.0 0.0 0 0 0 0 0 0 0 $0.00 0 0.0 0.0 0 0 0 0 0 0 0 $0.00 0 0.0 0.0 0 0 0 0 0 0 0 $0.00 0 0.0 0.0 0 0 0 0 0 0 0 $0.00 0 0.0 0.0 0 0 0 0 0 0 0 $0.00 0 0.0 0.0 0 0 0 0 0 0 0 $0.00 0 0.0 0.0 0 0 0 0 0 0 0 $0.00 0 0.0 0.0 0 0 0 0 0 0 0 $0.00 0 0.0 0.0 0 0 0 0 0 0 0 $0.00 0 0.0 0.0 0 0 0 0 0 0 0 $0.00 0 0.0 0.0 0 0 0 0 0 0 0 $0.00 0 0.0 0.0 0 0 0 0 0 0 0 $0.00 0 0.0 0.0 0 0 0 0 0 0 0

Total Hours 82 6 60 16 0 0 0 0 0 0 0

Direct Labor $4,253.25 $489.31 $2,786.74 $977.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 125.30% $5,329.33 $613.11 $3,491.79 $1,224.43 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 47.40% $2,016.03 $231.93 $1,320.91 $463.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $11,598.61 $1,334.35 $7,599.44 $2,664.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 1

FDEP COST ESTIMATEContractor: Environmental Consulting & Technology, Inc.

Date:

Task #: SubTask 1 Project Management SubTask 6

Site: ALL SubTask 2 File review and preparation of site summary. SubTask 7

Activity/Phase: Site Review Meeting SubTask 3 Client review meeting SubTask 8

Project Manager: Mark Culbreth SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $240.00 $0.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $160.00 $0.00 $160.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $400.00 $0.00 $400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $11,998.61 $1,334.35 $7,599.44 $3,064.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,159.86 $133.44 $759.94 $266.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $13,158.47 $1,467.79 $8,359.38 $3,331.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : ECT's 20 Sites SUBTASK Site Access Agreement / File Review

DATE: 4/6/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Sites: Handcraft Custom Moses Cleaners Bolton Plaza Crossroads Square Super Cleaners, Inc. Jet Cleaners #7

Sr. Associate Scientist KM Site access agreement search, verify current owner's signature on agreement 3 and provide FDEP with property and owner information if there is need for a new agreement or additional agreements. Off-site notice search. Provide FDEP off-site property owner information. (6 sites @ 0.5 hours/site)

Staff Scientist LL Site review - critical document review with associated evaluation of any assessment 9 /monitoring/O&M needs and cleanup/closure path needs. (6 sites @ 1.5 hours/site)

Sr.Principal Scientist MC Review and finalize Site Status Summary. (6 sites @ 0.5 hours/site) 3

Administrative BJ Prepare Powerpoint slides. (6 sites @ 0.5 hours/site) 3

GIS / CADD / Graphics

Project Sites: Loretto Cleaners Walgreen Store Jonfor Cleaners Miler Machinery Extra Mile Dry Cleaning Professional Cleaners Adams Cleaners

Sr. Associate Scientist KM Site access agreement search, verify current owner's signature on agreement 3.5 and provide FDEP with property and owner information if there is need for a new agreement or additional agreements. Off-site notice search. Provide FDEP off-site property owner information. (7 sites @ 0.5 hours/site)

Senior Scientist SM Site review - critical document review with associated evaluation of any assessment 10.5 /monitoring/O&M needs and cleanup/closure path needs. (7 sites @ 1.5 hours/site)

Sr.Principal Scientist MC Review and finalize Site Status Summary. (7 sites @ 0.5 hours/site) 3.5

Administrative BJ Prepare Powerpoint slides. (7 sites @ 0.5 hours/site) 3.5

GIS / CADD / Graphics

Project Sites: American Drive In Cleaners South Beach Cleaners Big B Cleaners #31 Koretizing Cleaners I Sunland Cleaners Koretizing Cleaners II (D282) Town & Country Cleaners (D496)

Sr. Associate Scientist KM Site access agreement search, verify current owner's signature on agreement 3.5 and provide FDEP with property and owner information if there is need for a new agreement or additional agreements. Off-site notice search. Provide FDEP off-site property owner information. (7 sites @ 0.5 hours/site)

Senior Engineer GS Site review - critical document review with associated evaluation of any assessment 10.5 /monitoring/O&M needs and cleanup/closure path needs. (7 sites @ 1.5 hours/site)

Sr.Principal Scientist MC Review and finalize Site Status Summary. (7 sites @ 0.5 hours/site) 3.5

Administrative BJ Prepare Powerpoint slides. (7 sites @ 0.5 hours/site) 3.5

GIS / CADD / Graphics

TOTAL LABOR 60

FINAL --7/24/96

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : ECT's 20 Sites SUBTASK: Client Review Meeting

DATE: 3/20/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Principal Scientist MAC Prepare for presentation, mob/demod to meeting, contractor review meeting. 8

Sr. Scientist SM Prepare for presentation, contractor review meeting. 8

TOTAL LABOR 16

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 day 2 $160.00

$0.00

TOTAL VEHICLE $160.00

PER DIEM STAFF RATE UNIT USEAGE

MC $80.00 day 2 $160.00

$0.00 $0.00 $0.00

TOTAL PER DIEM $160.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL EQUIPMENT $0.00

FINAL --7/24/96

1408 North Westshore Blvd, Ste 115, Tampa, FL 33607 ectinc.com 813.289.9338

March 30, 2022

ECT No. P22RA-0069

Ms. Melissa Walsh

Florida Department of Environmental Protection

2600 Blair Stone Road

Tallahassee, Florida 32399-2400

Re: Proposal for Site Review Meeting

Contract No. HW682

Dear Ms. Walsh:

Environmental Consulting & Technology, Inc. (ECT) has prepared this scope of work to be completed in preparation for the site review meeting of twenty (20) drycleaning sites assigned to ECT. Those sites include the following:

Adams Cleaners American Drive

In Cleaners

Big B Cleaners

#31

Bolton Plaza Crossroads Square

Shopping Center

Extra Mile Dry

Cleaning

Handcraft

Custom Dry

Cleaners, Inc

Jet Cleaners #7 Jonfor Cleaners Koretizing Cleaners

Koretizing

Cleaners (D282)

Loretto Cleaners Miller Machinery Moses Cleaners Professional

Cleaners

South Beach

Cleaners

Sunland Cleaners Super Cleaners, Inc.

Town & Country

Cleaners (D496)

Walgreen Store

Scope of Work

For each of the sites, ECT will conduct the following scope of work:

• Complete a file review for each site

• Identify real property owner

• Verify as to whether a site access agreement is in place

• Organize the sites as to their Phase o Assessment o Design o Remediation o Monitoring o PFAS Related

• Generate a brief site status for each site; to include our opinion of the current site status relative to reaching Risk Management Option (RMO) I or other closure alternative. This will include an evaluation of whether risk to potential receptors has been minimized or otherwise addressed.

• Perform an evaluation of active remediation systems, if any.

Ms. Melissa Walsh

FDEP

March 30, 2022 ectinc.com

• Perform an evaluation of existing site assessment data, to include o Identification of potential data gaps o Identification of additional data needs

• For sites in monitoring, o Perform an evaluation of whether site should remain in monitoring or whether a change in the path forward is needed.

o Perform an evaluation of whether monitoring well network is adequate.

o Evaluation of whether monitoring frequency is adequate.

• Perform an evaluation of whether off-site notice is necessary, whether it has been given, or does it need to be prepared and submitted.

Meeting

ECT will participate in an in-person meeting with FDEP staff to review the information gathered in the above-mentioned tasks.

Deliverable

Following the meeting, ECT will provide the FDEP a letter summarizing the meeting and a tabular summary of the information gathered in the above-mentioned tasks as a deliverable.

Cost

ECT proposes to conduct this scope of work for a cost of $12,186.61 in accordance with the Level of

Effort and Cost Estimate Form spreadsheets attached to this proposal. Actual spreadsheets were submitted electronically on March 23, 2022.

Please let me know if you have any questions regarding this proposal.

Sincerely, ENVIRONMENTAL CONSULTING & TECHNOLOGY, INC.

Susan M. McConnell Mark A. Culbreth, P.G

Senior Scientist Principal Scientist

SMM:MAC/baj

Attachments

Level of Effort Worksheet for Contractor Review Meeting v3.pdf
LOE SubTask 2
LOE SubTask 3