This document is a Task Assignment (TA) entered into between the State of Florida Department of Environmental Protection (FDEP) and Environmental Consulting and Technology, Inc. (ECT), a private environmental consulting firm. The task assignment is issued under Contract Number HW682 and is identified as TA Number DC029A. The work is being performed at the Extra Mile Dry Cleaners facility located in Jacksonville, Duval County, Florida, with a project identification number of ERIC_4527. The Department Project Manager is Karlee Fowler, and the Contractor's Project Manager is Mark A. Culbreth.
ECT will perform annual Natural Attenuation Monitoring (NAM) activities consisting of four subtasks: project management, groundwater sampling and reporting, PFAS screening, and investigation derived waste (IDW) management and disposal. Specifically, ECT will collect and analyze groundwater samples from seven monitoring wells, transport and dispose of IDW, screen samples for PFAS contamination, and generate a comprehensive NAM Report. The total Task Assignment value is $12,535.74 on a fixed unit rate basis, with payment contingent upon FDEP approval of deliverables. The invoice schedule breaks down costs by subtask: $9,416.10 for the Annual NAM Report (due July 31, 2025), $1,592.03 for the PFAS email deliverable (due July 31, 2025), $506.84 for IDW manifest and project management (due August 31, 2025), and $1,020.77 for final project management invoicing (due September 30, 2025). The task assignment is effective through December 12, 2025, and includes 63 total labor hours. IDW disposal will be subcontracted to Erwin Remediation at a cost of $545.00 for transportation and disposal of PFAS-impacted purge water.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW682
DC029A Completion December 12, 2025
This Task Assignment authorizes ECT to perform annual Natural Attenuation Monitoring (NAM) at Extra Mile Dry Cleaners in Jacksonville, FL. ECT will collect and analyze groundwater samples from seven monitoring wells, transport and dispose of IDW, screen for PFAS, and generate a NAM Report.
Karlee Fowler 850 245-8944 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor
Contractor Mark A. Culbreth Contractor 813-289-9338
ERIC_4527
Jacksonville, Duval County, Florida
Extra Mile Dry Cleaners
Contractor Contractor
✔ $ 12,535.74
$ 12,535.74
Scope of Work
Environmental Consulting and Technology, Inc. (ECT Contractor Mark A. Culbreth
Contract Manager Digitally signed by Mark Culbreth Date: 2025.06.12 16:25:58-04'00'Mark Culbreth
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2025.06.10 08:00:38 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Annual NAM Report (Subtask 2) 08/30/2024
Email Deliverable for PFAS (Subtask 3) 08/30/2024
Project Management, IDW Manifest (Subtask 1 & Subtask 4) 09/27/2024
FDEP Approval of Annual NAM Report (Subtask 2) $ 9,416.10
FDEP Approval of Email Delvierable for PFAS (Subtask 3) $ 1,592.03
FDEP Approval of Project Management, IDW Manifest (Subtask 1 & Subtask 4) $ 1,527.61
$ 12,535.74
HW682
DC029A
Printed on recycled paper.
FFLORIDAA DEPARTMENTT OF
EEnvironmentall Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ronn DeSantis Governor
From:
Date:
To: HW Contract Negotiation File
ERIC_
, Project Manager
, 202 Subject: Negotiation Summary
HW
This Task Assignment is $ with labor hours.
FDEP COST ESTIMATEContractor: Environmental Consulting & Technology, Inc.
Date: 22-May-25
Task #: SubTask 1 Project Management
Site: Extra Mile Dy Cleaners SubTask 2 Annual GW Sampling
Activity/Phase: SubTask 3 PFAS Screening
Project Manager: Mark Culbreth SubTask 4 IDW Disposal
SubTask 5
Totals 1 2 3 4 Labor Rate Category
$85.85 Project Manager 3.96 3.96 $85.85 Senior Principal Scientist (MC) 5 5.0 0.0 0.0 $56.32 Senior Engineer / Scientist (DP) 19 13.0 3.0 3.0 $29.30 GIS Analyst / Graphics (JV) 7 6.0 1.0 0.0 $31.88 Technician (DF) 21 18.0 3.0 0.0 $34.81 Administrative (BJ) 7 6.0 1.0 0.0
Total Hours 62.96 3.96 48.0 8.0 3.0
Direct Labor $2,957.87 $340.29 $2,119.91 $328.71 $168.96
Overhead 125.30% $3,706.21 $426.38 $2,656.25 $411.87 $211.71 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 47.40% $1,402.04 $161.30 $1,004.84 $155.81 $80.09 Total Labor $8,066.12 $927.97 $5,781.00 $896.39 $460.76
Travel Vehicle Rental $360.00 $360.00 $0.00 $0.00 Per diem + Hotel $378.00 $378.00 $0.00 $0.00 Total Travel $738.00 $738.00 $0.00 $0.00
Subcontractor (Equipment Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Erwin Remediation $545.00 $0.00 $545.00 $0.00 Subcontractor Subtotal $545.00 $0.00 $545.00 $0.00 Handling Fee $54.50 $0.00 $54.50 $0.00 Total Subcontractor Cost $599.50 $0.00 $599.50 $0.00
Laboratory Analytical Costs $584.00 $584.00 $0.00 $0.00 Sample Shipping $52.00 $52.00 $0.00 $0.00 FDEP PFAS Analytical Cost $0.00 $0.00 $0.00 $0.00 FDEP Sample Shipping $0.00 $0.00 $0.00 $0.00 Total Laboratory $636.00 $636.00 $0.00 $0.00
Field Expenses Expendables $80.00 $80.00 $0.00 $0.00 Equipment (Deep Groundwater Sampling Kit) $830.00 $830.00 $0.00 $0.00 Equipment (Shallow Groundwater Sampling Ki $580.00 $580.00 $0.00 $0.00 Equipment (Metal Detector) $80.00 $80.00 $0.00 $0.00 Equipment (IDW Drum) $100.00 $100.00 $0.00 $0.00 Equipment (Ice) $19.50 $13.00 $6.50 $0.00 Total Field Expenses $1,689.50 $1,683.00 $6.50 $0.00
Subtotal $11,729.12 $927.97 $8,838.00 $1,502.39 $460.76 Completion Fee $806.62 $92.80 $578.10 $89.64 $46.08
Total Estimated Cost $12,535.74 $1,020.77 $9,416.10 $1,592.03 $506.84
Annual Groundwater Sampling
REV: 08/22 PRAC ECT Page 1
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Extra Mile Dy Cleaners SUBTASK:2: Annual NAM Sampling
DATE: 5/22/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations and prepare final Annual NAM Report 5 Total Hours 5
D. Phillips Senior Scientist Verification of property ownership, notify RPO of field activities 1 Prepare draft Annual NAM report 12
Total Hours 13 J. Von Borstel GIS Analyst Recreate Figures 6
Total Hours 6 D. Flake Technician Prep for field work and pickup DOT 55 gallon Drum 2
Round trip mobilization from Orlando to the site for the annual groundwater 5 Locate, open, and collect DTW at 13 wells 3 Annual groundwater sampling and/or PFAS screening at 7 wells and IDW drum 8
Total Hours 18 B. Jarvis Administrative Recreate tables and report production 6
Total Hours 6
TOTAL LABOR 48
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck D. Flake $120.00 day 3 $360.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
Per Diem D. Flake $36.00 day 3 $108.00 Hotel D. Flake $135.00 day 2 $270.00
TOTAL PER DIEM $378.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNITS
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC UNITS
USEPA Method 8260 for VOHs $73.00 7 $511.00 IDW USEPA Method 8260 for VOHs $73.00 1 $73.00 Shipping Samples $52.00 1 $52.00 Central FDEP Lab PFAS $0.00 5 $0.00 Central FDEP Lab PFAS IDW $0.00 1 $0.00 Central FDEP Lab PFAS Shipping $0.00 1 $0.00
TOTAL LAB $636.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 2 $80.00 Deep Groundwater Sampling Kit $415.00 Day 2 $830.00 Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00 Metal Detector $40.00 Day 2 $80.00 DOT 55 gallon drum $100.00 each 1 $100.00 Ice $6.50 each 2 $13.00
$1,683.00TOTAL EQUIPMENT
FINAL --7/24/96
SUBTASK: 3 (PFAS Screening)
DATE: 9/7/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D. Phillips Senior Engineer Prepare PFAS email deliverable with lab report, field notes, table & figure. 3 Total Hours 3
J. Von Borstel GIS Analyst Prepare PFAS Figure 1 Total Hours 1
D. Flake Technician PFAS screening at 5 wells 3 Total Hours 3
B. Jarvis Administrative Tabulate data for deliverable 1 Total Hours 1
TOTAL LABOR 8
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT COST UNITS
Erwin Remediation IDW T&D $545.00 1 $545.00
TOTAL $545.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Ice $6.50 each 1 $6.50
$0.00
$6.50TOTAL EQUIPMENT
SUBTASK:4 IDW Disposal
DATE: 5/22/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D. Phillips Senior Scientist Characterization of waste to profile IDW drums for T&D 3 Total Hours 3
TOTAL LABOR 3
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNITS
Erwin Remediation IDW T&D $545.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC UNITS
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 0 $0.00
$0.00TOTAL EQUIPMENT
ectinc.com
ATTACHMENT 1 SUBCONTRACTOR QUOTES – IDW DISPOSAL
408 Ditmar Street
Pensacola, FL 32503
To: Mr. Leif Layton
ECT
1715 North Westshore Boulevard, Suite 175 Tampa, FL 33607
May 15, 2025
Re: Non-Hazardous PFAS/PFOS Impacted Drum Disposal
Mr. Layton:
The price for transportation and disposal (T&D) of 55-gallon drums of non-hazardous PFOS/PFAS impacted soil or groundwater located in the state of Florida is itemized below:
Description Rate Unit Qty Total
Profile Fee (Charged once per site) $ 350.00 Per Site 1 $ 350.00
T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum 1 $ 195.00
T&D - Non-Haz PFOS/PFAS Impacted Soil $ 195.00 Per Drum 1 $ 195.00
The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location. This quote is valid for 120 days.
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: Robert@ErwinRemediation.com Phone: (850) 466-2358
1715 North Westshore Blvd, Ste 175, Tampa, FL 33607 ectinc.com 813.289-9338
May 22, 2025 ECT No. P25RA-5747
Ms. Karlee Fowler, P.G.
Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Re: Proposal for Annual Natural Attenuation Monitoring
Extra Mile Dry Cleaners 5111 Baymeadows Road #13 Jacksonville, Florida 32217 Facility ID: ERIC_4527 Contract No. HW682
Dear Ms. Fowler:
Environmental Consulting & Technology, Inc. (ECT) has prepared this scope of work to perform the annual natural attenuation monitoring and to prepare a Natural Attenuation Monitoring Report for the Extra Mile Dry Cleaners facility in Jacksonville, Florida.
Subtask 1 Project Management
This Subtask consists of calculated project management labor, based upon 13% of the direct labor costs in this proposal, and includes fringe, overhead, other direct costs (ODCs) and completion fees.
Subtask 2 Natural Attenuation Sampling and Reporting
ECT proposes to conduct the tasks necessary to complete the natural attenuation monitoring, consisting of the collection of depth-to-water (DTW) measurements at 13 monitoring well (MW005, MW008, MW010, MW011, MM012, MW013, MW0014, MW017, MW018, MW019, MW020, MW021, and RW004); and collection of groundwater samples from monitoring wells MW008, MW010, MW012, MW013, MW017, MW018, and MW020. All groundwater samples, including the investigation derived waste (IDW) purge water, will be analyzed by United States Environmental Protection Agency (USEPA) Method 8260 for the volatile organic halogens (VOHs) by a certified National Environmental Laboratory Accreditation Program certified laboratory. The scope of work is detailed in the attached Level of Effort Worksheet. A summary of activities in Subtask 2 is included in Table 1.
If the laboratory analytical results indicate that the IDW samples are below the PFAS criteria or if is classified as hazardous, a change order will be submitted to address proper T&D. A summary of Subtask 3 activities is included in Table 2. The IDW contractor quotes are included in Attachment 1.
Table 1. Subtask 2 Activities Summary Employee/Resource Activity Time Sr. Principal Scientist Develop conclusions and recommendations for the
Annual NAM Report 5 hours
Sr. Scientist Notify RPO of field activities 1 hour Sr. Scientist Prepare draft Annual NAM report 12 hours
Table 1. Subtask 2 Activities Summary GIS Analyst Recreate figures 6 hours Technician Prep for field work and obtain an IDW Drum 2 hours Technician Round trip mobilization from Orlando to the site for the annual groundwater 5 hours
Technician Locate, open, and collect DTW at 13 wells 3 hours Technician Annual groundwater sampling at 7 wells and IDW drum 8 hours Technician Truck for Groundwater Sampling Event 3 days Technician Per Diem 3 days Technician Hotel 2 days Administrative Recreate tables and report production 6 hours
Subtask 3 PFAS Screening
On November 29, 2022, ECT proposed selected wells for PFAS Screening. Breck Dalton with the Florida Department of Environmental Protection (FDEP) approved PFAS screening of groundwater samples from monitoring wells MW008, MW018, MW020, MW021, and RW004. PFAS screening samples will be submitted to the FDEP laboratory in Tallahassee, Florida for analysis of the PFAS compounds.
PFAS screening will be performed at monitoring wells MW008, MW018, MW020, MW021, and RW004.
A sample will also be collected from the IDW drum for PFAS analysis. These samples will be collected during the Subtask 2 groundwater sampling event and ECT will submit those samples to the FDEP Central laboratory. Once the analytical results are received, ECT will provide the PFAS analytical report, PFAS figures, PFAS table, and field notes in an email deliverable. A summary of activities in Subtask 3 is included in Table 2.
Table 2. Subtask 3 Activities Summary
Sr. Scientist Prepare PFAS email deliverable with lab report, field notes, table, & figure.
3 hours
GIS Analyst Create PFAS Figures 1 hour Technician PFAS Screening at 5 wells 3 hours Administrative Create PFAS tables 1 hour
The task includes the cost for proper disposal of one drum of PFAS-impacted purge water from the groundwater sampling event. Quotes were obtained to transport and dispose (T&D) of investigation derived waste (IDW) of PFAS water are summarized below and are provided as an attachment to this proposal. Based on these quotes, Erwin Remediation will be subcontracted to dispose of IDW generated at this site.
Subcontractor Cost Erwin Remediation $545.00
HEPACO $935.00
Universal Environmental Solutions No Bid
Subtask 4 Investigation Derived Waste Management
The scope of work for Subtask 4 consists of the labor to verify that the investigation derived waste (IDW) has been classified correctly. All purge water from the groundwater sampling event will be contained in a 55-gallon drum for disposal as PFAS-impacted IDW. Under this task, the IDW waste manifest will be prepared. A summary of the activities in Subtask 4 is included in Table 3.
Table 3. Subtask 4 Activities Summary
Sr. Scientist Characterization of waste to profile IDW drums for T&D 3 hours
Deliverable
A summary of cost and deliverable due dates with each Subtask is provided in Table 4.
Table 4. Deliverable and Invoice Schedule Subtasks Deliverable Deliverable Date Invoice Amount
2 Annual NAM Report 31 July 2025 $9,416.10 3 Email deliverable for PFAS 31 July 2025 $1,592.03 3 IDW Manifest 31 August 2025 $506.84 1 Project Management Final Invoicing 30 September 2025 $1,020.77
Total $12,535.74
Please let me know if you have any questions regarding this proposal.
Sincerely, ENVIRONMENTAL CONSULTING & TECHNOLOGY, INC.
Leif E. Layton, Ph.D., P.E. Mark A. Culbreth, P.G Engineer Principal Scientist
LEL:MAC/baj
Attachments