This is a Task Assignment (TA) under Contract Number HW682 between the State of Florida Department of Environmental Protection (FDEP) and Environmental Consulting and Technology, Inc. (ECT) for environmental remediation services at the Sunland Cleaners site located at 895 Fox Valley Drive, Suite 113, Longwood, Seminole County, Florida. The task assignment was executed on June 6, 2023, with a completion date of December 30, 2023. The Department Project Manager is Ginger Shirah (850-245-8899), and ECT's Project Manager is Mark A. Culbreth (813-289-9338). The project is identified under ERIC_5475.
The task authorizes ECT to perform replacement well installation activities and groundwater sampling in accordance with an attached Scope of Work and Cost Estimate. The contract is structured on a fixed unit rate basis with a total task assignment value of $9,062.01. Deliverables are scheduled in phases: Subtask 2 (Documentation of field activities and Groundwater Sampling Report, due 07/28/2023, invoiced at $7,465.39); Subtask 3 (Email deliverable for PFAS screening, due 08/28/2023, invoiced at $380.70); and Subtasks 1 & 4 (IDW Manifest and Project Management, due 09/28/2023, invoiced at $1,215.92). The scope includes replacement monitoring well MW001R installation and abandonment of the original MW001, depth-to-water measurements at three wells, groundwater sampling for volatile organic halogens via EPA Method 8260, PFAS analysis, and transport and disposal of investigation-derived waste. Subcontractor costs for well drilling services totaled $2,564.00 through Groundwater Protection, Inc.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW682
HW009B Completion December 30, 2023
This Task Assignment authorizes ECT to perform replacement well installation activities and groundwater sampling in accordance with the attached Scope of Work and Cost Estimate.
Ginger Shirah 850-245-8899 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Environmental Consulting and Technology, Inc. (ECT)
Environmental Consulting and Technology, Inc. (ECT)
Mark A. Culbreth 813-289-9338
ERIC_5475
895 Fox Valley Drive, Suite 113, Longwood, Seminole County
Sunland Cleaners
✔ $ 9,062.01
$ 9,062.01
Scope of Work
Mark A. Culbreth
Contract Manager
6/6/2023
Digitally signed by Mark Culbreth Date: 2023.06.06 14:31:42-04'00'Mark Culbreth Kelly Crain Digitally signed by Kelly Crain
Date: 2023.06.06 13:44:13 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2: Documentation of field activities; Groundwater Sampling Report 07/28/2023
Subtask 3: Email deliverable for PFAS screening 08/28/2023
Subtasks 1 & 4: IDW Manifest; Project Management 09/28/2023
Upon Submittal and FDEP approval of Documentation of field activities; Groundwater Sampling Report $ 7,465.39
Upon Submittal and FDEP approval of Email deliverable for PFAS screening $ 380.70
Upon Submittal and FDEP approval of IDW Manifest; Project Management $ 1,215.92
$ 9,062.01
HW682
HW009B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
To:
From:
Date:
HW682 Contract Negotiation File Sunland Cleanersrs Longwood, Seminole County
ERIC_5475
Ginger Shirah, Project Manager June 5, 2023
Subject: Negotiation Summary
HW682 DC009B
This Task Assignment authorizes ECT to conduct replacement well installation and groundwater sampling activities in accordance with the April 25, 2023 Scope of Work and Cost Estimate.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Replacement Well Installation & Groundwater Sampling This subtask includes costs associated with the well installation for replacement well MW001R, the well abandonment of MW001, depth to water measurements for three wells, and groundwater sampling for the replacement well at the site. Monitor well MW001R will be sampled and analyzed for PFAS as well as VOHs via EPA Method 8260
Subtask 3: PFAS Email Deliverable Monitoring well MW001 was part of the original PFAS screening schedule, but was unable to be sampled, therefore replacement monitoring well MW001R is being sampled instead. The results of the sampling will be submitted in an email deliverable containing the PFAS analytical report, PFAS figure, PFAS table, and field notes.
Subtask 4: IDW This subtasks includes costs associated with the transport and disposal of the IDW generated in Subtask 2.
A site access agreement has been executed for this site and is located in the site file.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $9,062.01 with 31 labor hours.
FDEP COST ESTIMATE
Contractor: Environmental Consulting & Technology, Inc.
Date: 17-Apr-23
Task #: SubTask 1 Project Management
Site: Sunland Cleaners SubTask 2 Well Installation & Sampling
Activity/Phase: SubTask 3 PFAS Screening
Project Manager: Mark Culbreth SubTask 4 IDW T&D
SubTask 5
Totals 1 2 3 4
Labor Rate Category
$80.12 Project Manager 2.2 2.2 $80.12 Senior Principal Scientist (MC) 2 2.0 0.0 0
$69.75 Principal Scientist (JP) 0 0.0 0.0 0
$42.03 Senior Engineer / Scientist (SM) 0 0.0 0.0 0
$52.89 Senior Engineer / Scientist (GS) 9 6.0 2.0 1
$55.00 Senior Engineer / Scientist (DP) 9.25 9.25 0.0 0
$26.54 GIS Analyst / Graphics (JV) 3 2.0 0.50 0
$22.44 Technician (BC) 4.75 4.75 0.0 0
$31.45 Administrative (BJ) 1 1.0 0.25 0
Total Hours 30.95 2.2 25.00 2.75 1
Direct Labor $1,533.69 $176.44 $1,177.45 $126.91 $52.89
Overhead 125.30% $1,921.71 $221.08 $1,475.34 $159.02 $66.27
Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 47.40% $726.97 $83.63 $558.11 $60.16 $25.07
Total Labor $4,182.37 $481.15 $3,210.90 $346.09 $144.23
Travel
Vehicle Rental $240.00 $240.00 $0.00 $0.00
Total Travel $240.00 $240.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Groundwater Protection $2,564.00 $2,564.00 $0.00 $0.00
Erwin Remediation $480.00 $0.00 $0.00 $480.00
Subcontractor Subtotal $480.00 $0.00 $0.00 $480.00
Handling Fee $304.40 $256.40 $0.00 $48.00
Total Subcontractor Cost $3,348.40 $2,820.40 $0.00 $528.00
Laboratory
Analytical Costs $73.00 $73.00 $0.00 $0.00
Sample Shipping $52.00 $52.00 $0.00 $0.00
FDEP PFAS Analytical Cost $0.00 $0.00 $0.00 $0.00
FDEP Shipping $0.00 $0.00 $0.00 $0.00
Total Laboratory $125.00 $125.00 $0.00 $0.00
Field Expenses
Expendables $80.00 $80.00 $0.00 $0.00
Equipment (Shallow Groundwater Sampling K $290.00 $290.00 $0.00 $0.00
Monitoring well Install Kit $325.00 $0.00 $0.00
Equipment (Metal Detector) $40.00 $40.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00
Ice $13.00 $13.00 $0.00 $0.00
Total Field Expenses $748.00 $748.00 $0.00 $0.00
Subtotal $8,643.77 $481.15 $7,144.30 $346.09 $672.23
Completion Fee $418.24 $48.12 $321.09 $34.61 $14.42
Total Estimated Cost $9,062.01 $529.27 $7,465.39 $380.70 $686.65
Well Installation & Sampling
REV: 08/22 PRAC ECT Page 1
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Sunland Cleaner SUBTASK: Annual NAM Report
DATE: 4/17/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations and prepare final Annual NAM Report 2 Total Hours 2
G. Sattler Senior Engineer Verification of property ownership, notify RPO of field activities 1 Prepare Supplemental Assessment draft report 5
Total Hours 6 D Phillips Senior Scientist Field preparation and Well Install Activities 8
Roundtrip mobilization from Orlando to Longwood to for the annual groundwater event 1.25 Total Hours 9.25
J. Von Borstel GIS Analyst Recreate Figures 2 Total Hours 2
B. Carrick Technician Field preparation 0.5 Roundtrip mobilization from Orlando to Longwood to for the annual groundwater event 1.25 Open Well and collect DTW at 3 wells 1 Groundwater sampling 1 wells and 1 IDW sample for VOHs & PFAS 2
Total Hours 4.75 B. Jarvis Administrative Tabulate data for deliverable and report production 1
Total Hours
TOTAL LABOR 25.00
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $120.00 day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE UNIT USEAGE
Groundwater Protection Monitoring well install $2,564.00 each 1 $2,564.00
TOTAL $2,564.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC UNITS
USEPA Method 8260 for VOHs $73.00 1 0 $73.00 Shipping Samples $52.00 0 1 $52.00 FDEP Central Lab PFAS Screening $0.00 1 0 $0.00 FDEP PFAS Shipping $0.00 0 1 $0.00
TOTAL LAB $125.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 2 $80.00 Monitoring well Install Kit $325.00 Event 1 $325.00 Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00 Metal Detector $40.00 Day 1 $40.00 Ice $6.50 each 2 $13.00
TOTAL EQUIPMENT $748.00
FINAL --7/24/96
SITE : Sunland Cleaners SUBTASK:3 (PFAS Screening)
DATE: 4/17/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Prepare PFAS email deliverable, lab report, field notes, table & figure. 2 Total Hours 2
J. Von Borstel GIS Analyst Prepare PFAS figure 0.5 Total Hours 0.5
B. Jarvis Administrative Tabulate data for deliverable 0.25 Total Hours 0.25
TOTAL LABOR 2.75
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNITS
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
SITE : Sunland Cleaners
SUBTASK:4 (IDW T&D)
DATE: 4/17/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer IDW Hazardous classification and scheduling T&D. 1 Review and submit the waste manifest as the deliverable 0.25
Total Hours 1.25
TOTAL LABOR 1.25
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNITS
Erwing Remediation IDW T&D $480.00 1 $480.00
TOTAL $480.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Sonic Auger DPT Injection Well Abandonment
DATE: 4/19/2023
ESTIMATE #: 423037
ID QTY Unit Rate TOTAL
1 1 ls 500.00$ 500.00$
2 Per Diem night 250.00$ -$
3 DPT Rig and 2 Man Crew w/420 M Dolly Rig 1 day 1,500.00$ 1,500.00$
4 1 each 75.00$ 75.00$
5 Materials: 1" PVC Well Installation 11 foot 4.00$ 44.00$
6 Materials: 1" x 5' PVC .006 Prepack Screen, 3" Exp Point 1 each 105.00$ 105.00$
7 Donut Pad w/3" Brass Completion 1 each 125.00$ 125.00$
8 Coredrill and Generator 1 each 150.00$ 150.00$
9 Refurbished Drums (Soil) As Needed 1 each 65.00$ 65.00$
10 Refurbished Drums (Water) As Needed each 65.00$ -$
11 Permits (N/A in Seminole County) -$
Subtotal 2,564.00$
Todd Hodgson
Todd Hodgson TOTAL 2,564.00$ Partner
Mobilization
Locations must be accessible with track mounted Sonic Rig
Damage to utilities on private property are the responsibility of the client Utility Locates on Private Property are the responsibility of the client
Borehole Clearance to 5’ bgs beyond 20 minutes may require a change order for additional time and costs.
THANK YOU FOR YOUR BUSINESS!
DESCRIPTION
If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 at Todd@drillprollc.com.
"Actual quantities used and days onsite will be invoiced"
Completion: 1 Day
1" PVC Well Abandonment w/Removal of 3" Completion, Concrete Patch
PROJECT
Sunland Cleaners 895 Fox Valley Drive, Ste. 113
Gregory Sattler, P.E.
CUSTOMER
ECT
Project Description:
(1) 1" x 11' PVC MW w/5' of .006 Prepack Screen, Donut Pad w/3" Brass Completion. (Indoor, NoSampling)
(1) 1" x 11' PVC Well Abandonment. Remove 3" Plastic Lid fill w/Concrete (Indoor)
Orlando, Florida 32803 Longwood, Seminole County, Florida 3751 Maguire Blvd, Ste. 234
(407) 903-0005 420 DPT Well Installation and Abandonment (Indoors)
2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586
EARTH TECH DRILLING
2703 NW 19TH STREET, POMPANO BEACH, FL 33069
954.974.2424 FAX:954.974.2423
Date: 4/18/2023
FAC ID#:
Unit Unit Rate Number of Units Extended Price
Equipment Type: __DPT Track Rig whole day $0.00 half day $1,750.00 1 $1,750.00
Auger Attachment, per foot $0.00 Pre-Packed Well Screen (includes all materials) 1" x 5' each $110.00 1 $110.00 Slotted PVC Well Screen (includes all materials) 5' Length Pack OD _______ each $0.00 Well Riser (includes all materials) 1" x 5' each $40.00 2 $80.00 per well $250.00 1 $250.00
Mobilization roundtrip $1,200.00 1 $1,200.00 Per Diem per crew / per night $475.00 1 $475.00 DOT Approved 55-gal Drum each $80.00 0 $0.00 Permits each $0.00 0 $0.00 Permits each $0.00 Water Sample each $0.00 Well Development w/ PVC Stickup each $0.00 Concrete Cores each $95.00 1 $95.00 Grout Abandon Existing 1" x 11' Well - Patch Surface each $125.00 1 $125.00
TOTAL QUOTE PRICE $4,085.00
Notes:
Project No.: ___________________________
Date: 4/18/2023
Direct Push Daily Rate 1 - on-site day
ETD Policy: If pea gravel is encountered, borehole advancement is terminated. If client would like to continue borehole advancement, it is at the risk of the consultant, FDEP or property owner.
Well Completion (includes 3" Brass Well Vault, concrete pad, 30 min development and locking well cap)
Contractor Name: ECT - Greg Sattler - 321 245-2124
Site Name : Sunland Cleaners - 895 Fox Valley Dr. Suite 113 - Longwood, FL 32779
PROPOSED SCOPE OF WORK:
Signature and Title of Person Submitting Quote: Charles Bucher
Hand clear ALL Locations to 5' to REFUSAL
(1) MW 1" x 11' w/ 5' .006 Pre-Pack Screen & 3" Brass Well Vault
Utilizing a Geoprobe 420M Dolly Mounted DPT Rig, Coredrill & Denerator
Grout Abandon Existing 1" x 11' Well - Concrete Patch
DIRECT PUSH TECHNOLOGY
MISCELLANEOUS
Days to Complete Scope of Work: 1/2 Day
Subcontract Company Name: EARTH TECH DRILLING. Inc.
Subcontract Mailing Address: 2703 NW 19th Street, Pompano Beach, FL 33069
Direct Push Half-Day Rate 1 - on-site half day (420M Dolly Rig)
Monitoring Wells Sparge Wells Horizontal and Vertical Extraction Wells Geotechnical Drilling Direct Push
Gregory Sattler
From: Austin Bonacum <austin@pdsflorida.com> Sent: Tuesday, April 18, 2023 9:05 AM To: Gregory Sattler Subject: RE: Sunland Cleaners Well Install Request for proposal
Hi Gregory, Based on the size of the scope and distance to the site, we are going to decline to bid. Thank you for the opportunity.
Best Regards, Austin Bonacum Project Estimator Preferred Drilling Solutions, Inc.
8820 66th Street North Pinellas Park, FL 33782 Ph: 727-561-7477 Cell: 210-819-8474 austin@pdsflorida.com www.pdsflorida.com
From: Gregory Sattler <gsattler@ectinc.com> Sent: Monday, April 17, 2023 5:04 PM To: Kevin Bonacum <kevin@pdsflorida.com> Subject: Sunland Cleaners Well Install Request for proposal
Good aŌernoon Kevin, ECT is requesƟng a proposal for the Sunland Cleaners site to reinstall a monitoring well installaƟon and abandon a monitoring well. Sunland Cleaners is located at 895 Fox Valley Drive, Suite 113, Longwood Florid, 32779. ECT would like to reinstall monitoring well MW001 which is constructed of 1-inch diameter prepack well with a 5 foot 0.006-inch sloƩed screen coupled to a 6-feet of riser and installed to a depth of 11 feet below land surface. The replacement monitoring well MW001 is inside of the former dry-cleaner facility and will require the hand dolly DPT rig for the installaƟon. A figure has been aƩached as a reference to the well installaƟon locaƟon. The well will be complete with a 3-inch brass well vault that will be affixed to exisƟng concrete.
AddiƟonally, the original MW001 will be abandoned and is 1-inch diameter with 5-feet of well screen and 6 feet of riser.
The well has been compromised so it may not require 11-feet of grout.
If you have any quesƟons or I am missing any informaƟon, please contact me.
Best Regards, Gregory Sattler, P.E.
Senior Remediation Engineer| Site Assessment & Remediation
Environmental Consulting & Technology, Inc.
Jeanette Von Borstel 3/23/2023 8:58:41 AMF:\220000_Cleaners\220941_Sunland\0100\F2_Site_Layout.dwg
N
FIGURE 2. SITE LAYOUT
SUNLAND CLEANERS
895 FOX VALLEY DRIVE, SUITE 113
LONGWOOD, FLORIDA 32779
AutoCAD SHX Text
PZ002
AutoCAD SHX Text
PZ001
AutoCAD SHX Text
PZ004
AutoCAD SHX Text
PZ003
AutoCAD SHX Text
MW004
AutoCAD SHX Text
MW002
AutoCAD SHX Text
MW003
AutoCAD SHX Text
MW005
AutoCAD SHX Text
MW006
AutoCAD SHX Text
MW007
AutoCAD SHX Text
MW001
AutoCAD SHX Text Source: Earth Systems, 2020; ECT, 2022.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Feet
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
MW002
AutoCAD SHX Text
MONITORING WELL LOCATION
AutoCAD SHX Text
PZ001
AutoCAD SHX Text
PIEZOMETER LOCATION
AutoCAD SHX Text
MW001
AutoCAD SHX Text
ABANDONED MONITORING WELL LOCATION
gsattler Oval gsattler Callout Location of the replacement well and well abandonment.
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To:
Mr. Gregory Sattler
Environmental Consulting & Technology, Inc.
3751 Maguire Blvd, Suite 234
Orlando, FL 32803
October 18, 2022
Re: Non-Hazardous Drum Disposal of PFOS/PFAS Impacted Materials
Mr. Sattler:
The price for the transportation and disposal (T&D) of drums of non-hazardous PFOS/PFAS soil, mud and water is listed below.
Description Rate Unit
Profile Fee (Charged once per site) $ 350.00 Per Site
T&D - Non-Haz PFOS/PFAS Impacted Soil $ 120.00 Per Drum
T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 130.00 Per Drum
The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
This quote is valid for 90 days.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
mailto:Remediation@Gmail.com
October 19, 2022
ECT
Senior Remediation Engineer
3751 Maguire Boulevard Suite 234
Orlando, Florida 32803
Subject: ASSESMENT WASTE DISPOSAL
Greg, Thank you for the opportunity to provide this proposal for the opportunity.
HEPACO is the premier environmental contractor with coverage over 45 regional offices. We specialize in emergency response, industrial services, remediation, and waste services. HEPACO serves a multitude of customers including transportation companies, energy companies, environmental consultants, industrial facilities, terminals, environmental service companies, general contractors, property owners, and many other public and private-sector clients.
HEPACO, with its well-rounded and cross-trained staff, can effectively and efficiently complete this project and appreciates the opportunity. We stand firmly behind our work and always strives to deliver exceptional value and a high level of service at reasonable pricing.
Scope of Work
HEPACO will provide the following:
T&D for assessment drums
1 truck 1 Operator
Assumptions
HEPACO assumes the following:
All waste soil and water deemed Non-Hazardous. PFAS water will be identified through Analysis.
Client is responsible for all testing and analysis. PFAS analytics will be provided before pickup.
Drums for pickup will be accessible and sealed with no damage. Damaged containers will be overpacked.
Drums will be from assessment activity containing soil or water.
Price
HEPACO’s price for this project is $935. A pricing itemization is provided in Attachment A. The pricing is a line-item quote. Volumes and time will vary per pickup due to the site locations needs.
HEPACO Basic Conditions:
This proposal is contingent upon credit approval and valid for thirty days
For any additional work beyond the original scope of work, time and material rates will apply.
Except for minimums, billing will be based on actual quantities at unit costs (see Attachment A).
A four-hour minimum will apply to all unit costs quoted by the hour
Unit costs quoted by the day will be billed at the full day rate for any work on site. There will be no partial billing for partial workdays.
Unit costs quoted by the day apply up to eight hours per day. After eight hours per day, the day rate will be pro-rated for additional hours.
Unit costs are based on a non-union work force, no prevailing wages, no overtime work, and no performance bond.
Additional costs related to unexpected, concealed, or unknown conditions or any delays at the project site shall be incurred by customer.
HEPACO will not be held responsible if underground or above ground structures, cables, conduits, site features, property, materials, or equipment are destroyed, damaged, or rendered inoperable during the project.
Pricing is based on current fuel prices. If fuel prices increase, additional charges may apply
Again, thank you for the opportunity and we look forward to completing this project.
Sincerely, Kevin Hamilton
Kevin Hamilton
HEPACO Account Manager
By signing below the customer acknowledges that they have received, reviewed, and agree to the HEPACO agree to the
HEPACO Proposal and Cost Estimate.
Owner or Owner Agent:
Signature:
Date of Acceptance:
Print Name
Owner or Owner Agent
ATTACHMENT A
PRICING ITEMIZATION
Item # Unit Cost Line Item Cost
145.00$ 145.00$
165.00$ 165.00$
165.00$ 165.00$
375.00$ 375.00$
85.00$ 85.00$
Additional Pricing
425.00$
935.00$ Estimated Total
2.0
1.0 Overpack Service for damaged 55 gallon drums 1 Each
PFAS (RCRA) Water Drums per 55 gallon drum
5.0 PFAS Drums Transport Fee
3.0
6.0 Energy Fee is currently 12.5% of invoice
7.0
Each
Each
4.0
Estimated
Quantity
Units
Soil NON-Hazardous per 55 gallon drum
Hour
DM
DM
DM
1.0
2.0
Transportation and 1 Driver/Technician
Water NON-Hazardous per 55 gallon drum.
Description
From: Ed Kinley <ekinley@uestampa.com>
Sent: Wednesday, October 19, 2022 3:36 PM
To: Gregory Sattler
Cc: Eric Ceballos
Subject: FDEP IDW Drum Trans. & Disposal
Hello Greg. Thank you for your call. UES has supported other Environmental Consultants with FDEP IDW drum management in the past.
Unfortunately, we cannot currently provide this service. Our operation is undergoing expansion and we cannot hold your waste drums. We hope to have a Solid Waste Solidification facility constructed in the near future. We have a Permit to Construct from the City of Tampa & are waiting on our Operations Permit from the FDEP.
Once this facility is completed we will have a turnkey operation. We currently can manage Non Hazardous Wastewaters at our Pretreatment Wastewater Facility. Soils and sludges will be managed at the Solidification Building.
I’ve copied our Business Development Mgr., Eric Ceballos, who will contact you in the near future to discuss all of our capabilities.
Regards, Ed Kinley
Ed Kinley, President (813)390-0659
1408 North Westshore Blvd, Ste 115, Tampa, FL 33607 ectinc.com 813.289.9338
April 25, 2023
ECT No. P23RA-0067
Ms. Ginger Shirah
Florida Department of Environmental Protection
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Re: Proposal for Sunland Cleaners
Annual Natural Attenuation Monitoring Report
895 Fox Valley Drive, Suite 113
Longwood, Florida 32779
Facility ID: ERIC_5475
Contract No. HW682
Dear Ms. Shirah:
Environmental Consulting & Technology, Inc. (ECT) has prepared this scope of work to perform the annual natural attenuation monitoring and to prepare a Groundwater Monitoring (GW) Report for the
Sunland Cleaners site in Longwood, Florida.
Subtask 1 – Project Management
This SubTask consists of the calculated project management labor, based upon 13% of the direct labor costs in this proposal, and includes fringe, overhead, other direct costs (ODCs) and completion fees.
SubTask 2 Scope of Work
ECT proposes to install a replacement monitoring well for MW001, which was found to be compromised during the January 19, 2023, groundwater sampling event. Once the replacement monitoring well MW001R has been installed and developed, the original monitoring well MW001 will be abandoned by a licensed well drilling subcontractor. Below is a summary of the drilling subcontractor costs.
Subcontractor Cost
Groundwater Protection. Inc. $2,564.00
Earth Tech, Inc. $4,085.00
Preferred Drilling Solutions, Inc. No Bid
After the abandoned well MW001 has time for the grout to cure, ECT proposes to return to the site for depth-to-water (DTW) measurements at three monitoring wells, collect groundwater samples from replacement monitoring well MW001R. The GW sampling schedule includes collecting DTW measurements at monitoring wells MW001, MW002, and MW006 and collecting GW samples from monitoring well MW001R. The groundwater samples will be analyzed for the volatile organic halogens by United States Environmental Protection Agency Method 8260 and submitted to a National
Environmental Laboratory Accreditation Program laboratory. The scope of work is detailed in the
Ms. Ginger Shirah FDEP
Sunland Cleaners ectinc.com attached Level of Effort Worksheet. A figure has been included as an attachment of the replacement monitoring well location.
The deliverable for SubTask 2 will be a GW Report that will include field notes, sampling forms, laboratory report, and updated figures and tables. The GW Report will be provided to the FDEP Project
Manager. A summary of SubTask 2 activities is provided in Table 1.
Table 1. SubTask 2 Activities Summary
Employee/Resource Activity Time
Sr. Principal Scientist
Develop conclusions and recommendations for the
GW Monitoring Report 2 hours
Sr. Engineer Verify and Notify RPO of field activities 1 hour
Sr. Engineer Prepare draft GW Monitoring Report 5 hours
Sr. Scientist Round Trip Mob Orlando to Longwood 1.25 hours
Sr. Scientist Monitoring well installation activities 8 hours
Sr. Scientist Truck for Monitoring Well Event 1 day
GIS Analyst Update figures 2 hours
Technician Preparation for field work 0.5 hour
Technician Round Trip Mob Orlando to Longwood 1.25 hours
Technician Locate, open, and collect DTWs at 3 wells 1 hours
Technician Groundwater & IDW Sampling 2 hours
Technician Truck for Groundwater Sampling Event 1 day
Administrative Update tables 1 hours
SubTask 3
ECT will collect PFAS samples at monitoring well MW001R during SubTask 2 groundwater sampling and submit samples to the Florida Department of Environmental Protection Central Laboratory. Once the analytical results are received ECT will provide the PFAS analytical report, PFAS figure, PFAS table, and field notes in an email deliverable. Monitoring well MW001 was a part of the original PFAS screening schedule and monitoring well MW001R is being sampled as a replacement for this location.
A summary of activities in SubTask 3 is included in Table 2.
Table 2. SubTask 3 PFAS Activities Summary
Employee/Resource Activity Time
Sr. Engineer Prepare PFAS deliverable 2 hours
GIS Analyst Update PFAS Figures 0.5 hours
Administrative Update PFAS tables 0.25 hours
SubTask 4
Given recent delays in transport and disposal of IDW, ECT proposes to use SubTask 3 as a separate deliverable for the IDW manifest.
Table 3. SubTask 4 IDW T&D
Employee/Resource Activity Time
Sr. Engineer IDW Hazardous classification and scheduling T&D. 1 hours
Sr. Engineer Review and submit the waste manifest as the deliverable 0.25 hours
Below is the IDW Subcontractor cost summary.
Subcontractor Cost
Erwin Remediation $480.00
HEPACO $935.00
Universal Environmental
Solutions
No Bid
Deliverable
A summary of cost and deliverable due dates associated with each SubTask is provided on Table 4.
Table 4. Deliverable and Invoice Schedule:
SubTasks Deliverable Deliverable Date
Invoice
Amount
2 GW Monitoring Report 28 July 2023 $7,538.39
3 Email deliverable for PFAS 28 August 2023 $380.70
4 Waste Manifest 28 September 2023 $686.65
1 Project Management Final Invoicing 28 October 2023 $529.27
Total $9,135.01
Please let us know if you have any questions regarding this proposal.
Sincerely, ENVIRONMENTAL CONSULTING & TECHNOLOGY, INC.
Gregory L. Sattler, P.E. Mark A. Culbreth, P.G
Senior Engineer Principal Scientist
GLS:MAC/baj
Attachments
| DC010B Annual GW Monitoring proposal - ERIC_4553.pdf |
| Figures 4-8.pdf |
| Sheets and Views |
| 1 SITE LOCATION MAP |
| 2 POTENTIOMETRIC MAP OF THE INTERMEDIATE ZONE |
| 3 POT MAP OF THE DEEP ZONE OF THE SURFICIAL AQUIFER |
| 4 GW CHARACTERIZATION SHALLOW ZONE SURFICIAL AQUIFER |
| 5 GW CHARACTERIZATION INTERMEDIATE ZONE SURFICIAL AQUIFER |
| 6 GW CHARACTERIZATION DEEP ZONE SURFICIAL AQUIFER |
| 7 GW CHARACTERIZATION ROCK ZONE SURFICIAL AQUIFER |
| 8 GROUNDWATER CHARACTERIZATION TPOC WELLS |
| PLOT |