CN-370000-HW682-DC14BCO2.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|HW682|8fccc28dda898687f0dd3c309f3a996b
Contract number
HW682
Issued by
Florida

About this file

This document is a Task Assignment Change Order (TACO No. 2) for the State of Florida Department of Environmental Protection (FDEP) for services at the Aldos Cleaners site in Boca Raton, Palm Beach County, Florida. The contract is held by Environmental Consulting and Technology, Inc. (ECT), with Mark A. Culbreth serving as the contractor's project manager and Karlee Fowler as the FDEP project manager. The contract number is HW682, and the task assignment number is DC014B.

The change order reconciles an overall cost reduction of $1,760.00 by decreasing the total task assignment value from $78,203.45 to $76,443.45. This reduction results from decreases in drilling costs ($430.00), analytical costs ($220.00), and Remedial and Remediation IDW management costs ($970.00). The work involves eight subtasks encompassing site assessment activities: HASP and utility clearance; soil and DPT groundwater sampling with interior well installation; exterior well installation and sampling; soil vapor assessment; professional land survey and IDW management; and project management with site assessment report preparation. The completion date remains May 14, 2025, with 239 total labor hours budgeted across multiple staff categories. Invoicing is structured by FDEP approval of deliverables, with the final cost of $76,443.45 to be paid upon completion of all work.

View the file

Other files

File Type Posted
CN-370000-HW682-DC001E.pdf PDF
CN-370000-HW682-DC003C.pdf PDF
CN-370000-HW682-DC004A.pdf PDF
CN-370000-HW682-DC004B.pdf PDF
CN-370000-HW682-DC006A.pdf PDF
CN-370000-HW682-DC009A.pdf PDF
CN-370000-HW682-DC019B.pdf PDF
CN-370000-HW682-DC021B.pdf PDF
CN-370000-HW682-DC022A.pdf PDF
CN-370000-HW682-DC03CCO1.pdf PDF
CN-370000-HW682-DC03CCO4.pdf PDF
CN-370000-HW682-DC04BCO4.pdf PDF
CN-370000-HW682-DC05BCO2.pdf PDF
CN-370000-HW682-DC05BCO3.pdf PDF
CN-370000-HW682-DC05BCO7.pdf PDF
CN-370000-HW682-DC08BCO3.pdf PDF
CN-370000-HW682-DC10BCO2.pdf PDF
CN-370000-HW682-DC10CCO1.pdf PDF
CN-370000-HW682-DC11AC12.pdf PDF
CN-370000-HW682-DC11AC14.pdf PDF
CN-370000-HW682-DC11ACO5.pdf PDF
CN-370000-HW682-DC11ACO9.pdf PDF
CN-370000-HW682-DC14BCO4.pdf PDF
CN-370000-HW682-DC16BCO1.pdf PDF
CN-370000-HW682-DC20ACO2.pdf PDF
CN-370000-HW682-DC20BCO1.pdf PDF
CN-370000-HW682-DC22ACO1.pdf PDF
CN-370000-HW682-DC25ACO1.pdf PDF
CN-370000-HW682-DC25ACO2.pdf PDF
CN-370000-HW682-FIL1.pdf PDF
CN-370000-HW682-FIL4.pdf PDF
CN-370000-HW682-FIL7.pdf PDF
CN-370000-HW682-HW012A.pdf PDF
CN-370000-HW682-HW017A.pdf PDF
CN-370000-GC914-T9CO2.pdf PDF
CN-370000-GC914.pdf PDF
CN-370000-HW682-DC001A.pdf PDF
CN-370000-HW682-DC001D.pdf PDF
CN-370000-HW682-DC006C.pdf PDF
CN-370000-HW682-DC007A.pdf PDF
CN-370000-HW682-DC008A.pdf PDF
CN-370000-HW682-DC008E.pdf PDF
CN-370000-HW682-DC011A.pdf PDF
CN-370000-HW682-DC012A.pdf PDF
CN-370000-HW682-DC012C.pdf PDF
CN-370000-HW682-DC013B.pdf PDF
CN-370000-HW682-DC014A.pdf PDF
CN-370000-HW682-DC017A.pdf PDF
CN-370000-HW682-DC018A.pdf PDF
CN-370000-HW682-DC018B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC014B 2 HW682

Karlee Fowler 850-245-8944 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor

Contractor Mark A. Culbreth Contractor 813-289-9338

ERIC_5188

Aldos Cleaners

✔ $ 76,443.45 $ 78,203.45

$ 76,443.45 $ 78,203.45 ✔ Completion

Completion 05/14/2025 05/14/2025 0

✔ 1 1 2

Environmental Consulting& Technology, Inc.

Contractor Mark A. Culbreth

Contract Manager

10/24/2024

Digitally signed by Mark Culbreth Date: 2024.10.24 14:30:19-04'00'Mark Culbreth

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.10.24 13:56:56 -04'00'

This change order reconciles a cost reduction caused by decreases in drilling costs, analytical costs, and IDW.

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW682

DC014B

$ 76,443.45

HASP and Utility Survey (Subtask 2)

Soil & DPT Groundwater Sampling & Interior Well Installation (Subtask 3)

Exterior Well Installation & Sampling (Subtask 4)

Soil Vapor Assessment (Subtask 5)

Professional Land Survey & IDW Management (Subtask 6, Subtask 7)

Project Management, Site Assessment Report (Subtask 1, Subtask 8)

FDEP Approval of HASP and Utility Survey (Subtask 2)

FDEP Approval of Exterior Well Installation & Sampling (Subtask 4)

FDEP Approval of Soil Vapor Assessment (Subtask 5)

FDEP Approval of Project Management, Site Assessment Report (Subtask 1, Subtask 8)

FDEP Approval of Professional Land Survey & IDW Management (Subtask 6, Subtask 7)

FDEP Approval of Soil & DPT Groundwater Sampling & Interior Well Installation (Subtask 3)

05/24/2024

06/28/2024

07/26/2024

12/06/2024

02/14/2025

11/01/2024

$ 35,154.51

$ 3,664.62

$ 12,941.16

$ 6,361.38

$ 6,186.87

$ 12,134.91

Printed on recycled paper.

FFLORIDAA DEPARTMENTT OF

EEnvironmentall Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ronn DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawnn Hamilton Secretary

From:

Date:

To: HW Contract Negotiation File

ERIC_

, Project Manager

, 202 Subject: Negotiation Summary

HW

This Task Assignment is with labor hours.

FD

EP

C O

ST

E

ST

IM

AT

E

C on tra ct or

E nv iro nm en ta l C os ul ta nt in g

T ec hn ol og y

D at e:

/1

6/

T as k

S ub

T as k

P ro je ct

M an ag em en t

S ub

T as k

P ro fe ss io na l L an d S ur ve y

S ite

A ld os

C le an er s (O rig in al

T A

C O a nd

S ub T as k

H

A S

P

U til ity C le ar an ce

S ub

T as k

ID

W

M an ag em en t

A ct iv ity

/P ha se

In iti al S ite A ss es sm en t

T as k

S oi l S am pl in g w ith D

P T

G ro un dw at er S am pl in g

S ub

T as k

S A

R P re pa ra tio n

P ro je ct

M an ag er

M ar k

C ul br et h

T as k

W el l I ns ta lla tio n

G ro un dw at er S am pl in g

S ub

T as k

S ub

T as k

M A

G S

S ub

T as k

T T ot al s

La bo r R at e

C at eg or y $8

2.

PP

ro je ct

M an ag er

.8

.8 $8

2.

Se ni or P rin ci pa l S ci en tis t (

M C

2.

$5 9.

Se ni or

E ng in ee r / S ci en tis t (

G S)

.5

3.

2.

0.

$5 5.

Se ni or

E ng in ee r / S ci en tis t (

D P)

.0

.0

.0

.0

$2 7.

G

IS

A na lys t / G ra ph ic s

(J V)

8.

0.

$2 2.

As so ci at e

En gi ne er

Sc ie nt is t (

JP

.0

.0

$2 4.

Te ch ni ci an

(B C

.0

$3 3.

Ad m in is tra tiv e

(B J)

.0

T ot al H ou rs

9.

.8

.0

.5

.0

.0

D ire ct L ab or

$1

1, 5.

$1 ,3

.1

$8

.2

$3

,2

.3

$1 ,4

.8

$1

,1

.9

$3

.4

$1

.8

$2 ,7

.1

O ve rh ea d

5.

$1

4, 5.

$1 ,6

.4

$1

,0

.3

$4 ,1

.0

$1

,8

.0

$1 ,5

.4

$4

.6

$1

.9

$3

,4

.4

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge

.4 0%

$5 ,3

.5

$6

.6

$3

.3

$1

,5

.9

$7

.6

$5

.7

$1

.9

$5 6.

$1

,2

.8

T ot al L

$3

0, 8.

$3 ,5

.2

$2

,2

.0

$8 ,9

.2

$4

,0

.6

$3 ,2

.1

$9

.1

$3

.1

$7

,4

.4

T ra ve l

V eh ic le

R en ta l

$1 ,4

.0

$1

.0

$4

.0

$4

.0

$2

.0

$1

.0

$0

.0

$0 .0

P er d ie m

H ot el

$1 ,8

.0

$0

.0

$7

.0

$4

.0

$4

.0

$2

.0

$0 .0

$0

.0

T ot al T ra ve l $3

,3

.0

$1

.0

$1 ,2

.0

$9

.0

$6

.0

$3

.0

$0

.0

$0 .0

S ub co nt ra ct or

(E qu ip m en t P ro cu re m t) co nt ra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P ro cu re m en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m ril lin g

(C on ve nt io na

l) $1

9, 6.

$0 .0

$1

4, 6.

$4 ,7

.0

$0

.0

$0 .0

$0

.0

$0 .0

S ur ve yi ng

$3 ,5

.0

$0

.0

$0 .0

$0

.0

$0 .0

$3

,5

.0

$0 .0

$0

.0

ID

W

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

G P

R $1

,3

.0

$9

.0

$0 .0

$0

.0

$0 .0

$0

.0

$4

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $2

4, 6.

$9

.0

$1 4, 6.

$4

,7

.0

$0 .0

$3

,5

.0

$4

.0

$0 .0

H an dl in g

Fe e

$2 ,4

.6

$9

0.

$1 ,4

.6

$4

.0

$0

.0

$3

.0

$4 7.

$0

.0

T ot al S ub co nt ra ct or

C os t $2

6, 7.

$9

.0

$1 5, 8.

$5

,1

.0

$0 .0

$3

,8

.0

$5

.0

$0 .0

La bo ra to ry

A na ly tic al

C os ts $8

,2

.0

$0 .0

$5

,8

.0

$1 ,1

.0

$1

,2

.0

$0 .0

$0

.0

$0 .0

S am pl e S hi pp in g

$5

.0

$0 .0

$3

.0

$7

0.

$1

.0

$0 .0

$0

.0

$0 .0

T ot al

L ab or at or y

$8 ,7

.0

$0

.0

$6 ,1

.0

$1

,2

.0

$1 ,3

.0

$0

.0

$0 .0

$0

.0

Fi el d E xp en se s

E xp en da bl es $4

.0

$4

0.

$2

.0

$1

.0

$4 0.

$4

0.

$0 .0

$0

.0

So il

As se ss m en t K it $7

.0

$0

.0

$7

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M on ito rin g w el l I ns ta ll

Ki t

$9

.0

$0 .0

$6

.0

$3

.0

$0

.0

$0 .0

$0

.0

$0 .0

Sh al lo w G ro un dw at er S am pl in g

Ki t

$8

.0

$0 .0

$2

.0

$5

.0

$0

.0

$0 .0

$0

.0

$0 .0

Ic e $9

1.

$0 .0

$6

5.

$2 6.

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ur ve y St at io n $5

0.

$0 .0

$5

0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ee p

G ro un dw at er

S am pl in g Ki t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M

AG

S

Ki t

$5

.0

$0 .0

$0

.0

$0 .0

$5

.0

$0

.0

$0 .0

$0

.0

Ai r S am pl in g

C an is te rs $1

.0

$0

.0

$0 .0

$0

.0

$1

.0

$0 .0

$0

.0

$0 .0

T ot al F ie ld

E xp en se s $3

,8

.0

$4 0.

$1

,9

.0

$1 ,0

.0

$7

.0

$4

0.

$0 .0

$0

.0

S ub to ta l $7

3, 9.

$3 ,5

.2

$3

,4

.0

$3 4, 5.

$1

2, 4.

$6 ,0

.1

$5

,2

.1

$8

.1

$7 ,4

.4

C om pl et io n Fe e $3

,0

.8

$3

.9

$2

.6

$8

.6

$4

.5

$3

.2

$9 7.

$3

2.

$7

.2

T ot al E st im at ed

C os t $7

6, 3.

$3 ,9

.1

$3

,6

.6

$3 5, 4.

$1

2, 1.

$6 ,3

.3

$5

,3

.3

$8

.5

$8 ,2

.7

Pa ge

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Aldos Cleaners (Original + TACO 1 and 2) SUBTASK 2: HASP & Utility Clearance

DATE: 10/16/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Prepare Health and Safety Plan 2 Verification of property ownership, notify RPO of field activities 1

Total Hours 3 D Phillips Senior Scientist Round trip Mobilization between Orlando and the site in Boca Raton 8

Utility clearance 4 Total Hours 12

TOTAL LABOR 15

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

GeoView Private Utility Location $900.00 1 $900.00

TOTAL $900.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 1 $40.00

TOTAL EQUIPMENT $40.00

FINAL --7/24/96

SUBTASK 3: Soil Sampling with DPT & Groundwater Sampling

DATE: 10/16/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer SPLP evaluation 1 SPLP and well placement correspondence and meetings with the FDEP 1.5

Total Hours 2.5 D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 8

Soil Borings and DPT Sampling 45 Depth to water measurement at 5 wells and piezomters 1 Groundwater sampling two wells 2

Total Hours 56 B. Jarvis Administrative Create tables and data entry 2

Total Hours 2

TOTAL LABOR 60.5

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck $480.00 week 1 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel D Phillips $150.00 day 4 $600.00 Per Diem D Phillips $36.00 day 5 $180.00

TOTAL PER DIEM $780.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Groundwater Protection DPT Soil & Groundwater Sampling $14,426.00 1 $14,426.00

TOTAL $14,426.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC UNITS

USEPA Method 8260 Full list Soil SBs $110.00 21 $2,310.00 SPLP Extractions $45.00 0 $0.00 USEPA Method 8260 for Full list Groundwater DPT $110.00 27 $2,970.00 USEPA Method 8260 Full list Grab samples from 2 MW $110.00 2 $220.00 USEPA Method 8260 for SPLP $110.00 0 $0.00 Encore Samplers $16.00 21 $336.00 Shipping Samples $70.00 5 $350.00

TOTAL LAB $6,186.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 day 5 $200.00 Soil Assessment Kit $700.00 week 1 $700.00 Monitoring well Install Kit $325.00 day 2 $650.00 Shallow Groundwater Sampling Kit $290.00 day 1 $290.00 Ice $6.50 each 10 $65.00 Total Survey Station $50.00 day 1 $50.00

TOTAL EQUIPMENT $1,955.00

SUBTASK 4: Well Installation & Groundwater Sampling

DATE: 10/16/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 8 Oversight of well installations 10

Total Hours 18 J. Penia 8

Open Well and collect DTW at 9 wells 1 Groundwater Sampling (4 piezometer, 5 shallow wells) 9 Groundwater Sampling deep well 0 Containerizieng purge water 1

Total Hours 19 B. Jarvis Administrative Create tables and data entry 2

Total Hours 2

TOTAL LABOR 39

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck DP $120.00 day 2 $240.00 Rental Truck DP $480.00 week 0 $0.00 Rental Truck JP $120.00 day 2 $240.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel D Phillips $150.00 day 1 $150.00 Per Diem D Phillips $36.00 day 2 $72.00

Hotel J. Penia $150.00 day 1 $150.00 Per Diem J. Penia $36.00 day 2 $72.00

TOTAL PER DIEM $444.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

GPI Well install 0 $0.00

Earth Tech Drilling Well install 1 $4,720.00

TOTAL $4,720.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units

IDW USEPA Method 8260 for VOHs Soil $73.00 1 $73.00 IDW USEPA Method 6020 or 6010 for RCRA 4 Metals $56.00 1 $56.00 IDW USEPA Method 8260 for VOHs Purge water $73.00 1 $73.00 USEPA Method 8260 Full list amples from MW's $110.00 9 $990.00 Shipping Samples $70.00 1 $70.00

TOTAL LAB $1,262.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 day 4 $160.00 Monitoring well Install Kit $1,300.00 week 0 $0.00 Monitoring well Install Kit $325.00 day 1 $325.00 Shallow Groundwater Sampling Kit $290.00 day 2 $580.00 Ice $6.50 each 4 $26.00 Total Survey Station $50.00 day 0 $0.00 Deep Groundwater Sampling Kit $415.00 day 0 $0.00 Generator $70.00 day 0 $0.00

TOTAL EQUIPMENT $1,091.00

$4,720.00

Engineer/Scienti st

Round trip Mobilization from Tampa to the site in Boca Raton

$10,125.00

SUBTASK 5: MAGS

DATE: 10/16/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer P.E. oversight of MGAS events (Provide SOW, guidance, and answer field question) 3 Check MAGS data. 3

Total Hours 6 J. Penia Round trip Mobilization from Tampa to the site in Boca Raton 9

Preform MAGS Testing 8 Total Hours 17

B. Carrick Technician Round trip Mobilization from Tampa to the site in Boca Raton 8 Preform MAGS Testing 8

Total Hours 16 B. Jarvis Administrative Update tables 2

Total 2

TOTAL LABOR 41

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck J. Penia $120.00 day 2 $240.00 Rental Truck B. Carrick $120.00 day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel J. Penia $150.00 day 1 $150.00 Per Diem J. Penia $36.00 day 2 $72.00

Hotel B. Carrick $150.00 day 1 $150.00 Per Diem B. Carrick $36.00 day 2 $72.00

TOTAL PER DIEM $444.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units

USEPA Method TO-15 for VOHs $200.00 6 $1,200.00 Sampling Shipping Overnight $70.00 2 $140.00

TOTAL LAB $1,340.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 1 $40.00 MAGS Kit $325.00 Day 1 $500.00 Air Sampling Canisters $33.00 Day 6 $198.00

TOTAL EQUIPMENT $738.00

Associate Scientist

SUBTASK 6: Professional Land Survey

DATE: 10/16/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Coordinate and schedule with Surveyor 1 Total Hours 1

J. Penia Technician Round trip Mobilize from Tampa to the site in Boca Raton 9 PLS Oversight and aid in location of wells 4

Total Hours 13

TOTAL LABOR 14

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck J. Penia $132.00 day 1 $132.00

TOTAL VEHICLE $132.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel JP $36.00 day 2 $72.00 Per Diem JP $150.00 day 1 $150.00

TOTAL PER DIEM $222.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Southeastern Professional Land Survey $3,500.00 1 $3,500.00

TOTAL $3,500.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

325 TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 1 $40.00

TOTAL EQUIPMENT $40.00

SUBTASK 7: IDW Management

DATE: 10/16/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Characterization of waste to profile soil & water IDW drums for transportation and disposal 1 Schedule IDW transport and disposal 1

Total 2

TOTAL LABOR 2

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW T&D Soil $125.00 2 $250.00 Erwin Remediation IDW T&D Water $110.00 2 $220.00

TOTAL $470.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

SUBTASK 8: SAR Preparation

DATE: 10/16/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Sr. Principal ScienDevelop conclusions, recommendations, and prepare final Assessment Report 2 Total 2

G Sattler Senior Engineer Prepare the draft SAR site background, SOW, soil, groundwater sections 30 Total 30

D. Phillips Senior Scientist Prepare draft SAR lithological section, create draft figures to be submitted for AutoCAD generatio 6 QA/QC of analytical data 2

Total 8 J. Von Borstel GIS Analyst Revise and Update Figures 8

Total 8 B. Jarvis Administrative Update tables, Document Preparation & Publishing 4

Total 4

TOTAL LABOR 52

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EP

C O

ST

E

ST

IM

AT

E

C on tra ct or

E nv iro nm en ta l C os ul ta nt in g

T ec hn ol

/1

6/

T as k

P ro je ct

M an ag em en t

S ub

T as k

P ro fe ss io na l L an d S ur ve y

S ite

A ld os

C le an er s (T

A C

O

S ub T as k

H

A S

P

U til ity C le ar an ce

S ub

T as k

ID

W

M an ag em en t

A ct iv ity

/P ha se

In iti al S ite A ss es sm

T as k

S oi l S am pl in g w ith D

P T

G ro un dw at er S am pl in g

S ub

T as k

S A

R P re pa ra tio n

P ro je ct

M an ag er

M ar k

C ul br

T as k

W el l I ns ta lla tio n

G ro un dw at er S am pl in g

S ub

T as k

S ub

T as k

M A

G S

S ub

T as k

T T ot al s

La bo r R at e

C at eg or y $8

2.

PP

ro je ct

M an

0.

0.

$8

2.

Se ni or P rin ci pa l S ci en tis t (

M C

0.

$5 9.

Se ni or

E ng in ee r / S ci en tis t (

G S)

0.

0.

0.

0.

$5 5.

Se ni or

E ng in ee r / S ci en tis t (

D P)

0.

0.

0.

0.

$2 7.

G

IS

A na lys t / G ra ph ic s

(J V)

0.

0.

$2 2.

As so ci at e

En gi ne er

Sc ie nt is t (

JP

0.

0.

$2 4.

Te ch ni ci an

(B C

0.

$3 3.

Ad m in is tra tiv e

(B J)

0.

T ot al H ou rs

0.

0.

0.

0.

0.

0.

D ire ct L

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

O ve rh ea d

5.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge

.4 0%

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

L

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ra ve l

V eh ic le

R en ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P er d ie m

H ot el $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

T ra ve l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (E qu ip m en t P ro cu re m co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ot al S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(S er vi ce s P ro cu re m lin g (C on ve nt io na l)

0.

$0

.0

$0 .0

0.

$0 .0

$0

.0

$0 .0

$0

.0

S ur ve yi ng $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

ID

W $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

G

P R

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

0.

$0

.0

S ub co nt ra ct or S ub to ta l

1, 0.

$0 .0

$0

.0

0.

$0

.0

$0 .0

0.

$0 .0

H an dl in g

Fe e

0.

$0

.0

$0 .0

.0

0) $0

.0

$0 .0

.0

0) $0

.0

T ot al S ub co nt ra ct or

C os t

1, 0.

$0

.0

$0 .0

3.

$0 .0

$0

.0

1, 7.

$0 .0

La bo ra ly tic al

C os ts

0.

$0 .0

0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S am pl e S hi pp in g

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ot al L ab or at or y

0.

$0 .0

0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fi el d

E xp en en da bl es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

So il

As se ss m en t K it $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M on ito rin g w el l I ns ta ll

Ki t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Sh al lo w

G ro un dw at er

S am pl in g Ki t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ic e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ur ve y St at io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ee p

G ro un dw at er

S am pl in g Ki t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M

AG

S

Ki t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ai r S am pl in g

C an is te rs $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al F ie ld

E xp en se s $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub to ta l

1, 0.

$0

.0

$0 .0

0.

3.

$0

.0

$0 .0

1, 7.

$0

.0

C om pl et io n

Fe e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al E st im at ed

C os t

1, 0.

$0

.0

$0 .0

0.

3.

$0

.0

$0 .0

1, 7.

$0

.0

Pa

SITE : Aldos Cleaners (TACO 2) SUBTASK 2: HASP & Utility Clearance

DATE: 10/16/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Prepare Health and Safety Plan 0 Verification of property ownership, notify RPO of field activities 0

Total Hours 0 D Phillips Senior Scientist Round trip Mobilization between Orlando and the site in Boca Raton 0

Utility clearance 0 Total Hours 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck $120.00 day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

GeoView Private Utility Location $900.00 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 0 $0.00

TOTAL EQUIPMENT $0.00

DATE: 10/16/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer SPLP evaluation 0 SPLP and well placement correspondence and meetings with the FDEP 0

Total Hours 0 D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 0

Soil Borings and DPT Sampling 0 Depth to water measurement at 5 wells and piezomters 0 Groundwater sampling two wells 0

Total Hours 0 B. Jarvis Administrative Create tables and data entry 0

Total Hours 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck $480.00 week 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel D Phillips $150.00 day 0 $0.00 Per Diem D Phillips $36.00 day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Groundwater Protection DPT Soil & Groundwater Sampling $14,426.00 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC UNITS

USEPA Method 8260 Full list Soil SBs $110.00 0 $0.00 SPLP Extractions $45.00 0 $0.00 USEPA Method 8260 for Full list Groundwater DPT $110.00 -2 ($220.00) USEPA Method 8260 Full list Grab samples from 2 MW $110.00 0 $0.00 USEPA Method 8260 for SPLP $110.00 0 $0.00 Encore Samplers $16.00 0 $0.00 Shipping Samples $70.00 0 $0.00

TOTAL LAB ($220.00)

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 day 0 $0.00 Soil Assessment Kit $700.00 week 0 $0.00 Monitoring well Install Kit $325.00 day 0 $0.00 Shallow Groundwater Sampling Kit $290.00 day 0 $0.00 Ice $6.50 each 0 $0.00 Total Survey Station $50.00 day 0 $0.00

DATE: 10/16/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 0 Oversight of well installations 0

Total Hours 0 J. Penia 0

Open Well and collect DTW at 9 wells 0 Groundwater Sampling (4 piezometer, 5 shallow wells) 0 Groundwater Sampling deep well 0 Containerizieng purge water 0

Total Hours 0 B. Jarvis Administrative Create tables and data entry 0

Total Hours 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck DP $120.00 day 0 $0.00 Rental Truck DP $480.00 week 0 $0.00 Rental Truck JP $120.00 day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel D Phillips $150.00 day 0 $0.00 Per Diem D Phillips $36.00 day 0 $0.00

Hotel J. Penia $150.00 day 0 $0.00 Per Diem J. Penia $36.00 day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

GPI Well install 0 $0.00

Earth Tech Drilling Well install 1 ($430.00)

TOTAL ($430.00)

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units

IDW USEPA Method 8260 for VOHs Soil $73.00 0 $0.00 IDW USEPA Method 6020 or 6010 for RCRA 4 Metals $56.00 0 $0.00 IDW USEPA Method 8260 for VOHs Purge water $73.00 0 $0.00 USEPA Method 8260 Full list amples from MW's $110.00 0 $0.00 Shipping Samples $70.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 day 0 $0.00 Monitoring well Install Kit $1,300.00 week 0 $0.00 Monitoring well Install Kit $325.00 day 0 $0.00 Shallow Groundwater Sampling Kit $290.00 day 0 $0.00 Ice $6.50 each 0 $0.00 Total Survey Station $50.00 day 0 $0.00 Deep Groundwater Sampling Kit $415.00 day 0 $0.00 Generator $70.00 day 0 $0.00

TOTAL EQUIPMENT $0.00

-$430.00

Engineer/Scienti st

DATE: 10/16/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer P.E. oversight of MGAS events (Provide SOW, guidance, and answer field question) 0 Check MAGS data. 0

Total Hours 0 J. Penia Round trip Mobilization from Tampa to the site in Boca Raton 0

Preform MAGS Testing 0 Total Hours 0

B. Carrick Technician Round trip Mobilization from Tampa to the site in Boca Raton 0 Preform MAGS Testing 0

Total Hours 0 B. Jarvis Administrative Update tables 0

Total 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck J. Penia $120.00 day 0 $0.00 Rental Truck B. Carrick $120.00 day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel J. Penia $150.00 day 0 $0.00 Per Diem J. Penia $36.00 day 0 $0.00

Hotel B. Carrick $150.00 day 0 $0.00 Per Diem B. Carrick $36.00 day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units

USEPA Method TO-15 for VOHs $200.00 0 $0.00 Sampling Shipping Overnight $70.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 MAGS Kit $500.00 Day 0 $0.00 Air Sampling Canisters $33.00 Day 0 $0.00

TOTAL EQUIPMENT $0.00

DATE: 10/16/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Coordinate and schedule with Surveyor 0 Total Hours 0

J. Penia Technician Round trip Mobilize from Tampa to the site in Boca Raton 0 PLS Oversight and aid in location of wells 0

Total Hours 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck J. Penia $132.00 day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel JP $36.00 day 0 $0.00 Per Diem JP $150.00 day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Southeastern Professional Land Survey $3,500.00 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

325 TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 0 $0.00

DATE: 10/16/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Characterization of waste to profile soil & water IDW drums for transportation and disposal 0 Schedule IDW transport and disposal 0

Total 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW T&D Soil $125.00 -6 ($750.00) Erwin Remediation IDW T&D Water $110.00 -2 ($220.00)

TOTAL ($970.00)

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

DATE: 10/16/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Sr. Principal ScienDevelop conclusions, recommendations, and prepare final Assessment Report 0 Total 0

G Sattler Senior Engineer Prepare the draft SAR site background, SOW, soil, groundwater sections 0 Total 0

D. Phillips Senior Scientist Prepare draft SAR lithological section, create draft figures to be submitted for AutoCAD generatio 0 QA/QC of analytical data 0

Total 0 J. Von Borstel GIS Analyst Revise and Update Figures 0

Total 0 B. Jarvis Administrative Update tables, Document Preparation & Publishing 0

Total 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

P C

O

ST

E

ST

IM

A

T E

C on tr ac r:

nv iro nm en ta l C os ul ta nt in g

T ec hn ol

7/

/2

T as k

P ro je ct

M an ag em en t

S ub

T as k

P ro fe ss io na l L an d S ur ve y

S ite

A ld os

C le an er s (O rig in al

T A

C O

S ub

T as k

H A

S P

U til ity

C le ar an ce S ub T as k

ID

W M an ag em en t

A ct iv ity

/P ha se

In iti al S ite A ss es sm

T as k

S oi l S am pl in g w ith D

P T

G ro un dw at er S am pl in g

S ub

T as k

S A

R P re pa ra tio n

P ro je ct

M an ag er

M ar k

C ul br

T as k

W el l I ns ta lla tio n

G ro un dw at er S am pl in g

S ub

T as k

S ub

T as k

M A

G S

S ub

T as k

TT

o ta ls

L ab o r

R at e C at eg o ry

$8 2.

P ro je ct M an

.8

.8

$8 2.

Se ni or

P rin ci pa l S ci en tis t ( M

C

2.

$5

9.

Se ni or E ng in ee r /

S ci en tis t ( G

S)

.5 3.

2.

0.

$5

5.

Se ni or E ng in ee r /

S ci en tis t ( D

P)

.0

.0

.0

.0

$2

7.

G

IS

A na ly st

G ra ph ic s

(J V)

8.

0.

$2 2.

As so ci at e

En gi ne er

Sc ie nt is t (

JP

.0

.0

$2 4.

Te ch ni ci an

(B C

.0

$3 3.

Ad m in is tra tiv e

(B J)

.0

T o ta l H o u rs

9.

.8

.0

.5

.0

.0

D ire ct L

$1

1, 5.

$1 ,3

.1

$8

.2

$3

,2

.3

$1 ,4

.8

$1

,1

.9

$3

.4

$1

.8

$2 ,7

.1

O ve rh ea d

5.

$1

4, 5.

$1 ,6

.4

$1

,0

.3

$4 ,1

.0

$1

,8

.0

$1 ,5

.4

$4

.6

$1

.9

$3

,4

.4

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

F rin ge

.4 0%

$5 ,3

.5

$6

.6

$3

.3

$1

,5

.9

$7

.6

$5

.7

$1

.9

$5 6.

$1

,2

.8

T o ta l L ab o r $3

0, 8.

$3 ,5

.2

$2

,2

.0

$8 ,9

.2

$4

,0

.6

$3 ,2

.1

$9

.1

$3

.1

$7

,4

.4

T ra ve l

V eh ic le

R en ta l

$1 ,4

.0

$1

.0

$4

.0

$4

.0

$2

.0

$1

.0

$0

.0

$0 .0

P er d ie m

H ot el

$1 ,8

.0

$0

.0

$7

.0

$4

.0

$4

.0

$2

.0

$0 .0

$0

.0

T ot al T ra ve l $3

,3

.0

$1

.0

$1 ,2

.0

$9

.0

$6

.0

$3

.0

$0

.0

$0 .0

S u b co n tr ac to r

(E q u ip m en t P ro cu re m co nt ra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P ro cu re m en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T o ta l S u b co n tr ac to r C o st

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S u b co n tr ac to r (S er vi ce s

P ro cu re m lin g

(C on ve nt io na

l) $1

9, 6.

$0 .0

$1

4, 6.

$5 ,1

.0

$0

.0

$0 .0

$0

.0

$0 .0

S ur ve yi ng

$3 ,5

.0

$0

.0

$0 .0

$0

.0

$0 .0

$3

,5

.0

$0 .0

$0

.0

ID

W

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

G P

R $2

,3

.0

$9

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1 ,4

.0

$0

.0

S ub co nt ra ct or S ub to ta l

$2 5, 6.

$9

.0

$1

4, 6.

$5 ,1

.0

$0

.0

$3 ,5

.0

$1

,4

.0

$0 .0

H an dl in g

F ee

$2 ,5

.6

$9

0.

$1 ,4

.6

$5

.0

$0

.0

$3

.0

$1

.0

$0 .0

T o ta l S u b co n tr ac to r C o st

$2 7, 7.

$9

.0

$1

5, 8.

$5 ,6

.0

$0

.0

$3 ,8

.0

$1

,5

.0

$0 .0

L ab o ra ly tic al C os ts

$8 ,4

.0

$0

.0

$6 ,0

.0

$1

,1

.0

$1 ,2

.0

$0

.0

$0 .0

$0

.0

S am pl e

S hi pp in g $5

.0

$0

.0

$3

.0

$7 0.

$1

.0

$0

.0

$0 .0

$0

.0

T o ta l L ab o ra to ry $9

,0

.0

$0 .0

$6

,4

.0

$1 ,2

.0

$1

,3

.0

$0 .0

$0

.0

$0 .0

F ie ld

E xp en en da bl es

$4

.0

$4 0.

$2

.0

$1

.0

$4

0.

$4 0.

$0

.0

$0 .0

So il As se ss m en t K it

$7

.0

$0 .0

$7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M on ito rin g w el l I ns ta ll Ki t $9

.0

$0

.0

$6

.0

$3

.0

$0 .0

$0

.0

$0 .0

$0

.0

Sh al lo w

G ro un dw at er

S am pl in g Ki t $8

.0

$0

.0

$2

.0

$5

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ic e

$9 1.

$0

.0

$6 5.

$2

6.

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ur ve y

St at io n

$5 0.

$0

.0

$5 0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

D ee p G ro un dw at er S am pl in g

Ki t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M

AG

S Ki t $5

.0

$0

.0

$0 .0

$0

.0

$5

.0

$0 .0

$0

.0

$0 .0

Ai r S am pl in g C an is te rs

$1

.0

$0 .0

$0

.0

$0 .0

$1

.0

$0

.0

$0 .0

$0

.0

T o ta l F ie ld

E xp en se s $3

,8

.0

$4 0.

$1

,9

.0

$1 ,0

.0

$7

.0

$4

0.

$0 .0

$0

.0

S u b to ta l

$7 5, 9.

$3

,5

.2

$3 ,4

.0

$3

4, 5.

$1 3, 7.

$6

,0

.1

$5 ,2

.1

$1

,9

.1

$7 ,4

.4

C o m p le ti o n F ee $3

,0

.8

$3

.9

$2

.6

$8

.6

$4

.5

$3

.2

$9 7.

$3

2.

$7

.2

T o ta l E st im at ed

C o st $7

8, 3.

$3 ,9

.1

$3

,6

.6

$3 5, 4.

$1

3, 4.

$6 ,3

.3

$5

,3

.3

$1 ,9

.5

$8

,2

.7

Pa

SITE : Aldos Cleaners (Original + TACO 1) SUBTASK 2: HASP & Utility Clearance

DATE: 7/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Prepare Health and Safety Plan 2 Verification of property ownership, notify RPO of field activities 1

Total Hours 3 D Phillips Senior Scientist Round trip Mobilization between Orlando and the site in Boca Raton 8

Utility clearance 4 Total Hours 12

TOTAL LABOR 15

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

GeoView Private Utility Location $900.00 1 $900.00

TOTAL $900.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 1 $40.00

TOTAL EQUIPMENT $40.00

DATE: 7/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer SPLP evaluation 1 SPLP and well placement correspondence and meetings with the FDEP 1.5

Total Hours 2.5 D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 8

Soil Borings and DPT Sampling 45 Depth to water measurement at 5 wells and piezomters 1 Groundwater sampling two wells 2

Total Hours 56 B. Jarvis Administrative Create tables and data entry 2

Total Hours 2

TOTAL LABOR 60.5

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck $480.00 week 1 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel D Phillips $150.00 day 4 $600.00 Per Diem D Phillips $36.00 day 5 $180.00

TOTAL PER DIEM $780.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Groundwater Protection DPT Soil & Groundwater Sampling $14,426.00 1 $14,426.00

TOTAL $14,426.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC UNITS

USEPA Method 8260 Full list Soil SBs $110.00 21 $2,310.00 SPLP Extractions $45.00 0 $0.00 USEPA Method 8260 for Full list Groundwater DPT $110.00 29 $3,190.00 USEPA Method 8260 Full list Grab samples from 2 MW $110.00 2 $220.00 USEPA Method 8260 for SPLP $110.00 0 $0.00 Encore Samplers $16.00 21 $336.00 Shipping Samples $70.00 5 $350.00

TOTAL LAB $6,406.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 day 5 $200.00 Soil Assessment Kit $700.00 week 1 $700.00 Monitoring well Install Kit $325.00 day 2 $650.00 Shallow Groundwater Sampling Kit $290.00 day 1 $290.00 Ice $6.50 each 10 $65.00 Total Survey Station $50.00 day 1 $50.00

TOTAL EQUIPMENT $1,955.00

DATE: 7/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 8 Oversight of well installations 10

Total Hours 18 J. Penia 8

Open Well and collect DTW at 9 wells 1 Groundwater Sampling (4 piezometer, 5 shallow wells) 9 Groundwater Sampling deep well 0 Containerizieng purge water 1

Total Hours 19 B. Jarvis Administrative Create tables and data entry 2

Total Hours 2

TOTAL LABOR 39

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck DP $120.00 day 2 $240.00 Rental Truck DP $480.00 week 0 $0.00 Rental Truck JP $120.00 day 2 $240.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel D Phillips $150.00 day 1 $150.00 Per Diem D Phillips $36.00 day 2 $72.00

Hotel J. Penia $150.00 day 1 $150.00 Per Diem J. Penia $36.00 day 2 $72.00

TOTAL PER DIEM $444.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

GPI Well install 0 $0.00

Earth Tech Drilling Well install 1 $5,150.00

TOTAL $5,150.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units

IDW USEPA Method 8260 for VOHs Soil $73.00 1 $73.00 IDW USEPA Method 6020 or 6010 for RCRA 4 Metals $56.00 1 $56.00 IDW USEPA Method 8260 for VOHs Purge water $73.00 1 $73.00 USEPA Method 8260 Full list amples from MW's $110.00 9 $990.00 Shipping Samples $70.00 1 $70.00

TOTAL LAB $1,262.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 day 4 $160.00 Monitoring well Install Kit $1,300.00 week 0 $0.00 Monitoring well Install Kit $325.00 day 1 $325.00 Shallow Groundwater Sampling Kit $290.00 day 2 $580.00 Ice $6.50 each 4 $26.00 Total Survey Station $50.00 day 0 $0.00 Deep Groundwater Sampling Kit $415.00 day 0 $0.00 Generator $70.00 day 0 $0.00

TOTAL EQUIPMENT $1,091.00

$5,150.00

Engineer/Scienti st

DATE: 7/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer P.E. oversight of MGAS events (Provide SOW, guidance, and answer field question) 3 Check MAGS data. 3

Total Hours 6 J. Penia Round trip Mobilization from Tampa to the site in Boca Raton 9

Preform MAGS Testing 8 Total Hours 17

B. Carrick Technician Round trip Mobilization from Tampa to the site in Boca Raton 8 Preform MAGS Testing 8

Total Hours 16 B. Jarvis Administrative Update tables 2

Total 2

TOTAL LABOR 41

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck J. Penia $120.00 day 2 $240.00 Rental Truck B. Carrick $120.00 day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel J. Penia $150.00 day 1 $150.00 Per Diem J. Penia $36.00 day 2 $72.00

Hotel B. Carrick $150.00 day 1 $150.00 Per Diem B. Carrick $36.00 day 2 $72.00

TOTAL PER DIEM $444.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units

USEPA Method TO-15 for VOHs $200.00 6 $1,200.00 Sampling Shipping Overnight $70.00 2 $140.00

TOTAL LAB $1,340.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 1 $40.00 MAGS Kit $325.00 Day 1 $500.00 Air Sampling Canisters $33.00 Day 6 $198.00

TOTAL EQUIPMENT $738.00

DATE: 7/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Coordinate and schedule with Surveyor 1 Total Hours 1

J. Penia Technician Round trip Mobilize from Tampa to the site in Boca Raton 9 PLS Oversight and aid in location of wells 4

Total Hours 13

TOTAL LABOR 14

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck J. Penia $132.00 day 1 $132.00

TOTAL VEHICLE $132.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel JP $36.00 day 2 $72.00 Per Diem JP $150.00 day 1 $150.00

TOTAL PER DIEM $222.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Southeastern Professional Land Survey $3,500.00 1 $3,500.00

TOTAL $3,500.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

325 TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 1 $40.00

TOTAL EQUIPMENT $40.00

DATE: 7/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Characterization of waste to profile soil & water IDW drums for transportation and disposal 1 Schedule IDW transport and disposal 1

Total 2

TOTAL LABOR 2

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW T&D Soil $125.00 8 $1,000.00 Erwin Remediation IDW T&D Water $110.00 4 $440.00

TOTAL $1,440.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

DATE: 7/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Sr. Principal ScienDevelop conclusions, recommendations, and prepare final Assessment Report 2

Total 2 G Sattler Senior Engineer Prepare the draft SAR site background, SOW, soil, groundwater sections 30

Total 30 D. Phillips Senior Scientist Prepare draft SAR lithological section, create draft figures to be submitted for AutoCAD generatio 6

QA/QC of analytical data 2 Total 8

J. Von Borstel GIS Analyst Revise and Update Figures 8 Total 8

B. Jarvis Administrative Update tables, Document Preparation & Publishing 4 Total 4

TOTAL LABOR 52

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC014B 1 HW682

Karlee Fowler 850-245-8944 Environmental Consulting and Technology, Inc. (ECT)

Mark A. Culbreth 813-289-9338

ERIC_5188

Aldos Cleaners

$ 78,203.45 $ 94,523.44

$ 78,203.45 $ 94,523.44

05/14/2025 05/14/2025 0

1 1 2

Environmental Consulting & Technology, Inc

Mark Culbreth

Contract Manager

09/10/2024

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.09.18 14:29:27 -04'00'

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

File details come from the government source that posted it. Updated .