This document is a Task Assignment Change Order (TACO No. 2) for the State of Florida Department of Environmental Protection (FDEP) for services at the Aldos Cleaners site in Boca Raton, Palm Beach County, Florida. The contract is held by Environmental Consulting and Technology, Inc. (ECT), with Mark A. Culbreth serving as the contractor's project manager and Karlee Fowler as the FDEP project manager. The contract number is HW682, and the task assignment number is DC014B.
The change order reconciles an overall cost reduction of $1,760.00 by decreasing the total task assignment value from $78,203.45 to $76,443.45. This reduction results from decreases in drilling costs ($430.00), analytical costs ($220.00), and Remedial and Remediation IDW management costs ($970.00). The work involves eight subtasks encompassing site assessment activities: HASP and utility clearance; soil and DPT groundwater sampling with interior well installation; exterior well installation and sampling; soil vapor assessment; professional land survey and IDW management; and project management with site assessment report preparation. The completion date remains May 14, 2025, with 239 total labor hours budgeted across multiple staff categories. Invoicing is structured by FDEP approval of deliverables, with the final cost of $76,443.45 to be paid upon completion of all work.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
DC014B 2 HW682
Karlee Fowler 850-245-8944 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor
Contractor Mark A. Culbreth Contractor 813-289-9338
ERIC_5188
Aldos Cleaners
✔ $ 76,443.45 $ 78,203.45
$ 76,443.45 $ 78,203.45 ✔ Completion
Completion 05/14/2025 05/14/2025 0
✔ 1 1 2
Environmental Consulting& Technology, Inc.
Contractor Mark A. Culbreth
Contract Manager
10/24/2024
Digitally signed by Mark Culbreth Date: 2024.10.24 14:30:19-04'00'Mark Culbreth
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2024.10.24 13:56:56 -04'00'
This change order reconciles a cost reduction caused by decreases in drilling costs, analytical costs, and IDW.
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW682
DC014B
$ 76,443.45
HASP and Utility Survey (Subtask 2)
Soil & DPT Groundwater Sampling & Interior Well Installation (Subtask 3)
Exterior Well Installation & Sampling (Subtask 4)
Soil Vapor Assessment (Subtask 5)
Professional Land Survey & IDW Management (Subtask 6, Subtask 7)
Project Management, Site Assessment Report (Subtask 1, Subtask 8)
FDEP Approval of HASP and Utility Survey (Subtask 2)
FDEP Approval of Exterior Well Installation & Sampling (Subtask 4)
FDEP Approval of Soil Vapor Assessment (Subtask 5)
FDEP Approval of Project Management, Site Assessment Report (Subtask 1, Subtask 8)
FDEP Approval of Professional Land Survey & IDW Management (Subtask 6, Subtask 7)
FDEP Approval of Soil & DPT Groundwater Sampling & Interior Well Installation (Subtask 3)
05/24/2024
06/28/2024
07/26/2024
12/06/2024
02/14/2025
11/01/2024
$ 35,154.51
$ 3,664.62
$ 12,941.16
$ 6,361.38
$ 6,186.87
$ 12,134.91
Printed on recycled paper.
FFLORIDAA DEPARTMENTT OF
EEnvironmentall Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ronn DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawnn Hamilton Secretary
From:
Date:
To: HW Contract Negotiation File
ERIC_
, Project Manager
, 202 Subject: Negotiation Summary
HW
This Task Assignment is with labor hours.
FD
EP
C O
ST
E
ST
IM
AT
E
C on tra ct or
E nv iro nm en ta l C os ul ta nt in g
T ec hn ol og y
D at e:
/1
6/
T as k
S ub
T as k
P ro je ct
M an ag em en t
S ub
T as k
P ro fe ss io na l L an d S ur ve y
S ite
A ld os
C le an er s (O rig in al
T A
C O a nd
S ub T as k
H
A S
P
U til ity C le ar an ce
S ub
T as k
ID
W
M an ag em en t
A ct iv ity
/P ha se
In iti al S ite A ss es sm en t
T as k
S oi l S am pl in g w ith D
P T
G ro un dw at er S am pl in g
S ub
T as k
S A
R P re pa ra tio n
P ro je ct
M an ag er
M ar k
C ul br et h
T as k
W el l I ns ta lla tio n
G ro un dw at er S am pl in g
S ub
T as k
S ub
T as k
M A
G S
S ub
T as k
T T ot al s
La bo r R at e
C at eg or y $8
2.
PP
ro je ct
M an ag er
.8
.8 $8
2.
Se ni or P rin ci pa l S ci en tis t (
M C
2.
$5 9.
Se ni or
E ng in ee r / S ci en tis t (
G S)
.5
3.
2.
0.
$5 5.
Se ni or
E ng in ee r / S ci en tis t (
D P)
.0
.0
.0
.0
$2 7.
G
IS
A na lys t / G ra ph ic s
(J V)
8.
0.
$2 2.
As so ci at e
En gi ne er
Sc ie nt is t (
JP
.0
.0
$2 4.
Te ch ni ci an
(B C
.0
$3 3.
Ad m in is tra tiv e
(B J)
.0
T ot al H ou rs
9.
.8
.0
.5
.0
.0
D ire ct L ab or
$1
1, 5.
$1 ,3
.1
$8
.2
$3
,2
.3
$1 ,4
.8
$1
,1
.9
$3
.4
$1
.8
$2 ,7
.1
O ve rh ea d
5.
$1
4, 5.
$1 ,6
.4
$1
,0
.3
$4 ,1
.0
$1
,8
.0
$1 ,5
.4
$4
.6
$1
.9
$3
,4
.4
G en
A dm in
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fr in ge
.4 0%
$5 ,3
.5
$6
.6
$3
.3
$1
,5
.9
$7
.6
$5
.7
$1
.9
$5 6.
$1
,2
.8
T ot al L
$3
0, 8.
$3 ,5
.2
$2
,2
.0
$8 ,9
.2
$4
,0
.6
$3 ,2
.1
$9
.1
$3
.1
$7
,4
.4
T ra ve l
V eh ic le
R en ta l
$1 ,4
.0
$1
.0
$4
.0
$4
.0
$2
.0
$1
.0
$0
.0
$0 .0
P er d ie m
H ot el
$1 ,8
.0
$0
.0
$7
.0
$4
.0
$4
.0
$2
.0
$0 .0
$0
.0
T ot al T ra ve l $3
,3
.0
$1
.0
$1 ,2
.0
$9
.0
$6
.0
$3
.0
$0
.0
$0 .0
S ub co nt ra ct or
(E qu ip m en t P ro cu re m t) co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P ro cu re m en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (S er vi ce s
P ro cu re m ril lin g
(C on ve nt io na
l) $1
9, 6.
$0 .0
$1
4, 6.
$4 ,7
.0
$0
.0
$0 .0
$0
.0
$0 .0
S ur ve yi ng
$3 ,5
.0
$0
.0
$0 .0
$0
.0
$0 .0
$3
,5
.0
$0 .0
$0
.0
ID
W
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
G P
R $1
,3
.0
$9
.0
$0 .0
$0
.0
$0 .0
$0
.0
$4
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $2
4, 6.
$9
.0
$1 4, 6.
$4
,7
.0
$0 .0
$3
,5
.0
$4
.0
$0 .0
H an dl in g
Fe e
$2 ,4
.6
$9
0.
$1 ,4
.6
$4
.0
$0
.0
$3
.0
$4 7.
$0
.0
T ot al S ub co nt ra ct or
C os t $2
6, 7.
$9
.0
$1 5, 8.
$5
,1
.0
$0 .0
$3
,8
.0
$5
.0
$0 .0
La bo ra to ry
A na ly tic al
C os ts $8
,2
.0
$0 .0
$5
,8
.0
$1 ,1
.0
$1
,2
.0
$0 .0
$0
.0
$0 .0
S am pl e S hi pp in g
$5
.0
$0 .0
$3
.0
$7
0.
$1
.0
$0 .0
$0
.0
$0 .0
T ot al
L ab or at or y
$8 ,7
.0
$0
.0
$6 ,1
.0
$1
,2
.0
$1 ,3
.0
$0
.0
$0 .0
$0
.0
Fi el d E xp en se s
E xp en da bl es $4
.0
$4
0.
$2
.0
$1
.0
$4 0.
$4
0.
$0 .0
$0
.0
So il
As se ss m en t K it $7
.0
$0
.0
$7
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M on ito rin g w el l I ns ta ll
Ki t
$9
.0
$0 .0
$6
.0
$3
.0
$0
.0
$0 .0
$0
.0
$0 .0
Sh al lo w G ro un dw at er S am pl in g
Ki t
$8
.0
$0 .0
$2
.0
$5
.0
$0
.0
$0 .0
$0
.0
$0 .0
Ic e $9
1.
$0 .0
$6
5.
$2 6.
$0
.0
$0 .0
$0
.0
$0 .0
To ta l S ur ve y St at io n $5
0.
$0 .0
$5
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ee p
G ro un dw at er
S am pl in g Ki t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M
AG
S
Ki t
$5
.0
$0 .0
$0
.0
$0 .0
$5
.0
$0
.0
$0 .0
$0
.0
Ai r S am pl in g
C an is te rs $1
.0
$0
.0
$0 .0
$0
.0
$1
.0
$0 .0
$0
.0
$0 .0
T ot al F ie ld
E xp en se s $3
,8
.0
$4 0.
$1
,9
.0
$1 ,0
.0
$7
.0
$4
0.
$0 .0
$0
.0
S ub to ta l $7
3, 9.
$3 ,5
.2
$3
,4
.0
$3 4, 5.
$1
2, 4.
$6 ,0
.1
$5
,2
.1
$8
.1
$7 ,4
.4
C om pl et io n Fe e $3
,0
.8
$3
.9
$2
.6
$8
.6
$4
.5
$3
.2
$9 7.
$3
2.
$7
.2
T ot al E st im at ed
C os t $7
6, 3.
$3 ,9
.1
$3
,6
.6
$3 5, 4.
$1
2, 1.
$6 ,3
.3
$5
,3
.3
$8
.5
$8 ,2
.7
Pa ge
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Aldos Cleaners (Original + TACO 1 and 2) SUBTASK 2: HASP & Utility Clearance
DATE: 10/16/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Prepare Health and Safety Plan 2 Verification of property ownership, notify RPO of field activities 1
Total Hours 3 D Phillips Senior Scientist Round trip Mobilization between Orlando and the site in Boca Raton 8
Utility clearance 4 Total Hours 12
TOTAL LABOR 15
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $120.00 day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNITS
GeoView Private Utility Location $900.00 1 $900.00
TOTAL $900.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 1 $40.00
TOTAL EQUIPMENT $40.00
FINAL --7/24/96
SUBTASK 3: Soil Sampling with DPT & Groundwater Sampling
DATE: 10/16/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer SPLP evaluation 1 SPLP and well placement correspondence and meetings with the FDEP 1.5
Total Hours 2.5 D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 8
Soil Borings and DPT Sampling 45 Depth to water measurement at 5 wells and piezomters 1 Groundwater sampling two wells 2
Total Hours 56 B. Jarvis Administrative Create tables and data entry 2
Total Hours 2
TOTAL LABOR 60.5
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $480.00 week 1 $480.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel D Phillips $150.00 day 4 $600.00 Per Diem D Phillips $36.00 day 5 $180.00
TOTAL PER DIEM $780.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Groundwater Protection DPT Soil & Groundwater Sampling $14,426.00 1 $14,426.00
TOTAL $14,426.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC UNITS
USEPA Method 8260 Full list Soil SBs $110.00 21 $2,310.00 SPLP Extractions $45.00 0 $0.00 USEPA Method 8260 for Full list Groundwater DPT $110.00 27 $2,970.00 USEPA Method 8260 Full list Grab samples from 2 MW $110.00 2 $220.00 USEPA Method 8260 for SPLP $110.00 0 $0.00 Encore Samplers $16.00 21 $336.00 Shipping Samples $70.00 5 $350.00
TOTAL LAB $6,186.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 5 $200.00 Soil Assessment Kit $700.00 week 1 $700.00 Monitoring well Install Kit $325.00 day 2 $650.00 Shallow Groundwater Sampling Kit $290.00 day 1 $290.00 Ice $6.50 each 10 $65.00 Total Survey Station $50.00 day 1 $50.00
TOTAL EQUIPMENT $1,955.00
SUBTASK 4: Well Installation & Groundwater Sampling
DATE: 10/16/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 8 Oversight of well installations 10
Total Hours 18 J. Penia 8
Open Well and collect DTW at 9 wells 1 Groundwater Sampling (4 piezometer, 5 shallow wells) 9 Groundwater Sampling deep well 0 Containerizieng purge water 1
Total Hours 19 B. Jarvis Administrative Create tables and data entry 2
Total Hours 2
TOTAL LABOR 39
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck DP $120.00 day 2 $240.00 Rental Truck DP $480.00 week 0 $0.00 Rental Truck JP $120.00 day 2 $240.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel D Phillips $150.00 day 1 $150.00 Per Diem D Phillips $36.00 day 2 $72.00
Hotel J. Penia $150.00 day 1 $150.00 Per Diem J. Penia $36.00 day 2 $72.00
TOTAL PER DIEM $444.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNITS
GPI Well install 0 $0.00
Earth Tech Drilling Well install 1 $4,720.00
TOTAL $4,720.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units
IDW USEPA Method 8260 for VOHs Soil $73.00 1 $73.00 IDW USEPA Method 6020 or 6010 for RCRA 4 Metals $56.00 1 $56.00 IDW USEPA Method 8260 for VOHs Purge water $73.00 1 $73.00 USEPA Method 8260 Full list amples from MW's $110.00 9 $990.00 Shipping Samples $70.00 1 $70.00
TOTAL LAB $1,262.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 4 $160.00 Monitoring well Install Kit $1,300.00 week 0 $0.00 Monitoring well Install Kit $325.00 day 1 $325.00 Shallow Groundwater Sampling Kit $290.00 day 2 $580.00 Ice $6.50 each 4 $26.00 Total Survey Station $50.00 day 0 $0.00 Deep Groundwater Sampling Kit $415.00 day 0 $0.00 Generator $70.00 day 0 $0.00
TOTAL EQUIPMENT $1,091.00
$4,720.00
Engineer/Scienti st
Round trip Mobilization from Tampa to the site in Boca Raton
$10,125.00
SUBTASK 5: MAGS
DATE: 10/16/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer P.E. oversight of MGAS events (Provide SOW, guidance, and answer field question) 3 Check MAGS data. 3
Total Hours 6 J. Penia Round trip Mobilization from Tampa to the site in Boca Raton 9
Preform MAGS Testing 8 Total Hours 17
B. Carrick Technician Round trip Mobilization from Tampa to the site in Boca Raton 8 Preform MAGS Testing 8
Total Hours 16 B. Jarvis Administrative Update tables 2
Total 2
TOTAL LABOR 41
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck J. Penia $120.00 day 2 $240.00 Rental Truck B. Carrick $120.00 day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel J. Penia $150.00 day 1 $150.00 Per Diem J. Penia $36.00 day 2 $72.00
Hotel B. Carrick $150.00 day 1 $150.00 Per Diem B. Carrick $36.00 day 2 $72.00
TOTAL PER DIEM $444.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units
USEPA Method TO-15 for VOHs $200.00 6 $1,200.00 Sampling Shipping Overnight $70.00 2 $140.00
TOTAL LAB $1,340.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 1 $40.00 MAGS Kit $325.00 Day 1 $500.00 Air Sampling Canisters $33.00 Day 6 $198.00
TOTAL EQUIPMENT $738.00
Associate Scientist
SUBTASK 6: Professional Land Survey
DATE: 10/16/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Coordinate and schedule with Surveyor 1 Total Hours 1
J. Penia Technician Round trip Mobilize from Tampa to the site in Boca Raton 9 PLS Oversight and aid in location of wells 4
Total Hours 13
TOTAL LABOR 14
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck J. Penia $132.00 day 1 $132.00
TOTAL VEHICLE $132.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel JP $36.00 day 2 $72.00 Per Diem JP $150.00 day 1 $150.00
TOTAL PER DIEM $222.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Southeastern Professional Land Survey $3,500.00 1 $3,500.00
TOTAL $3,500.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
325 TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 1 $40.00
TOTAL EQUIPMENT $40.00
SUBTASK 7: IDW Management
DATE: 10/16/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Characterization of waste to profile soil & water IDW drums for transportation and disposal 1 Schedule IDW transport and disposal 1
Total 2
TOTAL LABOR 2
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation IDW T&D Soil $125.00 2 $250.00 Erwin Remediation IDW T&D Water $110.00 2 $220.00
TOTAL $470.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
SUBTASK 8: SAR Preparation
DATE: 10/16/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
M. Culbreth Sr. Principal ScienDevelop conclusions, recommendations, and prepare final Assessment Report 2 Total 2
G Sattler Senior Engineer Prepare the draft SAR site background, SOW, soil, groundwater sections 30 Total 30
D. Phillips Senior Scientist Prepare draft SAR lithological section, create draft figures to be submitted for AutoCAD generatio 6 QA/QC of analytical data 2
Total 8 J. Von Borstel GIS Analyst Revise and Update Figures 8
Total 8 B. Jarvis Administrative Update tables, Document Preparation & Publishing 4
Total 4
TOTAL LABOR 52
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EP
C O
ST
E
ST
IM
AT
E
C on tra ct or
E nv iro nm en ta l C os ul ta nt in g
T ec hn ol
/1
6/
T as k
P ro je ct
M an ag em en t
S ub
T as k
P ro fe ss io na l L an d S ur ve y
S ite
A ld os
C le an er s (T
A C
O
S ub T as k
H
A S
P
U til ity C le ar an ce
S ub
T as k
ID
W
M an ag em en t
A ct iv ity
/P ha se
In iti al S ite A ss es sm
T as k
S oi l S am pl in g w ith D
P T
G ro un dw at er S am pl in g
S ub
T as k
S A
R P re pa ra tio n
P ro je ct
M an ag er
M ar k
C ul br
T as k
W el l I ns ta lla tio n
G ro un dw at er S am pl in g
S ub
T as k
S ub
T as k
M A
G S
S ub
T as k
T T ot al s
La bo r R at e
C at eg or y $8
2.
PP
ro je ct
M an
0.
0.
$8
2.
Se ni or P rin ci pa l S ci en tis t (
M C
0.
$5 9.
Se ni or
E ng in ee r / S ci en tis t (
G S)
0.
0.
0.
0.
$5 5.
Se ni or
E ng in ee r / S ci en tis t (
D P)
0.
0.
0.
0.
$2 7.
G
IS
A na lys t / G ra ph ic s
(J V)
0.
0.
$2 2.
As so ci at e
En gi ne er
Sc ie nt is t (
JP
0.
0.
$2 4.
Te ch ni ci an
(B C
0.
$3 3.
Ad m in is tra tiv e
(B J)
0.
T ot al H ou rs
0.
0.
0.
0.
0.
0.
D ire ct L
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
O ve rh ea d
5.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
G en
A dm in
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fr in ge
.4 0%
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
L
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ra ve l
V eh ic le
R en ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P er d ie m
H ot el $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
T ra ve l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (E qu ip m en t P ro cu re m co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P ro cu re m en t F ee
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al S ub co nt ra ct or
C os t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
(S er vi ce s P ro cu re m lin g (C on ve nt io na l)
0.
$0
.0
$0 .0
0.
$0 .0
$0
.0
$0 .0
$0
.0
S ur ve yi ng $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
ID
W $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
G
P R
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
0.
$0
.0
S ub co nt ra ct or S ub to ta l
1, 0.
$0 .0
$0
.0
0.
$0
.0
$0 .0
0.
$0 .0
H an dl in g
Fe e
0.
$0
.0
$0 .0
.0
0) $0
.0
$0 .0
.0
0) $0
.0
T ot al S ub co nt ra ct or
C os t
1, 0.
$0
.0
$0 .0
3.
$0 .0
$0
.0
1, 7.
$0 .0
La bo ra ly tic al
C os ts
0.
$0 .0
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S am pl e S hi pp in g
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al L ab or at or y
0.
$0 .0
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fi el d
E xp en en da bl es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
So il
As se ss m en t K it $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M on ito rin g w el l I ns ta ll
Ki t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Sh al lo w
G ro un dw at er
S am pl in g Ki t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Ic e $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l S ur ve y St at io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ee p
G ro un dw at er
S am pl in g Ki t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M
AG
S
Ki t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Ai r S am pl in g
C an is te rs $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al F ie ld
E xp en se s $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub to ta l
1, 0.
$0
.0
$0 .0
0.
3.
$0
.0
$0 .0
1, 7.
$0
.0
C om pl et io n
Fe e
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al E st im at ed
C os t
1, 0.
$0
.0
$0 .0
0.
3.
$0
.0
$0 .0
1, 7.
$0
.0
Pa
SITE : Aldos Cleaners (TACO 2) SUBTASK 2: HASP & Utility Clearance
DATE: 10/16/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Prepare Health and Safety Plan 0 Verification of property ownership, notify RPO of field activities 0
Total Hours 0 D Phillips Senior Scientist Round trip Mobilization between Orlando and the site in Boca Raton 0
Utility clearance 0 Total Hours 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $120.00 day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNITS
GeoView Private Utility Location $900.00 0 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 0 $0.00
TOTAL EQUIPMENT $0.00
DATE: 10/16/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer SPLP evaluation 0 SPLP and well placement correspondence and meetings with the FDEP 0
Total Hours 0 D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 0
Soil Borings and DPT Sampling 0 Depth to water measurement at 5 wells and piezomters 0 Groundwater sampling two wells 0
Total Hours 0 B. Jarvis Administrative Create tables and data entry 0
Total Hours 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $480.00 week 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel D Phillips $150.00 day 0 $0.00 Per Diem D Phillips $36.00 day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Groundwater Protection DPT Soil & Groundwater Sampling $14,426.00 0 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC UNITS
USEPA Method 8260 Full list Soil SBs $110.00 0 $0.00 SPLP Extractions $45.00 0 $0.00 USEPA Method 8260 for Full list Groundwater DPT $110.00 -2 ($220.00) USEPA Method 8260 Full list Grab samples from 2 MW $110.00 0 $0.00 USEPA Method 8260 for SPLP $110.00 0 $0.00 Encore Samplers $16.00 0 $0.00 Shipping Samples $70.00 0 $0.00
TOTAL LAB ($220.00)
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 0 $0.00 Soil Assessment Kit $700.00 week 0 $0.00 Monitoring well Install Kit $325.00 day 0 $0.00 Shallow Groundwater Sampling Kit $290.00 day 0 $0.00 Ice $6.50 each 0 $0.00 Total Survey Station $50.00 day 0 $0.00
DATE: 10/16/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 0 Oversight of well installations 0
Total Hours 0 J. Penia 0
Open Well and collect DTW at 9 wells 0 Groundwater Sampling (4 piezometer, 5 shallow wells) 0 Groundwater Sampling deep well 0 Containerizieng purge water 0
Total Hours 0 B. Jarvis Administrative Create tables and data entry 0
Total Hours 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck DP $120.00 day 0 $0.00 Rental Truck DP $480.00 week 0 $0.00 Rental Truck JP $120.00 day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel D Phillips $150.00 day 0 $0.00 Per Diem D Phillips $36.00 day 0 $0.00
Hotel J. Penia $150.00 day 0 $0.00 Per Diem J. Penia $36.00 day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNITS
GPI Well install 0 $0.00
Earth Tech Drilling Well install 1 ($430.00)
TOTAL ($430.00)
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units
IDW USEPA Method 8260 for VOHs Soil $73.00 0 $0.00 IDW USEPA Method 6020 or 6010 for RCRA 4 Metals $56.00 0 $0.00 IDW USEPA Method 8260 for VOHs Purge water $73.00 0 $0.00 USEPA Method 8260 Full list amples from MW's $110.00 0 $0.00 Shipping Samples $70.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 0 $0.00 Monitoring well Install Kit $1,300.00 week 0 $0.00 Monitoring well Install Kit $325.00 day 0 $0.00 Shallow Groundwater Sampling Kit $290.00 day 0 $0.00 Ice $6.50 each 0 $0.00 Total Survey Station $50.00 day 0 $0.00 Deep Groundwater Sampling Kit $415.00 day 0 $0.00 Generator $70.00 day 0 $0.00
TOTAL EQUIPMENT $0.00
-$430.00
Engineer/Scienti st
DATE: 10/16/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer P.E. oversight of MGAS events (Provide SOW, guidance, and answer field question) 0 Check MAGS data. 0
Total Hours 0 J. Penia Round trip Mobilization from Tampa to the site in Boca Raton 0
Preform MAGS Testing 0 Total Hours 0
B. Carrick Technician Round trip Mobilization from Tampa to the site in Boca Raton 0 Preform MAGS Testing 0
Total Hours 0 B. Jarvis Administrative Update tables 0
Total 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck J. Penia $120.00 day 0 $0.00 Rental Truck B. Carrick $120.00 day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel J. Penia $150.00 day 0 $0.00 Per Diem J. Penia $36.00 day 0 $0.00
Hotel B. Carrick $150.00 day 0 $0.00 Per Diem B. Carrick $36.00 day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units
USEPA Method TO-15 for VOHs $200.00 0 $0.00 Sampling Shipping Overnight $70.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00 MAGS Kit $500.00 Day 0 $0.00 Air Sampling Canisters $33.00 Day 0 $0.00
TOTAL EQUIPMENT $0.00
DATE: 10/16/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Coordinate and schedule with Surveyor 0 Total Hours 0
J. Penia Technician Round trip Mobilize from Tampa to the site in Boca Raton 0 PLS Oversight and aid in location of wells 0
Total Hours 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck J. Penia $132.00 day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel JP $36.00 day 0 $0.00 Per Diem JP $150.00 day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Southeastern Professional Land Survey $3,500.00 0 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
325 TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 0 $0.00
DATE: 10/16/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Characterization of waste to profile soil & water IDW drums for transportation and disposal 0 Schedule IDW transport and disposal 0
Total 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation IDW T&D Soil $125.00 -6 ($750.00) Erwin Remediation IDW T&D Water $110.00 -2 ($220.00)
TOTAL ($970.00)
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
DATE: 10/16/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
M. Culbreth Sr. Principal ScienDevelop conclusions, recommendations, and prepare final Assessment Report 0 Total 0
G Sattler Senior Engineer Prepare the draft SAR site background, SOW, soil, groundwater sections 0 Total 0
D. Phillips Senior Scientist Prepare draft SAR lithological section, create draft figures to be submitted for AutoCAD generatio 0 QA/QC of analytical data 0
Total 0 J. Von Borstel GIS Analyst Revise and Update Figures 0
Total 0 B. Jarvis Administrative Update tables, Document Preparation & Publishing 0
Total 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
P C
O
ST
E
ST
IM
A
T E
C on tr ac r:
nv iro nm en ta l C os ul ta nt in g
T ec hn ol
7/
/2
T as k
P ro je ct
M an ag em en t
S ub
T as k
P ro fe ss io na l L an d S ur ve y
S ite
A ld os
C le an er s (O rig in al
T A
C O
S ub
T as k
H A
S P
U til ity
C le ar an ce S ub T as k
ID
W M an ag em en t
A ct iv ity
/P ha se
In iti al S ite A ss es sm
T as k
S oi l S am pl in g w ith D
P T
G ro un dw at er S am pl in g
S ub
T as k
S A
R P re pa ra tio n
P ro je ct
M an ag er
M ar k
C ul br
T as k
W el l I ns ta lla tio n
G ro un dw at er S am pl in g
S ub
T as k
S ub
T as k
M A
G S
S ub
T as k
TT
o ta ls
L ab o r
R at e C at eg o ry
$8 2.
P ro je ct M an
.8
.8
$8 2.
Se ni or
P rin ci pa l S ci en tis t ( M
C
2.
$5
9.
Se ni or E ng in ee r /
S ci en tis t ( G
S)
.5 3.
2.
0.
$5
5.
Se ni or E ng in ee r /
S ci en tis t ( D
P)
.0
.0
.0
.0
$2
7.
G
IS
A na ly st
G ra ph ic s
(J V)
8.
0.
$2 2.
As so ci at e
En gi ne er
Sc ie nt is t (
JP
.0
.0
$2 4.
Te ch ni ci an
(B C
.0
$3 3.
Ad m in is tra tiv e
(B J)
.0
T o ta l H o u rs
9.
.8
.0
.5
.0
.0
D ire ct L
$1
1, 5.
$1 ,3
.1
$8
.2
$3
,2
.3
$1 ,4
.8
$1
,1
.9
$3
.4
$1
.8
$2 ,7
.1
O ve rh ea d
5.
$1
4, 5.
$1 ,6
.4
$1
,0
.3
$4 ,1
.0
$1
,8
.0
$1 ,5
.4
$4
.6
$1
.9
$3
,4
.4
G en
A dm in
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
F rin ge
.4 0%
$5 ,3
.5
$6
.6
$3
.3
$1
,5
.9
$7
.6
$5
.7
$1
.9
$5 6.
$1
,2
.8
T o ta l L ab o r $3
0, 8.
$3 ,5
.2
$2
,2
.0
$8 ,9
.2
$4
,0
.6
$3 ,2
.1
$9
.1
$3
.1
$7
,4
.4
T ra ve l
V eh ic le
R en ta l
$1 ,4
.0
$1
.0
$4
.0
$4
.0
$2
.0
$1
.0
$0
.0
$0 .0
P er d ie m
H ot el
$1 ,8
.0
$0
.0
$7
.0
$4
.0
$4
.0
$2
.0
$0 .0
$0
.0
T ot al T ra ve l $3
,3
.0
$1
.0
$1 ,2
.0
$9
.0
$6
.0
$3
.0
$0
.0
$0 .0
S u b co n tr ac to r
(E q u ip m en t P ro cu re m co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P ro cu re m en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T o ta l S u b co n tr ac to r C o st
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S u b co n tr ac to r (S er vi ce s
P ro cu re m lin g
(C on ve nt io na
l) $1
9, 6.
$0 .0
$1
4, 6.
$5 ,1
.0
$0
.0
$0 .0
$0
.0
$0 .0
S ur ve yi ng
$3 ,5
.0
$0
.0
$0 .0
$0
.0
$0 .0
$3
,5
.0
$0 .0
$0
.0
ID
W
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
G P
R $2
,3
.0
$9
.0
$0 .0
$0
.0
$0 .0
$0
.0
$1 ,4
.0
$0
.0
S ub co nt ra ct or S ub to ta l
$2 5, 6.
$9
.0
$1
4, 6.
$5 ,1
.0
$0
.0
$3 ,5
.0
$1
,4
.0
$0 .0
H an dl in g
F ee
$2 ,5
.6
$9
0.
$1 ,4
.6
$5
.0
$0
.0
$3
.0
$1
.0
$0 .0
T o ta l S u b co n tr ac to r C o st
$2 7, 7.
$9
.0
$1
5, 8.
$5 ,6
.0
$0
.0
$3 ,8
.0
$1
,5
.0
$0 .0
L ab o ra ly tic al C os ts
$8 ,4
.0
$0
.0
$6 ,0
.0
$1
,1
.0
$1 ,2
.0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $5
.0
$0
.0
$3
.0
$7 0.
$1
.0
$0
.0
$0 .0
$0
.0
T o ta l L ab o ra to ry $9
,0
.0
$0 .0
$6
,4
.0
$1 ,2
.0
$1
,3
.0
$0 .0
$0
.0
$0 .0
F ie ld
E xp en en da bl es
$4
.0
$4 0.
$2
.0
$1
.0
$4
0.
$4 0.
$0
.0
$0 .0
So il As se ss m en t K it
$7
.0
$0 .0
$7
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M on ito rin g w el l I ns ta ll Ki t $9
.0
$0
.0
$6
.0
$3
.0
$0 .0
$0
.0
$0 .0
$0
.0
Sh al lo w
G ro un dw at er
S am pl in g Ki t $8
.0
$0
.0
$2
.0
$5
.0
$0 .0
$0
.0
$0 .0
$0
.0
Ic e
$9 1.
$0
.0
$6 5.
$2
6.
$0 .0
$0
.0
$0 .0
$0
.0
To ta l S ur ve y
St at io n
$5 0.
$0
.0
$5 0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
D ee p G ro un dw at er S am pl in g
Ki t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M
AG
S Ki t $5
.0
$0
.0
$0 .0
$0
.0
$5
.0
$0 .0
$0
.0
$0 .0
Ai r S am pl in g C an is te rs
$1
.0
$0 .0
$0
.0
$0 .0
$1
.0
$0
.0
$0 .0
$0
.0
T o ta l F ie ld
E xp en se s $3
,8
.0
$4 0.
$1
,9
.0
$1 ,0
.0
$7
.0
$4
0.
$0 .0
$0
.0
S u b to ta l
$7 5, 9.
$3
,5
.2
$3 ,4
.0
$3
4, 5.
$1 3, 7.
$6
,0
.1
$5 ,2
.1
$1
,9
.1
$7 ,4
.4
C o m p le ti o n F ee $3
,0
.8
$3
.9
$2
.6
$8
.6
$4
.5
$3
.2
$9 7.
$3
2.
$7
.2
T o ta l E st im at ed
C o st $7
8, 3.
$3 ,9
.1
$3
,6
.6
$3 5, 4.
$1
3, 4.
$6 ,3
.3
$5
,3
.3
$1 ,9
.5
$8
,2
.7
Pa
SITE : Aldos Cleaners (Original + TACO 1) SUBTASK 2: HASP & Utility Clearance
DATE: 7/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Prepare Health and Safety Plan 2 Verification of property ownership, notify RPO of field activities 1
Total Hours 3 D Phillips Senior Scientist Round trip Mobilization between Orlando and the site in Boca Raton 8
Utility clearance 4 Total Hours 12
TOTAL LABOR 15
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $120.00 day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNITS
GeoView Private Utility Location $900.00 1 $900.00
TOTAL $900.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 1 $40.00
TOTAL EQUIPMENT $40.00
DATE: 7/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer SPLP evaluation 1 SPLP and well placement correspondence and meetings with the FDEP 1.5
Total Hours 2.5 D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 8
Soil Borings and DPT Sampling 45 Depth to water measurement at 5 wells and piezomters 1 Groundwater sampling two wells 2
Total Hours 56 B. Jarvis Administrative Create tables and data entry 2
Total Hours 2
TOTAL LABOR 60.5
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $480.00 week 1 $480.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel D Phillips $150.00 day 4 $600.00 Per Diem D Phillips $36.00 day 5 $180.00
TOTAL PER DIEM $780.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Groundwater Protection DPT Soil & Groundwater Sampling $14,426.00 1 $14,426.00
TOTAL $14,426.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC UNITS
USEPA Method 8260 Full list Soil SBs $110.00 21 $2,310.00 SPLP Extractions $45.00 0 $0.00 USEPA Method 8260 for Full list Groundwater DPT $110.00 29 $3,190.00 USEPA Method 8260 Full list Grab samples from 2 MW $110.00 2 $220.00 USEPA Method 8260 for SPLP $110.00 0 $0.00 Encore Samplers $16.00 21 $336.00 Shipping Samples $70.00 5 $350.00
TOTAL LAB $6,406.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 5 $200.00 Soil Assessment Kit $700.00 week 1 $700.00 Monitoring well Install Kit $325.00 day 2 $650.00 Shallow Groundwater Sampling Kit $290.00 day 1 $290.00 Ice $6.50 each 10 $65.00 Total Survey Station $50.00 day 1 $50.00
TOTAL EQUIPMENT $1,955.00
DATE: 7/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 8 Oversight of well installations 10
Total Hours 18 J. Penia 8
Open Well and collect DTW at 9 wells 1 Groundwater Sampling (4 piezometer, 5 shallow wells) 9 Groundwater Sampling deep well 0 Containerizieng purge water 1
Total Hours 19 B. Jarvis Administrative Create tables and data entry 2
Total Hours 2
TOTAL LABOR 39
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck DP $120.00 day 2 $240.00 Rental Truck DP $480.00 week 0 $0.00 Rental Truck JP $120.00 day 2 $240.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel D Phillips $150.00 day 1 $150.00 Per Diem D Phillips $36.00 day 2 $72.00
Hotel J. Penia $150.00 day 1 $150.00 Per Diem J. Penia $36.00 day 2 $72.00
TOTAL PER DIEM $444.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNITS
GPI Well install 0 $0.00
Earth Tech Drilling Well install 1 $5,150.00
TOTAL $5,150.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units
IDW USEPA Method 8260 for VOHs Soil $73.00 1 $73.00 IDW USEPA Method 6020 or 6010 for RCRA 4 Metals $56.00 1 $56.00 IDW USEPA Method 8260 for VOHs Purge water $73.00 1 $73.00 USEPA Method 8260 Full list amples from MW's $110.00 9 $990.00 Shipping Samples $70.00 1 $70.00
TOTAL LAB $1,262.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 4 $160.00 Monitoring well Install Kit $1,300.00 week 0 $0.00 Monitoring well Install Kit $325.00 day 1 $325.00 Shallow Groundwater Sampling Kit $290.00 day 2 $580.00 Ice $6.50 each 4 $26.00 Total Survey Station $50.00 day 0 $0.00 Deep Groundwater Sampling Kit $415.00 day 0 $0.00 Generator $70.00 day 0 $0.00
TOTAL EQUIPMENT $1,091.00
$5,150.00
Engineer/Scienti st
DATE: 7/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer P.E. oversight of MGAS events (Provide SOW, guidance, and answer field question) 3 Check MAGS data. 3
Total Hours 6 J. Penia Round trip Mobilization from Tampa to the site in Boca Raton 9
Preform MAGS Testing 8 Total Hours 17
B. Carrick Technician Round trip Mobilization from Tampa to the site in Boca Raton 8 Preform MAGS Testing 8
Total Hours 16 B. Jarvis Administrative Update tables 2
Total 2
TOTAL LABOR 41
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck J. Penia $120.00 day 2 $240.00 Rental Truck B. Carrick $120.00 day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel J. Penia $150.00 day 1 $150.00 Per Diem J. Penia $36.00 day 2 $72.00
Hotel B. Carrick $150.00 day 1 $150.00 Per Diem B. Carrick $36.00 day 2 $72.00
TOTAL PER DIEM $444.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units
USEPA Method TO-15 for VOHs $200.00 6 $1,200.00 Sampling Shipping Overnight $70.00 2 $140.00
TOTAL LAB $1,340.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 1 $40.00 MAGS Kit $325.00 Day 1 $500.00 Air Sampling Canisters $33.00 Day 6 $198.00
TOTAL EQUIPMENT $738.00
DATE: 7/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Coordinate and schedule with Surveyor 1 Total Hours 1
J. Penia Technician Round trip Mobilize from Tampa to the site in Boca Raton 9 PLS Oversight and aid in location of wells 4
Total Hours 13
TOTAL LABOR 14
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck J. Penia $132.00 day 1 $132.00
TOTAL VEHICLE $132.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel JP $36.00 day 2 $72.00 Per Diem JP $150.00 day 1 $150.00
TOTAL PER DIEM $222.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Southeastern Professional Land Survey $3,500.00 1 $3,500.00
TOTAL $3,500.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
325 TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 1 $40.00
TOTAL EQUIPMENT $40.00
DATE: 7/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Characterization of waste to profile soil & water IDW drums for transportation and disposal 1 Schedule IDW transport and disposal 1
Total 2
TOTAL LABOR 2
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation IDW T&D Soil $125.00 8 $1,000.00 Erwin Remediation IDW T&D Water $110.00 4 $440.00
TOTAL $1,440.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
DATE: 7/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
M. Culbreth Sr. Principal ScienDevelop conclusions, recommendations, and prepare final Assessment Report 2
Total 2 G Sattler Senior Engineer Prepare the draft SAR site background, SOW, soil, groundwater sections 30
Total 30 D. Phillips Senior Scientist Prepare draft SAR lithological section, create draft figures to be submitted for AutoCAD generatio 6
QA/QC of analytical data 2 Total 8
J. Von Borstel GIS Analyst Revise and Update Figures 8 Total 8
B. Jarvis Administrative Update tables, Document Preparation & Publishing 4 Total 4
TOTAL LABOR 52
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
DC014B 1 HW682
Karlee Fowler 850-245-8944 Environmental Consulting and Technology, Inc. (ECT)
Mark A. Culbreth 813-289-9338
ERIC_5188
Aldos Cleaners
$ 78,203.45 $ 94,523.44
$ 78,203.45 $ 94,523.44
05/14/2025 05/14/2025 0
1 1 2
Environmental Consulting & Technology, Inc
Mark Culbreth
Contract Manager
09/10/2024
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2024.09.18 14:29:27 -04'00'
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
File details come from the government source that posted it. Updated .