CN-370000-CN230-T36CO1.pdf

PDF 5 MB Posted

Attached to
Master Agreement FL|CN230|5f4ec01f5eb38b1957861cb8292c2183
Contract number
CN230
Issued by
Florida

About this file

This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for a project at Ft. Pierce Inlet State Park. The change order involves FDEP, Weiler Engineering Corporation as the consulting contractor, and authorizes modifications to Task Assignment No. 36 under FDEP Contract No. CN230. The document is dated November 1, 2022, and has been executed by authorized representatives from both FDEP and Weiler Engineering, including budget, project management, and contract authority personnel.

The change order extends the project timeline for the South Beach Access Day Use Restroom Replacement project at no additional cost to FDEP. The original task execution date was October 14, 2021, with an initial end date of December 31, 2022. This change order extends the project completion date by 365 days to December 31, 2023, to allow time for construction activities and project closeout. The total task amount remains unchanged at $33,694.50, comprising $750.00 in reimbursable expenses and $32,944.50 in fixed fees. The extension was requested due to delays in the project completion process, with Subtasks 4 through 5K remaining outstanding pending the commencement of construction.

View the file

Other files

File Type Posted
CN-370000-CN230-CMC3.pdf PDF
CN-370000-CN230-T14CO1.pdf PDF
CN-370000-CN230-T14CO2.pdf PDF
CN-370000-CN230-T15.pdf PDF
CN-370000-CN230-T16.pdf PDF
CN-370000-CN230-T1CO1.pdf PDF
CN-370000-CN230-T20.pdf PDF
CN-370000-CN230-T21.pdf PDF
CN-370000-CN230-T24.pdf PDF
CN-370000-CN230-T25.pdf PDF
CN-370000-CN230-T2CO2.pdf PDF
CN-370000-CN230-T3.pdf PDF
CN-370000-CN230-T34CO2.pdf PDF
CN-370000-CN230-T35.pdf PDF
CN-370000-CN230-T36CO2.pdf PDF
CN-370000-CN230-T39.pdf PDF
CN-370000-CN230-T3CO1.pdf PDF
CN-370000-CN230-T45.pdf PDF
CN-370000-CN230-T45CO2.pdf PDF
CN-370000-CN230-T49.pdf PDF
CN-370000-CN230-T51.pdf PDF
CN-370000-CN230-T53CO2.pdf PDF
CN-370000-CN230-T56.pdf PDF
CN-370000-CN230-T62.pdf PDF
CN-370000-CN230-T64CO1.pdf PDF
CN-370000-CN230-T76.pdf PDF
CN-370000-CN230-T79.pdf PDF
CN-370000-CN230-T7CO1.pdf PDF
CN-370000-CN230-T9.pdf PDF
CN-370000-CN230-T92.pdf PDF
CN-370000-CN230-TA33.pdf PDF
CN-370000-CN230-CMC5.pdf PDF
CN-370000-CN230-T1.pdf PDF
CN-370000-CN230-T12.pdf PDF
CN-370000-CN230-T13.pdf PDF
CN-370000-CN230-T14.pdf PDF
CN-370000-CN230-T18.pdf PDF
CN-370000-CN230-T19CO1.pdf PDF
CN-370000-CN230-T19CO2.pdf PDF
CN-370000-CN230-T22.pdf PDF
CN-370000-CN230-T25CO1.pdf PDF
CN-370000-CN230-T25CO3.pdf PDF
CN-370000-CN230-T26.pdf PDF
CN-370000-CN230-T2CO1.pdf PDF
CN-370000-CN230-T37CO2.pdf PDF
CN-370000-CN230-T45CO1.pdf PDF
CN-370000-CN230-T4CO1.pdf PDF
CN-370000-CN230-T52.pdf PDF
CN-370000-CN230-T53.pdf PDF
CN-370000-CN230-T53CO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT CHANGE ORDER FORM

(Revised 9-26-2018) Page 1 of 1

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description and Justification of Change:

Change in Task Amount:

Item Reimbursement Fixed Fee Total

Original Task Amount:

Task amount including all previous Change Orders:

Net increase/decrease in task amount for this Change Order:

Total Amounts with all Change Orders:

Change in Task Time:

Original Task Execution Date:

Original Task End Date:

Present Task End Date:

Net Change in Days:

New Task End Date:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 Digit FLAIR Code: Total:

CN230 36 1 61384C

Ft. Pierce Inlet State Park South Beach Access Day Use Restroom Replacement

Weiler Engineering

Robin Palmer 941-505-1700 rpalmer@weilerengineering.org

Ralph Perkins 850-245-2460 Ralph.Perkins@FloridaDEP.gov

The process for completion of this project has taken longer than expected by FDEP and a Task Assignment Time Extension is required for remaining services. No cost change order. See attached dated 10/28/2022.

$ 750.00 $ 32,944.50 $ 33,694.50 $ 750.00 $ 32,944.50 $ 33,694.50 $ 0.00 $ 0.00 $ 0.00

$ 750.00 $ 32,944.50 $ 33,694.50

10/14/2021

12/31/2022

12/31/2022

12/31/2023

Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2022.11.01 07:41:25 -04'00'

Jim McGuire Jim McGuire Digitally signed by Jim McGuire Date: 2022.10.31 11:12:12 -04'00'

David Matson for Ralph Perkins David Matson Digitally signed by David Matson Date: 2022.11.01 08:27:34 -04'00'

Jeff Weiler Jeff Weiler Digitally signed by Jeff Weiler Date: 2022.11.01 11:07:44 -04'00'

Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.

Digitally signed by Michael W.

Foster Jr., P.E.

Date: 2022.11.09 09:53:38 -05'00'

$ 0.00

PUNTA GORDA OFFICE: 201 WEST MARION AVENUE - SUITE 1306 | PUNTA GORDA | FL 33950 | TEL 941-505 -1700 | FAX 941-505 -1702 MARATHON OFFICE: 6805 OVERSEAS HIGHWAY | MARATHON | FL 33050 | TEL 305 -289-4161 | FAX 305 -289-4 1 6 2 WE INVITE YOU TO VISIT OUR WEB SITE AT WWW.WEILERENGINEERING.ORG OR EMAIL US AT INFO@WEILERENGINEERING.ORG

October 28, 2022

Edward Straight

Design Project Manager

Bureau of Design and Construction

Florida Department of Environmental Protection

3900 Commonwealth Boulevard 260K, MS 520

Tallahassee, FL 32399

850-245-2685

Re: Ft. Pierce Inlet State Park South Beach Access Day Use Restroom Replacement FDEP Contract No:

CN230 Task Assignment No: 35, Project No: 61384C

Mr. Straight, We are requesting a time extension for the Ft. Pierce Inlet State Park South Beach Access Day Use Restroom

Replacement project. This extension would be at no additional cost to the FDEP. The current contract expired on 12/31/2022; however, Subtask 4 through Subtask 5K are outstanding pending the commencement of construction. We are requesting a 365 day extension to allow for enough time for the project to be constructed and closed out.

If you have any questions, or require additional information, please do not hesitate to contact me at (941)

505-1700 or electronically at rpalmer@weilerengineering.org.

Sincerely, Robin Palmer, P.E.

Project Manager

Weiler Engineering Corporation

Williams_BrD Text Box

BLANK TA CO FORM.pdf
Ft Pierce Inlet Request for Contract Extension (002).pdf

File details come from the government source that posted it. Updated .