This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for contract CN225 involving DRMP, Inc., a consulting firm based in Tallahassee, Florida. The change order pertains to the Mike Roess Gold Head Branch Sewer Line Replacement project located in Florida (Project No. 61297C). Key personnel include Benjamin Lennon serving as the Consultant Representative for DRMP, Inc., and Uyles W. Keen Jr. as the FDEP Contract Manager. The document was executed on May 16-18, 2022, with digital signatures from all required approval authorities.
The change order extends the task completion timeline by 180 days without any modification to the financial terms. The original task end date of June 30, 2022 is extended to December 26, 2022 to allow DRMP, Inc. to complete construction administrative services. The total task amount remains unchanged at $31,466.93, consisting of a $5,650.00 reimbursement component and a $25,816.93 fixed fee. No net increase or decrease in task amount is associated with this change order, which is purely a time extension requested by the consultant in an email dated May 13, 2022.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
(Revised 9-26-2018) Page 1 of 1
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description and Justification of Change:
Change in Task Amount:
Item Reimbursement Fixed Fee Total
Original Task Amount:
Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders:
Change in Task Time:
Original Task Execution Date:
Original Task End Date:
Present Task End Date:
Net Change in Days:
New Task End Date:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 Digit FLAIR Code: Total:
CN225 24 2 61297C
Mike Roess Gold Head Branch Sewer Line Replacement
DRMP, Inc
Benjamin Lennon 850.562.9600 BLennon@drmp.com
Uyles W. Keen Jr 352-339-5101 uyles.keen@dep.state.fl.us
180 day time extension to complete the construction administrative services. This is for time only. Per attache d dated 5/13/2022.
$ 650.00 $ 24,936.85 $ 25,586.85 $ 5,650.00 $ 25,816.93 $ 31,466.93
$ 0.00 $ 0.00 $ 0.00 $ 5,650.00 $ 25,816.93 $ 31,466.93
12/03/2020
6/30/2022
6/30/2022
12/26/2022
Diane Langston Diane Langston Digitally signed by Diane Langston Date: 2022.05.16 08:19:03 -04'00'
Uyles W. Keen Jr Uyles W. Keen Jr Digitally signed by Uyles W. Keen Jr Date: 2022.05.16 09:26:23 -04'00'
Jeff Whitfield Jeffrey Whitfield Digitally signed by Jeffrey Whitfield Date: 2022.05.16 09:56:15 -04'00'
Benjamin Lennon Benjamin R Lennon
2022.05.16 11:15:04-04'00'
Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2022.05.18 15:11:46 -04'00'
$ 0.00
From: Benjamin Lennon To: Keen, Uyles (JR) Cc: Allison DeGraw Subject: Gold Head Time Extension Date: Friday, May 13, 2022 12:57:27 PM Attachments: image001.png image002.png image003.png image004.png image005.png image006.png
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
JR,
The subject project is set to expire 6/30/2022.
We are requesting a time extension of 180 days.
Thank you, Benjamin Lennon, PE Project Manager Main: 850.562.9600 | Direct: 850.692.5659 blennon@drmp.com
DRMP, Inc.
1625 Summit Lake Drive, Suite 200, Tallahassee, FL 32317 mailto:BLennon@drmp.com mailto:Uyles.Keen@dep.state.fl.us mailto:aDeGraw@drmp.com https://secure-web.cisco.com/16rU3DvifsrviGCUBpgocJjka5QNmv1MmY9AK_MurbfGo8wTjt4iXsn-ZbwaFkrhRlrUWceBI0SyXdu9HFrKmLqHR-Cad-ZPIziREQuqxUi_cw4vew9MhJOBAPg8zoexI5Kj19UTVJNkTxewVlrDJUdRUt5qIsMabVJlAJ7K_c4ZOGkgpXYfFo5P-UTt9RC7fl6ZMdmoHDqKji5CKBUOC6_H9o3RrwnpNQ-A38Es3pzjyVgvKMvPksqv31N-xO8ifql4U7pWNJwkWlkGpIgvNpP-pfP4l9NBgqbE0DocogzMHoVNamKaSdfTER6DWhm1E/https%3A%2F%2Fdrmp.com%2F tel:850.692.5659 mailto:BLennon@drmp.com https://secure-web.cisco.com/1Y1XWVihv_wZIvhvIMZ3eIZz6Qu5OcUoG9CUWd8rALugzurzpi0_02hgj3-YGE_cNZcKPUbvylp4Gwifw1L1GsAlmFLWg6ilkA1jWTreVcGU3is0MPqZ7XcK2VSoiJki0THEO6Lw9ELeVXl8BlUkvTycrk-WUJaHGeL-DpoUjozzn_gRcnc5VrelRT2UvYfWhYJNtBHEKDoc0gX1ywA4Nsnh1NUtfFX2Ul4cy75nWWp1h34o2DsdIEteRdeUWs4Mv9UT02mqKsCglGCWzI9XSL899j6QEDiPeXykBsGu1K8kBPHP-D9xxd2BLmMF1OXPJ/https%3A%2F%2Fwww.facebook.com%2FDRMP-Inc-291245692343%2F https://secure-web.cisco.com/1rCsnK2f_nLGvKwzalarZCh3Lka_34NREL4xEw79dmCaPgeegFG_tw-SoE9XUqnVZL0aMEYmBkmOwNZLk7IKc7h6tnJEyRhf5tIULn-dAnAt_QI43QwsG_2ppalAsIZcBeYT6nW_co-5eQg8H7BCpXHcyDHhhZwHOpmCfTFse6J1aMRpf9DFzLpuLHZ7sQEacVLSR9yXM6hAtgA-DkEjMbYfSdOTB7wZPYeJY63MGiUWPtQf7O2KLdAQAF5_PEGpsFQaNtaH_n6PdnhkMs-r2aT5lRFo9zJxVzD55JoXo2_ESuS3AcV4nya16W0H70qaL/https%3A%2F%2Fwww.linkedin.com%2Fcompany%2F46447%2Fadmin%2F https://secure-web.cisco.com/15DOJpkIrj2TKBvpGZ41SfE1iazXSO6zLr0JrwTbXuK12YQlRLzC7JdKGXHhJRdYKkdehut9-nUCFHbKqmkoNhz1r6X5xw-JbEJ3ZHzdOmPzzCf75Yu4GmDYIw2Dft7ewVMgMpyU3zFenmeJWsT-ebJyrO8ZIQ87yIE5Hl325mzHl20VyYP8AaCHSXcuS37nwZrxVg9wYZhY5eF0uTbYttN9bR6Hf_Go5NfkkiBRTqUZ5X9leaLr8S9dCS88mxI246PWPK3ezh8Sc-U34DcXNReuH_hyxBCNT7ERrdLFVEwIP-SrzViJK4mPpTu3d__MX/https%3A%2F%2Ftwitter.com%2FDRMPInc https://secure-web.cisco.com/1woIGpMAzbWLaUq8MW496LnNHyPa70xQBMBCU_ow0r_fiHdPtMJnw3Geo0V2o6LC_LDdKNhm6v7hZU8oGKmTxtJEhP0bwCvnb0FQNRA-0gPDbx2NVMd70tv4Vf4bQy_VZosSH7_yAbIX6kQ1sfy07P6itUpsuZHG1A3r19PAAQHcJIa_RfKXGEz0ybrsBI0yIg7lKS68mDvualvIdrvj0rpRMV-aOEgMp8t2AHxWd6zzpk1In33ZtAMHuU14EERHgfe3285La-6kx5eD8Y6AVp_qp0p1waj-zRSPdoMq7gxtnqp1np78ZLGduitSB4lCt/https%3A%2F%2Fwww.youtube.com%2Fuser%2FDRMPengineering https://secure-web.cisco.com/16rU3DvifsrviGCUBpgocJjka5QNmv1MmY9AK_MurbfGo8wTjt4iXsn-ZbwaFkrhRlrUWceBI0SyXdu9HFrKmLqHR-Cad-ZPIziREQuqxUi_cw4vew9MhJOBAPg8zoexI5Kj19UTVJNkTxewVlrDJUdRUt5qIsMabVJlAJ7K_c4ZOGkgpXYfFo5P-UTt9RC7fl6ZMdmoHDqKji5CKBUOC6_H9o3RrwnpNQ-A38Es3pzjyVgvKMvPksqv31N-xO8ifql4U7pWNJwkWlkGpIgvNpP-pfP4l9NBgqbE0DocogzMHoVNamKaSdfTER6DWhm1E/https%3A%2F%2Fdrmp.com%2F
| CN225 TA24 CO02 Time Only |
| TA 24 Gold Head Time Extension |
File details come from the government source that posted it. Updated .