This is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) under Contract CN210, Task Assignment No. 5. The contract engages CPH, Inc. as the consultant to provide design and construction administration services for the Grayton Beach State Park Campground Reinvestment Project (Project No. 61111C), located in Grayton Beach, Florida. The FDEP's Bureau of Design and Construction serves as the owner, with Jason Toole, P.E., as the consultant representative and Mae Roth as the FDEP Contract Manager. The project is managed by Theresa Carron of FDEP's Pre-Construction Project Management team.
The scope of work encompasses six primary subtasks: (1) topographic survey of the 7.5-acre campground area; (2) preparation of 60% design plans for water, sewer, and electrical utilities for existing campsites 1-31 and 33-36, plus two future campsites; (3) permitting coordination with regional utilities and local agencies; (4) 90% design plans with constructability review; (5) 100% design plans suitable for bidding and construction; and (6) construction administration services including bidding support and field inspections. The fixed price cost is $47,433.38, with cost reimbursement not to exceed $1,279.37, for a total task amount of $48,712.75. The project schedule extends from February 15, 2017, through June 30, 2018, with staggered completion dates for each subtask. Payment will be made upon approval of deliverables for each subtask by FDEP.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .