This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) under Contract No. CN210 for the Fort Clinch State Park Road Repair and Waterline Replacements project located in Fort Clinch State Park. The consultant on the project is CPH, Inc., represented by Kayla Sheffield, P.E. The change order was approved on April 4-5, 2024, and is managed by FDEP Contract Manager Ralph Perkins. The document represents an indefinite delivery task assignment vehicle with multiple subtasks spanning surveying, permitting, engineering, design, and construction administration services.

The change order adds professional services for completion of the waterline replacement and connection project to the Ft Clinch Beachside Bath Houses, increasing the net task amount by $65,301.37 for a total task amount of $69,873.88. The project encompasses twelve subtasks with fixed-price and reimbursable components, including gopher tortoise surveys ($5,811.20), FFWCC permitting fees ($6,607.71), ecological services ($4,182.30), topographic surveys ($8,842.88), geotechnical engineering ($5,926.04), 60% through 100% design documents and opinions of probable cost ($16,328.82), City of Fernandina Beach Technical Review Committee submittal and responses ($11,027.23), and construction administration services ($5,490.24). The total overall cost is $65,301.37, with payment contingent upon FDEP approval of deliverables for each subtask. The project execution runs from January 23, 2023, through January 10, 2025.

View the file

Other files

File Type Posted
CN-370000-CN210-T13.pdf PDF
CN-370000-CN210-T14.pdf PDF
CN-370000-CN210-T14CO2.pdf PDF
CN-370000-CN210-T15.pdf PDF
CN-370000-CN210-T22.pdf PDF
CN-370000-CN210-T23CO1.pdf PDF
CN-370000-CN210-T25CO1.pdf PDF
CN-370000-CN210-T26.pdf PDF
CN-370000-CN210-T33.pdf PDF
CN-370000-CN210-T35.pdf PDF
CN-370000-CN210-T35CO2.pdf PDF
CN-370000-CN210-T35CO3.pdf PDF
CN-370000-CN210-T35CO5.pdf PDF
CN-370000-CN210-T38CO2.pdf PDF
CN-370000-CN210-T41.pdf PDF
CN-370000-CN210-T43.pdf PDF
CN-370000-CN210-T44.pdf PDF
CN-370000-CN210-T44CO6.pdf PDF
CN-370000-CN210-T46CO2.pdf PDF
CN-370000-CN210-T47.pdf PDF
CN-370000-CN210-T47CO2.pdf PDF
CN-370000-CN210-T48CO1.pdf PDF
CN-370000-CN210-T48CO2.pdf PDF
CN-370000-CN210-T49.pdf PDF
CN-370000-CN210-T49CO2.pdf PDF
CN-370000-CN210-T4CO3.pdf PDF
CN-370000-CN210-T4CO5.pdf PDF
CN-370000-CN210-T6.pdf PDF
CN-370000-CN210-T8CO3.pdf PDF
CN-370000-CN210-TA28.pdf PDF
CN-370000-CN210-A1.pdf PDF
CN-370000-CN210-CMC2.pdf PDF
CN-370000-CN210-CMC3.pdf PDF
CN-370000-CN210-CMC4.pdf PDF
CN-370000-CN210-CMC5.pdf PDF
CN-370000-CN210-T14CO3.pdf.crdownload CRDOWNLOAD file
CN-370000-CN210-T18CO3.pdf PDF
CN-370000-CN210-T1CO2.pdf PDF
CN-370000-CN210-T23.pdf PDF
CN-370000-CN210-T23CO3.pdf PDF
CN-370000-CN210-T25.pdf PDF
CN-370000-CN210-T3.pdf PDF
CN-370000-CN210-T30CO1.pdf PDF
CN-370000-CN210-T30CO2.pdf PDF
CN-370000-CN210-T31.pdf PDF
CN-370000-CN210-T32.pdf PDF
CN-370000-CN210-T35CO1.pdf PDF
CN-370000-CN210-T36CO1.pdf PDF
CN-370000-CN210-T37CO2.pdf PDF
CN-370000-CN210-T38.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT CHANGE ORDER FORM

( ) Page 1 of 1

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description and Justification of Change:

Change in Task Amount:

Item Reimbursement Fixed Fee Total

Original Task Amount:

Task amount including all previous Change Orders:

Net increase/decrease in task amount for this Change Order:

Total Amounts with all Change Orders:

Change in Task Time:

Original Task Execution Date:

Original Task End Date:

Present Task End Date:

Net Change in Days:

New Task End Date:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 Digit FLAIR Code: Total:

CN210 39 01 61499C

Fort Clinch State Park Road Repair and Waterline Replacements.

CPH, Inc.

Kayla Sheffield 904-332-0999 ksheffield@cphcorp.com

Ralph Perkins 850-245-2640 Ralph.Perkins@FloridaDEP.gov

Adding professional services to original Task Assignment for completion of waterline replacement and connection project, per the attached dated April 2nd, 2024.

$ 4,572.51 $ 4,572.51 $ 4,572.51 $ 4,572.51 $ 65,301.37 $ 65,301.37

$ 0.00 $ 69,873.88 $ 69,873.88

01/23/2023

01/10/2025

01/10/2025

01/10/2025

Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2024.04.04 11:37:42 -04'00'

Joel Pollock Joel Pollock Digitally signed by Joel Pollock Date: 2024.04.04 13:13:03 -04'00'

Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2024.04.04 13:38:46 -04'00'

Kayla Sheffield, P.E. Kayla Sheffield

2024.04.05 10:36:46-04'00'

Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.

Digitally signed by Michael W.

Foster Jr., P.E.

Date: 2024.04.05 16:02:41 -04'00'

61499C 37502000027 080039/23 423001 U3200 131500 QK $ 65,301.37

$ 65,301.37