CN-370000-CN210-T18CO2.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|CN210|c74bacc1301afbdccbbd4f57e12bda99
Contract number
CN210
Issued by
Florida

About this file

This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for consultant services related to the Weeki Wachee Springs State Park Headspring Erosion Control project. The contract involves FDEP and consulting firm CPH, Inc., with AREHNA Engineering, Inc. providing specialized geotechnical services. The document represents Change Order No. 2 to Task Assignment No. 18 under FDEP Contract No. CN210, with project number 61241C. FDEP Contract Manager Jack Brady and Project Manager C Hewitt oversee the work with consultant representative Ariel Elvambuena from CPH, Inc.

The change order authorizes additional survey, geo-technical, and engineering services totaling $19,893.51, increasing the total task amount from $72,853.15 to $92,846.66. Specific deliverables include a Pond Siting Technical Memo, topographic surveys (north and south areas), 30% design documents incorporating pond design, and geotechnical engineering services including borings, infiltration testing, and laboratory analysis. The work consists of four subtasks: Subtask 13 ($3,979.32 base, $3,891.69 optional) for pond siting, Subtask 14 ($6,976.76 base, $13,996.50 optional) for surveys, Subtask 15 ($6,235.98) for 30% plans, and Subtask 16 ($2,701.45 base, $1,472.48 optional) for geotechnical services. The project execution was extended by 183 days, with a new end date of June 30, 2020. Payment is made upon FDEP approval of deliverables for each subtask. The funding source identifies Project 61241C, Grant 37504000281, with accounting codes Fund 675002, Module U3200, Object Code 131500, and fiscal year category 080039/19.

View the file

Other files

File Type Posted
CN-370000-CN210-T13.pdf PDF
CN-370000-CN210-T14.pdf PDF
CN-370000-CN210-T14CO2.pdf PDF
CN-370000-CN210-T15.pdf PDF
CN-370000-CN210-T22.pdf PDF
CN-370000-CN210-T23CO1.pdf PDF
CN-370000-CN210-T25CO1.pdf PDF
CN-370000-CN210-T26.pdf PDF
CN-370000-CN210-T33.pdf PDF
CN-370000-CN210-T35.pdf PDF
CN-370000-CN210-T35CO2.pdf PDF
CN-370000-CN210-T35CO3.pdf PDF
CN-370000-CN210-T35CO5.pdf PDF
CN-370000-CN210-T38CO2.pdf PDF
CN-370000-CN210-T41.pdf PDF
CN-370000-CN210-T43.pdf PDF
CN-370000-CN210-T44.pdf PDF
CN-370000-CN210-T44CO6.pdf PDF
CN-370000-CN210-T46CO2.pdf PDF
CN-370000-CN210-T47.pdf PDF
CN-370000-CN210-T47CO2.pdf PDF
CN-370000-CN210-T48CO1.pdf PDF
CN-370000-CN210-T48CO2.pdf PDF
CN-370000-CN210-T49.pdf PDF
CN-370000-CN210-T49CO2.pdf PDF
CN-370000-CN210-T4CO3.pdf PDF
CN-370000-CN210-T4CO5.pdf PDF
CN-370000-CN210-T6.pdf PDF
CN-370000-CN210-T8CO3.pdf PDF
CN-370000-CN210-TA28.pdf PDF
CN-370000-CN210-A1.pdf PDF
CN-370000-CN210-CMC2.pdf PDF
CN-370000-CN210-CMC3.pdf PDF
CN-370000-CN210-CMC4.pdf PDF
CN-370000-CN210-CMC5.pdf PDF
CN-370000-CN210-T14CO3.pdf.crdownload CRDOWNLOAD file
CN-370000-CN210-T18CO3.pdf PDF
CN-370000-CN210-T1CO2.pdf PDF
CN-370000-CN210-T23.pdf PDF
CN-370000-CN210-T23CO3.pdf PDF
CN-370000-CN210-T25.pdf PDF
CN-370000-CN210-T3.pdf PDF
CN-370000-CN210-T30CO1.pdf PDF
CN-370000-CN210-T30CO2.pdf PDF
CN-370000-CN210-T31.pdf PDF
CN-370000-CN210-T32.pdf PDF
CN-370000-CN210-T35CO1.pdf PDF
CN-370000-CN210-T36CO1.pdf PDF
CN-370000-CN210-T37CO2.pdf PDF
CN-370000-CN210-T38.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT CHANGE ORDER FORM

Required Signatures: Adobe Signature

FDEP Contract No.: I Task Assignment No.: Change Order No.: I Project No.:

CN210 18 2 61241C

Project Location: Project Name:

Weeki Wachee Springs State Park Headspring Erosion Control Consultant Name:

CPH, Inc.

Consultant Representative: Phone: Email:

Ariel Elvambuena 813-288-0233 aelvambuena@cphcorp.com FDEP Contract Manager: Phone: Email:

Jack Brady 850-245-2535 Jack.BradycmFioridaDEP.gov Description and Justification of Change:

Additional survey, geo-technical, and engineering services per the attached proposal dated 07/09/2019 .

Ch ange in as . Ti kA mount:

Item Reimbursement Fixed Fee Original Task Amount: $ 100.00 $65,294.76 Task amount including all previous Change Orders: $ 100.00 $72,853.15 Net increase/decrease in task amount for this Change Order: $ 19.893.51 Total Amounts with all Change Orders: $ 100.00 $ 92.746.66

Ch ange in as ,me: . Ti k r,·

Original Task Execution Date: 12/5/2018

Greg Turral Budget Representative, FDEP

C Hewitt Project Manager, FDEP

Jack Brady

Original Task End Date: 12/31/2019

Present Task End Date: 12/31/2019

Net Change in Days: 183

New Task End Date: 6/30/2020

Approval Signatures:

Gregory Tu rra I Digitally signed by Gregory Turral Date: 2019.07.11 17:00:13-04'00'

Signature Philip Madden for C Hewitt

Signature

Digitally signed by Philip Madden tore Hewitt Date: 2019.07.12 16:49:44-04'00'

J a Ck B rad Y Digitally signed by Jack Brady Date: 2019.07.12 16:50:52 -04'00'

Signature DigilaUysignedt,yJl50!1LToole

Date

Date

Date

Total

$ 65 394.76 $72 953.15 $19 893.51 $ 92 846.66

Contract Manager, FDEP

Jason Toole

J LT I ON:C=US,O=CPHINC .•

ason 00 e 00:110

1427E0000016TTA302EC900002789,CN�JasonLTDDle

=�:7�: �:�;,:�� documam 7 /12/19

Consultant

Michael W. Foster Jr., P.E.

Contract Authority, FDEP

Project# Grant# Ore Code 61241C 37504000281

29 Di2it FLAIR Code:

(Revised 9-26-2018)

Signature

Cat/Year 080039/19

Fund Module Object Code EO Amount

675002 U3200 131500 XR $19,893.51

Total: $19,893.51

July 9, 2019

C.B. Hewitt

Project Manager

Bureau of Design and Construction

3900 Commonwealth Blvd. MS520

Tallahassee FL, 32399

RE: CN210

Weeki Wachee - Headspring Erosion Control

Project #61241C

Dear C, For your review, CPH, Inc., has provided a proposal summary and man-hour documentation for the services tasks identified below:

• Creating a Pond Siting Technical Memo based on the correspondence with FDEP

• Additional Survey for proposed pond location.

• Additional efforts performed in the 30% documents/Conceptual Plans phase due to additional direction from FDEP that exceeded the original scope.

• Additional Geotech needed for the proposed pond.

Per FDEP direction, an optional scope and fee was also calculated for areas outside of the park limits to determine the feasibility of routing stormwater runoff inside the park limits to an existing pond south of the parking lot.

In the original Contract and EWA, CPH is tasked with redesigning the Weeki Wachee Park Beach area to alleviate erosion and accommodate stormwater runoff and remove existing pipe within the Park that outfalls into the Spring.

Please review the attached Proposal Summary and deliverables.

Sincerely, Ariel P. Elvambuena

CPH, Inc.

Weeki Wachee Swimming Area Improvements

Weeki Wachee

CN210, TA18

Subtask 13: Pond Siting Technical Memo

Description:

• 13A - From the numerous correspondences with FDEP regarding their preference on preventing runoff going into the springs, CPH will evaluate the pond on the northeast corner of the park for stormwater runoff.

• 13B (OptioAal) FDf-P ,"equests 01'1 013tiol'l0,' seo13e 01'16 fee to et10!u0te 13ossihly 6i,"eetit'lg 0.'!

sto,"fflwBter rut'lojffrom the 13t:1r-.'< to the eHistit'lg f30l'l6 e0st <>f the 13ef'k Bl'l6 ultimetely to the etistit'lg f361'1d sout/:1 of the f3B,�il'lg ,'et.

Deliverable: Pond Siting Memo in PDF Format.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 13A

Firm Name Position Classification Hourly Hours Total Fixed

Rate Price Cost

CPH, Inc. Principal $178.23 2 $356.46

CPH, Inc. Sr. Project Manager $132.61 20 $2,652.20

CPH, Inc. Project Engineer $73.37 10 $733.70

CPH, Inc. Administrative $59.24 4 $236.96

Subtotal= $3,979.32

5t:tetaslE 13B (OptieAal)

FiFffi Name PositioA ClassiiieatieA � � =l=otal FilEeEI

Hate PFiee Cost

CPI-I, IAe. PFiAeipal $H8.iB � $356.46

CPI-I, IAe. 5F. PFojeet MaAageF $13�.6:I: � $�,65�.�9

CPI-I, IAe. PFOjeet EAgiAeeF � ¼9 $733.79

CPI-I, IAe. AEIFAiAiStFati•,e � ¼ �

5t:tetetal $3,89:1:.69

Total for Subtask 13: $3,979.32, ($7-,780.92 wi#J O,,aane/.)

Subtask 14: Survey

Description:

• 14A North (Blue Area-2.0± acres) - Topographic Survey at 15' grid and the location of visible above ground improvements and visible above ground utilities within the project area to include sidewalks, sea wall and the toe of the sea wall. Project area defined within the area depicted in blue on the attached "Aerial Map"

• Location of trees measured at diameter at breast height (dbh) within scope (size and type only).

• 148 Se1:1t-R fOp#ene,'){Gt'een Aree 10.0• eeresJ Fopegffipfiic S1:111tey et 50' griti enti the !ecet'en

&f 1tisible ebe1te g,r.e1:1nti imp.r.evements enti 1tisibk ebeve gre1:1nti 1:1#.'-ities wit-hint-he project e.-:ee.

Pfflject e.-:ee tiefineti wit-hin the e."Ce tiepicteti in green en the ettecheti "Aeriel ,\4ep"

• Lece#en &f t"Ces mee,s1:1,"Cti et tiiemeter et 13,"Cest height (til,hJ wit-hin scepe {sfEe enti type en.'yj.

Deliverable:

• Subtask 14A- PDF/CAD file of blue survey area for use in design.

• Sl:lbtasl( l:4B PDF/CAD file of gFeen Sl:lFVe'/ aFea foF l:lSe in Elesign.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Subtask 14A - North

Firm Name Position Classification Hourly Hours Total Fixed

Rate Price Cost

CPH, Inc. Survey Crew (2 Man) $119.16 36 $4,289.76

CPH, Inc. Survey Project Manager/CADD $80.47 24 $1,931.28

CPH, Inc. GPS (2 Man) $146.66 2 $293.32

CPH, Inc. Field Crew Coordinator $62.43 2 $124.86

CPH, Inc. Principal Surveyor $121.41 2 $242.82

CPH, Inc. Clerical II $47.36 2 $94.72

Subtotal= $6,976.76

S1:1btaslE l:48 {913tional) So1:1th

Firm Name Position Classification Hettfly Hetff:s +otal Fii1eel

,Rate PFice Cost

CPH, Inc. S1:1i;•e•1 CFew {i!: Man) $1:l:9. l:6 +:J: $8,579.52':

CPH, Inc. Sl:lf>ole'f PFeject ManageF/CADD � -59 $4,Qi!:3.59

CPH, Inc. GPS {i!: Man) $1:46.66 4 $586.64

CPII, Inc. Fielel Cre•1, CoorelinatoF � 6 $374.58

CPII, Inc. PFinci13al Sl:lf>tle'/OF $1:i!:l:.41: � $i!:4i!:.8i!:

CPH, Inc. CleFical II :$47-36 4 $1:89.44

51:Jbtotal $1:3,996.59

Total for Subtask 14: $6,976.76 ($29,973.26 with Optiens/J

Subtask 15: 30% Documents/Conceptual Plans

Description: As part of the original 30% conceptual plans and additional pipe removal for the swimming area improvements, CPH will incorporate the proposed pond design into the 30% plans. Manhours below indicate efforts made in additional to the original scope as directed by FDEP

Deliverable:

• Set of 30% review aerial in pdf format

• Preliminary Opinion of Probable Cost (OPC}

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 15

Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost

CPH, Inc. Principal $178.23 2 $356.46

CPH, Inc. Sr. Project Manager $132.61 16 $2,121.76

CPH, Inc. Project Engineer $73.37 16 $1,173.92

CPH, Inc. Senior Design Technician $73.34 32 $2,346.88

CPH, Inc. Administrative $59.24 4 $236.96

Total for Subtask 15: $6,235.98

Subtask 16: Geotechnical Engineering Services

Description:

16A North - The purpose of our geotechnical study is to obtain information on the general subsurface conditions at the Weeki Wachee Springs State Park for a proposed pond and existing pond(s). The subsurface materials encountered will then be evaluated with respect to the available project characteristics. In this regard, engineering assessments for the following items will be formulated and documented in a single written engineering report. Our geotechnical report will include:

• Existing USDA Soil Survey and USGS Topographic mapping.

• Soil and groundwater conditions encountered in the borings. General location and description of deleterious materials encountered in the borings which may have an impact on the proposed project. Environmental sampling and testing are not a part of our services.

• Identification of the existing ground water levels and estimated normal seasonal high ground water fluctuations.

• General site preparation recommendations.

• Infiltration rates based on the results of a Double Ring Infiltration (DR/) test. A horizontal infiltration value will be estimated based on correlations from the vertical infiltration rate and soil types encountered. Further, fillable porosity of the soil will be estimated based on the results of the hand auger boring and DR/ test.

The following services will be performed:

• Locate borings in the field and request utility location services from Sunshine811.

• Standard Penetration Test (SPT) borings:

Two SPT borings extending to depths of approximately 15 feet below the ground surface will be performed at the north and east locations indicated on the provided site plan.

• Double Ring Infiltration (DR/) tests:

Two DR/ tests will be performed at the location indicated on the provided site plan. The

DR/ tests will be performed approximately 2 feet below the existing ground surface or½ foot above the recorded groundwater level.

• Visually classify and stratify soil samples in the laboratory using the Unified Soil

Classification System and conduct a laboratory testing program on representative samples, as appropriate.

• Stal'l<Ja,"Cl .Oel'letffltiel'I Test (S.OT) bel'fl'lgs:

Twe SPT berif'l(}S ei(tef'l<iil'I(} te dep#ls af appft3�ffflate.'-y 15 feet be.ler, the g,•euf'l<i surfaee r1iN be perfal'ffle<J at #le seu#lerfl ojfsfte ,1eeatfef'ls if'l<Jfeate<J ef'I #le previde<J sft:e J3,'-6n.

• Det:Jb.'e Ril'I(} !ftfNtft3tiol'I (DR,') tests:

Ol'le DRt tests r1i.«I be perfa,meel at the Jaeatiel'I il'l<ifeate<J Ol'I #le prevfdeel site plal'I. The

DRJ tests will be perfa,rmeel appro�fflate,'-y 2 feet be!aw the �stil'I(} (}fflt:Jl'l<i surfaee Bl' J� feet above the r-eeo,-ele<J (}fflUl'lelwate.r .«e�rcf.

Deliverable:

• 16A North - The results of the field exploration and engineering analyses will be presented in a written report signed and sealed by a professional engineer specializing in geotechnical engineering. The digitally signed and sealed report will be submitted within three weeks of the completion of the fieldwork.

• 168 S01:1tl=-l !Optier-rnl) Tl=-le Fesults ef tl=-lis eptieAal fielel e>tpleFatieA aF1el eAgiAeeFiAg aAalyses will ee pFeseF1teel iFI a wFitteA Fepert sigAeel aAel sealeel ey a prnfessieAal eF1giF1eeF specialii!!iAg iFI geeteel=-lAieal engineeFing. Tl=-le eligitally signeel anel sealeel Fepert ·.viii ee sueFRitteel vritl=-lin tl=-lFee wee Its ef tl=-le eeFRpletien ef tl=-le fielelweFlt.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost·

Subtask 16A North

Firm Name Position Classification Unit Rate Unit Quantity Total Fixed

Price Cost

Engineering Services

AREHNA

Staff Engineer $ 88.74 Hour 6 $ 532.44

Engineering, Inc.

AREHNA

Senior Project Engineer $ 129.81 Hour 1 $ 129.81

Engineering, Inc.

AREHNA

Principal Engineer $ 142.50 Hour 0.5 $ 71.25

Engineering, Inc.

AREHNA

Engineering Tech/ Inspector $ 49.50 Hour 3 $ 148.50

Engineering, Inc.

AREHNA

CAD Designer $ 75.00 Hour 2 $ 150.00

Engineering, Inc.

AREHNA

Secretary $ 54.45 Hour 1 $ 54.45

Engineering, Inc.

Field Services

AREHNA

Mobilization* $750.00 Each 0 $ 0.00

Engineering, Inc.

AREHNA Moving Between SPT $75.00 Each 1 $ 75.00

Engineering, Inc. Borings

AREHNA Standard Penetration Test $12.00 Feet 30 $ 360.00

Engineering, Inc. Borings - 0 to 50 feet

AREHNA Borehole Backfill (Bentonite $4.00 Feet 30 $ 120.00

Engineering, Inc. Chips)

AREHNA Double Ring Infiltration $400.00 Test 2 $ 800.00

Engineering, Inc. Tests

Laboratory Services

AREHNA

Natural Moisture Content $15.00 Test 3 $ 45.00

Engineering, Inc.

AREHNA

Percent Fines $50.00 Test 3 $ 150.00

Engineering, Inc.

AREHNA

Atterberg Limits $65.00 Test 1 $ 65.00

Engineering, Inc.

AREHNA

Organic Content $50.00 Test 0 $ 0.00 Engineering, Inc.

Subtotal= $2,701.45

S1:1etaslt :1:6B Se1:1H1 (919tieAall FiFffi P•aFFte PesitieA ClassitieatieA UAit Rate Yfl# QtlaAtity +etal Filteel

PFiee Gest EAgiAeeFiAg SeFYiees

AREIINA

Staff EAgiAeer $ 88.74 H-ettf � $ :1:77.48 EAgiAeeFiAg, IA€.

AREHNA

SeAieF PFejeet EAgiAeer $ :1:29.8:1: H-ettf G $-MG EAgiAeeriAg, IAe.

AREIINA

PriAeipal EAgiAeeF $ :1:42.50 Hettf G $-MG EAgiAeeFiAg, IA€.

AREHNA

EAgiAeeFiAg +eeh / IAspeeter $ 49.50 H-ettf G $-MG EAgiAeeriAg, IAe.

AREIINA

CAD DesigAer $ 75.00 H-ettf � $ :1:50.09 EAgiAeeFiAg, IA€.

AREHNA

Seeretary $ 54.45 H-ettf G $-MG EAgiAeeFiAg, IA€.

Fielel Sef'aliees

AREIINA

Meeilii!atieA* $750.00 Eee-1:t G $-MG EAgiAeeriAg, IAe.

AREHNA MeviAg BetweeA SP+

� Eee-1:t � $ :1:50.00 EAgiAeeriAg, IAe. BeriAgs AREHNA StaAElaFEI PeAetratieA +est

$H-:eG l=eet 39 $ 360.00 EAgiAeeFiAg, IAe. BeriAgs 0 te 50 teet AREI-INA Berehele Baelttill (BeAteAite

$+.GB l=eet 39 $ :1:20.00 EAgiAeeriAg, IAe. � AREIINA De1:1ele RiAg IAfiltFatieA

$400.00 +est '± $ 400.00 EAgiAeeFiAg, IA€. +effi l:aeerateFV Se1,•iees

AREHNA

Nat1:1Fal Meist1:1re CeAteAt � +est '± $ :1:5.00 EAgiAeeFiAg, IA€.

AREHNA

PeFeeAt FiAes � +est '± $ 50.00 EAgiAeeFiAg, IAe.

AREHNA

Attereerg Liffiits S,65:99 +est G $-MG EAgiAeeriAg, IAe.

AREHNA

9rgaAie CeAteAt ,$-SMG +est '± $ 50.00 EAgiAeeriAg, IAe.

S1:1etetal $:l:,47i!.48

Total for Subtask 16: $2,701.45 ($4,113.93 wi#t f>ptie11e,I)

*AREHNA assumes that work will be performed in conjunction with the seawall extension scope. If notice to proceed is not granted at the same time, a!l additional mobilization will be charged.

Proiect Schedule:

Activity

Subtask 13A: Pond Siting Technical Memo

5t:1e:t:aslE BB !01:1:t:ieRall: PeRcl

5i:t:iRg =t=eel:!Rieal IVleR'le

Subtask 14A: Survey- North

5t:1e:t:aslt 148: 5t:1FYey 5et:1:t:l:t

Subtask 15: 30% plans

Subtask 16A: Geotechnical Services - North

5t:1etaslE 168 !01:1tieRal):

6eeteel:!Rieal 5eFviees

Summarv of Fees:

Subtask

5et:1tl:t

Subtask 13A: Pond Siting Technical Memo

5t:1etaslE BB !01:1tieRal): PeRcl 5itiRg =t=eel:!Rieal IVleR'le

Subtask 14A: Survey- North

5t:1etaslE 148: 5t:1FYey 5et:1tl:t

Subtask 15: 30% plans

Subtask 16A: Geotechnical Services - North

5t:1etaslE :1:68 !01:1tieRal):

6eeteel:!Rieal 5eFYiees 5et:1tl:t

Total=

Total with Optional Services

Duration (Calendar Days) Dates

15 8f8f19 :t:e 8f22f19

45 8f8f19 :t:e 8f22/19

28 7f H�f19 :t:e 8f+f 19

2-8 +f 19f19 :t:e 8f7f 19

With Revised Original Scope

With Revised Original Scope

Witl:t Revised OFigiRal 5ee1:1e

Subtask Fixed Optional Subtask Reimbursable Price Cost

$3,979.32

$3,891.69

$6,976.76

$B,996.59

$6,235.98

$2,701.45

$1,472.48

$19,893.51 $:l:9,�79.58

$�9,:1:64.99

Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.