This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for a design and construction project at Wekiwa Springs State Park. The change order modifies an existing indefinite delivery contract (CN210, Task Assignment No. 23) with CPH, Inc., a consulting firm serving as the primary contractor. The project is located in Orange and Seminole Counties, Florida, and involves coordination with multiple state and local agencies including the Florida Fish and Wildlife Conservation Commission (FFWCC), Orange County, Seminole County, and the Water Management District (WMD).
The change order authorizes eight subtasks valued at $80,013.97 in total cost, comprising $78,950.97 in fixed fees and $1,063.00 in reimbursable costs. The scope of work includes roadway survey ($15,067.87), roadway geotechnical services ($7,694.95), 30% design plans for a right-turn lane ($3,059.26), 60% design plans ($15,963.05), permitting and utility coordination ($17,382.66), final construction plans ($7,172.46), construction administration services ($7,499.85), and gopher tortoise survey, permitting, and relocation ($6,173.87). Payment is contingent upon FDEP approval of deliverables for each subtask. The project execution period runs from September 23, 2019, through December 20, 2020, with specific milestone dates established for each phase of design, permitting, and construction support activities.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .