This is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) Bureau of Design and Construction to assign work under FDEP Contract No. CN210. The assignment engages CPH, Inc., a professional engineering consulting firm, to provide services for the Guana Tolomato Matanzas National Estuarine Research Reserve (GTM NERR) Visitor Center project located at GTMNERR. The project manager is Laura Ross, with David Melfi serving as the consultant representative and Jack Brady as the FDEP contract manager.
The task involves analyzing and providing an alternative HVAC design and comparison for the GTM NERR Visitor Center's baseline HVAC system. The work is structured in two subtasks: Subtask 1A requires site evaluation and determination of alternatives within three calendar days, and Subtask 1B requires analysis of alternatives and delivery of a report within ten business days following Subtask 1A. The fixed price cost for Subtask 1A is $1,986.22, and Subtask 1B is $6,889.92, with reimbursable costs not to exceed $109.64. The total task amount is $8,985.78. Payment will be made upon FDEP approval of deliverables for each subtask. The task was executed on 7/17/2019 with a completion date of 12/31/2010, and deliverables include signed and sealed reports in both digital PDF and hard copy formats.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .