CN-370000-CN210-T48CO2.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|CN210|c74bacc1301afbdccbbd4f57e12bda99
Contract number
CN210
Issued by
Florida

About this file

This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for professional design services related to the Eden Garden State Park ADA Sidewalk and New Boardwalk project. The consultant is CPH, Inc., represented by Jason Toole, P.E., with FDEP Contract Manager Ralph Perkins overseeing the engagement. The contract is identified as FDEP Contract No. CN210, Task Assignment No. TA48, Change Order No. CO2, and Project No. 61452C.

The scope of work involves completion of a Cultural Resources Assessment Study (CRAS) Report for the proposed sidewalk and boardwalk improvements at Eden Gardens State Park. The deliverables are organized into three subtasks: Subtask 8 addresses Phase 1A-32 permit procurement, background research, and field survey ($5,677.83); Subtask 9 covers laboratory analysis and artifact curation ($872.61); and Subtask 10 encompasses preparation of the final technical report ($6,543.05). The total contract amount is $13,093.49 with no reimbursable costs. The original task execution date was April 11, 2023, with an original end date of April 11, 2026; however, this change order adjusts the task end date to March 3, 2025, with zero net change in days. Payment is due upon FDEP approval of deliverables for each subtask. The contract utilizes state funding identified by the 29-digit FLAIR code with Object Code 134000 and an appropriations code of 61452C.

View the file

Other files

File Type Posted
CN-370000-CN210-T12.pdf PDF
CN-370000-CN210-T17.pdf PDF
CN-370000-CN210-T18CO1.pdf PDF
CN-370000-CN210-T18CO2.pdf PDF
CN-370000-CN210-T21.pdf PDF
CN-370000-CN210-T21CO2.pdf PDF
CN-370000-CN210-T21CO3.pdf PDF
CN-370000-CN210-T23CO2.pdf PDF
CN-370000-CN210-T29CO1.pdf PDF
CN-370000-CN210-T30.pdf PDF
CN-370000-CN210-T31CO1.pdf PDF
CN-370000-CN210-T34.pdf PDF
CN-370000-CN210-T37.pdf PDF
CN-370000-CN210-T37CO1.pdf PDF
CN-370000-CN210-T38CO1.pdf PDF
CN-370000-CN210-T39CO1.pdf PDF
CN-370000-CN210-T3CO2.pdf PDF
CN-370000-CN210-T42CO1.pdf PDF
CN-370000-CN210-T44CO3.pdf PDF
CN-370000-CN210-T46.pdf PDF
CN-370000-CN210-T46CO1.pdf PDF
CN-370000-CN210-T48.pdf PDF
CN-370000-CN210-T49CO1.pdf PDF
CN-370000-CN210-T5.pdf PDF
CN-370000-CN210-T5CO1.pdf PDF
CN-370000-CN210-T8.pdf PDF
CN-370000-CN210-T8CO1.pdf PDF
CN-370000-CN210-TA25 CO2.pdf PDF
CN-370000-CN210-TA3CO3.pdf PDF
CN-370000-CN210-TA42CO2.pdf PDF
CN-370000-CN210-TA4CO2.pdf PDF
CN-370000-CN210.pdf PDF
CN-370000-CN210-A1.pdf PDF
CN-370000-CN210-CMC2.pdf PDF
CN-370000-CN210-CMC3.pdf PDF
CN-370000-CN210-CMC4.pdf PDF
CN-370000-CN210-CMC5.pdf PDF
CN-370000-CN210-T14CO3.pdf.crdownload CRDOWNLOAD file
CN-370000-CN210-T18CO3.pdf PDF
CN-370000-CN210-T1CO2.pdf PDF
CN-370000-CN210-T23.pdf PDF
CN-370000-CN210-T23CO3.pdf PDF
CN-370000-CN210-T25.pdf PDF
CN-370000-CN210-T3.pdf PDF
CN-370000-CN210-T30CO1.pdf PDF
CN-370000-CN210-T30CO2.pdf PDF
CN-370000-CN210-T31.pdf PDF
CN-370000-CN210-T32.pdf PDF
CN-370000-CN210-T35CO1.pdf PDF
CN-370000-CN210-T36CO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT CHANGE ORDER FORM

( ) Page 1 of 1

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description and Justification of Change:

Change in Task Amount:

Item Reimbursement Fixed Fee Total

Original Task Amount:

Task amount including all previous Change Orders:

Net increase/decrease in task amount for this Change Order:

Total Amounts with all Change Orders:

Change in Task Time:

Original Task Execution Date:

Original Task End Date:

Present Task End Date:

Net Change in Days:

New Task End Date:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 Digit FLAIR Code: Total:

CN210 TA48 CO2 61452C

Eden Garden State Park ADA Sidewalk & New Boardwalk

CPH, Inc.

Jason Toole, P.E. (850)563-1490 jtoole@cphcorp.com

Ralph Perkins, or successor (850) 245-2460 Ralph.Perkins@FloridaDEP.gov

Completion of a CRAS Study for Eden Gardens State Park per Proposal dated January 21, 2024.

$ 0.00 $ 84,838.59 $ 84,838.59 $ 0.00 $ 99,304.45 $ 99,304.45 $ 0.00 $ 13,093.49 $ 13,093.49 $ 0.00 $ 112,397.94 $ 112,397.94

04/11/2023

04/11/2026

03/03/2025

03/03/2025

Tamika Bass

Del Cobb

Ralph Perkins

Jason Toole, P.E.

Bryan Bradner

61452C 37501000020 080039/23 000286 U3100 134000 AD $ 13,093.49

$ 13,093.49

January 21, 2024

Mr. Del Cobb Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard, MS 520 Tallahassee, FL 32399

RE: Eden Garden State Park Professional Design Services for CRAS Report for Proposed Sidewalk and Boardwalk

Dear Del:

For your review, CPH, LLC., has provided a proposal summary and man-hour documentation for the professional design service tasks identified below:

- Completion of a CRAS Report for the above proposed project.

Please review the attached Proposal Summary and deliverables.

Sincerely, Jason Toole, P.E.

Program Manager

CPH, LLC.

1031-C W. 23rd Street Panama City, FL 32405

Phone: 850.563.1490 Fax: 850.563.1495

Eden Gardens State Park ADA Path and Elevated Boardwalk

CRAS Report Services

Subtask 8: 1A-32 Permit, Background Research, and Field Survey Description:

CPH will hire a sub-consultant to conduct background research in order to prepare a Research Design to include with the application for a Phase 1A-32 permit. Sub-Consultant will complete fieldwork to include shovel tests and pedestrian survey in the area of proposed improvements.

Deliverable:

Executed Phase 1A-32 Permit to conduct archaeological research on state lands.

Management Summary of Phase I Survey

Fixed Price Cost:

Subtask 8 – 1A-32 Permit, Background Research, and Field Survey Firm Name Position Classification Hourly

Rate Hours Total Fixed Price

Cost Chronical Heritage Principal in Charge $135 8 $1,080 Chronical Heritage Senior Archaeologist $95 10 $950 Chronical Heritage Project Manager $85 8 $680 Chronical Heritage GIS Specialist $65 5 $325 Chronical Heritage Technician $55 17 $935 Chronical Heritage Crew Chief $70 17 $1,190 Chronical Heritage Administrative Assistant $60 2 $120 CPH, LLC Sr. Project Manager $132.61 3 $397.83

Subtotal Task 8 $5,677.83

Subtask 9: Laboratory Analysis and Curation Description:

Materials collected during Subtask 8 will be taken to the laboratory for cleaning, stabilization, analysis and preparation for curation. Materials will be bagged, appropriately sized, and labeled as needed for 1A-32 Permit requirements.

Deliverable:

Artifact Analysis Table and curated artifacts for BAR.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 9 – Laboratory Analysis and Curation Firm Name Position Classification Hourly

Rate Hours Total Fixed Price

Cost Chronical Heritage Project Manager $85 1 $85 Chronical Heritage Senior Archaeologist $95 1 $95 Chronical Heritage Laboratory Manager $70 8 $560 CPH, LLC Sr. Project Manager $132.61 1 $132.61

Subtotal Task 9 $872.61

Subtask 10: Technical Report Description:

CPH hired sub-consultant will produce a technical report of the findings. Report will detail the background research, methodology, survey results, as well as recommendations. Report will follow the American Antiquity style guide and will meet or exceed current professional standards within the discipline.

Deliverable:

PDF copy of final Phase 1 Cultural Resources Assessment Report.

Curated artifacts and documentation to be delivered to BAR in fulfilment of the 1A-32 Permit.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 10 – Technical Report Firm Name Position Classification Hourly

Rate Hours Total Fixed Price

Cost Chronical Heritage Principal in Charge $135 12 $1,620 Chronical Heritage Senior Archaeologist $95 24 $2,280 Chronical Heritage Project Manager $85 12 $1,020 Chronical Heritage GIS Specialist $65 12 $780 Chronical Heritage Administrative Assistant $60 3 $180 CPH, LLC Sr. Project Manager $132.61 5 $663.05

Subtotal Task 10 $6,543.05

Project Schedule:

Activity Estimated Duration

(Calendar Days) Proposed Dates

Subtask 8 – 1A-32 Permit, Background Research, and Field Survey

45 2/2/24-3/18/24

Subtask 9 – Laboratory Analysis and Curation 10 3/18/24 – 3/28/24 Subtask 10 – Technical Report 60 3/18/24 – 5/17/24

Summary of Fees:

Subtask Subtask Fixed Price Cost Reimbursable Subtask 8 –1A-32 Permit, Background Research, and Field Survey

$5,677.83

Subtask 9 – Laboratory Analysis and Curation

$872.61

Subtask 10 – Technical Report $6,543.05

Total Reimbursable Cost: $0

Overall Total Cost: $13,093.49

Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.