About this file

This is a Task Assignment Change Order Form submitted by the Florida Department of Environmental Protection (FDEP) for Contract No. CN210, Task Assignment No. TA49, Change Order No. 01. The project involves Big Shoals State Park Septic Replacement and is being executed by CPH, Inc., a consulting firm based in Jacksonville, Florida. The FDEP Contract Manager is Ralph Perkins, with Project Manager Joel Pollock and Budget Representative Tamika Bass overseeing the work. The change order was digitally signed and approved by all relevant parties between June 25 and July 8, 2024.

The change order authorizes an underground locate survey to determine the exact location of five existing septic tanks and associated drainfields at Big Shoals State Park, as detailed in the proposal dated May 23, 2024. Subtask 7A involves Southeastern Surveying conducting horizontal location and field marking of the septic tanks and drainfields with a fixed cost of $4,261.00, while Subtask 8A requires CPH Consulting to update the original survey files with the utility information at a fixed cost of $1,007.99, for a total change order amount of $5,268.99 with no reimbursable costs. The project schedule allocates 30 calendar days for the underground locates and 5 calendar days for survey updates, with a new task end date of June 13, 2026. The total task amount including all change orders is $47,099.75, with payment contingent upon FDEP approval of deliverables.

View the file

Other files

File Type Posted
CN-370000-CN210-T13.pdf PDF
CN-370000-CN210-T14.pdf PDF
CN-370000-CN210-T14CO2.pdf PDF
CN-370000-CN210-T15.pdf PDF
CN-370000-CN210-T22.pdf PDF
CN-370000-CN210-T23CO1.pdf PDF
CN-370000-CN210-T25CO1.pdf PDF
CN-370000-CN210-T26.pdf PDF
CN-370000-CN210-T33.pdf PDF
CN-370000-CN210-T35.pdf PDF
CN-370000-CN210-T35CO2.pdf PDF
CN-370000-CN210-T35CO3.pdf PDF
CN-370000-CN210-T35CO5.pdf PDF
CN-370000-CN210-T38CO2.pdf PDF
CN-370000-CN210-T41.pdf PDF
CN-370000-CN210-T43.pdf PDF
CN-370000-CN210-T44.pdf PDF
CN-370000-CN210-T44CO6.pdf PDF
CN-370000-CN210-T46CO2.pdf PDF
CN-370000-CN210-T47.pdf PDF
CN-370000-CN210-T47CO2.pdf PDF
CN-370000-CN210-T48CO1.pdf PDF
CN-370000-CN210-T48CO2.pdf PDF
CN-370000-CN210-T49.pdf PDF
CN-370000-CN210-T49CO2.pdf PDF
CN-370000-CN210-T4CO3.pdf PDF
CN-370000-CN210-T4CO5.pdf PDF
CN-370000-CN210-T6.pdf PDF
CN-370000-CN210-T8CO3.pdf PDF
CN-370000-CN210-TA28.pdf PDF
CN-370000-CN210-T12.pdf PDF
CN-370000-CN210-T17.pdf PDF
CN-370000-CN210-T18CO1.pdf PDF
CN-370000-CN210-T18CO2.pdf PDF
CN-370000-CN210-T21.pdf PDF
CN-370000-CN210-T21CO2.pdf PDF
CN-370000-CN210-T21CO3.pdf PDF
CN-370000-CN210-T23CO2.pdf PDF
CN-370000-CN210-T29CO1.pdf PDF
CN-370000-CN210-T30.pdf PDF
CN-370000-CN210-T31CO1.pdf PDF
CN-370000-CN210-T34.pdf PDF
CN-370000-CN210-T37.pdf PDF
CN-370000-CN210-T37CO1.pdf PDF
CN-370000-CN210-T38CO1.pdf PDF
CN-370000-CN210-T39CO1.pdf PDF
CN-370000-CN210-T3CO2.pdf PDF
CN-370000-CN210-T42CO1.pdf PDF
CN-370000-CN210-T44CO3.pdf PDF
CN-370000-CN210-T46.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT CHANGE ORDER FORM

(Revised 9-26-2018) Page 1 of 1

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description and Justification of Change:

Change in Task Amount:

Item Reimbursement Fixed Fee Total

Original Task Amount:

Task amount including all previous Change Orders:

Net increase/decrease in task amount for this Change Order:

Total Amounts with all Change Orders:

Change in Task Time:

Original Task Execution Date:

Original Task End Date:

Present Task End Date:

Net Change in Days:

New Task End Date:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 Digit FLAIR Code: Total:

CN210 TA49 01 61518C

Big Shoals State Park Septic Replacement

CPH, Inc.

Kayla Sheffield P.E. (904) 332-0999 ksheffield@cphcorp.com

Ralph Perkins, or successor 850-245-2460 Ralph.Perkins@FloridaDEP.gov

Adding an underground locate survey to locate exact location of septic tanks per the the proposal dated 05/23/2024

$ 2,139.00 $ 39,691.76 $ 41,830.76 $ 41,830.76 $ 41,830.76 $ 5,268.99 $ 5,268.99

$ 0.00 $ 47,099.75 $ 47,099.75

06/22/2023

06/13/2026

06/13/2026

06/13/2026

Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2024.06.25 14:18:12 -04'00'

Joel Pollock Joel Pollock Digitally signed by Joel Pollock Date: 2024.06.25 15:15:04 -04'00'

Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2024.06.25 16:02:45 -04'00'

Kayla Sheffield P.E. Kayla Sheffield

2024.06.26 09:20:17-04'00'

Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.

Digitally signed by Michael W.

Foster Jr., P.E.

Date: 2024.07.08 09:55:23 -04'00'

61518C 37502000213 080039/23 423001 U3200 131500 QK $ 5,268.99

$ 5,268.99

May 23, 2024

Mr. Joel Pollock

Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard, MS 520 Tallahassee, FL 32399

RE: CN210

Big Shoals Septic Replacement – Change Order 1

Dear Joel, For your review, CPH, Inc., has provided a proposal summary and man-hour documentation for the service tasks identified below:

- Underground locates of five (5) existing septic tanks and associated drainfields

- Update original survey files

Sincerely, Kayla Sheffield

Kayla Sheffield, PE CPH, Inc.

5200 Belfort Road Suite 220

Jacksonville, FL 32256

Phone: 904.332.0999 Fax: 904.332.0997

Big Shoals State Park

Septic Replacement

Change Order 1

Subtask 7: Underground Locates

Description:

7A – Southeastern Surveying shall horizontally locate and field mark (paint and flags) the existing five (5) septic tanks and drain fields. Southeastern Surveying shall locate all utility data using GPS or conventional surveying equipment and control furnished by CPH Consulting, LLC.

Deliverable:

7A – One (1) CAD file of utility information

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 7A – Additional City of Jacksonville Permitting

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Southeastern Surveying 2-man SUE crew $210.00 16 $3,360.00

Southeastern Surveying 2-man survey crew $130.00 5 $650.00

Southeastern Surveying Project Manager $130.00 1 $130.00

Southeastern Surveying CAD $86.00 1 $86.00

Southeastern Surveying Clerical $35.00 1 $35.00

Subtotal $4,261.00

Total for Subtask 7: $4,261.00

Subtask 8: Survey Updates

Description:

8A – CPH Consulting, LLC shall coordinate field locations of five (5) existing septic tank systems with Southeastern Surveying. CPH shall incorporate the underground utility information furnished by Southeastern Surveying in the original survey files.

Deliverable:

8A – One (1) PDF and one (1) CAD file of updated survey

Perf Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 8A – Survey Updates

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Southeastern Surveying Survey Project Manager/CADD $80.47 8 $643.76

Southeastern Surveying Principal Surveyor $121.41 3 $364.23

Subtotal $1,007.99

Total for Subtask 8: $1,007.99

Project Schedule:

Activity Duration (Calendar Days)

Subtask 7A Underground Locates 30 days

Subtask 8A Survey Updates 5 days

Summary of Fees:

Subtask Subtask Fixed Price Cost

Subtask Reimbursable

Subtask 7A Underground Locates $4,261.00

Subtask 8A Survey Updates $1,007.99

Total Fixed Price Cost: $5,268.99

Total Reimbursable Cost: $0.00

Overall Total Cost: $5,268.99.00

Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.