About this file
This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for a pre-construction project management engagement with CPH, Inc. at Grayton Beach State Park. The document modifies Contract No. CN210, Task Assignment No. 01, under Change Order No. 01, with Project No. 61136C. Key parties include FDEP (contract administrator), CPH, Inc. (consultant), and Brice R. Nist, P.E. (subcontracted consulting civil engineer). The change order was approved on August 5, 2016, by representatives from FDEP's Bureau of Design and Construction and authorized by Contract Authority Michael W. Foster Jr., P.E.
The additional services requested involve evaluating the existing lift station and providing capacity calculations for proposed additional sewage flow connections at the Grayon Beach Sanitary Sewer Project. The deliverable is an electronic evaluation summary report detailing existing station condition and available capacity. The fixed price cost for Subtask 7 is $880, based on 11 hours of consulting civil engineer time at $80 per hour. The net increase to the task amount is $880, bringing the total task cost to $35,901.39. The subtask execution period is 30 calendar days from August 10, 2016, with no extension to the original task end date of December 31, 2016. Payment will be made upon FDEP approval of the deliverables.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .