Attachment D.6 Drawings 6 of 7 - 13 pages.pdf
PDF 17 MB Posted
- Solicitation number
- 36C26323R0023
About this file
This document provides details for a federal contract opportunity with the Department of Veterans Affairs to renovate a private patient bed ward. The solicitation number is 36C26323R0023 and seeks to award a contract for project Z1DA--618-22-102 to renovate a private patient bed ward (3D) at Veterans Integrated Service Network 23. The opportunity type is a solicitation and the description provided indicates the contractor will be renovating a private patient bed ward. No further specifics on requirements, response dates, or pricing are included in this attachment, which appears to only contain drawings related to the renovation project.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
TRIPLE C - The A/E Group
(612) 355-1251
Mat Perkins
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.B .L
.r v t
/1
/2
:4
:0
A
M
09/12/2022 K. Luke N.Harper
618-22-102
1391 - M-701
MECHANICAL SCHEDULES
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING
100% CONSTRUCTION
DOCUMENTS
SINGLE DUCT CONSTANT VOLUME AND VARIABLE AIR VOLUME TERMINAL UNITS WITH HOT WATER REHEAT COILS: FURNISH AND INSTALL SINGLE DUCT VARIABLE AIR VOLUME CONTROL ASSEMBLIES OF SIZES AND CAPACITIES SHOWN ON THE DRAWINGS. ALL UNITS SHALL BE CAPABLE OF VARIABLE AIR VOLUME CONTROL WITH TERMINAL HOT WATER REHEAT. VALVE ASSEMBLY SHALL BE NORMALLY OPEN ARRANGEMENT, PRESSURE INDEPENDENT AND SHALL BE CAPABLE OF FIELD RESET TO ANY DESIRED AIR FLOW BETWEEN ZERO AND THE MAXIMUM SCHEDULED CFM. ALL TERMINAL UNITS SHALL BE FURNISHED WITH ACOUSTICALLY LINED CASINGS CONSTRUCTED OF 22 GAUGE GALVANIZED STEEL INTERNAL LINING OF 1" THICKNESS, 1- 1/2 POUND DENSITY, UL 181 AND ASTM C1071 REQUIREMENTS. EACH UNIT SHALL BE FURNISHED WITH A FACTORY ATTENUATOR SECTION HAVING THE SAME CONSTRUCTION AND LINER AS ABOVE. DAMPER BLADE SHALL BE CONSTRUCTED OF EXTRUDED ALUMINUM WITH RUSTPROO F SELF LUBRICATING BEARINGS. DAMPER SHALL SEAL AGAINST GASKETED STOPS. THE DAMPER LEAKAGE SHALL BE CERTIFIED TO NOT EXCEED 2 PERCENT LEAKAGE AT 6" INLET STATIC PRESSURE AS DETERMINED BY AIR DIFFUSION COUNCIL STANDARDS. A FLOW MEASURING PROBE SHALL BE INSTALLED IN THE UNIT INTAKE AND PROVIDE TOTAL AND STATIC PRESSURE CONNECTIONS ON THE INLET COLLAR EXTERIOR. SOUND R ATINGS SHALL NOT EXCEED THOSE SCHEDULED AT 3 INCH STATIC PRESSURE. RADIATED NOISE CRITERIA ADDITIONALLY ASSUMES A CEILING STC OF 35-39. ALL TERMINALS SHALL BE END OUTLET. TERMINALS SHALL BE SHIPPED WITH APPROPRIATE IDENTIFICATION INCLUDING MODEL, SIZE AND CFM MARKED ON THE UNIT. SEE FLOOR PLANS FOR LOCATION AND MAXIMUM AND MINIMUM AIR FLOW REQUIREMENTS AND HEATING WATER GPM OF EACH UNIT. PERMANENTLY AFFIXED ENGRAVED METAL
NAMEPLATE CONTAINING MODEL AND SERIAL NUMBER.
UNITS SHALL BE TITUS.
HEATING: COILS SHALL BE 2 ROWS MINIMUM SELECTED FOR HOT WATER DUTY AT 180 DEGREES F EWT, 160 DEGREES F LWT, AND SHALL BE CAPABLE OF RAISING THE MINIMUM AIR FLOW SCHEDULED ON THE DRAWINGS FROM 55 DEGREES EAT TO 95 DEGREES LAT, USING 4.3 GPM PER 1000 CFM OF AIR FLOW. COILS SHALL BE SELECTED FOR SAME END CONNECTIONS, ARI CERTIFIED, AND SELECTED SUCH THAT MAXIMUM STATIC PRESSURE DROP THROUGH THE ENTIRE VAV REHEAT ASSEMBLY SHALL NOT EXCEED 0.55" APD. WATER PD THROUGH COIL SHALL NOT EXCEED 10 FT.
TERMINAL UNIT CONTROLS: UNIT CONTROL SYSTEM SHALL INCLUDE DIRECT DIGITAL VARIABLE VOLUME TERMINAL UNIT CONTROLLER MOUNTED IN NEMA I ENCLOSURE, 120/24 VAC CONTROL TRANSFORMER SIZED FOR THE REQUIRED CONTROL 24 VAC LOADS, A DETAILED POINT TO POINT WIRING DIAGRAM, AND 24 VAC FLOATING POINT AIR VALVE ACTUATOR AND HOT WATER REHEAT COIL CONTROL VALVE WITH ELECTRONIC FULLY MODULATING ACTUATOR SHALL BE FURNISHED AND INSTALLED BY TEMPERATURE CONTROL SUB-CONTRACTOR UNDER SPECIFICATION SECTION 230900. SECTION 230900 SHALL PROVIDE AND CONNECT ALL CONTROL WIRING, SAFETY DISCONNECT, TRANSFORMER SECONDARY FUSING, ETC. IN ACCORDANCE WITH THE DETAILED POINT TO POINT WIRING DIAGRAM, AND PERFORM A PRELIMINARY STARTUP AND TESTING PROCEDURE ON THE INSTALLED ASSEMBLY. THE TERMINAL UNIT HOT WATER VALVE SHALL BE FURNISHED UNDER SECTION 230900 FOR FIELD PIPING INSTALLATION BY THE CONTRACTOR. ALL REQUIRED DDC SYSTEM COMMUNICATIONS WIRING, AND SPACE TEMPERATURE SENSOR STATION SHALL BE SUPPLIED AND INSTALLED UNDER SECTION 230900.
AIR FLOW CONTROL VALVE NOTES:
1. PROVIDE INSULATED VERSION FOR SUPPLY AIR VALVES.
2. ALL CONTROLS SHALL BE INTEGRATED WITH EXISTING BMS.
3. PROVIDE HEATING HOT WATER REHEAT COIL FOR ALL SUPPLY AIR VALVES.
4. PROVIDE FLEXIBLE HOT WATER COIL CONNECTIONS FOR VIBRATION ISOLATION.
5. COORDINATE POWER REQUIREMENTS WITH ELECTRICAL.
6. CONTRACTOR SHALL BALANCE SUPPLY AND EXHAUST VALVES TO MAINTAIN VOLUMETRIC FLOW OFFSET REQUIRED TO PROVIDE DIFFERENTIAL PRESSURE ACCORDING TO M-601 AND M-802
7. CONTRACTOR SHALL PERFORM PRE-CONSTRUCTION TAB READINGS OF ALL EXISTING SYSTEMS IMPACTED BY THIS RENOVATION AND REBALANCE EXISTING SYSTEMS AFTER POST-CONSTRUCTION TO PRE-CONSTRUCTION READINGS.
8. VALVES AND ALL PARTS SHALL BE CONSTRUCTED ACCORDING TO SPECIFICATIONS
9. INSTALLATION OF VALVES BY MECHANICAL CONTRACTOR, WIRING, AND CABLING BY BMS CONTRACTOR.
10. REHEAT COILS SHALL BE PROVIDED WITH AUTOMATIC MODULATING VALVES AND PRE-FABRICATED DELUXE PIPING PACKAGE.
11. REHEAT COIL ASSEMBLIES SHALL BE PROVIDED WITH ACCESS PANEL FOR MAINTENANCE.
12/17/2021 ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
TRIPLE C - The A/E Group
(612) 355-1251
Mat Perkins
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.B .L
.r v t
/1
/2
:2
:5
A
M
09/12/2022 K. Luke N.Harper
618-22-102
1391 - M-702
MECHANICAL SCHEDULES
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING
100% CONSTRUCTION
DOCUMENTS
PUMP SCHEDULE NOTES:
1. PROVIDE WITH SUCTION GUIDE
2. PROVIDE WITH "FLO-TREX" VALVE.
3. MOTOR ENCLOSURE SHALL BE TYPE TEFC.
4. CONTRACTOR SHALL PHASE PUMP REPLACEMENT TO MAINTAIN 100% EXISTING UTILITY SERVICE.
ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.B .L
.r v t
/1
/2
:4
:0
A
M
09/12/2022 K. Luke N.Harper
618-22-102
1391 - M-703
MECHANICAL SCHEDULES
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING100% CONSTRUCTION
DOCUMENTS12/17/2021
LA LEVEL ALARM
AT ANALYTICAL TRANSMITTER
AY ANALYTICAL SIGNAL CONVERTER
ACV ANALYTICAL CONTROL VALVE
AIT ANALYTICAL INDICATING CONTROLLER
EY VOLTAGE SIGNAL CONVERTER
IY CURRENT SIGNAL CONVERTER
HS HAND SWITCH
FIT FLOW INDICATING TRANSMITTER
FET FLOW ELEMENT\TRANSMITTER
ESL VOLTAGE SWITCH LOW (24 VAC OR LESS)
II CURRENT INDICATOR
IT CURRENT TRANSMITTER
IS CURRENT SWITCH
IA CURRENT ALARM
FA FLOW ALARM
HSI HAND SWITCH INDICATOR
HK MANUAL VARIABLE CONTROL
FY FLOW SIGNAL CONVERTER
FT FLOW TRANSMITTER
FS FLOW SWITCH
FI FLOW INDICATOR
FE FLOW ELEMENT
FCV FLOW CONTROL VALVE
ET VOLTAGE TRANSMITTER
ES VOLTAGE SWITCH (CONTROL RELAY)
EA VOLTAGE ALARM
EI VOLTAGE INDICATOR
PY PRESSURE SIGNAL CONVERTER
PDT PRESSURE DIFFERENTIAL TRANSMITTER
PS PRESSURE SWITCH
PA PRESSURE ALARM
PT PRESSURE TRANSMITTER
PIT PRESSURE INDICATING TRANSMITTER
PIS PRESSURE INDICATING SWITCH
PI PRESSURE INDICATOR
PDS PRESSURE DIFFERENTIAL SWITCH
PDI PRESSURE DIFFERENTIAL INDICATOR
PCV PRESSURE CONTROL VALVE
MV MANUAL HAND VALVE
LT LEVEL TRANSMITTER
LS LEVEL SWITCH
LE LEVEL ELEMENT
LY LEVEL SIGNAL CONVERTER
LIT LEVEL INDICATING TRANSMITTER
LIC LEVEL INDICATING CONTROLLER
LCV LEVEL CONTROL VALVE
LC LEVEL CONTROLLER (STAND ALONE)
VA VIBRATION ALARM
VS VIBRATION SWITCH
XV SOLENOID VALVE
YS SMOKE DETECTOR
VA VIBRATION ALARM
VS VIBRATION SWITCH
YCD SMOKE DAMPER
TT TEMPERATURE TRANSMITTER
TS TEMPERATURE SWITCH
TIC TEMPERATURE INDICATING CONTROLLER
TIT TEMPERATURE INDICATING TRANSMITTER
TI TEMPERATURE INDICATOR
TET TEMPERATURE ELEMENT TRANSMITTER
TE TEMPERATURE ELEMENT
TCV TEMPERATURE CONTROL VALVE
TC TEMPERATURE CONTROLLER
TA TEMPERATURE ALARM
SCM SPEED CONTROL MANUAL
TSL FREEZE STAT
SC SPEED CONTROL
INSTRUMENTATION SOCIETY OF AMERICA TABLE
INSTRUMENTATION TYPE ABBREVIATION LIST
AIC ANALYTICAL INDICATING CONTROLLER
AET ANALYTICAL ELEMENT TRANSMITTER
A
AC ANALYTICAL CONTROLLER
AI ANALYTICAL INDICATOR
AE ANALYTICAL ELEMENT
AA ANALYTICAL ALARM
CODE DESCRIPTION
VARIABLE
FINAL CONTROL ELEMENT
CODE DESCRIPTION
KC TIME CLOCK
JY POWER SIGNAL CONVERTER
JIT POWER INDICATING TRANSMITTER
TOTALIZE
CHANGE
CONNECTION
CODE DESCRIPTION
VIEWING DEVICE
PRIMARY ELEMENT
NORMALLY CLOSED OVERLOAD CONTACTS
ABBREVIATIONS
IA INSTRUMENTATION AIR
DDC DIRECT DIGITAL CONTROL
C COMMON VALVE PORT
F.O FAIL OPEN
F.C FAIL CLOSED
SR SPRING RANGE
TR THROTTLING RANGE
PH PREHEAT
HR HEAT RECOVERY
CPA CONTROL POINT ADJUSTMENT
SPDT SINGLE POLE DOUBLE THROW
DPDT DOUBLE THROW DOUBLE POLE
DA DIRECT ACTING
RA REVERSE ACTING
EP COIL IN MOTOR STARTER
TRANSFORMER
R
C
OL
HOA
CONTACT NORMALLY OPEN
PILOT LIGHT (COLOR INDICATION)
COIL IN MOTOR STARTER
CONTACT NORMALLY CLOSED
SWITCH
FUSE
HAND-OFF-AUTO SWITCH
I UNDEFINED INTERLOCK LOGIC
GENERAL INSTRUMENT OR FUNCTION SYMBOLS
FIELD
MOUNTED MOUNTED
PANEL AUXILIARY
LOCATION
ACCESSIBLE INACCESSIBLE
LOCATION
AUXILIARY
DISCRETE INSTRUMENTS
SHARED DISPLAY, SHARED CONTROL
PROGRAMMABLE LOGIC CONTROL
OR DIRECT DIGITAL CONTROL
COMPUTER FUNCTION
DUAL (MULTI)
FUNCTION INSTRUMENT
INDICATING LIGHTS, ALARMS OR HORNS
CONTROL VALVE BODY/ DAMPER SYMBOLS
GENERAL SYMBOL
ANGLE
BUTTERFLY
ROTARY VALVE
THREE - WAY
FOUR - WAY
GLOBE
PARALLEL BLADE
OPPOSED BLADE
TEMPERATURE
DUCT MOUNTED AVERAGING
WELL MOUNTED
ELEMENT/SENSOR ELEMENT/SENSOR
ELEMENT/SENSOR ELEMENT/SENSOR
SURFACE MOUNTED
PRESSURE
DIRECT MOUNTED
ELEMENT/SENSOR
DIFFERENTIAL PRESSURE
ELEMENT/SENSOR
LEVEL
FLOAT TYPE PADDLE TYPE
LEVEL TRANSMITTER
TANK MOUNTED
SONIC OR
RADIOACTIVE
FLOW
ORIFICE PLATE
TURBINE OR
PROPELLER
TYPE
SENSOR
VORTEX
TYPE
TARGET
SENSOR TRANSMITTER
MAGNETIC
TYPE
M
TRANSIT TIME
SONIC FLOWMETER
"DOPPLER" OR
FLOW ARROW
XXX INDICATES
AIR TYPE
INSTRUMENT NAMING CONVENTION
XXX - FUNCTION ID
NNN - DEVICE NUMBER
ZZZ - USER CHOICE
CURRENT
CURRENT SENSOR/TRANSMITTER
LINE LEGEND
INTERNAL SYSTEM LINK
ELECTRICAL SIGNAL
PNEUMATIC SIGNAL
YI EQUIPMENT STATUS
YA EQUIPMENT ALARM
ZI POSITION INDICATOR
ZS POSITION SWITCH
ZC POSITION CONTROL
AAA - UNIT ASSOCIATION OR
PROCESS CODE
PROCESS CODES
TW COOLING TOWER OR CONDENSER WATER
CHW CHILLED WATER
SCHW SECONDARY CHILLED WATER
HW HOT WATER
SHW SECONDARY HOT WATER
STM STEAM
AAA-NNN
XXX
ZZZ
NT HUMIDITY TRANSMITTER
FMS SYSTEM OPERATING CONSTRAINTS
THE FMS CONTROL SYSTEM SHALL OPERATE WITHIN THE FOLLOWING SYSTEM CONSTRAINTS FOR CONTROL:
SUPPLY AIR DRYBULB TEMPERATURE
MIXED AIR DRYBULB TEMPERATURE
WATER TEMPERATURE
DUCT STATIC PRESSURE
SUPPLY/ RETURN AIR VOLUME
OUTSIDE AIR/ RELIEF AIR VOLUME
BUILDING PRESSURE
ROOM TEMPERATURE
ROOM AIR VOLUME
HUMIDITY LEVEL
WATER TEMPERATURE
WATER DIFFERENTIAL PRESSURE
+/- 0.5°F OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL
FT
FT
FE
FE
FEFE
L
L
L
TE
L
PD
TETE
TE
+/- 0.5°F OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL
+/- 1.0 PSI OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL
+/- 0.5°F OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL
+/- 0.1" W.C. OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL
+/- 2.5% OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL
+/- 2.5% OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL
+/- 0.01" W.C. OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL
+/- 1.0°F OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL
+/- 2.5% OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL
+/- 2.5% R.H. OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL
+/- 1.0°F OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL
FIRST LETTER SUCCEEDING LETTERS (3)
MEASURING OR MODIFIER READOUT OR OUTPUT MODIFIER
INITIATING PASSIVE FUNCTION FUNCTION
ANALYSIS ALARM
B BURNER FLAME USER CHOICE USER CHOICE USER CHOICE
C CONDUCTIVITY CONTROL (13)
D DENSITY DIFFERENTIAL
E VOLTAGE SENSOR
F FLOW RATE RATIO FRACTION
G GAUGE GLASS,
H HAND HIGH
I CURRENT INDICATE
J POWER SCAN
K TIME TIME RATE OF CONTROL STATION
L LEVEL LIGHT LOW
M MOTION MOMENTARY MIDDLE
INTERMEDIATE
N HUMIDITY USER DEFINED USER DEFINED USER DEFINED
O USER CHOICE ORIFICE RESTRICTION
P PRESSURE, VACUUM POINT (TEST)
Q QUANTITY INTEGRATE,
R RADIATION RECORD
S SPEED, FREQUENCY SAFETY SWITCH
T TEMPERATURE TRANSMIT
U MULTI-VARIABLE MULTI-FUNCTION MULTI-FUNCTION MULTI-FUNCTION
V VIBRATION, MECHANICAL VALVE, DAMPER
ANALYSIS LOUVER
W WEIGHT, FORCE WELL
X UNCLASSIFIED X-AXIS UNCLASSIFIED UNCLASSIFIED UNCLASSIFIED
Y EVENT, STATE OR Y-AXIS RELAY, COMPUTE
PRESENCE CONVERT
Z POSITION Z-AXIS DRIVER, ACTUATOR
DIMENSION UNCLASSIFIED
GENERAL SHEET NOTES
MECHANICAL CONTROLS GENERAL NOTES
A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB REPORT FOR
THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS
AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND BALANCE
CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION AND VERIFY ALL EXISTING
EQUIPMENT AND DEVICES, AND DEVELOP THEIR TEST AND BALANCE FORMS INCLUDING
DRAWINGS SHOWING EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG
NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT FIELD
CONDITIONS, THE TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE AIRFLOW AND
WATER FLOW READINGS ON THE FORMS AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE
ON THE DRAWINGS. REFER TO SPECIFICATION SECTION 23 50 93 FOR MORE INFORMATION.
B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO ESTABLISH NEW
HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE RENOVATION. DATA SHALL BE
FORWARDED TO THE PROJECT ENGINEER FOR REVIEW AND COMMENT PRIOR TO
COMMENCING THE DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
C. THE CONTRACTOR SHALL REMOVE ALL EXISTING EQUIPMENT, DUCTWORK, PIPING, CONTROL
PANELS, CONTROL DEVICES INCLUDING PNEUMATIC TUBING, AND ASSOCIATED ITEMS WHICH
ARE BEING REPLACED, IN THEIR ENTIRETY. THE CONTRACTOR IS RESPONSIBLE FOR
REMOVING ALL DEMOLISHED ITEMS FROM THE SITE. REFER TO SPECIFICATIONS FOR MORE
INFORMATION.
D. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION.
E. ALL NEW TO EXISTING DUCT CONNECTIONS SHALL BE FIELD VERIFIED PRIOR TO ORDERING
AND FABRICATING NEW DUCTWORK OR DAMPERS.
F. ALL CONTROL WIRING SHALL BE ROUTED IN CONDUIT TO EACH CONTROL DEVICE.
G. AS-BUILT NOTE: THE BUILDING'S VERTICAL STRUCTURE AND GRID LAYOUT IS SHOWN BASED
ON RECORD DOCUMENTS AND / OR LASER SCANS OF THE AREA. COLUMNS MAY BE OFFSET
FROM GRID LINES WITHOUT AN IDENTIFYING GRID LINE AND ALL GRID LINES MAY NOT HOST
COLUMNS ON ALL LEVELS.
H. CONTRACTOR TO PERFORM MECHANICAL EQUIPMENT REPLACEMENT DURING NIGHTS AND
WEEKENDS TO MITIGATE FACILITY DOWNTIME. ALL OUTAGES MUST BE SCHEDULED WITH AND
APPROVED BY THE VA. FACILITY HOURS OF OPERATION ARE 7:00 AM TO 4:00 PM.
1. EQUIPMENT CONTROLLERS SHALL CONTAIN COMPLETE CONTROL LOGIC, INCLUDING ALL I/O
POINTS TO PROVIDE STAND-ALONE CONTROL IN THE EVENT OF COMMUNICATION FAILURE.
2. ALL EQUIPMENT CONTROL HARDWARE SHALL USE BACNET PROTOCOL BETWEEN THE OPERATOR
WORKSTATION, WEBSERVER AND FOR COMMUNICATIONS BETWEEN CONTROLLERS.
3. ALL EQUIPMENT CONTROL HARDWARE SHALL CONFORM TO APPLICABLE BACNET DEVICE
PROFILES AND SHALL BE LISTED BY THE BACNET TESTING LABORATORIES.
4. THE MECHANICAL CONTROL SYSTEM SOFTWARE SHALL INCLUDE A GRAPHICAL USER INTERFACE WITH POINT AND CLICK NAVIGATION THAT ALLOWS THE OPERATOR TO ADJUST PROPERTIES, SET
POINTS AND ALARMS.
5. GRAPHICAL USER INTERFACE SHALL PROVIDE AT LEAST ONE GRAPHIC FOR EACH PIECE OF
EQUIPMENT AND ZONE. GRAPHICAL USER INTERFACE SHALL USE DYNAMIC COLORS TO
REPRESENT EACH ZONE'S TEMPERATURE RELATIVE TO ITS SETPOINT.
6. CONTROL SYSTEM SHALL INCLUDE AN ENERGY REPORTING TOOL AND SCHEDULING
FUNCTIONALITY.
7. CONTRACTOR SHALL PROVIDE ALL THE TOOLS AND FUNCTIONALITY NECESSARY FOR THE
OPERATOR TO MAINTAIN AND ADJUST THE SYSTEM, INCLUDING: CONFIGURING THE DATABASE;
DOWNLOADING MEMORY TO THE CONTROLLERS; ADD, DELETE AND CONTROL PRIVILEGES FOR
EACH OPERATOR; CONFIGURE ALARMS, ALARM MESSAGES, AND ALARM REACTIONS; CONFIGURE
TRENDS INCLUDING SETTING THE INTERVAL RANGE OR CHANGE VALUE INCREMENT THAT
CAUSES A TREND SAMPLE TO BE RECORDED; CONFIGURE AND RUN STANDARD REPORTS TO
SHOW POINT STATUS, ALARM STATUS, LOCKED POINTS, AND OPERATOR ACTIVITY; CREATE AND
EDIT SYSTEM GRAPHICS AND TO DISPLAY DYNAMIC SYSTEM DATA ON THE GRAPHICS; AND
CREATE AND EDIT CUSTOM CONTROL PROGRAMS AND DOWNLOAD THESE PROGRAMS TO EACH
CONTROLLER.
8. SYSTEM SECURITY SHALL ALLOW AN AUTHORIZED USER TO CONTROL PRIVILEGES ASSOCIATED WITH EACH OPERATOR INCLUDING THE ABILITY TO VARY AND REGULATE ACCESS TO INDIVIDUAL
PIECES OF EQUIPMENT.
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
1/4" = 1'-0"
B
IM
/6
-2
-1
R e n o va te
D B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.G e n e ra l.
S h e e ts
.r v t
/1
/2
:0 :5
P
M
09/12/2022 K. Luke N. Harper
618-22-102
1391 - M-801
MECHANICAL CONTROL SYMBOL LEGEND
AND ABBREVIATIONS
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
As indicated
B
IM
/6
-2
-1
R e n o va te
D B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.G e n e ra l.
S h e e ts
.r v t
/1
/2
:0 :0
P
M
09/12/2022 K. Luke N. Harper
618-22-102
1391 - M-802
MECHANICAL CONTROL DIAGRAMS
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING100% CONSTRUCTION
DOCUMENTS
NTS
F5
JACKETED STEAM HUMIDIFER CONTROLS
MERV 11
CONTRO
L PANEL
I
I I
I
I
PI
TITCV
PA
HS YI SC
FCV
FT
PT
YATI
PDI
SC
YI
PDT
TT
TCV
FCV
YSTT
HS
FCV
TT
FCV
FCV
YS
FI
PS
PS
FCV
IAQ
IAQ
YA
TI
PDI
PDT
FIT
FI
FI
FIT
TI
TT TT
TI
NS
TI NI
NI
NS
CHWS
CHWR
C
C
C
PH
V V
V V
V
V (4 FAN ARRAY)
FLOW STATION
FINAL
FILTER
MERV 16A
FLOW STATION
(AI)S
T
A T
IC
P
R E
S S
U R
E
(AI)S
A
T E
M P
E R
A T
U R
E
(AO)V
A
L V
E S
IG
N
A L
C O
O L
IN
G C
O
IL
P R
E S
S U
R E
A L A
R M
S T
A R
T /S
T O
P
S T
A T
U S
(DI)
(DO) (DI) S
P
E E
D S
IG
N
A L
(AO)
(AO)D
M
P S
IG
N
A L
VFD
S.A S.A
STATIC PRESSURE PROBE
SEE SPECIFICATION
LO HI
(DI)S
M
O K
E D
E T
E C
T O
R
(AI)
(AI)
(AO)
(DI)
(DO)S
T
A R
T /S
T O
P
S T
A T
U S
S P
E E
D S
IG
N
A L
F
IL
T E
R D
IF
F
P
R E
S S
M A
T E
M P
E R
A T
U R
E
S.A
R.A
O.A
POWER
CONTROL
POWER
CONTROL
NC
D M
P S
IG
N
A L
(AO)
D M
P S
IG
N
A L
(AO)(AI)A
IR
V O
L U
M E
NC
CONTROL
POWER
R.A
IA
Q
L E
V E
L
(AI)
S M
O K
E D
E T
E C
T O
R
(DI)
(AI)R
A
T E
M P
E R
A T
U R
E
NEW AIR HANDLING UNIT 70-AH3NE-21 CONTROL DIAGRAM
F
IL
T E
R D
IF
F
P
R E
S S
(AI)
RF-18
VFD
R .A
RELIEF AIR
(0-17,000 CFM)
RETURN AIR
NO
(AI)A
IR
F L O
W R
A F
A N
(AI)A
IR
F L O
W S
A F
A N
(AI)M
A
/P R
E H
E A
T T
E M
P E
R A
T U
R E
N.O.
(AI)H
U
M
ID
IF
IE
R T
E M
P E
R A
T U
R E
(AO)H
U
M
ID
IT
Y
S
IG
N A
L
(AI)H
U
M
ID
IT
Y
S
A
(AI)H
U
M
ID
IT
Y
R
A
NOTE:
OUTSIDE AIR FLOW MEASUREMENT SHALL BE PROVIDED BY MEANS OF RUSKIN IAQ DAMPER
ASSEMBLY COMPLETE WITH AIRFLOW STRAIGHTENING VANES, INTEGRAL MEASUREMENT PORTS, 24 VAC
ELECTRONIC MODULATING DAMPER ACTUATOR AND CONTROLLER. REFER TO MECHANICAL
EQUIPMENT SCHEDULE AND SPECIFICATION SECTION 23 72 00 AND 23 73 00. PROVIDED BY CONTROLS CONTRACTOR.
CONTROL ITEMS NOT PROVIDED BY THE MANUFACTURER AS PART OF A FACTORY INSTALLED DEVICE SHALL BE PROVIDED AND INSTALLED BY THE CONTROLS CONTRACTOR. IT IS THE RESPONSIBILITY OF THE DIVISION 23 CONTRACTOR TO PROVIDE A COMPLETE AND OPERATIONAL CONTROLS SYSTEM AS SHOWN ON THE CONTROL DIAGRAMS, DESCRIBED IN THE SEQUENCE OF OPERATIONS AND AS NOTED IN THE
SPECIFICATIONS.
1. PROVIDED AND INSTALLED BY CONTROLS CONTRACTOR.
2. PROVIDED BY MANUFACTURER, INSTALLED AND WIRED BY CONTROLS CONTRACTOR.
3. PROVIDED AND WIRED BY DIVISION 28 CONTRACTOR, INSTALLED BY DIVISION 23 CONTRACTOR.
KEYED NOTES
(0-17,000 CFM)
ATM
TSL
TA
(DI)F
R
E E
Z E
S T
A T
A L A
R M
SET @ 35 F
I
FS
HS
YI
SC
TT
TI
PDT
TT
TT
TI
TI
PDI
TT
AHU21
FCV
TI
S T
A R
T /S
T O
P
S T
A T
U S
(DO)
(DI)
S P
E E
D S
IG
N
A L
(AO) (AI)T
E
M P
S
A
VFD
EF-34
O P
E N
/C L O
S E
(DO)
I
O.A
E.A
EA
(AI)E
A
T E
M P
E R
A T
U R
E
(AI)O
S
A T
E M
P E
R A
T U
R E
F
IL
T E
R D
IF
F
P
R E
S S
(AI)
(AI)W
H
E E
L L
E A
V
IN
G T
E M
P E
R A
T U
R E
FCV
NO
FCV
NO
FCV
O P
E N
/C L O
S E
(DO)
PA
(DI)P
R
E S
S U
R E
A L A
R M
PS
I
FT
FI
A
IR
F L O
W E
A F
A N
(AI)
NT
TO FMS~
HS YI
S T
A R
T /S
T O
P
S T
A T
U S
(DO) (DI)
ES
LINE~
IS
TCV
TCV
MPS
MPR
(AO)V
A
L V
E S
IG
N
A L
S T
E A
M P
R E
H E
A T
C O
IL
POWER
CONTROL
N.O.
HS YI
S T
A R
T /S
T O
P
S T
A T
U S
(DO) (DI)
ES
LINE~
IS
EA
PS
I
PA
(DI)P
R
E S
S U
R E
A L A
R M
PA
(DI)P
R
E S
S U
R E
A L A
R M
S.A
I
IYS PS
YA
S M
O K
E D
E T
E C
T O
R
(DI)
PA
(DI)P
R
E S
S U
R E
A L A
R M
I
S.A
PS
PA
(DI)P
R
E S
S U
R E
A L A
R M
I
AHU21 AHU21
AHU21
AHU21
AHU21
AHU21 AHU21
AHU21
AHU21
AHU21
AHU21
AHU21 AHU21 AHU21 AHU21 AHU21
AHU21
AHU21
AHU21
AHU21
AHU21
AHU21 AHU21 AHU21
AHU21 AHU21 AHU21 AHU21 AHU21
AHU21 AHU21 AHU21
AHU21 AHU21
AHU21 AHU21
AHU21
AHU21
AHU21 AHU21 AHU21 AHU21 AHU21 AHU21
AHU21 AHU21 AHU21 AHU21 AHU21
AHU21
AHU21 AHU21 AHU21 AHU21 AHU21 AHU21 AHU21 AHU21 AHU21 AHU21 AHU21 AHU21 AHU21 AHU21 AHU21 AHU21 AHU21 AHU21 AHU21 AHU21 AHU21 AHU21
AHU21
AHU21
AHU21
AHU21AHU21
AHU21AHU21AHU21AHU21
AHU21
AHU21AHU21
AHU21
AHU21
AHU21AHU21
AHU21
AHU21AHU21 AHU21
AHU21
AHU21
4. ULTRA-LOW LEAKAGE DAMPER SET TO NO DURING NROMAL OPERATION. TO BE CLOSED DURING EMERGENCY MODE.
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
1/4" = 1'-0"
B
IM
/6
-2
-1
R e n o va te
D B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.G e n e ra l.
S h e e ts
.r v t
/1
/2
:0 :1
P
M
09/12/2022 K. Luke N. Harper
618-22-102
1391 - M-803
MECHANICAL CONTROL DIAGRAMS
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
STEAM HUMIDIFIER SEQUENCE OF OPERATION
RETURN AIR HUMIDITY SHALL BE MONITORED. ON A CALL FOR HUMIDIFICATION, HUMIDIFIER VALVE V-1 SHALL MODULATE TO MAINTAIN THE RETURN AIR HUMIDITY SET POINT TO 40% MINIMUM. PRIOR TO ACTIVATION OF V-1, THE ON-OFF CONTROL VALVE V-2 SHALL BE ENABLED THROUGH ECC AND JACKET TEMPERATURE SENSED BY TSH SHALL BE WARM ENOUGH TO PREVENT CONDENSATION. THE HIGH LIMIT HUMIDITY SENSOR, LOCATED IN THE SUPPLY AIR DUCT 10 FT AWAY FROM THE HUMIDIFIER SHALL DISABLE THE HUMIDIFIER AND GIVE AN ALARM SIGNAL TO THE ECC, IF THE SUPPLY AIR HUMIDITY EXCEEDS 55%. THE
AIRFLOW SWITCH SHALL PROVE AIRFLOW BEFORE HUMIDITY CONTROLS ARE ACTIVATED.
1 2
120 VAC
NH
H N
120 VAC
C
B
A ALL RELAYS, WIRING, AND RACEWAY SHALL BE INSTALLED BY DIV. 26.
SMOKE DETECTORS LOCATED IN THE MAIN SUPPLY AND EXHAUST AIR
STREAMS SHALL BE MONITORED AND INTERLOCKED TO THE
BUILDING FIRE ALARM SYSTEM BY THE DIVISION 26 CONTRACTOR.
THE DIVISION 26 CONTRACTOR SHALL SUPPLY A CONTACT TO THE
AIR HANDLING UNIT WHICH WILL ACTIVATE UPON A FIRE/SMOKE
CONDITION OF THE DUCT DETECTORS, BUILDING TOTAL AREA
COVERAGE FIRE ALARM AREA DETECTORS. (ASSOCIATED WITHIN
THAT PORTION OF THE BUILDING SUPPLIED BY THE AHU), OR MANUAL
FIRE ALARM PULL STATIONS (LOCATED WITHIN THE BUILDING AREA
SUPPLIED BY THE AHU).
THE DIV. 23 CONTRACTOR SHALL USE THE CONTACT TO SHUT OFF
THE UNIT SUPPLY AND EXHAUST FANS AND RETURN THE UNIT
DAMPERS TO THEIR NORMAL POSITION.
WITH THE ACTIVITION OF A FIRE/SMOKE CONDITION THE FIRE ALARM
RELAY SHALL DEACTIVATE ELECTRICAL POWER TO THE SMOKE
DAMPER RELAY WHICH SHALL CAUSE ALL THE FIRE/SMOKE DAMPERS
ASSOCIATED WITH THE AIR HANDLING UNIT TO CLOSE. THE
FIRE/SMOKE DAMPERS SHALL CLOSE ONLY ON ACTIVATION OF THE
FIRE/SMOKE RELAY AND NOT ANY OTHER AIR HANDLER FUNCTION.
GENERAL NOTES
KEYED NOTES
CONTROL MODULE OR OUTPUT CONTACT FROM FIRE ALARM SYSTEM,
ACTIVATED AS NOTED BELOW.
AUXILARY CONTROL RELAY SUPPLIED BY FIRE ALARM SYSTEM, (DIV.
26). MORE THAN ONE OUTPUT CONTACT CAN BE USED FOR MULTIPLE
CIRCUITS. INSTALL NEAR FIRE ALARM PANEL OR SUB PANEL AS
REQUIRED.
SMOKE DAMPER ACTUATOR (NORMALLY CLOSED/FAIL CLOSED).
FURNISHED AND INSTALLED BY DIVISION 23.
DMDM
CR
FIRE/SMOKE CONTROL:
SMOKE DETECTORS LOCATED IN SUPPLY AIR AND EXHAUST AIR
STREAMS SHALL BE MONITORED AND INTERLOCKED WITH BUILDING
FIRE ALARM SYSTEM. UPON ACTIVATION OF EITHER AHU SMOKE
DETECTOR OR BUILDING SMOKE/FIRE ALARM SYSTEM, THE AIR
HANDLING UNIT SHALL AUTOMATICALLY BE DEACTIVATED BY MEANS OF
THE FIRE ALARM RELAY INTERLOCK AND SUPPLY FAN SHALL BE SHUT
OFF.
D
~FCV
SMK-01
ZS
SMK-01
SMK-01
ZIO
SMK-01
ZIC
FAS RELAY
O P
E N
S T
A T
U S
(DI) C
L O
S E
S T
A T
U S
(DI)
MS
EF-1-01
II
EF-1-01
HS
ES
EF-1-01
IS
EF-1-01
CONTROL DIAGRAM EF-1 AND EF-ED
S T
A T
U S
(DI) (DO)S
T
A R
T /S
T O
P
E .A
E
.A
NTS
D4
STEAM HUMIDIFIER CONTROLS - VA STANDARD DETAIL
NTS
C3
DUCT SMOKE DETECTOR CONTROL
NTS
F8
F/S DAMPER LADDER DIAGRAM
NTS
F7
EXHAUST FAN CONTROL DIAGRAM
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
As indicated
B
IM
/6
-2
-1
R e n o va te
D B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.G e n e ra l.
S h e e ts
.r v t
/1
/2
:0 :1
P
M
09/12/2022 K. Luke N. Harper
618-22-102
1391 - M-804
MECHANICAL CONTROL DIAGRAMS
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
6" = 1'-0"
B
IM
/6
-2
-1
R e n o va te
D B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.G e n e ra l.
S h e e ts
.r v t
/1
/2
:0 :1
P
M
09/12/2022 K. Luke N. Harper
618-22-102
1391 - M-805
MECHANICAL CONTROL DIAGRAMS
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING100% CONSTRUCTION
DOCUMENTS
NTS
F6
CONSTANT VOLUME AIR TERMINAL UNIT CONTROL DIAGRAM
NTS
C6
VARIABLE VOLUME AIR TERMINAL UNIT CONTROL DIAGRAM
ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
B
IM
/6
-2
-1
R e n o va te
D B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.G e n e ra l.
S h e e ts
.r v t
/1
/2
:0 :2
P
M
09/12/2022 K. Luke N. Harper
618-22-102
1391 - M-806
MECHANICAL POINTS SCHEDULE
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
NOT FOR CONSTRUCTION
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins 12" = 1'-0"
B
IM
/6
-2
-1
R e n o va te
D B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.G e n e ra l.
S h e e ts
.r v t
/1
/2
:0 :3
P
M
09/12/2022 K. Luke N. Harper
618-22-102
1391- M-901
MECHANICAL CUTSHEETS & BASIS OF
DESIGN
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
NOT FOR CONSTRUCTION
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins 12" = 1'-0"
B
IM
/6
-2
-1
R e n o va te
D B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.G e n e ra l.
S h e e ts
.r v t
/1
/2
:0 :4
P
M
09/12/2022 K. Luke N. Harper
618-22-102
1391- M-902
MECHANICAL CUTSHEETS & BASIS OF
DESIGN
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
NOT FOR CONSTRUCTION
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
B
IM
/6
-2
-1
R e n o va te
D B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.G e n e ra l.
S h e e ts
.r v t
/1
/2
:0 :5
P
M
09/12/2022 K. Luke N. Harper
618-22-102
1391- M-903
MECHANICAL CUTSHEETS & BASIS OF
DESIGN
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
B
IM
/6
-2
-1
R e n o va te
D B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.G e n e ra l.
S h e e ts
.r v t
/1
/2
:0 :0
P
M
09/12/2022 K. Luke N. Harper
618-22-102
1391 - M-904
MECHANICAL CUTSHEETS & BASIS OF
DESIGN
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
File details come from the government source that posted it. Updated .