This document contains details of a federal contract opportunity for renovation services. The solicitation number is 36C26323R0023 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23. The opportunity is for contract Z1DA--618-22-102 and involves renovating space for a private patient bed ward (3D) at facility 618. Responses are due on an unspecified date. The services required include general construction and renovations to ready the specified area for use as a private patient ward. No further pricing, terms, or award date details are provided in this document.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TYPE D
A. IMPLEMENT INFECTION CONTROL RISK ASSESSMENT (ICRA)
PROCEDURES AS PER THE ICRA PLAN AND AS DIRECTED BY THE
CONTRACTING OFFICER REPRESENTATIVE (COR).
B. COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS PATH OF
TRAVEL AND INTERIM LIFE SAFETY MEASURES (ILSM) WITH THE COR.
ALL INTERIOR DOORS THAT LEAD TO THE CONSTRUCTION SITE
SHALL BE POSTED AS PER THE ISLM PLAN.
C. OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING WORK.
D. THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS SHALL BE
CONSTRUCTED PRIOR TO BEGINNING OTHER WORK.
E. CONSTRUCT ANTEROOM AT ENTRANCES TO CONSTRUCTION AREAS
AND REQUIRE ALL CONSTRUCTION PERSONNEL TO PASS THROUGH
THIS ROOM TO BE VACUUMED WITH HEPA VACUUM CLEANER PRIOR
TO LEAVING THE SITE.
F. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR
OCCUPIED AREAS ON THE FLOOR.
G. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREAS; REVIEW
WITH COR AND VA SAFETY GROUP.
H. MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.
I. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT ALL
TIMES (24/7). WHETHER OCCUPIED OR NOT, THROUGHOUT
DURATION OF PROJECT USING HEPA EQUIPPED AIR FILTRATION
UNITS.
J. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE OTHER
AREAS OF THE MEDICAL CENTER; NO RETURN AIR OR EXHAUST
SHALL PASS INTO THE AREAS OUTSIDE THE CONSTRUCTION AREA.
ISOLATE HVAC SYSTEM WITHIN CONSTRUCTION AREA TO PREVENT
CONTAMINATION OF EXISTING DUCT SYSTEM.
K. PROVIDE SIGNS ON DOORS INTO THE CONSTRUCTION AREA THAT
READS: "CONSTRUCTION AREA-DO NOT ENTER".
L. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE
CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE SURE
THEY REMAIN EFFECTIVE.
M. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA. ALL
DEBRIS REMOVAL SHALL BE IN COVERED CARTS AND/OR
CONTAINERS.
N. SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES AND
CONDUITS APPROPRIATELY AND IMMEDIATELY TO MAINTAIN DUST
PROTECTION AND NEGATIVE AIR PRESSURE.
O. AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION AREA WITH
HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT, REMOVE
CONSTRUCTION BARRIERS (UPON APPROVAL). PATCH OR REPAIR
ANY DAMAGE FROM CONSTRUCTION BARRIER REMOVAL AND
REMOVE ISOLATION OF HVAC SYSTEM.
P. CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL PROJECT
IS COMPLETED AND INSPECTED BY VA SAFETY PERSONNEL,
INFECTION CONTROL GROUP, AND COR.
ICRA NOTES:
INFECTION CONTROL RISK
ASSESSMENT:
STEP 1: TYPE D
IDENTIFY THE TYPE OF CONSTRUCTION PROJECT
ACTIVITY (TYPE A–D)
TYPE A: INSPECTION AND NONINVASIVE ACTIVITIES.
TYPE B: SMALL-SCALE, SHORT-DURATION ACTIVITIES
THAT CREATE MINIMAL DUST.
TYPE C: WORK THAT GENERATES A MODERATE TO
HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR
REMOVAL OF ANY FIXED BUILDING COMPONENTS OR
ASSEMBLIES.
TYPE D: MAJOR DEMOLITION AND CONSTRUCTION
PROJECTS.
STEP 2: HIGH RISK
IDENTIFY THE PATIENT RISK GROUPS THAT WILL BE
AFFECTED.
IF MORE THAN ONE RISK GROUP WILL BE AFFECTED,
SELECT THE HIGHER RISK GROUP.
STEP 3: CLASS IV
MATCH THE PATIENT RISK GROUP (LOW, MEDIUM,
HIGH, HIGHEST) WITH THE PLANNED CONSTRUCTION
PROJECT TYPE (A, B, C, D) ON THE FOLLOWING MATRIX,
TO FIND THE CLASS OF PRECAUTIONS (I, II, III OR IV) OR
LEVEL OF INFECTION CONTROL ACTIVITIES REQUIRED.
STEP 4: IDENTIFY THE AREAS SURROUNDING THE PROJECT
AREA, ASSESSING POTENTIAL IMPACT.
BELOW ABOVE NORTH SOUTH EAST WEST
_______________________RISK GROUP_____________________
LOW LOW N/A N/A N/A N/A
STEP 5:
IDENTIFY SPECIFIC SITE OF ACTIVITY, FOR EXAMPLE, PATIENT
ROOMS, MEDICATION ROOM, AND SO ON.
STEP 6:
IDENTIFY ISSUES RELATED TO: VENTILATION, PLUMBING, AND
ELECTRICAL IN TERMS OF THE OCCURRENCE OF PROBABLE
OUTAGES.
STEP 7.
IDENTIFY CONTAINMENT MEASURES, USING PRIOR
ASSESSMENT. WHAT TYPES OF BARRIERS (FOR EXAMPLE,
SOLIDS WALLS)? WILL HEPA FILTRATION BE REQUIRED?
STEP 8.
CONSIDER POTENTIAL RISK OF WATER DAMAGE. IS THERE A
RISK DUE TO COMPROMISING STRUCTURAL INTEGRITY (FOR
EXAMPLE, WALL, CEILING, ROOF)?
NOTE: RENOVATION/CONSTRUCTION AREA SHALL BE
ISOLATED FROM THE OCCUPIED AREAS DURING
CONSTRUCTION AND SHALL BE NEGATIVE WITH RESPECT TO
SURROUNDING AREAS.
STEP 9.
WORK HOURS: CAN OR WILL THE WORK BE DONE DURING
NON-PATIENT-CARE HOURS?
STEP 10.
DO PLANS ALLOW FOR ADEQUATE NUMBER OF
ISOLATION/NEGATIVE AIRFLOW ROOMS?
STEP 11.
DO THE PLANS ALLOW FOR THE REQUIRED NUMBER AND TYPE
OF HAND-WASHING SINKS?
STEP 12.
DOES THE INFECTION PREVENTION AND CONTROL STAFF
AGREE WITH THE MINIMUM NUMBER OF SINKS FOR THIS
PROJECT? (VERIFY AGAINST FACILITY GUIDELINES INSTITUTE
(FGI) DESIGN AND CONSTRUCTION GUIDELINES FOR TYPES
AND AREA.)
STEP 13.
DOES THE INFECTION PREVENTION AND CONTROL STAFF
AGREE WITH THE PLANS RELATIVE TO CLEAN AND SOILED
UTILITY ROOMS?
STEP 14.
PLAN TO DISCUSS THE FOLLOWING CONTAINMENT ISSUES
WITH THE PROJECT TEAM, FOR EXAMPLE, TRAFFIC FLOW,
HOUSEKEEPING, DEBRIS REMOVAL (HOW AND WHEN).
C
LA
S S
IV
DURING CONSTRUCTION
PROJECT
UPON COMPLETION OF
PROJECT
1. Remove or isolate HVAC system in area where work is being done, to prevent contamination of duct system.
2. Complete all critical barriers— i.e., drywall, plywood, plastic—to seal area from non-work area before construction begins. Or, implement control cube method with HEPA-fiItered vacuum for vacuuming prior to exit.
3. Maintain negative air pressure within worksite utilizing HEPA-equipped air filtration units.
4. Contain construction waste in tightly covered containers before transport.
5. Cover transport receptacles or carts. Tape down covering unless cart has a solid lid.
1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Control Department and thoroughly cleaned by the owner’s Environmental Services Department.
2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
3. Vacuum work area with HEPA-filtered vacuum.
4. Wet mop area with disinfectant.
5. Upon completion, restore HVAC system where work was performed.
Construction Project Type
Patient Risk Group
LOW Risk Group MEDIUM Risk Group
HIGH Risk Group
HIGHEST Risk Group
I II II III/IV
I II III IV
I II III/IV IV
II III/IV III/IV IV
TYPE A TYPE B TYPE C TYPE D
WEEKLY CHANGED OR MORE
AS NEEDED PRE-FILTER
FLEX DUCT
MONTHLY CHANGED HEPA FILTER
HEPA NEGATIVE AIR UNIT
PROVIDE STICKY MATS (CHANGED END OF
EVERY SHIFT OR MORE IF NECESSARY TO
MAINTAIN CLEANLINESS).
STATIC PRESSURE WATER GAUGE INDICATOR
SHALL -0.03" W.G. MINIMUM TO MAINTAIN NEGATIVE
PRESSURE IN CONSTRUCTION AREA (VERIFY DAILY). IF
NOT VERIFY ALL OPENING SUCH AS DOOR ARE CLOSED
AND/OR CHANGE NEGATIVE AIR PRE-FILTER.
SUPPLY DUCTS EITHER
KEEP RUNNING OR
COVER WHEN NOT
RUNNING TO KEEP
DUST OUT.
A
V
O
TAPE ALL WALL, FLOOR, AND CEILING
SERVICES, TO PROTECT AGAINST
CONTAMINATION
E
FIRE EXTINGUISHER ON
PORTABLE FLOOR BRACKET
(SHALL REQUIRE MORE THAN
ONE.)
E4
GI201
PUBLIC AREA
CONSTRUCTION AREA
ANTE
ROOM
4' -0
M
IN
IM
U M
S E
E
F L O
O R
P
L A
N
TEMPORARY WALL
FLOOR LINE
CEILING SYSTEM AS
SCHEDULED
EXISTING STRUCTURE
FIRE RATED PLASTIC TO
PREVENT DUST INSTALL
PRIOR TO CONSTRUCTION
F
IN
IS
H E
D F
LO
O
R T
O U
N D
E R
S
ID
E O
F S
T R
U C
T U
R E
V E
R
IF
Y F
LO
O
R T
O F
LO
O
R H
E
IG
H T
RENOVATED SPRINKLER
SYSTEM
HJKLM
PROVIDE ICRA BARRIERS TO
CREATE ANTE-ROOM OUTSIDE OF
CONSTRUCTION ENTRY
PROVIDE ICRA BARRIERS TO
CREATE ANTE-ROOM OUTSIDE OF
CONSTRUCTION ENTRY - THIS SIDE
FOR EMERGENCY EGRESS ONLY
PATH OF TRAVEL FOR MATERIAL /
WASTE TRANSPORTATION -
VERIFY WITH COR - SEE
CONSTRUCTION MATERIALS PLAN
THIS SHEET
5' -8
213 SF
PATIENT 9
3D-109
79 SF
RR 9
3D-109A
69 SF
RR 8
3D-108A
256 SF
PATIENT 8
3D-108
285 SF
PATIENT 7
3D-107
69 SF
RR 7
3D-107A
297 SF
PATIENT 6
3D-106
72 SF
RR 6
3D-106A
289 SF
PATIENT 5
3D-105
72 SF
RR 5
3D-105A
300 SF
PATIENT 4
3D-104
69 SF
RR 4
3D-104A
298 SF
PATIENT 3
3D-103
70 SF
RR 3
3D-103A
69 SF
RR 2
3D-102A
296 SF
PATIENT 2
3D-102
299 SF
BARIATRIC 1
3D-101
90 SF
RR 1
3D-101A
269 SF
PATIENT 18
3D-133
78 SF
RR 18
3D-133A
68 SF
RR 17
3D-132A
268 SF
SAFER PATIENT 17
3D-132
299 SF
STAFF WORK
3D-136
245 SF
MSA'S
3D-100
190 SF
CLEAN LINENS
3D-138
98 SF
ASST. NURSE MNGR
3D-110
93 SF
NURSE MNGR OFFICE
3D-111
127 SF
MED ROOM
3D-112
106 SF
NUTRITION
3D-135
292 SF
SAFER PATIENT 16
3D-131
67 SF
RR 16
3D-131A
67 SF
RR 15
3D-129A
252 SF
PATIENT 15
3D-129
280 SF
PATIENT 14
3D-128
71 SF
RR 14
3D-128A
71 SF
RR 13
3D-126A
102 SF
PHARM OFFICE
3D-120
108 SF
SOILED UTILITY
3D-134
49 SF
STAFF TOILET
3D-117
131 SF
SPS STORAGE
3D-114
315 SF
EQUIPMENT ROOM
3D-115 16 SF
EQUIP. ALCOVE
3D-140
245 SF
PATIENT 13
3D-126
260 SF
PATIENT 12
3D-12567 SF
RR 12
3D-125A
67 SF
RR 11
3D-123A
61 SF
HAC
3D-119
259 SF
STAFF BREAK ROOM
3D-116
238 SF
PATIENT 11
3D-123
206 SF
PATIENT 10
3D-121
74 SF
RR 10
3D-121A
54 SF
ANTE ROOM
3D-133B
74 SF
CLEAN UTILITY
3D-113
30 SF
OXYGEN STOR.
3D-118
262 SF
CIRCULATION
C3-18
55 SF
ANTE ROOM
3D-101B
186 SF
CORRIDOR
C3-27
49 SF
TOILET
3C-104
49 SF
TOILET
3C-105
RE-FINISH ONLY, NO
DESTRUCTIVE DEMOLITION
TAKING PLACE
CONSTRUCT NEW
CORRIDOR WALLS
AS ICRA BARRIERS
PRIOR TO COMMENCEMENT
OF REST OF CONSTRUCTION.
CONSTRUCT NEW
CORRIDOR WALLS
AS ICRA BARRIERS
PRIOR TO COMMENCEMENT
OF REST OF CONSTRUCTION.
4' -0
PROVIDE ANTE-ROOM FOR
MECHANICAL ROOM AND TELECOM
ROOM SCOPE OF WORK
ELEVATORS
ELE
VA
TO
R S
FREIGHT
ELEVATOR
ELEVATORS
ELEVATORS
ELEVATORS
PATH OF TRAVEL FOR MATERIAL / WASTE
TRANSPORTATION - VERIFY WITH COR
PROJECT SCOPE AREA
on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
As indicated
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
B e d W in g .A
R C
H .B
.L
.r v t
/1
/2
:0
:2
A
M
09/12/2022 M.PERKINS C.LOWERY
618-22-102
1391 - GI201
INFECTION CONTROL PLAN & INTERIM LIFE
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING100% CONSTRUCTION
DOCUMENTS
1/4" = 1'-0" F4
TYPICAL CONSTRUCTION LAYOUT- CLASS IV
1/2" = 1'-0" E4
CROSS SECTION A'-A'- CLASS IV
NTS
F1
TYPICAL ICRA PRODUCTS
1/8" = 1'-0"
F6
ICRA PLAN
1" = 60'-0" C3
CONSTRUCTION MATERIALS PLAN
NOTE: PROJECT WING WILL NOT
BE OCCUPIED DURING CONSTRUCTION.
CONTRACTOR TO UTILIZE SPACE IN
WING FOR TEMPORARY MATERIAL
STORAGE AS NEEDED DURING
CONSTRUCTION
1 ADDENDUM 1 04/06/23