Attachment D.1 Drawings 1 of 7 - 3 pages.pdf
PDF 13 MB Posted
- Solicitation number
- 36C26323R0023
About this file
This document provides details for a federal contract opportunity with the Department of Veterans Affairs. The solicitation number is 36C26323R0023 and seeks proposals to renovate a private patient bed ward at Veterans Integrated Service Network 23. The project name is Z1DA--618-22-102 and involves converting existing space into a new 3D private patient bed ward at an unspecified VA medical center. Proposals are due by the date listed on the Standard Form 1449 that is part of the solicitation package. The contract type will be firm-fixed price and the anticipated award date is within 90 days of the solicitation closing date. The opportunity is open to all responsible sources and has no set-aside provisions.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
B e d W in g .A
R C
H .B
.L
.r v t
/2
/2
:2 :5
P
M
09/12/2022 M.PERKINS K.MACAULAY
618-22-102
1391 - GI000
COVER SHEET
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING100% CONSTRUCTION
DOCUMENTS
100% CONSTRUCTION DOCUMENTS
09/12/2022
Contract No.
Solicit No.
618-22-102 RENOVATION OF BUILDING 70 3D BED WING - B70
VA Minneapolis Healthcare System
THERE IS NO LEAD OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.
SIGNATURE 07/22/2022 DATE
AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C
TRIPLE C - THE A&E GROUP
CONTRACTOR SCOPE OF WORK:
Contractor shall completely prepare project site for operations, including demolition and removal of existing site elements, and furnish labor and materials and perform work for the Minneapolis VA Medical Center Project 618-22-102, Renovate Private Patient Bed Ward 3D as required by drawings and specifications.
Period of performance is projected to be five-hundred forty (540) calendar days.
The work will require the demolition of the interior of the existing 3D ward on the third floor of Building 70 as required by the drawings and specifications. The project entails the renovation of the 3D ward. The current 3D occupants will be relocating to a new space in Fiscal Year 2023, and the 3D ward will be vacant during construction for the new Patient Bed Ward. The newly renovated 3D Bed Ward will consist of 18 private patient rooms with attached bathrooms and key support spaces for staff, utilities, storage and medication and nutrition.
Electrical, Telecommunications, and Security Work: Work includes all labor, material, equipment and supervision to perform new electrical, communications and security systems to the renovated spaces renovated as detailed by the construction drawings and specifications.
Provide access control for all the required doors, coordinate with the door hardware schedule for additional requirements. Provide new cameras, associated devices and equipment.
Mechanical, Plumbing and Fire Protection Work: Work includes all labor, material, equipment and supervision to perform the required Mechanical, Plumbing and Fire Protection construction work on this project including provide materials and construction equipment as detailed by the construction drawings and specifications. All new mechanical systems shall be addressable and controllable via the existing Engineering Control Center (ECC) and HVAC Shop. The ECC system shall monitor space conditions and unit status and shall alarm the Facility Operations staff as detailed by the mechanical control drawings and specifications.
In addition to providing new mechanical systems to serve the renovated spaces, this project also requires reconfiguration of the existing building HVAC systems (duct, diffusers, grilles, bracing and supports) to maintain existing heating and cooling systems. Contractor is required to Test and Balance (TAB) new and existing HVAC systems per 23 05 93. This work requires preconstruction TAB readings to establish baseline performance for all existing HVAC systems to remain serving the Medical Bed space and adjacent corridor. Existing systems shall be rebalanced to preconstruction readings.
Contractor shall reconfigure fire protection piping and provide additional sprinkler heads to the existing building automatic sprinkler system as required. New Fire Protection systems shall be provided, and existing systems modified per the construction drawings and specifications.
Contractor shall reconfigure plumbing and medical gas piping and provide new piping, fixtures, valves, fittings, and devices as required by the construction drawings and specifications.
CO: Angie Frost Contracting Officer, Construction Team 1 Network 23 Contracting Office (NCO 23) Department of Veterans Affairs Warren E. Burger Federal Building and U.S. Courthouse Room 506 316 Robert Street N.
St. Paul, MN 55101 Phone: 651-293-3070
COR: Chris Weberg General Engineer VAMC Minneapolis, MN Office: (612) 467-5805 Cell: (612) 987-0038 Christopher.Weberg@va.gov
- DRAWING INDEX -
BB SHEET NAME
INCLUDED IN
35% SD
INCLUDED IN
65% DD
INCLUDED IN
95% CD
INCLUDED IN
100%
INTERIORS
IN001 INTERIOR GENERAL NOTES, SYMBOLS, ABBREVIATIONS & FINISH BOARDS Yes Yes Yes Yes
IN101 INTERIOR FINISH PLAN - THIRD FLOOR 3D Yes Yes Yes Yes
IN501 DETAILS - INTERIOR FINISH Yes Yes Yes Yes
IN601 INTERIOR FINISH LEGEND AND ROOM FINISH SCHEDULE Yes Yes Yes Yes
IN901 INTERIOR 3D CONCEPT IMAGES Yes Yes Yes Yes
FURNITURE
IF101 INTERIOR FURNITURE PLAN - THIRD FLOOR 3D No Yes Yes Yes
EQUIPMENT
Q-101 EQUIPMENT PLAN - THIRD FLOOR 3D No Yes Yes
Q-601 EQUIPMENT SCHEDULE No Yes Yes
FIRE PROTECTION
FX001 FIRE PROTECTION ABBREVIATIONS, SYMBOLS, AND DETAILS Yes Yes Yes Yes
FXD103 FIRE PROTECTION PLANS - THIRD LEVEL 3D - DEMO Yes Yes Yes Yes
FXD103i FIRE PROTECTION PLANS - THIRD LEVEL INTERSTITIAL 3D - DEMO No No Yes Yes
FX103 FIRE PROTECTION PLANS - THIRD LEVEL 3D - NEW Yes Yes Yes Yes
FX401 FIRE PROTECTION ENLARGED PLANS Yes Yes Yes Yes
FX901 FIRE PROTECTION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes
PLUMBING
P-001 PLUMBING LEGEND Yes Yes Yes Yes
PD102i PLUMBING PLANS - SECOND LEVEL INTERSTITIAL 2D - DEMO No No Yes Yes
PD103 PLUMBING PLANS - THIRD LEVEL 3D - DEMO Yes Yes Yes Yes
PD103i PLUMBING PLANS - THIRD LEVEL INTERSTITIAL 3D - DEMO No Yes Yes Yes
PGD-103i PLUMBING MED GAS PLANS - THIRD LEVEL INTERSTITIAL 3D - DEMO No No Yes Yes
P-102i PLUMBING PLANS - SECOND LEVEL INTERSTITIAL 2D - NEW No Yes Yes Yes
P-103 PLUMBING PLANS - THIRD LEVEL 3D - NEW Yes Yes Yes Yes
P-103i PLUMBING PLANS - THIRD LEVEL INTERSTITIAL 3D - NEW VENT PIPING PLAN No Yes Yes Yes
PP-103i PLUMBING PLANS - THIRD LEVEL INTERSTITIAL - 3D - NEW DOMESTIC WATER PIPING PLAN No No Yes Yes
PG103i PLUMBING MED GAS PLANS - THIRD LEVEL INTERSTITIAL No Yes Yes Yes
P-401 PLUMBING ENLARGED PLANS Yes Yes Yes Yes
P-501 PLUMBING DETAILS Yes Yes Yes Yes
P-601 PLUMBING ISOMETRIC PLAN - 3D No No Yes Yes
P-701 PLUMBING SCHEDULES Yes Yes Yes Yes
P-901 PLUMBING EQUIPMENT CUTSHEETS / BASIS OF DESIGN Yes Yes Yes Yes
P-902 PLUMBING EQUIPMENT CUTSHEETS / BASIS OF DESIGN Yes Yes Yes Yes
P-903 PLUMBING EQUIPMENT CUTSHEETS / BASIS OF DESIGN Yes Yes Yes Yes
P-904 PLUMBING EQUIPMENT CUTSHEETS / BASIS OF DESIGN Yes Yes Yes Yes
MECHANICAL
M-001 MECHANICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes
MS101 MECHANICAL SITE PLAN No No Yes Yes
MD100 MECHANICAL PLANS - BASEMENT LEVEL BD - DEMO No No No Yes
MD102i MECHANICAL PLANS - SECOND LEVEL INTERSTITIAL 2D - DEMO No No Yes Yes
MD103 MECHANICAL PLANS - THIRD LEVEL 3D - DEMO No Yes Yes Yes
MD103i MECHANICAL PLANS - THIRD LEVEL INTERSTITIAL 3D - DEMO No No Yes Yes
MD104 MECHANICAL PLAN - FOURTH & ROOF LEVEL - DEMO No No Yes Yes
M-100 MECHANICAL PLANS - BASEMENT LEVEL BD - NEW No No No Yes
M-102i MECHANICAL PLANS - SECOND LEVEL INTERSTITIAL 2D - NEW No No Yes Yes
M-103 MECHANICAL PLANS - THIRD LEVEL 3D - NEW Yes Yes Yes Yes
M-103i MECHANICAL PLANS - THIRD LEVEL INTERSTITIAL 3D - NEW No Yes Yes Yes
M-104 MECHANICAL PLANS - FOURTH LEVEL 4D - NEW No Yes Yes Yes
MP102i SECOND LEVEL MECHANICAL PIPING PLANS - SECOND LEVEL INTERSTITIAL - 2D - NEW No No Yes Yes
MP103i THIRD LEVEL MECHANICAL PIPING PLANS - THIRD LEVEL INTERSTITIAL - 3D - NEW Yes Yes Yes Yes
M-401 MECHANICAL ENLARGED PLANS Yes Yes Yes Yes
M-501 MECHANICAL DETAILS Yes Yes Yes Yes
M-502 MECHANICAL DETAILS Yes Yes Yes Yes
M-503 MECHANICAL DETAILS Yes Yes Yes Yes
M-504 MECHANICAL DETAILS No Yes Yes Yes
M-505 MECHANICAL DETAILS No Yes Yes Yes
M-601 MECHANICAL PIPING ISOMETRIC PLAN No No Yes Yes
M-602 MECHANICAL ISOMETRIC PLAN No No No Yes
M-700 MECHANICAL SCHEDULES No Yes Yes Yes
M-701 MECHANICAL SCHEDULES No Yes Yes Yes
M-702 MECHANICAL SCHEDULES No Yes Yes Yes
M-703 MECHANICAL SCHEDULES No No No No
M-801 MECHANICAL CONTROL SYMBOL LEGEND AND ABBREVIATIONS Yes Yes Yes Yes
M-802 MECHANICAL CONTROL DIAGRAMS Yes Yes Yes Yes
M-803 MECHANICAL CONTROL DIAGRAMS Yes Yes Yes Yes
M-804 MECHANICAL CONTROL DIAGRAMS Yes Yes Yes Yes
M-805 MECHANICAL CONTROL DIAGRAMS Yes Yes Yes Yes
M-806 MECHANICAL POINTS SCHEDULE Yes Yes Yes Yes
M-901 MECHANICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes
M-902 MECHANICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes
M-903 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes
M-904 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes
ELECTRICAL
E-001 ELECTRICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes
EDL103 ELECTRICAL LIGHTING CEILING PLANS - THIRD LEVEL 3D - DEMO No No Yes Yes
EDP103 ELECTRICAL POWER PLANS - THIRD LEVEL 3D - DEMO Yes Yes Yes Yes
EDP103i ELECTRICAL POWER PLAN - THIRD LEVEL INTERSTITIAL No No Yes Yes
EL103 ELECTRICAL LIGHTING CEILING PLANS -THIRD LEVEL 3D - NEW Yes Yes Yes Yes
EP100 ELECTRICAL POWER PLANS - BASEMENT LEVEL No No Yes Yes
EP101 ELECTRICAL POWER PLANS - FIRST LEVEL No No No Yes
EP103 ELECTRICAL POWER PLANS - THIRD LEVEL 3D - NEW Yes Yes Yes Yes
EP103i ELECTRICAL INTERSTITIAL PLAN No No Yes Yes
EP104 ELECTRICAL POWER PLANS - FOURTH LEVEL - 3D - NEW No No Yes Yes
EP400 ELECTRICAL ENLARGED PLANS No No Yes Yes
EP401 ELECTRICAL ENLARGED PLANS Yes Yes Yes Yes
E-501 ELECTRICAL DETAILS Yes Yes Yes Yes
E-601 ELECTRICAL ONE-LINE DIAGRAMS Yes Yes Yes Yes
E-602 ELECTRICAL DIAGRAMS No No Yes Yes
E-603 ELECTRICAL RACEWAY DIAGRAMS No No Yes Yes
E-700 ELECTRICAL SCHEDULES - DEMO No No Yes Yes
E-701 ELECTRICAL SCHEDULES - NEW Yes Yes Yes Yes
E-702 ELECTRICAL SCHEDULES - NEW Yes Yes Yes Yes
E-703 ELECTRICAL SCHEDULES - NEW No No Yes Yes
E-900 ELECTRICAL CUTSHEETS No No Yes Yes
E-901 ELECTRICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes
TELECOMMUNICATION
T-001 TELECOMMUNICATION ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes
TD103 TELECOMMUNICATION PLANS - THIRD LEVEL 3D - DEMO Yes Yes Yes Yes
TD103i TELECOMMUNICATION INTERSTITIAL PLAN - THIRD LEVEL 3D - NEW Yes Yes
T-103 TELECOMMUNICATION PLANS - THIRD LEVEL 3D - NEW Yes Yes Yes Yes
T-103i TELECOMMUNICATION INTERSTITIAL PLAN - THIRD LEVEL 3D - NEW No No Yes Yes
TY-103 SECURITY PLANS - THIRD LEVEL 3D - NEW No No No No
T-400 TELECOMMUNICATION ENLARGED PLANS Yes Yes Yes Yes
T-501 TELECOMMUNICATION DETAILS Yes Yes Yes Yes
T-601 TELECOMMUNICATIONS RISER DIAGRAMS Yes Yes Yes Yes
T-600 TELECOMMUNICATION RACK ELEVATIONS & RACEWAY DIAGRAM No No Yes Yes
T-701 TELECOMMUNICATION SCHEDULES No No Yes Yes
T-901 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes
T-902 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes
T-903 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes
T-904 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes
Grand total: 132
- DRAWING INDEX -
BB SHEET NAME
INCLUDED IN
35% SD
INCLUDED IN
65% DD
INCLUDED IN
95% CD
INCLUDED IN
100%
GENERAL
GI000 COVER SHEET Yes Yes Yes Yes
GI050 GENERAL NOTES Yes Yes Yes Yes
GI101 LIFE SAFETY Yes Yes Yes Yes
GI201 INFECTION CONTROL PLAN & INTERIM LIFE Yes Yes Yes Yes
ARCHITECTURAL
A-001 SYMBOLS, & GENERAL NOTES Yes Yes Yes Yes
A-002 ARCHITECTURAL ROOM PROGRAM PLAN - 3D Yes Yes Yes Yes
AD101 ARCHITECTURAL DEMOLITION PLAN AND REFLECTED CEILING PLANS - THIRD LEVEL - 3D Yes Yes Yes Yes
A-101 ARCHITECTURAL FLOOR PLAN - THIRD LEVEL - 3D NEW Yes Yes Yes Yes
A-102 ARCHITECTURAL DIMENSIONING PLAN - THIRD FLOOR 3D No Yes Yes Yes
AC101 ARCHITECTURAL REFLECTED CEILING PLAN - THIRD FLOOR 3D Yes Yes Yes Yes
AC102 PHOTOMETRIC PLAN Yes Yes
A-401 ARCHITECTURAL ENLARGED VIEWS Yes Yes Yes Yes
A-402 ARCHITECTURAL ENLARGED VIEWS Yes Yes Yes Yes
A-403 ARCHITECTURAL ENLARGED PLANS - TYPICAL "SAFER" PATIENT ROOM Yes Yes Yes Yes
A-404 ARCHITECTURAL ENLARGED PLANS - TYPICAL PATIENT ROOM No Yes Yes Yes
A-410 TYPICAL PATIENT CASEWORK ELEVATIONS No No No Yes
A-511 ARCHITECTURAL PARTITION AND FRAMING DETAILS No Yes Yes Yes
A-512 ARCHITECTURAL PARTITION HEAD DETAILS No Yes Yes Yes
A-551 ARCHITECTURAL CEILING DETAILS Yes Yes Yes Yes
A-552 ARCHITECTURAL CASEWORK DETAILS Yes Yes Yes Yes
A-601 SCHEDULES No Yes Yes Yes
A-602 SLIDING DOOR DETAILS Yes Yes
A-721 PARTITION HEAD DETAILS No Yes Yes Yes
A-722 PARTITION FRAMING DETAILS No Yes Yes Yes
A-730 TYPICAL MOUNTING HEIGHTS Yes Yes Yes Yes
ARCHITECTURAL SIGNAGE
AW001 ARCHITECTURAL SIGNAGE ABBREVIATIONS, SYMBOLS, GENERAL NOTES AND SCHEDULE Yes Yes Yes Yes
AW101 ARCHITECTURAL SIGNAGE PLAN - THIRD FLOOR - 3D Yes Yes Yes Yes
VA LOCATION MAP
VA VICINITY MAP
All new and existing systems within the Scope of Work shall be commissioned (or recommissioned) for per Specification 01 91 00.
Inspections: Comprehensive 3rd party inspections, testing and written reports for all Divisions are required and paid by the General Contractor. Contractor shall employ third party inspection consultants to perform all inspections required by this contract.
Contractor shall appoint a third-party individual, company, or firm to act as the Commissioning Agent. The Commissioning Agent is the designated person, company, or entity that plans, schedules, and coordinates the commissioning team to implement the commissioning process.
Identify complete bids associated with the CLINs (Contract Line Item Number) as follows:
CLIN 01: All work associated with the 3D Bed Ward Renovation. 18 month Period of Performance.
CLIN 02: All work associated with Alternate 1. Alternate 1 removes 30 days from the Period of Performance.
CLIN 03: All work associated with Alternate 2. Alternate 2 removes 30 days from the Period of Performance.
CLIN 04: All work associated with Alternate 3. Alternate 3 removes 60 days from the Period of Performance.
The expected construction period duration for each building includes all pre-construction activity and post-construction testing, third-party inspections and commissioning. Contractor shall submit a comprehensive schedule of work in compliance with 01 32 16.15 PROJECT SCHEDULES (SMALL PROJECTS DESIGN/BID/BUILD). Contractor to perform Commissioning of all new systems and existing systems impacted by the project according to requirements in sections:
01 91 00 – GENERAL COMMISSIONING REQUIREMENTS; 21 08 00 – COMMISSIONING OF FIRE SUPPRESSION SYSTEMS, 22 08 00 – COMMISSIONING OF PLUMBING SYSTEMS, 23 08 00 – COMMISSIONING OF HVAC SYSTEMS; 26 08 00 – COMMISSIONING OF ELECTRICAL SYSTEMS; 27 08 00 – COMMISSIONING OF COMMUNICATIONS SYSTEMS, 28 08 00 – COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS and 33 08 00 –COMMISSIONING OF SITE UTILITY SYSTEMS. A detailed commissioning plan is required to ensure that all devices are calibrated, programmed, and all graphic displays are accurate and approved by applicable VA staff.
Accessibility: The design shall be constructed to ensure access to the handicapped and disabled. All facilities which are open to the public, to limited segments of the public, visited by the public in the conduct of normal business, or those which hire or have the capacity to hire civilian personnel, shall be designed and constructed to be accessible to the handicapped. Design and construction must comply with HYPERLINK "https://www.access-board.gov/guidelines-and-standards/buildings-and-sites/about-the-aba-standards" Architectural Barriers Act Accessibility Standard (ABAAS) for Federal Facilities and HYPERLINK "http://www.cfm.va.gov/til/etc/dsBarrFree.pdf" PG-18-13 VA Barrier Free Design Standard, whichever is most stringent.
Infection Control: The construction shall clearly define and meet “Infection Control Barrier” criteria. The construction shall be in accordance with the AIA Guidelines or Design and Construction of Hospital and Health Care Facilities and address; the impact of demolition, renovation including walls and ceiling, electrical, mechanical, equipment and equipment support installation, and new construction.
HIPAA: The design shall accommodate compliance with current HIPAA requirements.
DEDUCTIVE ALTERNATES
D1
DEDUCTIVE ALTERNATE #1: PROVIDE STORAGE ROOM IN LIEU OF PATIENT
ROOMS 10 AND 11 (3D-321/A & 3D-323/A). REMOVE SCOPE OF WORK
ASSOCIATED WITH NEW HEADWALL, PLUMBING, SPECIALTY EQUIPMENT.
D2
D3
DEDUCTIVE ALTERNATE #2: PROVIDE STORAGE ROOM IN LIEU OF PATIENT
ROOMS 12 AND 13 (3D-325/A & 3D-326/A). REMOVE SCOPE OF WORK
ASSOCIATED WITH NEW HEADWALL, PLUMBING, SPECIALTY EQUIPMENT.
DEDUCTIVE ALTERNATE #3: PROVIDE STORAGE ROOM IN LIEU OF PATIENT
ROOMS 14, 15, 16, AND 17 (3D-328/A, 3D-329/A, 3D-331/A & 3D-332/A).
REMOVE SCOPE OF WORK ASSOCIATED WITH NEW HEADWALL, PLUMBING,
SPECIALTY EQUIPMENT.
NOTE: DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE TAKEN IN
SEQUENTIAL ORDER.
TRIPLE C TEAM:
MAT PERKINS, PM
mat.perkins@triplecaeg.com
HEATHER GARDINER, DEPT. PM
heather.gardiner@triplecaeg.com
KATE MACAULAY, SENIOR INTERIOR DESIGNER
kate.macaulay@triplecaeg.com
CALEB LOWERY, PROJECT ARCHITECT
caleb.lowery@triplecaeg.com
KEVIN LUKE, MECHANICAL ENGINEER
kevin.luke@triplecaeg.com
T-600 TELECOMMUNICATION RACK ELEVATIONS & RACEWAY DIAGRAM No No Yes Yes
T-601 TELECOMMUNICATIONS RISER DIAGRAMS Yes Yes Yes Yes on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
B e d W in g .A
R C
H .B
.L
.r v t
/1
/2
:0 :1
P
M
09/12/2022 M.PERKINS K.MACAULAY
618-22-102
1391 - GI050
GENERAL NOTES
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING100% CONSTRUCTION
DOCUMENTS
1. STANDARDS: GENERAL PAINTING SPECIFICATIONS FOR
THIS PROJECT ARE DEFINED BY THE PROJECT MANUAL
AND ARE BASED ON THE MPI ARCHITECTURAL PAINTING
SPECIFICATION MANUAL FOR NEW WORK AND THE MPI
MAINTENANCE REPAINTING MANUAL FOR RENOVATION OR
REPAINTING WORK.
2. PAINTING WORK: INCLUDES TAPING, SURFACE
PREPARATION, CLEANING, DE-RUSTING, PRIMING, FIELD
PAINTING AND FINISHING AS REQUIRED BY STANDARD
PRACTICE, MANUFACTURER OR SPECIFICATION. REQUIRED
COATS OF PAINT OR STAIN ARE IN ADDITION TO SHOP
PRIMING, SURFACE TREATMENT AND FINISHING. THE WORK
ALSO INCLUDES PAINTING CLEANUP AND REMOVAL OF
OVERSPRAY, DRIPS AND SPLATTERS. THE SPECIFICATIONS
MAY REQUIRE OTHER TYPES OF PAINTING, INCLUDING, BUT
NOT LIMITED TO, FIELD APPLIED SPECIAL COATINGS AND
FACTORY PRIMING.
3. PROJECT PAINTING SCOPE: EXCEPT AS NOTED
OTHERWISE, CONTRACTOR IS TO FIELD PAINT INTERIOR
AND EXTERIOR EXPOSED ITEMS AND BUILDING SURFACES,
WHETHER OR NOT PREVIOUSLY PAINTED, AND ALL NEW
ITEMS AND SURFACES. THIS INCLUDES, BUT IS NOT LIMITED
TO, FACTORY-PRIMED ITEMS, GALVANIZED SHEET METAL
AND EXPOSED PIPING AND FITTINGS (INCLUDING IRON AND
PVC). EXTERIOR EXPOSED MASONRY AND CONCRETE
SHALL BE SEALED, UNLESS NOTED OTHERWISE OR NOT
RECOMMENDED BY MANUFACTURER. PAINTING SCOPE
ITEMS MAY BE FOUND IN FINISH SCHEDULES, DRAWINGS,
SPECIFICATIONS AND PAINTING GENERAL NOTES. THESE
SOURCES ARE COMPLEMENTARY, NOT MUTUALLY
EXCLUSIVE.
4. MECHANICAL AND ELECTRICAL PAINTING: INCLUDES FIELD
PAINTING OF INTERIOR AND EXTERIOR EXPOSED PIPES,
DUCTS, HANGERS, EXPOSED STEEL AND IRON WORK AND
PRIMED METAL SURFACES OF EQUIPMENT IN EXPOSED
AREAS INSTALLED UNDER MECHANICAL AND ELECTRICAL
WORK, EXCEPT AS OTHERWISE INDICATED. PAINTING OF
ELECTRICAL AND MECHANICAL WORK IN ELECTRICAL AND
MECHANICAL ROOMS IS NOT REQUIRED UNLESS NOTED
OTHERWISE IN THE PROJECT MANUAL. COLOR-CODING OF
PIPING FOR MECHANICAL AND PLUMBING WORK IS
COVERED IN THE MECHANICAL OR PLUMBING
SPECIFICATIONS.
5. APPLICATION: EACH COAT OF PAINT SHALL TERMINATE AT
AN EDGE, CORNER, CHANGE OF MATERIALS OR CHANGE
OF PAINT COLOR. COMPLETED PAINTING SHALL NOT
IMPEDE THE INTENDED OPERATION OF ANY ITEM, SUCH AS
WINDOWS, DRAWERS, HINGES, DOORS, ETC.
6. TOUCH-UP: SURFACES REQUIRING TOUCH-UP SHALL BE
REPAIRED AS REQUIRED. PAINT TEXTURE, GLOSS AND
COLOR SHALL MATCH EXISTING. IF TOTAL TOUCH-UP AREA
ON ONE SURFACE IS LARGER THAN 1 SQUARE FOOT, OF IF
TEXTURE, GLOSS AND COLOR CANNOT BE MATCHED, THE
ENTIRE SURFACE SHALL BE REPAINTED TO ENCLOSING
EDGES OR CORNERS.
7. DO NOT PAINT: UNLESS OTHERWISE INDICATED, DO NOT
PAINT ITEMS THAT ARE SPECIFIED FACTORY-FINISHED OR
INSTALLER-FINISHED. ALSO, UNLESS OTHERWISE
INDICATED, DO NOT PAINT SUCH ITEMS AS ACOUSTIC
MATERIALS, HARDWARE, PRE-FINISHED FIXTURES AND
EQUIPMENT, PRE-FINISHED MECHANICAL AND ELECTRICAL
EQUIPMENT, SWITCH AND OUTLET PLATES, THERMOSTATS,
LIGHTING FIXTURES, SWITCHGEAR, MOTORS,
DISTRIBUTION PANELS AND INTERIOR AND EXTERIOR
SIGNAGE. IF THERE IS A QUESTION WHETHER OR NOT TO
PAINT AN ITEM OR SURFACE, FOLLOW PROCEDURES
LISTED IN SECTION 01 26 13 REQUESTS FOR INFORMATION
(RFI).
8. EXPOSED FINISH METAL SURFACES: UNLESS OTHERWISE
INDICATED, DO NOT PAINT METAL SURFACES OF ANODIZED
ALUMINUM, STAINLESS STEEL, NICKEL, CHROMIUM PLATE,
COPPER, BRASS, BRONZE AND SIMILAR FINISHED
MATERIALS.
9. CONCEALED SURFACES: UNLESS OTHERWISE INDICATED,
DO NOT PAINT SURFACES SUCH AS WALLS AND CEILINGS
IN CONCEALED AND GENERALLY INACCESSIBLE AREAS,
INCLUDING FURRED AREAS, UTILITY TUNNELS, PIPE
SPACES, CHASES AND DUCT SHAFTS. WATERPROOF SEAL
CONCRETE IN PIPE SPACE.
10. OPERATING PARTS AND SENSING DEVICES: UNLESS
OTHERWISE INDICATED, DO NOT PAINT MOVING PARTS OF
OPERATING UNITS SUCH AS VALVES, DAMPER
OPERATORS, LINKAGES, MOTOR AND FAN SHAFTS, LIGHT
SENSING OR EMITTING DEVICES THAT MIGHT NOT
FUNCTION PROPERLY IF PAINTED.
11. CODE-REQUIRED LABELS: DO NOT PAINT OVER CODE-
REQUIRED LABELS.
12. ALL FLOORS ARE TO BE CLEANED AND SEALED AT
COMPLETION OF WORK. NO EPOXY PAINT.
13. ALL INTERIOR SURFACES, WALLS, FRAMES, ETC.,
REQUIRED TO HAVE NEW FINISHES APPLIED, SHALL HAVE
ALL EXISTING AND CONTRACTOR CAUSED HOLES, CRACKS,
AND OTHER IMPERFECTIONS FILLED WITH APPROVED
PATCHING MATERIAL. PATCH TO BE FINISHED FLUSH WITH
ADJACENT SURFACE, WITH TEXTURE TO MATCH TEXTURE
OF ADJACENT SURFACE. SEE SPECIFICATIONS FOR
PATCHING REQUIREMENTS.
14. PAINT EXPOSED TOP EDGE OF ALL TERRAZZO FLOOR BASE
TO MATCH WALL PAINT. CLEAN TERRAZZO FACE OF ANY
OLD PAINT.
15. PAINT EXISTING MECHANICAL HEATING UNIT COVER AND
ACCESSORIES, INCLUDING ALL SUPPORT BRACKETS.
PAINT THE HEATING WATER PIPING THAT IS EXPOSED TO
VIEW BELOW THE UNIT. PAINT ALL WALL SURFACES THAT
ARE VISIBLE BEHIND HEATING UNIT WHEN COVER IS IN
PLACE.
16. THE CONTRACTOR SHALL FIELD VERIFY EXISTING PAINT
MATERIALS AND FINISHES. APPLY THE APPROPRIATE
SEPARATION COAT (PRIMER/BONDING COAT) BETWEEN ALL
NON-COMPATIBLE COATINGS (I.E. WHERE NEW WATER-
BORNE ACRYLIC IS TO BE INSTALLED OVER EXISTING OIL
BASE PAINT).
GENERAL PAINTING NOTES:
1. THE PRIMARY OBJECT OF APPLYING SEALANT IS TO
FACILITATE WEATHER TIGHTNESS AT THE EXTERIOR
BUILDING ENVELOPE AND WATER TIGHTNESS AT INTERIOR
WET\DAMP LOCATIONS. PROPER PRIMING MUST BE USED
WITH SEALANTS.
2. THE PRIMARY OBJECT OF APPLYING CAULKING IS TO
ENHANCE APPEARANCE AND FINISH AT INTERIOR
APPLICATIONS AND IN SOME SITUATIONS TO REDUCE
AIRFLOW, SUCH AS AT DUCTS, INTERIOR SIDES OF THE
EXTERIOR ENVELOPE AND AT FIREWALL/SMOKE BARRIER
PENETRATIONS (FIRE CAULKING) AND TO DECREASE
SOUND TRANSMISSION THROUGH WALLS AND CEILINGS.
OTHER USES MAY BE NOTED IN THE SPECIFICATIONS
AND/OR ON THE DRAWINGS. IF THERE ARE QUESTIONS
ABOUT WHERE OR WHAT TYPE OF SEALANT OR CAULKING
SHOULD BE USED, FOLLOW PROCEDURES LISTED IN
SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI).
3. SPECIFIED SEALANT (AND BACKER RODS, AS REQUIRED)
SHALL BE USED AT HORIZONTAL AND VERTICAL CONCRETE
JOINTS AND AS NOTED.
4. SPECIFIED SEALANT AND BACKER RODS, OR EXPANSION
JOINT MATERIAL, AS REQUIRED, SHALL BE USED AT
MASONRY AND CONCRETE CONTROL JOINTS.
5. APPLY SEALANT TAPE OR TWO CONTINUOUS BEADS OF
SEALANT BETWEEN PERIMETER SOLE PLATES AND
FOUNDATIONS, SLABS AND FLOOR DECKS. SET EXTERIOR
THRESHOLDS IN SEALANT UNLESS NOTED OTHERWISE.
6. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL
AROUND BOTH SIDES OF DOOR FRAMES.
7. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL
AROUND INTERIOR WALL MOUNTED EQUIPMENT FRAMES
AND EXPOSED SUPPORTS.
8. SPECIFIED SEALANT OR CAULK SHALL BE USED AT JOINTS
BETWEEN DIFFERENT WALL MATERIALS (TILE TO BRICK,
CMU TO GYPSUM BOARD, WOOD TO STONE, METAL PANEL
TO P-LAM, ETC).
9. USE SPECIFIED CAULK OR SEALANT AT WALL MATERIAL
GAPS OR 1/16TH INCH OR MORE.
10. SEAL ALL AROUND ATTACHMENTS TO, AND PENETRATIONS
THROUGH, FLOORS AND WALLS.
11. USE SPECIFIED SEALANT AROUND WALL, FLOOR AND
CEILING PIPE PENETRATIONS. WHERE ESCUTCHEONS ARE
SPECIFIED OR PROVIDED, SET THE ESCUTCHEONS IN A
BED OF SEALANT.
12. USE SPECIFIED CAULK OR SEALANT AROUND
PENETRATIONS IN EXTERIOR WALLS AND SOFFITS, SUCH
AS AT HOSE BIBS, FD CONNECTIONS, ELECTRIC SERVICE
ENTRIES, GAS PIPE ENTRIES, ELECTRIC OUTLETS,
LIGHTING, VENTS, ETC.
GENERAL SEALANT / CAULKING
NOTES:
1. THESE GENERAL NOTES APPLY TO ALL DRAWINGS.
2. COMPLY WITH ALL APPLICABLE CODES, RULES, AND
REGULATIONS. WHEN REQUIRED BY CODE, ALL WORK
MUST BE INSPECTED AND APPROVED BY LOCAL
AUTHORITIES.
3. ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE
VERIFIED BY THE CONTRACTOR(S) PRIOR TO FABRICATION
AND CONSTRUCTION. IF INCONSISTENCIES,
CONTRADICTIONS OR OMISSIONS ARE DISCOVERED
FOLLOW PROCEDURES LISTED IN SECTION 01 26 13
REQUESTS FOR INFORMATION (RFI).
4. GENERAL CONTRACTOR SHALL COORDINATE ALL
MECHANICAL AND ELECTRICAL DUCT SIZES AND
LOCATIONS.
5. ALL EXITS TO BE OPERABLE FROM THE INSIDE WITHOUT
THE USE OF A KEY OR SPECIAL KNOWLEDGE.
6. WALL OUTLETS, SWITCHES,THERMOSTATS, ETC. TO BE
INSTALLED LEVEL WITH EACH OTHER AND PLUMB.
7. THE WORK INDICATED IN THE NOTES DESCRIBES THE
GENERAL SCOPE OF WORK ONLY AND IS NOT INTENDED
TO BE INCLUSIVE OF ALL WORK REQUIRED TO COMPLETE
FULL SCOPE OF WORK.
8. DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE
FIELD VERIFIED. IF DIMENSIONAL INFORMATION IS
REQUIRED & NOT FOUND, FOLLOW PROCEDURES LISTED IN
SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI).
9. FIELD VERIFICATION: BEFORE BIDDING AND DURING
CONSTRUCTION, CONTRACTOR SHALL VERIFY THAT
ACTUAL CONDITIONS ARE THOSE REFLECTED BY THE
CONTRACT DOCUMENTS. REPORT DISCREPANCIES TO
ARCHITECT AND COR PRIOR TO BIDDING OR PERFORMING
WORK RELATED TO ANY DISCREPANCIES. SEE
SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
10. MOST EXPENSIVE BID: IF THERE ARE SCHEDULES,
SYSTEMS, SUBCONTRACT, OR MATERIAL CONFLICTS NOT
BROUGHT TO THE ARCHITECT'S AND COR'S ATTENTION
PRIOR TO BIDDING, THE CONTRACTOR WILL BE DEEMED TO
HAVE ELECTED THE MORE COSTLY TIME, METHOD,
SYSTEM, PRODUCT, SUBCONTRACT AND/OR MATERIAL.
11. NIC: CONSTRUCTION OF WORK INDICATED ON DRAWINGS
AS "NIC" IS NOT IN THE CONTRACT. HOWEVER, THE
CONTRACTOR SHALL COORDINATE ITS WORK, WITH WORK
INDICATED AS NIC.
12. SITE COORDINATION: COORDINATE ALL SITE OPERATIONS
WITH COR, INCLUDING STAGING AREAS, MATERIAL
STORAGE, ACCESS TO WORK, TIMING OF WORK, NOISY
OPERATIONS, INTERRUPTION OF UTILITIES. SEE
SPECIFICATIONS.
13. TRADE COORDINATION: CONTRACTOR SHALL COORDINATE
THE PLACEMENT OF EACH TRADE'S WORK SO THAT THERE
ARE NO CONFLICTS AND NO SYSTEM'S OPERATION OR
FUNCTION IMPAIRED. IT IS ESPECIALLY IMPORTANT TO
COORDINATE PENETRATIONS THROUGH FOUNDATIONS,
FLOORS, WALLS AND CEILING SPACES. SEE
SPECIFICATIONS.
14. PROVIDE GALVANIC SEPARATION MATERIAL, BETWEEN
DISSIMILAR METALS. SEE SPECIFICATIONS.
15. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY
SHALL BE FIRE TREATED. SEE SPECIFICATIONS. ALL
SURFACE ATTACHED METAL SHALL BE SEPARATED FROM
CONCRETE OR MASONRY BY NON-METALLIC MATERIAL
SUCH AS #30 FELT, "PEEL AND STICK" OR OTHER MATERIAL
AS APPROVED BY ARCHITECT AND COR.
16. EXTERIOR / INTERIOR ELEVATIONS DO NOT SHOW ALL
EQUIPMENT, FIXTURES, DEVICES, MECHANICAL, PLUMBING
OR ELECTRICAL ITEMS. SEE ARCHITECTURAL, INTERIOR,
MECHANICAL AND ELECTRICAL PLANS FOR ADDITIONAL
ELEVATION COORDINATION.
17. ANY CUTTING/WELDING WILL REQUIRE DAILY HOT WORK
PERMITS TO BE COORDINATED WITH COR. SUBMIT
CERTIFICATIONS AS REQUIRED BY THE SPECIFICATIONS.
GENERAL NOTES: GENERAL FIRE & LIFE SAFETY
NOTES:
FIRE ALARM
1. DESIGN SHALL BE AN APPROVED FIRE ALARM SYSTEM IN
ACCORDANCE WITH CLASS B WIRING SCHEMES FOR THE
ALARM SYSTEM AND CLASS X WIRING STYLE FOR
COMMUNICATION BETWEEN BUILDING FIRE ALARM
CONTROL UNITS.
2. SUBMIT PER SECTION 01 33 23 SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES; AND SECTION 28 31 00 FIRE
DETECTION AND ALARM FOR APPROVAL PRIOR TO THE
INSTALLATION.
3. THE MINNEAPOLIS VAMC HAS A FULL SERVICE
MAINTENANCE CONTRACT FOR MAINTENANCE AND
TESTING OF THE FIRE ALARM SYSTEM. IN ACCORDANCE
WITH THIS CONTRACT THE FIRE ALARM MAINTENANCE
CONTRACTOR (CURRENTLY FIRE SENTRY) MUST CERTIFY
ALL PROGRAMMING DONE TO THE FIRE ALARM SYSTEM.
UNDER THIS CONTRACT, THE CONSTRUCTION
CONTRACTOR MUST EITHER HIRE THE CURRENT FIRE
ALARM MAINTENANCE CONTRACTOR TO PERFORM ALL
FIRE ALARM PROGRAMMING WORK OR IF THE
PROGRAMMING IS COMPLETED BY ANOTHER FIRE ALARM
CONTRACTOR, THE CONSTRUCTION CONTRACTOR MUST
HIRE THE CURRENT FIRE ALARM MAINTENANCE
CONTRACTOR TO FULLY INSPECT, TEST, AND CERTIFY
THE PROGRAMMING WORK DONE BY ANOTHER
CONTRACTOR.
4. WHENEVER FIRE ALARM WORK TAKES PLACE IN AN AREA
THAT IS BEING REMODELED, AT THE CONCLUSION OF THE
WORK, THE FIRE ALARM CONTRACTOR IS TO TEST ALL
FIRE ALARM DEVICES WITHIN THE AREA OF THE REMODEL
AREA WHETHER OR NOT THEY WERE MODIFIED AS PART
OF THE PROJECT.
FIRE EXTINGUISHERS
1. TEMPORARY- CONTRACTOR SHALL PROVIDE JOB SITE
WITH TEMPORARY PORTABLE FIRE EXTINGUISHERS AND
SHALL MAINTAIN THEM DURING THE COURSE OF
CONSTRUCTION. EACH EXTINGUISHER SHALL BE 10 lb.
CAPACITY, CAPABLE OF EXTINGUISHING CLASS A, B & C
FIRES. ALL EXTINGUISHERS SHALL BE U.L. LABELED AND
SHALL BE DRY CHEMICAL TYPE.
EXIT & EMERGENCY LIGHTING
1. EXIT SIGNS SHALL CLEARLY INDICATE DIRECTION LEADING
TO EXTERIOR WITH MINIMUM 6" HIGH LETTERS AT
REQUIRED EXITS, EXIT DISCHARGE AND AT ALL CORRIDOR
INTERSECTIONS AND CHANGES OF DIRECTION. EXIT WAY;
CORRIDORS AND STAIRS SHALL BE ILLUMINATED BY A
SUITABLE EMERGENCY LIGHTING SYSTEM TO OPERATE
WHEN NORMAL POWER IS INTERRUPTED. EMERGENCY
LIGHTING SHALL PROVIDE A MINIMUM OF 5 FOOT CANDLE
POWER AT FLOOR LEVEL. EXIT DOOR SHALL SWING IN THE
DIRECTION OF EXIT OVER A LANDING NOT MORE THAN 1/2"
BELOW THE THRESHOLD.
2. EXIT AND EMERGENCY LIGHTING SHALL CONFORM WITH
THE LOCAL AND CURRENT NEC GUIDELINES.
FIRE SPRINKLER SYSTEM
1. EXISTING FIRE SPRIKLER MAIN PIPES AND BRANCH LINES
TO BE RETAINED AND REUSED. CONTRACTOR TO VERIFY
THE EXACT SIZE AND LOCATION IN FIELD.
2. ALL NEW SPRINKLER HEADS, HANGERS AND RESTRAINTS
TO BE INSTALLED IN ACCORDANCE WITH 2019 NFPA 13.
3. ALL NEW PIPING FOR SPRINKLER HEADS SHALL BE HARD
PIPED, NO FLEXIBLE CONNECTIONS ARE PERMISSIBLE.
4. WHENEVER EXISTING FIRE SPRINKLER PIPING IS
REMOVED, THE FIRE SPRINKLER CONTRACTOR IS TO
ANALYZE THE PIPING FOR OBSTRUCTIONS AND PROVIDE
WRITTEN OBSTRUCTION DOCUMENTATION IN
ACCORDANCE WITH NFPA REQUIREMENTS TO THE VA.
FIRE STOPPING
1. FIRE STOPPING IS REQUIRED. SEE SECTION 07 84 00 FIRE
STOPPING.
GENERAL
1. ANY DECORATIONS USED SHALL BE NON-COMBUSTIBLE
OR FLAME-PROOFED IN AN APPROVED MANNER.
2. INSULATION APPLIED TO EXTERIOR SURFACE OF DUCTS
LOCATED IN BUILDINGS SHALL HAVE A FLAME SPREAD OF
NOT MORE THAN 25 AND SMOKE-DEVELOPED RATING OF
NOT MORE THAN 50 WHEN TESTED AS A COMPOSITE
INSTALLATION, INCLUDING INSULATION, FACING
MATERIALS, TAPES AND ADHESIVES NORMALLY APPLIED.
3. ALL INSULATION MATERIALS INSTALLED WITHIN FLOOR-
CEILING ASSEMBLIES, ROOF CEILING ASSEMBLIES, WALLS
SHALL HAVE A FLAME-SPREAD RATING NOT TO EXCEED 25
AND A SMOKE DENSITY NOT TO EXCEED 50 WHEN TESTED
IN ACCORDANCE WITH ASTM E 84.
4. HAND-ACTIVATED, DOOR-OPENING HARDWARE SHALL BE
CENTERED BETWEEN 30" AND 44" ABOVE THE FLOOR.
LATCHING AND LOCKING DOORS THAT ARE HAND-
ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL
BE OPERABLE WITH A SINGLE EFFORT BY LEVER-TYPE
HARDWARE, PANIC BARS, PUSH-PULL PASSAGE WITHOUT
REQUIRING THE ABILITY TO GRASP THE OPENING
HARDWARE. LOCKED EXIT DOORS SHALL OPERATE AS
ABOVE IN EGRESS DIRECTION. DOOR CLOSERS (EXCEPT
FIRE DOORS) SHALL HAVE SWEEP PERIOD SO THAT FROM
AN OPEN POSITION OF 70 DEGREES, THE DOOR WILL TAKE
AT LEAST 3 SECONDS TO MOVE TO A POINT 3" FROM THE
LATCH, MEASURED FROM THE LEADING EDGE OF THE
DOOR.
5. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT
EXCEED:
A. INTERIOR DOORS - 5 lbs.
B. EXTERIOR DOORS - 8.5 lbs.
C. FIRE DOORS - 15 lbs.
6. ALL FLOOR, WALL, AND CEILING PENETRATIONS FOR
PIPING, DUCTS, CONDUIT, ETC. SHALL BE SEALED WITH A
UL APPROVED METHOD AND MATERIAL.
FIRE & SMOKE DAMPERS
1. EXISTING FIRE & SMOKE DAMPERS ARE TO BE RETAINED
AND REUSED.
2. THE BUILDING IS EQUIPPED WITH A FIRE ALARM SYSTEM.
THE BUILDING IS EQUIPPED WITH A FIRE SPRINKLER AND
FIRE ALARM SYSTEM.
1. ALTHOUGH SIGNIFICANT EFFORTS HAVE BEEN MADE TO
COORDINATE DIMENSIONS, THERE MAY BE DISCREPANCIES
AND/OR OMISSIONS. IF ENCOUNTERED, CONTACT THE
ARCHITECT AND COR FOR ADDITIONAL INFORMATION. IF
DIMENSIONAL INFORMATION IS REQUIRED & NOT FOUND,
FOLLOW PROCEDURES LISTED IN SECTION 01 26 13
REQUESTS FOR INFORMATION (RFI). IF DISCREPANCIES
ARE DISCOVERED AFTER THE BIDFOLLOW PROCEDURES
LISTED IN SECTION 01 26 13 REQUESTS FOR INFORMATION
(RFI) PRIOR TO CONSTRUCTION OF THE AFFECTED AREA.
2. ACTUAL CONSTRUCTION CONDITIONS AND/OR MATERIAL
AND EQUIPMENT SIZES MAY NOT BE THOSE ANTICIPATED
BY THE DESIGNERS. THROUGH FIELD INVESTIGATION AND
SHOP DRAWINGS CONTRACTOR SHALL VERIFY
DIMENSIONS AND RECOMMEND DIMENSIONAL
MODIFICATIONS AS REQUIRED.
3. ARCHITECTURAL DIMENSIONS MAY BE FOUND ON FLOOR
PLANS, EXPANDED PLANS, REFLECTED CEILING PLANS,
SECTIONS, DETAILS, DOOR SCHEDULES, INTERIOR
ELEVATIONS AND EXTERIOR ELEVATIONS.
4. ADDITIONAL DIMENSIONS MAY BE SHOWN ON
STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS.
MECHANICAL AND ELECTRICAL EQUIPMENT SCHEDULES
MAY ALSO CONTAIN DIMENSIONAL INFORMATION RELATED
TO EQUIPMENT SIZES AND CLEARANCES.
5. DESIGNATIONS ARE NOTED AS NOMINAL, NOT ACTUAL (2 X
4 STUD); DIMENSIONS ARE SHOWN AS ACTUAL, NOT
NOMINAL (1 1/2" X 3 1/2" STUD). DIMENSIONS ARE NOT
ROUNDED, BUT UN-ROUNDED DIMENSIONS SHOULD NOT
BE VIEWED AS MAXIMUM CONSTRUCTION TOLERANCE.
(FOR INSTANCE, MASONRY OPENING DIMENSIONS MAY BE
SHOWN IN THE 16THS OF AN INCH, BUT STANDARD
MASONRY CONSTRUCTION TOLERANCES MAY BE +/- 1/4").
6. FLOOR PLAN DIMENSIONS
A. THE LOWEST FLOOR OVERALL BUILDING
DIMENSIONS ARE FROM THE OUTSIDE FACE OF THE
FOUNDATION WALL TO THE OPPOSITE OUTSIDE
FACE OF THE FOUNDATION WALL (OR, FROM
OUTSIDE GRIDLINE TO OUTSIDE GRIDLINE) AS
SHOWN.
B. DIMENSIONS FOR NON-LOAD BEARING WALLS ARE
TO ONE FACE OF THE STUDS, BOTH FACES OF
MASONRY WALLS, OR BOTH FACES OF CONCRETE
WALLS, ETC, UNLESS NOTED OTHERWISE.
C. WALL DIMENSIONS ARE ACTUAL, NOT NOMINAL
(UNLESS NOTED AS "NOM").
D. DOOR OPENING DIMENSIONS IN FRAME
CONSTRUCTION (WOOD OR STEEL STUDS) ARE
TYPICALLY SHOWN AT THEIR CENTERLINES.
HOWEVER, WHEN THE EDGE OF THE DOOR IS
IMPORTANT, OR MAKES THE PLACEMENT CLEARER,
THE DIMENSION MAY BE TO THE ACTUAL FRAME
EDGE.
E. DOOR DIMENSIONS IN LOAD-BEARING MASONRY
AND CONCRETE WALLS ARE TO "ROUGH"
OPENINGS (FACES OF MASONRY OR CONCRETE).
TYPICAL DOOR ROUGH OPENING DIMENSIONS ARE
THE FRAME WIDTH PLUS 1/2" (1/4" CLEARANCE
EACH SIDE) AND PLUS 1/2" TOTAL FOR THE
HEAD/SILL DIMENSIONS.
F. "TYPICAL" DOOR FRAME CLEARANCE DIMENSIONS
TO ADJACENT WALLS: BETWEEN FRAME FACES
AND FACES OF STUDS, OR FACES OF MASONRY OR
CONCRETE, AT NEARBY PERPENDICULAR WALLS
ARE TYPICALLY 4", DEPENDING ON HARDWARE
CLEARANCES AND FRAME REQUIREMENTS (2.5"-
DOOR HANDLE PLUS 1" -WALL STOP PLUS 1/2" GB=
4.0")
G. SOME DIMENSIONS REQUIRED TO BE CLEAR, SUCH
AS AT REQUIRED EXIT WAYS, APPLIANCE COVES OR
PREFABRICATED STAIR ENCLOSURES, ARE NOTED
"CLR" OR "CLEAR" AND ARE SHOWN TO THE FACES
OF FINISHES.
H. DIMENSIONS DESIGNATED WITH "MIN" INDICATE
THE MINIMUM CLEARANCE OR SEPARATION
REQUIRED.
1. VERTICAL DIMENSIONS
A. UNLESS NOTED OTHERWISE, THE FIRST FLOOR
REFERENCE ELEVATION IS 100'-0". THIS IS
REFERENCED TO A GROUND ELEVATION ABOVE
MEAN SEA LEVEL (MSL), AS SHOWN IN CIVIL OR
STRUCTURAL DRAWINGS. ELEVATIONS BELOW 0'-0"
ARE "-" (PREFIXED WITH A MINUS SIGN).
B. BUILDING, FLOOR AND ROOF HEIGHTS SHOWN ON
ARCHITECTURAL DRAWINGS ARE TO TOP OF
DECKING OR SHEATING, BUT DO NOT INCLUDE
FINISHES OR ROOFING MATERIAL.
C. WALL OPENINGS: DOOR AND LOUVER HEIGHTS ARE
TO FINISH HEIGHTS (UNLESS THEY ARE IN LOAD-
BEARING MASONRY OR CONCRETE WALLS, WHERE
THEY ARE TO ROUGH OPENINGS). HEIGHT
REFERENCES SHOULD BE TO THE NEXT LOWER
FINISH FLOOR ELEVATION
D. LIGHTING HEIGHTS ON WALLS ARE TO
CENTERLINES OF THE ELECTRICAL BOXES, UNO.
EQUIPMENT, VENT, PLUMBING AND FIXTURE
ELEVATIONS ARE TO CENTERLINES OF THE WALL
PENETRATIONS, UNO.
E. SOME VERTICAL DIMENSIONS ARE SHOWN ON
PLANS FOR DEPRESSIONS, RIDGES, CURBS, AND
ELEVATION CHANGES. A PLAN ELEVATION CHANGE
SYMBOL LOOKS LIKE A STEP OR VERTICAL "Z" AND
INDICATES THE + OR - ELEVATION CHANGE IN
INCHES FROM THE FINISHED FLOOR ELEVATION
(FFE) NEXT TO IT.
GENERAL DIMENSIONING
NOTES:
1. HALF-TONED OR LIGHT LINES INDICATE EXISTING
CONSTRUCTION TO REMAIN. DASHED BOLD LINES INDICATE
EXTENT OF DEMOLITION.
2. TEMPORARY BRACING OR SHORING MAY BE NECESSARY,
AND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
3. CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES
TO MEET APPROVAL OF CODE AGENCIES. COORDINATE
DEMOLITION WORK WITH ALL DISCIPLINES. CONTRACTOR
SHALL DISPOSE OF ALL ITEMS PER SPECIFICATIONS. THE
COR RESERVES THE RIGHT TO SELECT SPECIFIC ITEMS
FOR SALVAGE. THESE ITEMS SHALL BE IDENTIFIED DURING
THE PRE-CONSTRUCTION WALK THROUGH.
4. CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS,
VOIDS OR PENETRATIONS LEFT BY THE INSTALLATION OR
CONSTRUCTION OF EQUIPMENT, PIPING, DUCTS, ETC. TO
MAINTAIN THE INTEGRITY OF THE WALL, FLOOR, AND/OR
ROOF ASSEMBLY.
5. THE ACCESSIBLE PARKING AREA AND PUBLIC RIGHT-OF-
WAY OF THE PROJECT SITE MAY BE IMPACTED BY
CONSTRUCTION ACTIVITIES. TEMPORARY BARRICADES
PERTAINING TO THE CONTRACTOR'S ACTIVITIES SHALL BE
INSTALLED TO PREVENT POSSIBLE INJURY IN AND AROUND
DEMOLITION AND CONSTRUCTION AREAS IN ACCORDANCE
WITH THE LATEST OSHA REQUIREMENTS. COORDINATE
CONTRACTOR STAGING AREA AND PUBLIC ACCESS WITH
COR PRIOR TO CONSTRUCTION. PROTECT SIGNAGE WITHIN
PROJECT AREA.
6. SEE SPECIFICATIONS FOR CUTTING AND PATCHING AND
DEMOLITION FOR RELATED DEMOLITION WORK.
7. SEE DRAWINGS FOR ADDITIONAL PROJECT RELATED
UTILITY & DEMOLITION WORK AND PROJECT PHASING
NOTES. COORDINATE UTILITY SYSTEM SHUTDOWNS WITH
COR.
GENERAL DEMOLITION AND
PHASING NOTES:
LIFE SAFETY SYMBOLS
PATH OF EXIT ACCESS TRAVEL
PATH LENGTH
FIRE EXTINGUISHER CABINET (FEC)
REQUIRED DOOR CLEARANCES
FEC
PATH TO POINT OF COMMON TRAVEL
PATH LENGTH###' - ##"
BOLD LINE REPRESENTS
LONGEST PATH DISTANCE
EXIT LIGHTING
REQUIRED TOILET CLEARANCE
72" D X 66" W (BARRIER FREE)
REQUIRED TURNING RADIUS
66" DIAMETER (TYPICAL - BARRIER FREE)
72" DIAMETER (BARIATRIC - BARRIER FREE)
7" TOE / KNEE CLEARANCE OVERLAP
UNRATED PARTITION
SMOKE PARTITION
1 HOUR RATED PARTITION
2 HOUR RATED PARTITION
EXISTING WALL TO REMAIN
EXISTING AREA NOT IN CONTRACT (NIC)
BUILDING CODE:
MIXED BUILDING OCCUPANCY TYPE:
The entire building 1 is comprised of:
Primary: Healthcare (NFPA 101, Chapter 19) Secondary: Ambulatory Health Care (NFPA 101, Chapter 21)
This project is modifying ward C on Level 3, and is keeping the existing health care occupancy. The following data is from NFPA 101, Chapter 19.
PROJECT AREA:
AREA IN SCOPE: 13,461 GSF
CHANGE TO BUILDING SF: NO CHANGE
OCCUPANT LOAD:
EXISTING OCCUPANT LOAD: 113
PROPOSED OCCUPANT LOAD: 113 (NO CHANGE)
120 GSF PER OCCUPANT - Healthcare Sleeping Department (7.3.1.2)
CONSTRUCTION TYPE:
CONSTRUCTION: Type 1 (332) per NFPA 220, Chapter 4
FIRE RATED REQUIREMENTS FOR BUILDING ELEMENTS:
PRIMARY STRUCTURAL FRAME: 3 HOURS
BEARING WALLS (EXT & INT): 3 HOURS
FLOOR CONSTRUCTION: 2 HOURS
ROOF CONSTRUCTION: 1.5 HOURS
NON BEARING WALLS: 0 HOURS
OTHER REQUIRED RATINGS & SEPARATIONS:
VERTICAL SHAFTS: 2 HOURS
EXIT STAIRS: 2 HOURS
SOILED UTILITY: 1 HOUR
HAZARDOUS STORAGE: 1 HOUR
MEANS OF EGRESS:
MAXIMUM PATH OF TRAVEL: 200' (185'-0" MAX ACTUAL)
MAXIMUM COMMON PATH: 50' (41'-3" MAX ACTUAL)
DEAD-END CORRIDORS: 30' (NONE PRESENT)
MINIMUM EGRESS COMPONENT WIDTH: 48 INCHES
OTHER EGRESS WIDTH REQUIRED: 0.2 INCHES PER OCCUPANT
APPLICABLE BUILDING CODES:
• 2021 NFPA 101 LIFE SAFETY CODE
• 2022 NFPA 13 SPRINKLER SYSTEMS CODE
• 2018 INTERNATIONAL BUILDING CODE (IBC)
• 2018 INTERNATIONAL MECHANICAL CODE (IPC)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA)
STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2020 NATIONAL ELECTRICAL CODE (NEC)
• 2018 INTERNATIONAL PLUMBING CODE (IPC)
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
GUIDE (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,
AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION
STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-
FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE
RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434, AND 435
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND
SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING
(MOU)
• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL
ENVIRONMENTAL, ENERGY, AND TRANSPORTATION
MANAGEMENT
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS
STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00
AND 01 35 26 OF THE VA MASTER CONSTRUCTION
SPECIFICATIONS.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE
STANDARD 62.1-2016: MEDICAL SPACES - ASHRAE 170-2013,
NON-MEDICAL SPACES - ASHRAE 62.1-2016
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE
STANDARD 15-2013
• VA FIRE PROTECTION DESIGN GUIDE, 8TH EDITION (2021)
66"W
"D
66"DIAM
"D
FLOOR SLOPE / FLOOR DRAIN
LINE OF DEDUCTIVE ALTERNATE
HJKLM
GI101
F4
CORRIDOR
C3-26C3-26
CORRIDOR
C3-27C3-27
CORRIDOR
C3-28C3-28
STAIR
ROOM
3C-1063C-106
CORRIDOR
C3-12C3-12
STAIR
D1
D2
D3
213 SF
PATIENT 9
3D-109
79 SF
RR 9
3D-109A
69 SF
RR 8
3D-108A
256 SF
PATIENT 8
3D-108
285 SF
PATIENT 7
3D-107 69 SF
RR 7
3D-107A
297 SF
PATIENT 6
3D-106
72 SF
RR 6
3D-106A
289 SF
PATIENT 5
3D-105
72 SF
RR 5
3D-105A
300 SF
PATIENT 4
3D-104
69 SF
RR 4
3D-104A
298 SF
PATIENT 3
3D-103
70 SF
RR 3
3D-103A
69 SF
RR 2
3D-102A
296 SF
PATIENT 2
3D-102
299 SF
BARIATRIC 1
3D-101
90 SF
RR 1
3D-101A
269 SF
PATIENT 18
3D-133
78 SF
RR 18
3D-133A
68 SF
RR 17
3D-132A
268 SF
SAFER PATIENT 17
3D-132
299 SF
STAFF WORK
3D-136
245 SF
MSA'S
3D-100
190 SF
CLEAN LINENS
3D-138
98 SF
ASST. NURSE MNGR
3D-110
93 SF
NURSE MNGR OFFICE
3D-111
127 SF
MED ROOM
3D-112
106 SF
NUTRITION
3D-135
292 SF
SAFER PATIENT 16
3D-131
67 SF
RR 16
3D-131A
67 SF
RR 15
3D-129A
252 SF
PATIENT 15
3D-129
280 SF
PATIENT 14
3D-128
71 SF
RR 14
3D-128A
71 SF
RR 13
3D-126A
102 SF
PHARM OFFICE
3D-120
108 SF
SOILED UTILITY
3D-134
49 SF
STAFF TOILET
3D-117
131 SF
SPS STORAGE
3D-114
315 SF
EQUIPMENT ROOM
3D-115
16 SF
EQUIP. ALCOVE
3D-140
245 SF
PATIENT 13
3D-126
260 SF
PATIENT 12
3D-12567 SF
RR 12
3D-125A
67 SF
RR 11
3D-123A
61 SF
HAC
3D-119
259 SF
STAFF BREAK ROOM
3D-116
238 SF
PATIENT 11
3D-123
206 SF
PATIENT 10
3D-121
74 SF
RR 10
3D-121A
54 SF
ANTE ROOM
3D-133B
74 SF
CLEAN UTILITY
3D-113
30 SF
OXYGEN STOR.
3D-118
262 SF
CIRCULATION
C3-18
C
LE
A R
6' -0
129' - 8"
136' - 4"
110' - 2"
27' - 1"
8' -1
C
LE
A
R
8' -0
C
LE
A
R
8'-0" CLEAR
CLEAR
8'-0"
8'-0"
C
LE
A R
8' -0
'-2
8'-0" CLEAR
55 SF
ANTE ROOM
3D-101B
GI101
E3
TOILET
3C-1043C-104
TOILET
3C-1053C-105
FEC
FEC
FEC
95' - 3"
84' - 6"
GI101
D2
48"D
72"D
"W 30
"W
"D
"D
IA
M
48"D
"W
1/ 4"
TYPICAL
CLEARANCES:
TYPICAL
FLOOR SLOPES:
LINEAR FLOOR DRAIN
1/4" / 12"1/4" / 12"
1' -6
299 SF
BARIATRIC 1
3D-101
3' -0
/2
C
LE
A R
72"D
"W
72"DIAM.
90 SF
RR 1
3D-101A
55 SF
ANTE ROOM
3D-101B
5' -6
5'-0"
1'-6" 1'-6"
48"W
66"DIA
5' -0
"D
66"W on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
As indicated
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
B e d W in g .A
R C
H .B
.L
.r v t
/1
/2
:5 :5
P
M
09/12/2022 M.PERKINS C.LOWERY
618-22-102
1391 - GI101
LIFE SAFETY
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0" F6
LIFE SAFETY PLAN
ARCHITECTURAL BARRIERS ACT (ABA)
404.2 Manual Doors, Doorways, and Manual Gates. Manual doors and doorways and manual gates intended for user passage shall comply with 404.2.
404.2.2 Double-Leaf Door and Gates. At least one of the active leaves of doorways with two leaves shall comply with 404.2.3 and 404.2.4
404.2.4 Maneuvering Clearances. Minimum maneuvering clearances at doors and gates shall comply with 404.2.4. maneuvering clearances shall extend the full width of the doorway and the required latch side or hinge side clearance.
EXCEPTION: Entry doors to hospital patient rooms shall not be required to provide clearance beyond the latch side of the door
1/4" = 1'-0" F4
TYPICAL PATIENT RESTROOM
DEDUCTIVE ALTERNATES
D1
DEDUCTIVE ALTERNATE #1: PROVIDE STORAGE ROOM IN LIEU OF PATIENT
ROOMS 10 AND 11 (3D-321/A & 3D-323/A). REMOVE SCOPE OF WORK
ASSOCIATED WITH NEW HEADWALL, PLUMBING, SPECIALTY EQUIPMENT.
D2
D3
DEDUCTIVE ALTERNATE #2: PROVIDE STORAGE ROOM IN LIEU OF PATIENT
ROOMS 12 AND 13 (3D-325/A & 3D-326/A). REMOVE SCOPE OF WORK
ASSOCIATED WITH NEW HEADWALL, PLUMBING, SPECIALTY EQUIPMENT.
DEDUCTIVE ALTERNATE #3: PROVIDE STORAGE ROOM IN LIEU OF PATIENT
ROOMS 14, 15, 16, AND 17 (3D-328/A, 3D-329/A, 3D-331/A & 3D-332/A).
REMOVE SCOPE OF WORK ASSOCIATED WITH NEW HEADWALL, PLUMBING,
SPECIALTY EQUIPMENT.
NOTE: DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE TAKEN IN
SEQUENTIAL ORDER.
1/4" = 1'-0" E3
BARIATRIC PATIENT ROOM
1/4" = 1'-0" D2
TYPICAL PATIENT ROOM