This addendum provides revisions to specifications and drawings for the Minneapolis Renovate Private Bed Ward 3D Building 70 project. Key details include removing deductive alternates and changing the project duration to 365 days with a 90 day administrative notice to proceed. Added scope includes a high performance barn door and revisions to door hardware sets. Drawing revisions remove deductive alternates and update information for various disciplines including architecture, interiors, food service, mechanical, electrical, and plumbing. Revised specification sections concern general requirements, doors, hardware, and ceiling lifts. The related federal contract opportunity is for solicitation number 36C26323R0023 to renovate a private patient bed ward for the Department of Veterans Affairs Veterans Health Administration VISN 23.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CVE Verified Service-Disabled Veteran-Owned Small Business
TRIPLE C – THE A&E GROUP
OUR REASONABLE SERVICE - TO PROVIDE YOU WITH EXEMPLARY SERVICE
410 Grand Avenue, Suite 201C � Laramie, Wyoming 82070 � Telephone: (307) 460-2054 � Fax: (307) 460-2053
Addendum Number 01
Project: Minneapolis Renovate Private Bed Ward 3D Building 70
Project number: 618-22-102
Date: April 6, 2023
NOTICE TO PROPOSERS:
A. This Addendum shall be considered part of the contract documents for the above-mentioned project as though it had been issued at the same time and incorporated integrally therewith.
Where provisions of the following supplementary data differ from those of the original contract documents, this Addendum shall govern and take precedence.
B. Proposers are hereby notified that they shall make any necessary adjustments in their estimate on account of this Addendum. It will be construed that each Proposer’s proposal is submitted with full knowledge of all modifications and supplemental data specified therein. Acknowledge receipt of this addendum in the space provided on the proposal form. Failure to do so may subject Proposer to disqualification.
Revisions:
Specifications:
Section Description of / Reason for Change
00 01 00 – Table of Contents Update to include added and removed sections.
01 00 00 – General Requirements Removed Deductive Alternates. Changed project duration to
365 days.
01 32 16.01 - Architectural and
Engineering CPM Schedules
Removed from the Project.
08 36 16.13 - High Performance
Barn (Sliding) Door
Added to the Project.
Meeting Agenda
08 17 10 - Integrated Door
Assemblies
Edited door hardware sets.
08 71 00 – Door Hardware Edited door hardware sets.
11 73 00 – Ceiling Mounted Patient
Lift System
Note removed to clarify lift system provided by contract.
Drawing Changes:
Sheet
Number
Revision
Number Description of / Reason for Change
GI000 1 Removed Deductive Alternates. Changed project duration to 365 days with a 90 day administrative NTP.
GI101 1 Removed Deductive Alternates.
GI201 1 Removed Deductive Alternates.
A-002 1 Removed Deductive Alternates.
A-101 1 Removed Deductive Alternates.
A-102 1 Removed Deductive Alternates.
AC101 1 Removed Deductive Alternates.
A-601 1 Hardware set for door C3-18 changed from 10A to SH-10A.
IN101 1 Removed Deductive Alternates.
IN601 1 Removed Deductive Alternates.
IF101 1 Removed Deductive Alternates.
Q-101 1 Removed Deductive Alternates.
Q-601 1 Additional information added to Locker Description.
FX103 1 Removed Deductive Alternates.
P-103 1 Removed Deductive Alternates.
M-103 1 Removed Deductive Alternates.
MP103i 1 Updated keynote 1 to include replacing shutoff valves on mains.
M-501 1 Added note calling out Trap Monitor.
M-502 1 Updated connections to be copper only (F4), added hose bib to vent (B1).
M-503 1 Added Test Tee, Drip Trap (F4). Added Test Tee and called out steam trap
(B4). Updated Notes to add automatic air vents and to pipe them to drains (F7).
M-504 1 Added Test Tees to B1, B3, and B6.
M-601 1 Updated Keynote 36 to include hydronic air vents.
M-702 1 Added Basis of Design: Bell & Gosset VSX Model to Notes.
M-802 1 Updated preheat coil to be Steam Only.
M-804 1 Updated preheat coil to be Steam Only.
EP103 1 Removed Deductive Alternates.
EP104 1 Removed Deductive Alternates.
EL103 1 Removed Deductive Alternates.
T-103 1 Removed Deductive Alternates.
End of Addenda
Meeting Agenda
Attachments:
Sheets:
A-002
A-101
A-102
AC101
A-601
IN101
IN601
IF101
Q-101
Q-601
FX103
P-103
M-103
MP103i
M-501
M-502
M-503
M-504
M-601
M-702
M-802
M-804
EP103
EP104
EL103
T-103
Specification Sections:
00 01 00 – Table of Contents
01 00 00 – General Requirements
08 36 16.13 - High Performance Barn (Sliding) Door
08 17 10 - Integrated Door Assemblies
08 71 00 – Door Hardware
11 73 00 – Ceiling Mounted Patient Lift System