S06 Revised Drawings M-503 M-504 and M-601 - 3 pages.pdf
PDF 13 MB Posted
- Solicitation number
- 36C26323R0023
About this file
This document provides details for a federal contract solicitation from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23. The solicitation number is 36C26323R0023 and is for project number 618-22-102 to renovate a private patient bed ward (3D) at a cost of $36C263-23-AP-0055. The solicitation involves renovations to add additional private patient rooms. Responses are due by June 15, 2022, with the contract to be awarded by August 1, 2022. The solicitation is set aside for service-disabled veteran-owned small businesses. The work must be completed within 180 calendar days of the award date.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FILL OPENING WITH
GROUTOR SEALANT
DEPENDING UPON
BUILDING MATERIALS
PENETRATED
PIPE SLEEVE OR
SHEET METAL SLEEVE
SEAL ALL AROUND
WITH RESILIENT
NON-HARDENING
SEALER-TYP BUILDING WALL OR FLOOR
1/2" TO 5/8" ANNULAR
SPACE-PACK SPACE
WITH FIBERGLASS
MATERIAL
PIPE OR ELECTRICAL CONDUIT
5 FT
6 8 10
9 1110 12
-1312 14 -16 -
1614 17 2219 23
2725 28 3230
20 241814 16128 1064 532 2 1/21 1/21 1 1/4THRU 3/4
7 7
7 98
SIDE VIEW TRAPEZE HANGER FOR UP TO
1000 LB. UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE SPECIFICATIONS ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE SPECIFICATIONS
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
IN.
FT.
FT.
M A
X
PROVIDE INSULATION
SHIELD & INSERT FOR
ALL PIPING (8" MIN.)
BAND
1-5/8" 12 GAUGE
CHANNEL OR
2"x2"x1/4"
ANGLE
1/2" DIA. HANGER
RODS WITH
36" MAX. SPACING
ON EACH CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH
COMPRESSIVE
STRENGTH INSULATION (9
PSF MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
NOTES:
SEE SPECIFER FOR
DETAILED HANGER
REQUIREMENTS
SUPPLY WATER SHALL BE CONNECTED
TO AIR LEAVING SIDE OF COIL
COLLECT ALL DRAINS, INSTALL HOSE
CONNECTION AND CAP
TEMP. AND PRESS. FITTING TYP.
PRESSURE GAUGE
THERMOMETER
UNION
AUTOMATIC TWO-WAY CONTROL VALVE
BUTTERFLY VALVE
MANUAL AIR VENT
1/2" GATE VALVE AND DRAIN
DASHED PIPING AND COILS INDICATE
TYPICAL PIPING REQUIREMENTS FOR
MULTIPLE COILS
FLOW CONTROL VALVE, SEE
SPECIFICATIONS SECT. 15080
CONNECTION
STRAINER WITH HOSE BIBB
DRAINS AND VENTS FOR SEASONAL MAINTENANCE
STEAM HIGHER THAN 15 PSI NEEDS TO BE IN STEEL
BRONZE VALVES ARE STILL INDICATED FOR SOME
STEAM VALVES IN SPEC, PER DECEMBER 21
DIRECTION.
GENERAL NOTES
1 PROVIDE AUTOMATIC AIR VENTS AT ALL
HIGH POINTS IN SYSTEM. TO BE PIPED TO
NEAREST FLOOR DRAIN.
2 SEE PLANS AND/OR PIPING
SCHEMATIC FOR PIPE SIZES.
3 TEMP./PRESS. FITTINGS INSTALLED
IN PIPING 2" AND SMALLER SHALL
BE INSTALLED IN ELBOW OR IN THE
BRANCH SIDE OF A 2" TEE.
COIL
COIL
AIR FLOW
CHS
CHR
1" OVERLAP
ON ALL SIDES
OF DAMPER
AIRFLOW
1" OVERLAP
ON ALL SIDES
OF DAMPER
AIRFLOW
MULTIBLADE NON-AIRFOIL
(LOW VELOCITY APPLICATIONS
1500 FPM & LESS)
MULTIBLADE AIRFOIL
(HIGH VELOCITY APPLICATIONS
IN EXCESS OF 1500 FPM)
WALL OR FLOOR
SLEEVE - SEE MANUFACTURE'S INSTALLATION NOTES
MOUNTING ANGLES CONTINUOUS AROUND SLEEVE WITH MINIMUM 1" OVERLAP
SQUARE OR RECTANGULAR DAMPER FRAME FOR ROUND OR OVAL DUCTS,
PROVIDE DUCT TRANSITION
BREAKAWAY DUCT CONNECTION - SEE INSTALLATION NOTES
INSTALL DAMPER ASSEMBLY PER MANUFACTURER'S INSTALLATION INSTRUCTIONS
1/4" MINIMUM EXPANSION CLEARANCE - SEE MANUFACTURE'S INSTALLATION NOTES
APPROVED SEALING MATERIAL IN ACCORDANCE WITH MANUFACTURER'S
INSTALLATION INSTRUCTIONS
U.L. APPROVED DAMPER ACTUATOR ASSEMBLY WITH MOUNTING BRACKET,
ELECTRIC FUSE LINK, AND OPERATING JACK SHAFT LINKAGE. DAMPER
ACTUATOR SHALL BE MOUNTED ON DUCT OUTSIDE AIR STREAM\
INTEGRAL FACTORY WIRED FOR SINGLE POINT POWER CONNECTION, NO FLOW
SMOKE DETECTOR WITH BUILT-IN TEST SWITCH RATED FOR 0-3000 FPM, MOUNTED
INTERNALLY TO THE DAMPER SLEEVE
* FUSIBLE ROD IS NOT REQUIRED FOR SMOKE DAMPER APPLICATION
6" 6"6"6"
10 3
STEAM TRAP
TEST TEE
STEAM TRAP MONITOR CONNECTED
TO BMS, SEE MECHANICAL
CONTROLS DRAWINGS
INCLUDE A LOCKABLE VALVE
TEST TEE
DOUBLE STEAM TRAP
DRIP TRAP
REFERENCE
M-501/B1
NTS
D4
PIPE PENTRATION DETAIL
NTS
B7
PIPE SUPPORTS
NTS
F7
CHILLED WATER COIL PIPING SCHEMATIC WITH 2-WAY VALVE
NTS
F1
SMOKE DAMPER AND COMBINATION FIRE SMOKE DAMPER DETAIL
on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
As indicated
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.G e n e ra l.
S h e e ts
.r v t
/1
/2
:1 :4
P
M
09/12/2022 K. Luke N. Harper
618-22-102
1391 - M-503
MECHANICAL DETAILS
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING100% CONSTRUCTION
DOCUMENTS
NTS
D7
DUCTWORK SQUARE VANE ELBOWS
NTS
B4
STEAM SAFETY VALVE
NTS
B1
STEAM SAFETY VALVE
SCALE: 12" = 1'-0"
F4
AIR HANDLING UNIT STEAM COIL
PIPING DETAIL
1 ADDENDUM #1 4/10/23
12/17/2021
HEPA FILTER
AT DIFFUSERS
34 VA
TEST TEE 1
TEST TEE
TEST TEE
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
As indicated
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.G e n e ra l.
S h e e ts
.r v t
/1
/2
:1 :4
P
M
09/12/2022 K. Luke N. Harper
618-22-102
1391 - M-504
MECHANICAL DETAILS
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING100% CONSTRUCTION
DOCUMENTS
NTS
F1
AIR SYSTEM FOR COMBINATION AIRBORNE INFECTION ISOLATION (AII)/PROTECTIVE ENVIORNMENT (PE) ROOM
WITH NEGATIVE ANTEROOM
NTS
B1
INVERTED BUCKET STEAM TRAP ASSEMBLY
NTS
B3
FLOAT AND THERMOSTATIC STEAM TRAP ASSEMBLY
NTS
B6
THERMOSTATIC STEAM TRAP ASSEMBLY
NTS
B8
SUPPLY DUCTWORK TAKE-OFFS
NTS
C8
SUPPLY DUCT TAKE-OFFS - AIR TERMINAL UNIT
NTS
D8
ALTERNATIVE SUPPLY DUCT TAKEOFF - AIR TERMINAL UNITS
NTS
F8
EXHAUST OR RETURN BRANCH DUCTWORK
NTS
F5
AIR SYSTEM FOR AIRBORNE INFECTION ISOLATION ROOM (AII)(WITH ANTE ROOM)
1 ADDENDUM #1 4/10/23
70.FTR.3D118.1
70.FTR.3D117.2
70.FTR.3D117.1
70.FTR.3D116.1
70.FTR.3D115.2
70.FTR.3D115.1
70.FTR.3D114.1
70.FTR.3D113.1
70.FTR.3D112.2
70.FTR.3D112.1
70.FTR.3D111.1
70.FTR.3D110.1
70.VAV.21.3D-111
70.VAV.21.C3-19.2
70.VAV.21.3D-112
70.VAV.21.3D-113
70.VAV.21.3D-133
70.VAV.21.3D-114
70.VAV.21.3D-115
70.VAV.21.C3-20
70.VAV.21.3D-135
70.VAV.21.C3-19.3
70.VAV.21.3D-116
70.VAV.21.3D-136
70.VAV.21.3D-117
70.VVE.21.3D-118.2
70.VVE.21.3D-118.1
70.VVS.21.3D-118
70.VAV.21.3D-138
70.VAV.21.C3-24
70.VAV.21.3D-121
70.VAV.21.3D-119
70.VAV.21.C3-25.170.VAV.21.3D-102
70.VVS.21.3D-101
70.VVE.21.3D-101.2
70.VVE.21.3D-101.1
70.VAV.21.3D-122
70.VAV.21.3D-123
70.VAV.21.C3-25.2
70.VAV.21.3D-103
70.VAV.21.3D-104
70.VAV.21.3D-105
70.VAV.21.3D-125
70.VAV.21.3D-106
70.VAV.21.3D-12670.VAV.21.3D-107
70.VAV.21.C3-25.3
70.VAV.21.3D-128
70.VAV.21.3D-108
70.VAV.21.C3-19.1
70.VVS.21.3D-110
70.VVE.21.3D-110.1
70.VVE.21.3D-110.2
70.VAV.21.C3-18
70.VVS.21.3D-109
70.VVE.21.3D-109.2
70.VVE.21.3D-109.1
VVRC-2
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
2 1/2" HWS
2 1/2" HWR
2 1/2" HWS
2 1/2" HWR
1 1/2" HWS
1 1/2" HWR
1 1/2" HWS
1 1/2" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
1 1/4" HWS
1 1/4" HWR
1 1/4" HWS
1 1/4" HWR
1 1/4" HWS
1 1/4" HWR
3/4" HWS
3/4" HWR 3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS 3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR 2" HWS
3/4" HWR
2" HWS
3/4" HWS
3/4" HWR
3/4" HWS
2" HWS
3/4" HWR
3/4" HWS
2" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
2" HWS
2" HWS
1" HWR
2" HWS
1" HWR
1" HWR
3/4" HWR
3/4" HWR
3/4" HWR
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
(612) 355-1251
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
GENERAL NOTES
KEYNOTES
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.B .L
.r v t
/1
/2
:4
:5
A
M
09/12/2022 M. Perkins N.Harper
618-22-102
1391 - M-601
MECHANICAL PIPING ISOMETRIC PLAN
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING
100% CONSTRUCTION
DOCUMENTS
SCALE:
F3
MECHANICAL PIPING ISOMETRIC
VIEW
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
1. PROVIDE NEW SUPPLY AIR GRILLE, COORDINATE WITH NEW AND EXISTING
CONDITIONS.
2. PROVIDE NEW RETURN AIR GRILLE, COORDINATE WITH NEW AND EXISTING
CONDITIONS.
3. PROVIDE NEW EXHAUST FAN, COORDINATE WITH NEW AND EXISTING
CONDITIONS.
4. REPLACE EXISTING FIN TUBE RADIATION WINDOW HEATER WITH NEW. PROVIDE
NEW DIGITAL MODULATING CONTROL VALVES AND PIPING IN THE INTERSTITIAL
LEVEL BELOW.
5. RETAIN TRUNK/MAIN DUCT WORK IN INTERSTITIAL BACK TO AHU, RF, AND EF.
6. PROVIDE NEW DDC TERMINAL UNIT, CONNECT TO EXISTING BUILDING
AUTOMATION SYSTEM. PROVIDE NEW THERMOSTAT TO MATCH BUILDING
STANDARDS. REFER TO SHEET M-501 FOR DETAILS AND M-803 FOR CONTROLS.
7. CONNECT EXISTING DUCTWORK TO NEW TERMINAL UNIT. PROVIDE
TRANSITIONS AS NECESSARY TO MAKE CONNECTION AND SEAL AIRTIGHT.
8. CONNECT NEW MAINS SERVING 3D TO EXISTING RISERS 3" HEATING WATER
SUPPLY AND 2" HEATING WATER RETURN. PROVIDE NEW ISOLATION VALVES AT
DOMESTIC WATER POINTS OF CONNECTION.PROVIDE NEW THERMOSTAT,
COORDINATE WITH NEW AND EXISTING CONDITIONS.
9. PROVIDE NEW THERMOSTAT, COORDINATE WITH NEW AND EXISTING
CONDITIONS.
10. CONNECT NEW MAINS SERVING 3D TO EXISTING RISERS 4" CHILLED WATER
SUPPLY, 4" CHILLED WATER RETURN, 3" MEDIUM PRESSURE STEAM, AND 3"
MEDIUM PRESSURE RETURN. PROVIDE NEW ISOLATION VALVES AT POINTS OF
CONNECTION.
11. EXISTING PNEUMATIC CONTROLS DEVICES SERVING EQUIPMENT PLACED WITH
THIS PROJECT SHALL BE REMOVED AND REPLACED WITH NEW DDC CONTROLS.
12. EXISTING DDC CONTROLS ENCLOSURE TO REMAIN, PROTECT IN PLACE.
13. CONTRACTOR SHALL PROVIDE NEW MECHANICAL CONTROL SYSTEM
HARDWARE AND SOFTWARE AND INTEGRATE WITH EXISTING CONTROLS
SYSTEM HARDWARE AND SOFTWARE IN ACCORDANCE WITH SPECIFICATION
SECTION 23 09 23. COORDINATE WITH VA AND COMMISSION ALL NEW
MECHANICAL EQUIPMENT WITH THE EXISTING ENGINEERING CONTROL CENTER.
ALL TRENDS, POINTS, AND ALARMS SHALL BE ADDRESSABLE BY THE EXISTING
NETWORK.
14. PROVIDE NEW OUTSIDE AIR DUCT, DAMPER, AND LOUVER. SIZED FOR 100%
OUTSIDE AIR.
15. REPLACE EXISTING EF-50 AND HEPA FILTER ASSEMBLY SERVING ISOLATION
ROOM. PROVIDE NEW EF-50 PER THE MECHANICAL SCHEDULES WITH NEW
HEPA FILTER BOX, HOUSING, ACCESS PANEL AND INTEGRATED DIFFERNENTIAL
PRESSURE. (2) FILTERS @ 24"X24"X12" EACH WITH MAXIMUM FACE VELOCITY OF
400 FPM. SEE F1/M-504 FOR MORE DETAILS.
16. PROVIDE NEW AIR HANDLING UNIT 70-AH3NE-21 WITH 100% OUTSIDE AIR
EMERGENCY PANDEMIC MODE OPERATION. SEE MECHANICAL SCHEDULES FOR
AHU SPECIFICATIONS. SHIPPING SPLITS SHALL BE SIZED TO FIT THROUGH
EXISTING KNOCKOUT LOUVER AT THE OUTSIDE AIR INTAKE.
17. PROVIDE NEW EXHAUST FAN 70-EF34 WITH HEPA FILTER TO SERVE NEGATIVE
PRESSURE ROOMS. REPLACE DUCTWORK BACK TO POINT OF CONNECTION IN
THE THIRD LEVEL MECHANICAL ROOM.
18. PROVIDE NEW CHILLED WATER SUPPLY AND RETURN PIPING BACK TO EXISTING
MECHANICAL ROOM RISER TO SERVE NEW AHU CHILLED WATER COIL. SEE
MECHANICAL SCHEDULES.
19. PROVIDE MEDIUM PRESSURE STEAM AND CONDENSATE PIPING BACK TO
EXISTING MECHANICAL ROOM RISER TO SERVE NEW 70-AH3NE-21 PREHEATING
COIL. SEE MECHANICAL SCHEDULES.
20. EXISTING SUPPLY AIR MAIN DUCTWORK FROM 70-AH3NE-21 SHALL BE RETAINED
AND REUSED TO SERVE RENOVATED SPACE.
21. PROVIDE TEMPORARY AHU SERVING EXISTING SUPPLY AIR MAINS DURING
REPLACMENT OF THE EXISTING AHU. TEMPORARY UNIT SHALL BE SIZED PER
MECHANICAL EQUIPMENT SCHEDULES. PROVIDE FLEXIBLE DUCT WORK AND
ISOLATION DAMPERS DURING CHANGEOVER TO TEMPORARY UNIT. TEMPORARY
AHU SHALL BE FULLY COMMISISONED PRIOR TO REMOVING EXISTING UNIT.
22. PROVIDE NEW VENTURI SUPPLY AND EXHAUST VALVES. BALANCE ISOLATION
ROOMS AS REQUIRED BY DETAIL F1/M-504.
23. EF-33 TO REMAIN, PROTECT IN PLACE.
24. PROVIDE NEW 1 HOUR FIRE SMOKE DAMPER.
25. REPLACE EXISTING FIRE SMOKE DAMPERS WITH NEW DDC CONTROLLED
DAMPERS.
26. PROVIDE ROOM PRESSURE SENSORS AND PRESSURE MONITORING
TOUCHSCREENS EACH SIDE OF BUFFER, ANTE AND STORAGE PARTITIONS TO
MONITOR COMPOUNDING SUITE PRESSURE DIFFERENTIALS. SEE SHEET M-601
FOR PRESSURE AND AIRFLOW REQUIREMENTS.
27. EXISTING DUCTWORK TO REMAIN.
28. PROVIDE NEW FLUSH MOUNT WALL FIN BELOW WINDOW.
29. NEW EXHAUST DUCT FROM EF-50 THROUGH ROOF ABOVE. CONTRACTOR TO
FIELD VERIFY EXISTING ROOF CONDITIONS.
30. PROVIDE BAG-IN-BAG OUT FILTER SYSTEM. UNIT TO INCLUDE FULLY WELDED
304 STAINLESS STEEL CASING WITH OPENING FOR INSPECTION, ONE GASKETED
ACCESS DOOR, GEL SEAL BAG-IN/BAG-OUT HOUSING, 2" DEEP PREFILTER,
11-1/2" DEEP HEPA FINAL FILTER, AND PRESSURE SENSORS. SENSORS TO BE
MONITORED BY BAS.
31. PROVIDE EXHAUST FAN WITH EXHAUST STACK AND NOZZLE DISCHARGE.
FURNISH AND INSTALL AS INDICATED IN DETAIL B4/M5-02.
32. LOCATE EF-50A & EF 50B 25'0" AWAY FROM ALL INTAKES
33. PROVIDE SUPPORTS FOR EXTERIOR DUCTWORK AND BAG-INBAG OUT FILTER
SYSTEM. SUPPORTS TO BE LOCATED 10'0" OR ANY CHANGE IN DIRECTION. SEE
DETAIL D6/M5-02
34. EXTEND DUCT TO CONNECT TO 12" GENERAL EXHAUST. REBALANCE EXISTING
GENERAL EXHAUST FAN TO ACCOUNT FOR NEW SPACES SERVICED.
35. PROVIDE NEW RISER TO LEVEL 4 FOR ISOLATION EXHAUST. REPLACE FIRE
DAMPER WITH NEW. CONNECTION TO LEVEL 2 SHALL BE REMOVED.
36. PROVIDE AUTOMATIC AND MANUAL AIR VENT AT HIGHEST POINT OF SYSTEM TO
RELEASE AIR OUT OF PIPING SYSTEM. AIR VENTS ARE TO BE DRAINED TO
NEAREST FLOOR DRAIN.
37. ROUTE 1/2" CONDENSATE TO NEAREST FLOOR DRAIN.
38. DUCTWORK FROM CONDENSATE DRAIN UP THROUGH EXHAUST STACK TO BE
TYPE 304 STAINLESS STEEL.
TYP.
1 ADDENDUM 1 4/6/23
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
File details come from the government source that posted it. Updated .