S06 Q_A Atch 6 - Revised Drawings GI000 and GI101 - 2 pages.pdf

PDF 13 MB Posted

Attached to
Z1DA--618-22-102, Renovate for a Private Patient Bed Ward (3D) 36C263-23-AP-0055
Solicitation number
36C26323R0023
Issued by

About this file

This government file contains revised drawings for a federal contract solicitation to renovate a private patient bed ward for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23. The solicitation number is 36C26323R0023 and seeks to renovate a 3D private patient bed ward under opportunity number Z1DA--618-22-102. The revised drawings provide additional details for the renovation project, specifying changes to drawings GI000 and GI101. The contract award will support improvements to inpatient facilities for veterans served by VISN 23.

View the file

Other files

File Type Posted
S06 Q_A Atch 1 - Revised Atch C.1 Specifications Vol 1.2 - 609 pages.pdf PDF
S06 36C26323R0023 Amendment 0005.docx DOCX document
S06 Revised Drawings - 12 pages.pdf PDF
S06 Q_A Atch 2 - Revised Atch C.1 Specifications Vol 1.1 - 291 pages.pdf PDF
S06 Late Questions - Solicitation 36C26323R0023 - 1 page.pdf PDF
S06 Addendum Number 2 - 2 pages.pdf PDF
36C26323R0023 0004.docx DOCX document
S06 36C26323R0023 Amendment 0003.docx DOCX document
S06 Q_A Atch 3 - Revised Drawing A-601 - 1 page.pdf PDF
S06 Revised Atch F Wage Determination MN20230117 4-14-23 - 9 pages.pdf PDF
S06 Q_A Atch 5 - Lidar Scans - 1 page.pdf PDF
S06 Q_A Atch 4 - Revised Drawing Q-601 - 1 page.pdf PDF
S06 Q_A Atch 1.2 - Revised Atch C.1 Specifications Vol 1.2 - 634 pages.pdf PDF
S06 Revised Drawings MP103i M-501 and M-502 - 3 pages.pdf PDF
S06 36C26323R0023 Amendment 0002.docx DOCX document
S06 Q_A Atch 1.1 - Revised Atch C.1 Specifications Vol 1.1 - 291 pages.pdf PDF
S06 Q_A Atch 7 - Revised Drawing GI201 - 1 page.pdf PDF
S06 Revised Drawings M-702 M-802 and M-804 - 3 pages.pdf PDF
S06 Questions - Solicitation 36C26323R0023.pdf PDF
S06 Q_A Atch 2 - Revised Drawings - 15 pages.pdf PDF
S06 Q_A Atch 8 - Revised Atch E Brand Name J and A - 30 pages.pdf PDF
S06 Revised Drawings M-503 M-504 and M-601 - 3 pages.pdf PDF
S06 Addendum Number 1 - 3 pages.pdf PDF
S06 Attachment 1 - Pre-Bid Sign-In Sheet - 2 pages.pdf PDF
S06 36C26323R0023 Amendment 0001.docx DOCX document
S06 Attachment 2 - Pre-Bid Site Visit Agenda - 2 pages.pdf PDF
36C26323R0023.docx DOCX document
Attachment I Questions Request Form - 1 page.doc DOC document
Attachment D.6 Drawings 6 of 7 - 13 pages.pdf PDF
Attachment A SOW - 3 pages.pdf PDF
Attachment B Price Schedule Breakdown Sheet - 1 page.xlsx XLSX spreadsheet
Attachment J VAAR 852.219-75 Limitations on Subcontracting Cert of Compliance - 2 pages.pdf PDF
Attachment C.3 Specifications Volume 3 - 410 pages.pdf PDF
Attachment F Wage Determination MN20230117 1-6-23 - 7 pages.pdf PDF
Attachment D.7 Drawings 7 of 7 - 37 pages.pdf PDF
Attachment D.1 Drawings 1 of 7 - 3 pages.pdf PDF
Attachment D.4 Drawings 4 of 7 - 24 pages.pdf PDF
Attachment G VA6500 Appendix C 1-2-3a-6a-7a-7d-9 and Appendix D - 6 pages.pdf PDF
Attachment C.2 Specifications Volume 2 - 14 pages.pdf PDF
Attachment D.3 Drawings 3 of 7 - 24 pages.pdf PDF
Attachment H Past Performance Questionnaire - 3 Pages.docx DOCX document
Attachment D.2 Drawings 2 of 7 - 8 pages.pdf PDF
Attachment D.5 Drawings 5 of 7 - 23 pages.pdf PDF
Attachment E Brand Name Justification and Approvals _Redacted - 27 pages.pdf PDF
Attachment C.1 Specifications Volume 1 - 930 pages.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

TRUE NORTH

PLAN NORTH

KEYPLAN

A/E:

TRIPLE C - The A/E Group

(520) 481-8548

Mat Perkins

A

B D

EF

G

H

J

K

L

M

C

B

IM

/6

-2

-1

R e n o v a te

D

B e d W in g -B

-M

P L S

V A

M C

/6 -2

-7

.M

P L S

.3 D

B e d W in g .A

R C

H .B

.L

.r v t

/1

/2

:1

:3

A

M

09/12/2022 M.PERKINS K.MACAULAY

618-22-102

1391 - GI000

COVER SHEET

1 Veterans Drive, Minneapolis, MN 55417

B70

RENOVATION OF BUILDING 70 3D

BED WING100% CONSTRUCTION

DOCUMENTS

100% CONSTRUCTION DOCUMENTS

09/12/2022

Contract No.

Solicit No.

618-22-102 RENOVATION OF BUILDING 70 3D BED WING - B70

VA Minneapolis Healthcare System

THERE IS NO LEAD OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.

SIGNATURE 07/22/2022 DATE

AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C

TRIPLE C - THE A&E GROUP

CONTRACTOR SCOPE OF WORK:

Contractor shall completely prepare project site for operations, including demolition and removal of existing site elements, and furnish labor and materials and perform work for the Minneapolis VA Medical Center Project 618-22-102, Renovate Private Patient Bed Ward 3D as required by drawings and specifications.

Period of performance is projected to be

The work will require the demolition of the interior of the existing 3D ward on the third floor of Building 70 as required by the drawings and specifications. The project entails the renovation of the 3D ward. The current 3D occupants will be relocating to a new space in Fiscal Year 2023, and the 3D ward will be vacant during construction for the new Patient Bed Ward. The newly renovated 3D Bed Ward will consist of 18 private patient rooms with attached bathrooms and key support spaces for staff, utilities, storage and medication and nutrition.

Electrical, Telecommunications, and Security Work: Work includes all labor, material, equipment and supervision to perform new electrical, communications and security systems to the renovated spaces renovated as detailed by the construction drawings and specifications.

Provide access control for all the required doors, coordinate with the door hardware schedule for additional requirements. Provide new cameras, associated devices and equipment.

Mechanical, Plumbing and Fire Protection Work: Work includes all labor, material, equipment and supervision to perform the required Mechanical, Plumbing and Fire Protection construction work on this project including provide materials and construction equipment as detailed by the construction drawings and specifications. All new mechanical systems shall be addressable and controllable via the existing Engineering Control Center (ECC) and HVAC Shop. The ECC system shall monitor space conditions and unit status and shall alarm the Facility Operations staff as detailed by the mechanical control drawings and specifications.

In addition to providing new mechanical systems to serve the renovated spaces, this project also requires reconfiguration of the existing building HVAC systems (duct, diffusers, grilles, bracing and supports) to maintain existing heating and cooling systems. Contractor is required to Test and Balance (TAB) new and existing HVAC systems per 23 05 93. This work requires preconstruction TAB readings to establish baseline performance for all existing HVAC systems to remain serving the Medical Bed space and adjacent corridor. Existing systems shall be rebalanced to preconstruction readings.

Contractor shall reconfigure fire protection piping and provide additional sprinkler heads to the existing building automatic sprinkler system as required. New Fire Protection systems shall be provided, and existing systems modified per the construction drawings and specifications.

Contractor shall reconfigure plumbing and medical gas piping and provide new piping, fixtures, valves, fittings, and devices as required by the construction drawings and specifications.

CO: Chris Gauthier Contracting Officer, Construction Team 1 Department of Veterans Affairs Network Contracting Office - 23 316 Robert Street N., Suite 506 Saint Paul, MN, 55101 phone: 651-293-3023 christine.gauthier@va.gov

COR: Robert Malecha VA Minneapolis Healthcare System 1 Veterans Dr

Minneapolis, MN 55417 Phone: 612.467.5532 robert.malecha@va.gov

- DRAWING INDEX -

BB SHEET NAME

INCLUDED IN

35% SD

INCLUDED IN

65% DD

INCLUDED IN

95% CD

INCLUDED IN

100%

INTERIORS

IN001 INTERIOR GENERAL NOTES, SYMBOLS, ABBREVIATIONS & FINISH BOARDS Yes Yes Yes Yes

IN101 INTERIOR FINISH PLAN - THIRD FLOOR 3D Yes Yes Yes Yes

IN501 DETAILS - INTERIOR FINISH Yes Yes Yes Yes

IN601 INTERIOR FINISH LEGEND AND ROOM FINISH SCHEDULE Yes Yes Yes Yes

IN901 INTERIOR 3D CONCEPT IMAGES Yes Yes Yes Yes

FURNITURE

IF101 INTERIOR FURNITURE PLAN - THIRD FLOOR 3D No Yes Yes Yes

EQUIPMENT

Q-101 EQUIPMENT PLAN - THIRD FLOOR 3D No Yes Yes

Q-601 EQUIPMENT SCHEDULE No Yes Yes

FIRE PROTECTION

FX001 FIRE PROTECTION ABBREVIATIONS, SYMBOLS, AND DETAILS Yes Yes Yes Yes

FXD103 FIRE PROTECTION PLANS - THIRD LEVEL 3D - DEMO Yes Yes Yes Yes

FXD103i FIRE PROTECTION PLANS - THIRD LEVEL INTERSTITIAL 3D - DEMO No No Yes Yes

FX103 FIRE PROTECTION PLANS - THIRD LEVEL 3D - NEW Yes Yes Yes Yes

FX401 FIRE PROTECTION ENLARGED PLANS Yes Yes Yes Yes

FX901 FIRE PROTECTION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes

PLUMBING

P-001 PLUMBING LEGEND Yes Yes Yes Yes

PD102i PLUMBING PLANS - SECOND LEVEL INTERSTITIAL 2D - DEMO No No Yes Yes

PD103 PLUMBING PLANS - THIRD LEVEL 3D - DEMO Yes Yes Yes Yes

PD103i PLUMBING PLANS - THIRD LEVEL INTERSTITIAL 3D - DEMO No Yes Yes Yes

PGD-103i PLUMBING MED GAS PLANS - THIRD LEVEL INTERSTITIAL 3D - DEMO No No Yes Yes

P-102i PLUMBING PLANS - SECOND LEVEL INTERSTITIAL 2D - NEW No Yes Yes Yes

P-103 PLUMBING PLANS - THIRD LEVEL 3D - NEW Yes Yes Yes Yes

P-103i PLUMBING PLANS - THIRD LEVEL INTERSTITIAL 3D - NEW VENT PIPING PLAN No Yes Yes Yes

PP-103i PLUMBING PLANS - THIRD LEVEL INTERSTITIAL - 3D - NEW DOMESTIC WATER PIPING PLAN No No Yes Yes

PG103i PLUMBING MED GAS PLANS - THIRD LEVEL INTERSTITIAL No Yes Yes Yes

P-401 PLUMBING ENLARGED PLANS Yes Yes Yes Yes

P-501 PLUMBING DETAILS Yes Yes Yes Yes

P-601 PLUMBING ISOMETRIC PLAN - 3D No No Yes Yes

P-701 PLUMBING SCHEDULES Yes Yes Yes Yes

P-901 PLUMBING EQUIPMENT CUTSHEETS / BASIS OF DESIGN Yes Yes Yes Yes

P-902 PLUMBING EQUIPMENT CUTSHEETS / BASIS OF DESIGN Yes Yes Yes Yes

P-903 PLUMBING EQUIPMENT CUTSHEETS / BASIS OF DESIGN Yes Yes Yes Yes

P-904 PLUMBING EQUIPMENT CUTSHEETS / BASIS OF DESIGN Yes Yes Yes Yes

MECHANICAL

M-001 MECHANICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes

MS101 MECHANICAL SITE PLAN No No Yes Yes

MD100 MECHANICAL PLANS - BASEMENT LEVEL BD - DEMO No No No Yes

MD102i MECHANICAL PLANS - SECOND LEVEL INTERSTITIAL 2D - DEMO No No Yes Yes

MD103 MECHANICAL PLANS - THIRD LEVEL 3D - DEMO No Yes Yes Yes

MD103i MECHANICAL PLANS - THIRD LEVEL INTERSTITIAL 3D - DEMO No No Yes Yes

MD104 MECHANICAL PLAN - FOURTH & ROOF LEVEL - DEMO No No Yes Yes

M-100 MECHANICAL PLANS - BASEMENT LEVEL BD - NEW No No No Yes

M-102i MECHANICAL PLANS - SECOND LEVEL INTERSTITIAL 2D - NEW No No Yes Yes

M-103 MECHANICAL PLANS - THIRD LEVEL 3D - NEW Yes Yes Yes Yes

M-103i MECHANICAL PLANS - THIRD LEVEL INTERSTITIAL 3D - NEW No Yes Yes Yes

M-104 MECHANICAL PLANS - FOURTH LEVEL 4D - NEW No Yes Yes Yes

MP102i SECOND LEVEL MECHANICAL PIPING PLANS - SECOND LEVEL INTERSTITIAL - 2D - NEW No No Yes Yes

MP103i THIRD LEVEL MECHANICAL PIPING PLANS - THIRD LEVEL INTERSTITIAL - 3D - NEW Yes Yes Yes Yes

M-401 MECHANICAL ENLARGED PLANS Yes Yes Yes Yes

M-501 MECHANICAL DETAILS Yes Yes Yes Yes

M-502 MECHANICAL DETAILS Yes Yes Yes Yes

M-503 MECHANICAL DETAILS Yes Yes Yes Yes

M-504 MECHANICAL DETAILS No Yes Yes Yes

M-505 MECHANICAL DETAILS No Yes Yes Yes

M-601 MECHANICAL PIPING ISOMETRIC PLAN No No Yes Yes

M-602 MECHANICAL ISOMETRIC PLAN No No No Yes

M-700 MECHANICAL SCHEDULES No Yes Yes Yes

M-701 MECHANICAL SCHEDULES No Yes Yes Yes

M-702 MECHANICAL SCHEDULES No Yes Yes Yes

M-703 MECHANICAL SCHEDULES No No No No

M-801 MECHANICAL CONTROL SYMBOL LEGEND AND ABBREVIATIONS Yes Yes Yes Yes

M-802 MECHANICAL CONTROL DIAGRAMS Yes Yes Yes Yes

M-803 MECHANICAL CONTROL DIAGRAMS Yes Yes Yes Yes

M-804 MECHANICAL CONTROL DIAGRAMS Yes Yes Yes Yes

M-805 MECHANICAL CONTROL DIAGRAMS Yes Yes Yes Yes

M-806 MECHANICAL POINTS SCHEDULE Yes Yes Yes Yes

M-901 MECHANICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes

M-902 MECHANICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes

M-903 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes

M-904 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes

ELECTRICAL

E-001 ELECTRICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes

EDL103 ELECTRICAL LIGHTING CEILING PLANS - THIRD LEVEL 3D - DEMO No No Yes Yes

EDP103 ELECTRICAL POWER PLANS - THIRD LEVEL 3D - DEMO Yes Yes Yes Yes

EDP103i ELECTRICAL POWER PLAN - THIRD LEVEL INTERSTITIAL No No Yes Yes

EL103 ELECTRICAL LIGHTING CEILING PLANS -THIRD LEVEL 3D - NEW Yes Yes Yes Yes

EP100 ELECTRICAL POWER PLANS - BASEMENT LEVEL No No Yes Yes

EP101 ELECTRICAL POWER PLANS - FIRST LEVEL No No No Yes

EP103 ELECTRICAL POWER PLANS - THIRD LEVEL 3D - NEW Yes Yes Yes Yes

EP103i ELECTRICAL INTERSTITIAL PLAN No No Yes Yes

EP104 ELECTRICAL POWER PLANS - FOURTH LEVEL - 3D - NEW No No Yes Yes

EP400 ELECTRICAL ENLARGED PLANS No No Yes Yes

EP401 ELECTRICAL ENLARGED PLANS Yes Yes Yes Yes

E-501 ELECTRICAL DETAILS Yes Yes Yes Yes

E-601 ELECTRICAL ONE-LINE DIAGRAMS Yes Yes Yes Yes

E-602 ELECTRICAL DIAGRAMS No No Yes Yes

E-603 ELECTRICAL RACEWAY DIAGRAMS No No Yes Yes

E-700 ELECTRICAL SCHEDULES - DEMO No No Yes Yes

E-701 ELECTRICAL SCHEDULES - NEW Yes Yes Yes Yes

E-702 ELECTRICAL SCHEDULES - NEW Yes Yes Yes Yes

E-703 ELECTRICAL SCHEDULES - NEW No No Yes Yes

E-900 ELECTRICAL CUTSHEETS No No Yes Yes

E-901 ELECTRICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes

TELECOMMUNICATION

T-001 TELECOMMUNICATION ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes

TD103 TELECOMMUNICATION PLANS - THIRD LEVEL 3D - DEMO Yes Yes Yes Yes

TD103i TELECOMMUNICATION INTERSTITIAL PLAN - THIRD LEVEL 3D - NEW Yes Yes

T-103 TELECOMMUNICATION PLANS - THIRD LEVEL 3D - NEW Yes Yes Yes Yes

T-103i TELECOMMUNICATION INTERSTITIAL PLAN - THIRD LEVEL 3D - NEW No No Yes Yes

TY-103 SECURITY PLANS - THIRD LEVEL 3D - NEW No No No No

T-400 TELECOMMUNICATION ENLARGED PLANS Yes Yes Yes Yes

T-501 TELECOMMUNICATION DETAILS Yes Yes Yes Yes

T-601 TELECOMMUNICATIONS RISER DIAGRAMS Yes Yes Yes Yes

T-600 TELECOMMUNICATION RACK ELEVATIONS & RACEWAY DIAGRAM No No Yes Yes

T-701 TELECOMMUNICATION SCHEDULES No No Yes Yes

T-901 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes

T-902 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes

T-903 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes

T-904 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes

Grand total: 132

- DRAWING INDEX -

BB SHEET NAME

INCLUDED IN

35% SD

INCLUDED IN

65% DD

INCLUDED IN

95% CD

INCLUDED IN

100%

GENERAL

GI000 COVER SHEET Yes Yes Yes Yes

GI050 GENERAL NOTES Yes Yes Yes Yes

GI101 LIFE SAFETY Yes Yes Yes Yes

GI201 INFECTION CONTROL PLAN & INTERIM LIFE Yes Yes Yes Yes

ARCHITECTURAL

A-001 SYMBOLS, & GENERAL NOTES Yes Yes Yes Yes

A-002 ARCHITECTURAL ROOM PROGRAM PLAN - 3D Yes Yes Yes Yes

AD101 ARCHITECTURAL DEMOLITION PLAN AND REFLECTED CEILING PLANS - THIRD LEVEL - 3D Yes Yes Yes Yes

A-101 ARCHITECTURAL FLOOR PLAN - THIRD LEVEL - 3D NEW Yes Yes Yes Yes

A-102 ARCHITECTURAL DIMENSIONING PLAN - THIRD FLOOR 3D No Yes Yes Yes

AC101 ARCHITECTURAL REFLECTED CEILING PLAN - THIRD FLOOR 3D Yes Yes Yes Yes

AC102 PHOTOMETRIC PLAN Yes Yes

A-401 ARCHITECTURAL ENLARGED VIEWS Yes Yes Yes Yes

A-402 ARCHITECTURAL ENLARGED VIEWS Yes Yes Yes Yes

A-403 ARCHITECTURAL ENLARGED PLANS - TYPICAL "SAFER" PATIENT ROOM Yes Yes Yes Yes

A-404 ARCHITECTURAL ENLARGED PLANS - TYPICAL PATIENT ROOM No Yes Yes Yes

A-410 TYPICAL PATIENT CASEWORK ELEVATIONS No No No Yes

A-511 ARCHITECTURAL PARTITION AND FRAMING DETAILS No Yes Yes Yes

A-512 ARCHITECTURAL PARTITION HEAD DETAILS No Yes Yes Yes

A-551 ARCHITECTURAL CEILING DETAILS Yes Yes Yes Yes

A-552 ARCHITECTURAL CASEWORK DETAILS Yes Yes Yes Yes

A-601 SCHEDULES No Yes Yes Yes

A-602 SLIDING DOOR DETAILS Yes Yes

A-721 PARTITION HEAD DETAILS No Yes Yes Yes

A-722 PARTITION FRAMING DETAILS No Yes Yes Yes

A-730 TYPICAL MOUNTING HEIGHTS Yes Yes Yes Yes

ARCHITECTURAL SIGNAGE

AW001 ARCHITECTURAL SIGNAGE ABBREVIATIONS, SYMBOLS, GENERAL NOTES AND SCHEDULE Yes Yes Yes Yes

AW101 ARCHITECTURAL SIGNAGE PLAN - THIRD FLOOR - 3D Yes Yes Yes Yes

VA LOCATION MAP

VA VICINITY MAP

All new and existing systems within the Scope of Work shall be commissioned (or recommissioned) for per Specification 01 91 00.

Inspections: Comprehensive 3rd party inspections, testing and written reports for all Divisions are required and paid by the General Contractor. Contractor shall employ third party inspection consultants to perform all inspections required by this contract.

Contractor shall appoint a third-party individual, company, or firm to act as the Commissioning Agent. The Commissioning Agent is the designated person, company, or entity that plans, schedules, and coordinates the commissioning team to implement the commissioning process.

Identify complete bids associated with the CLINs (Contract Line Item Number) as follows:

CLIN 01: All work associated with the 3D Bed Ward Renovation. 18 month Period of Performance.

CLIN 02: All work associated with Alternate 1. Alternate 1 removes 30 days from the Period of Performance.

CLIN 03: All work associated with Alternate 2. Alternate 2 removes 30 days from the Period of Performance.

CLIN 04: All work associated with Alternate 3. Alternate 3 removes 60 days from the Period of Performance.

The expected construction period duration for each building includes all pre-construction activity and post-construction testing, third-party inspections and commissioning. Contractor shall submit a comprehensive schedule of work in compliance with 01 32 16.15 PROJECT SCHEDULES (SMALL PROJECTS DESIGN/BID/BUILD). Contractor to perform Commissioning of all new systems and existing systems impacted by the project according to requirements in sections:

01 91 00 – GENERAL COMMISSIONING REQUIREMENTS; 21 08 00 – COMMISSIONING OF FIRE SUPPRESSION SYSTEMS, 22 08 00 – COMMISSIONING OF PLUMBING SYSTEMS, 23 08 00 – COMMISSIONING OF HVAC SYSTEMS; 26 08 00 – COMMISSIONING OF ELECTRICAL SYSTEMS; 27 08 00 – COMMISSIONING OF COMMUNICATIONS SYSTEMS, 28 08 00 – COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS and 33 08 00 –COMMISSIONING OF SITE UTILITY SYSTEMS. A detailed commissioning plan is required to ensure that all devices are calibrated, programmed, and all graphic displays are accurate and approved by applicable VA staff.

Accessibility: The design shall be constructed to ensure access to the handicapped and disabled. All facilities which are open to the public, to limited segments of the public, visited by the public in the conduct of normal business, or those which hire or have the capacity to hire civilian personnel, shall be designed and constructed to be accessible to the handicapped. Design and construction must comply with HYPERLINK "https://www.access-board.gov/guidelines-and-standards/buildings-and-sites/about-the-aba-standards" Architectural Barriers Act Accessibility Standard (ABAAS) for Federal Facilities and HYPERLINK "http://www.cfm.va.gov/til/etc/dsBarrFree.pdf" PG-18-13 VA Barrier Free Design Standard, whichever is most stringent.

Infection Control: The construction shall clearly define and meet “Infection Control Barrier” criteria. The construction shall be in accordance with the AIA Guidelines or Design and Construction of Hospital and Health Care Facilities and address; the impact of demolition, renovation including walls and ceiling, electrical, mechanical, equipment and equipment support installation, and new construction.

HIPAA: The design shall accommodate compliance with current HIPAA requirements.

TRIPLE C TEAM:

MAT PERKINS, PM

mat.perkins@triplecaeg.com

HEATHER GARDINER, DEPT. PM

heather.gardiner@triplecaeg.com

KATE MACAULAY, SENIOR INTERIOR DESIGNER

kate.macaulay@triplecaeg.com

CALEB LOWERY, PROJECT ARCHITECT

caleb.lowery@triplecaeg.com

KEVIN LUKE, MECHANICAL ENGINEER

kevin.luke@triplecaeg.com

Yes

Yes

Yes

T-600 TELECOMMUNICATION RACK ELEVATIONS & RACEWAY DIAGRAM No No Yes Yes

T-601 TELECOMMUNICATIONS RISER DIAGRAMS Yes Yes Yes Yes three-hundred sixty-five (365) days with a ninety (90) day administrative NTP. 1

1 ADDENDUM 1 04/06/23

LIFE SAFETY SYMBOLS

PATH OF EXIT ACCESS TRAVEL

PATH LENGTH

FIRE EXTINGUISHER CABINET (FEC)

REQUIRED DOOR CLEARANCES

FEC

PATH TO POINT OF COMMON TRAVEL

PATH LENGTH###' - ##"

BOLD LINE REPRESENTS

LONGEST PATH DISTANCE

EXIT LIGHTING

REQUIRED TOILET CLEARANCE

72" D X 66" W (BARRIER FREE)

REQUIRED TURNING RADIUS

66" DIAMETER (TYPICAL - BARRIER FREE)

72" DIAMETER (BARIATRIC - BARRIER FREE)

7" TOE / KNEE CLEARANCE OVERLAP

UNRATED PARTITION

SMOKE PARTITION

1 HOUR RATED PARTITION

2 HOUR RATED PARTITION

EXISTING WALL TO REMAIN

EXISTING AREA NOT IN CONTRACT (NIC)

BUILDING CODE:

MIXED BUILDING OCCUPANCY TYPE:

The entire building 1 is comprised of:

Primary: Healthcare (NFPA 101, Chapter 19) Secondary: Ambulatory Health Care (NFPA 101, Chapter 21)

This project is modifying ward C on Level 3, and is keeping the existing health care occupancy. The following data is from NFPA 101, Chapter 19.

PROJECT AREA:

AREA IN SCOPE: 13,461 GSF

CHANGE TO BUILDING SF: NO CHANGE

OCCUPANT LOAD:

EXISTING OCCUPANT LOAD: 113

PROPOSED OCCUPANT LOAD: 113 (NO CHANGE)

120 GSF PER OCCUPANT - Healthcare Sleeping Department (7.3.1.2)

CONSTRUCTION TYPE:

CONSTRUCTION: Type 1 (332) per NFPA 220, Chapter 4

FIRE RATED REQUIREMENTS FOR BUILDING ELEMENTS:

PRIMARY STRUCTURAL FRAME: 3 HOURS

BEARING WALLS (EXT & INT): 3 HOURS

FLOOR CONSTRUCTION: 2 HOURS

ROOF CONSTRUCTION: 1.5 HOURS

NON BEARING WALLS: 0 HOURS

OTHER REQUIRED RATINGS & SEPARATIONS:

VERTICAL SHAFTS: 2 HOURS

EXIT STAIRS: 2 HOURS

SOILED UTILITY: 1 HOUR

HAZARDOUS STORAGE: 1 HOUR

MEANS OF EGRESS:

MAXIMUM PATH OF TRAVEL: 200' (185'-0" MAX ACTUAL)

MAXIMUM COMMON PATH: 50' (41'-3" MAX ACTUAL)

DEAD-END CORRIDORS: 30' (NONE PRESENT)

MINIMUM EGRESS COMPONENT WIDTH: 48 INCHES

OTHER EGRESS WIDTH REQUIRED: 0.2 INCHES PER OCCUPANT

APPLICABLE BUILDING CODES:

• 2021 NFPA 101 LIFE SAFETY CODE

• 2022 NFPA 13 SPRINKLER SYSTEMS CODE

• 2018 INTERNATIONAL BUILDING CODE (IBC)

• 2018 INTERNATIONAL MECHANICAL CODE (IPC)

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA)

STANDARDS.

• VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• 2020 NATIONAL ELECTRICAL CODE (NEC)

• 2018 INTERNATIONAL PLUMBING CODE (IPC)

• ASME CODE FOR PRESSURE PIPING

• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS

(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN

GUIDE (PG-18-13)

• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,

AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)

• ENERGY POLICY ACT OF 2005 (EPACT)

• DOE INTERIM FINAL RULE: ENERGY CONSERVATION

STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-

FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE

RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434, AND 435

• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND

SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING

(MOU)

• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL

ENVIRONMENTAL, ENERGY, AND TRANSPORTATION

MANAGEMENT

• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS

STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00

AND 01 35 26 OF THE VA MASTER CONSTRUCTION

SPECIFICATIONS.

• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE

STANDARD 62.1-2016: MEDICAL SPACES - ASHRAE 170-2013,

NON-MEDICAL SPACES - ASHRAE 62.1-2016

• SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE

STANDARD 15-2013

• VA FIRE PROTECTION DESIGN GUIDE, 8TH EDITION (2021)

66"W

"D

66"DIAM

"D

FLOOR SLOPE / FLOOR DRAIN

HJKLM

GI101

F4

CORRIDOR

C3-26C3-26

CORRIDOR

C3-27C3-27

CORRIDOR

C3-28C3-28

STAIR

ROOM

3C-1063C-106

CORRIDOR

C3-12C3-12

STAIR

213 SF

PATIENT 9

3D-109

79 SF

RR 9

3D-109A

69 SF

RR 8

3D-108A

256 SF

PATIENT 8

3D-108

285 SF

PATIENT 7

3D-107 69 SF

RR 7

3D-107A

297 SF

PATIENT 6

3D-106

72 SF

RR 6

3D-106A

289 SF

PATIENT 5

3D-105

72 SF

RR 5

3D-105A

300 SF

PATIENT 4

3D-104

69 SF

RR 4

3D-104A

298 SF

PATIENT 3

3D-103

70 SF

RR 3

3D-103A

69 SF

RR 2

3D-102A

296 SF

PATIENT 2

3D-102

299 SF

BARIATRIC 1

3D-101

90 SF

RR 1

3D-101A

269 SF

PATIENT 18

3D-133

78 SF

RR 18

3D-133A

68 SF

RR 17

3D-132A

268 SF

SAFER PATIENT 17

3D-132

299 SF

STAFF WORK

3D-136

245 SF

MSA'S

3D-100

190 SF

CLEAN LINENS

3D-138

98 SF

ASST. NURSE MNGR

3D-110

93 SF

NURSE MNGR OFFICE

3D-111

127 SF

MED ROOM

3D-112

106 SF

NUTRITION

3D-135

292 SF

SAFER PATIENT 16

3D-131

67 SF

RR 16

3D-131A

67 SF

RR 15

3D-129A

252 SF

PATIENT 15

3D-129

280 SF

PATIENT 14

3D-128

71 SF

RR 14

3D-128A

71 SF

RR 13

3D-126A

102 SF

PHARM OFFICE

3D-120

108 SF

SOILED UTILITY

3D-134

49 SF

STAFF TOILET

3D-117

131 SF

SPS STORAGE

3D-114

315 SF

EQUIPMENT ROOM

3D-115

16 SF

EQUIP. ALCOVE

3D-140

245 SF

PATIENT 13

3D-126

260 SF

PATIENT 12

3D-12567 SF

RR 12

3D-125A

67 SF

RR 11

3D-123A

61 SF

HAC

3D-119

259 SF

STAFF BREAK ROOM

3D-116

238 SF

PATIENT 11

3D-123

206 SF

PATIENT 10

3D-121

74 SF

RR 10

3D-121A

54 SF

ANTE ROOM

3D-133B

74 SF

CLEAN UTILITY

3D-113

30 SF

OXYGEN STOR.

3D-118

262 SF

CIRCULATION

C3-18

C

LE

A R

6' -0

129' - 8"

136' - 4"

110' - 2"

27' - 1"

8' -1

C

LE

A

R

8' -0

C

LE

A

R

8'-0" CLEAR

CLEAR

8'-0"

8'-0"

C

LE

A R

8' -0

'-2

8'-0" CLEAR

55 SF

ANTE ROOM

3D-101B

GI101

E3

TOILET

3C-1043C-104

TOILET

3C-1053C-105

FEC

FEC

FEC

95' - 3"

84' - 6"

GI101

D2

48"D

72"D

"W 30

"W

"D

"D

IA

M

48"D

"W

1/ 4"

TYPICAL

CLEARANCES:

TYPICAL

FLOOR SLOPES:

LINEAR FLOOR DRAIN

1/4" / 12"1/4" / 12"

1' -6

299 SF

BARIATRIC 1

3D-101

3' -0

/2

C

LE

A R

72"D

"W

72"DIAM.

90 SF

RR 1

3D-101A

55 SF

ANTE ROOM

3D-101B

5' -6

5'-0"

1'-6" 1'-6"

48"W

66"DIA

5' -0

"D

66"W on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

TRUE NORTH

PLAN NORTH

KEYPLAN

A/E:

TRIPLE C - The A/E Group

(520) 481-8548

Mat Perkins

A

B D

EF

G

H

J

K

L

M

C

As indicated

B

IM

/6

-2

-1

R e n o v a te

D

B e d W in g -B

-M

P L S

V A

M C

/6 -2

-7

.M

P L S

.3 D

B e d W in g .A

R C

H .B

.L

.r v t

/1

/2

:0

:4

A

M

09/12/2022 M.PERKINS C.LOWERY

618-22-102

1391 - GI101

LIFE SAFETY

1 Veterans Drive, Minneapolis, MN 55417

B70

RENOVATION OF BUILDING 70 3D

BED WING100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0" F6

LIFE SAFETY PLAN

ARCHITECTURAL BARRIERS ACT (ABA)

404.2 Manual Doors, Doorways, and Manual Gates. Manual doors and doorways and manual gates intended for user passage shall comply with 404.2.

404.2.2 Double-Leaf Door and Gates. At least one of the active leaves of doorways with two leaves shall comply with 404.2.3 and 404.2.4

404.2.4 Maneuvering Clearances. Minimum maneuvering clearances at doors and gates shall comply with 404.2.4. maneuvering clearances shall extend the full width of the doorway and the required latch side or hinge side clearance.

EXCEPTION: Entry doors to hospital patient rooms shall not be required to provide clearance beyond the latch side of the door

1/4" = 1'-0" F4

TYPICAL PATIENT RESTROOM

1/4" = 1'-0" E3

BARIATRIC PATIENT ROOM

1 ADDENDUM 1 04/06/23

1/4" = 1'-0" D2

TYPICAL PATIENT ROOM

File details come from the government source that posted it. Updated .