S06 Addendum Number 2 - 2 pages.pdf
PDF 296 KB Posted
- Solicitation number
- 36C26323R0023
About this file
This document is an addendum to a solicitation for renovations to a private patient bed ward at a Veterans Affairs medical center. The addendum provides revisions to specifications, drawings, and schedules to show a new double-acting corridor door at the ward entrance and demolition of an office door. It removes specifications for an advanced utility metering system and equipment for new Avasure technology. Bidders are notified to acknowledge receipt of the addendum and adjust estimates accordingly. The related federal contract opportunity is solicitation number 36C26323R0023 for project number 618-22-102 to renovate ward 3D at the Veterans Health Administration facility in Minneapolis, issued by the Department of Veterans Affairs Veterans Integrated Service Network 23.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CVE Verified Service-Disabled Veteran-Owned Small Business
TRIPLE C – THE A&E GROUP
OUR REASONABLE SERVICE - TO PROVIDE YOU WITH EXEMPLARY SERVICE
410 Grand Avenue, Suite 201C � Laramie, Wyoming 82070 � Telephone: (307) 460-2054 � Fax: (307) 460-2053
Addendum Number 02
Project: Minneapolis Renovate Private Bed Ward 3D Building 70
Project number: 618-22-102
Date: May 3, 2023
NOTICE TO PROPOSERS:
A. This Addendum shall be considered part of the contract documents for the above-mentioned project as though it had been issued at the same time and incorporated integrally therewith.
Where provisions of the following supplementary data differ from those of the original contract documents, this Addendum shall govern and take precedence.
B. Proposers are hereby notified that they shall make any necessary adjustments in their estimate on account of this Addendum. It will be construed that each Proposer’s proposal is submitted with full knowledge of all modifications and supplemental data specified therein. Acknowledge receipt of this addendum in the space provided on the proposal form. Failure to do so may subject Proposer to disqualification.
Revisions:
Specifications:
Section Description of / Reason for Change
00 01 00 – Table of Contents Updated to remove Specification 25 10 10.
08 71 00 – Door hardware Added door hardware group HM-8C for double acting corridor door at Ward 3D entrance.
25 10 10 – Advanced Utility
Metering System
Removed specification, not in scope of work.
Drawing Changes:
Sheet
Number
Revision
Number Description of / Reason for Change
GI101 2 Updated graphics to show new double acting corridor door at Ward 3D entrance. Indicated demolition and infill for Office door 3C-103.
GI201 2 Updated graphics to show new double acting corridor door at Ward 3D entrance. Indicated demolition and infill for Office door 3C-103.
A-002 2 Updated graphics to show new double acting corridor door at Ward 3D entrance. Indicated demolition and infill for Office door 3C-103.
AD101 2 Updated graphics to show new double acting corridor door at Ward 3D entrance. Indicated demolition and infill for Office door 3C-103.
A-101 2 Updated graphics to show new double acting corridor door at Ward 3D entrance. Indicated demolition and infill for Office door 3C-103.
A-102 2 Updated graphics to show new double acting corridor door at Ward 3D entrance. Indicated demolition and infill for Office door 3C-103.
AC101 2 Updated graphics to show new double acting corridor door at Ward 3D entrance. Indicated demolition and infill for Office door 3C-103.
A-601 2 Updated door schedule and notes to show new double acting corridor door at Ward 3D entrance.
IN101 2 Updated graphics to show new double acting corridor door at Ward 3D entrance. Indicated demolition and infill for Office door 3C-103.
IF101 2 Updated graphics to show new double acting corridor door at Ward 3D entrance. Indicated demolition and infill for Office door 3C-103.
Q-101 2 Updated graphics to show new double acting corridor door at Ward 3D entrance. Indicated demolition and infill for Office door 3C-103.
TY103 2 Removed new Avasure equipment. Contractor shall provide cable, faceplates and terminations for future equipment.
End of Addenda
Attachments:
Sheets:
GI101
GI201
A-002
AD101
A-101
A-102
AC101
A-601
IN101
IF101
Q-101
TY103
Specification Sections:
00 01 00 – Table of Contents
08 71 00 – Door Hardware