This is an amendment to a solicitation for renovation services. The amendment provides revised specifications, drawings, wage determinations, and responses to questions from offerors. Key changes include updated specifications volumes, revised architectural and engineering drawings, replacement of the wage determination, and additional drawings for mechanical, plumbing and electrical systems. Proposals are still due on May 1, 2023 at 1:00 PM Central Time. The solicitation is for renovation of a private patient bed ward at the Department of Veterans Affairs facility in St. Paul, Minnesota.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
4-21-2023 618-23-3-6967-0002
618-22-102 36C263 Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
Angie Frost, Contract Specialist 316 Robert Street N. STE. 506 St. Paul MN 55101
Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
316 Robert Street N. STE. 506 St. Paul MN 55101 To all Offerors/Bidders
36C26323R0023 03-21-2023
X
618-3630162-6967-854200-3220-23NR1WA21
One The purpose of this amendment is to:
1. See page 2 for Summary of Changes.
2. Proposal due date is not extended. Proposals remain due 5/1/2023 at 1:00 PM CT.
All other terms and conditions remain the same.
Jennifer Johnson Contracting Officer
SAOC16L3-0537
SUMMARY OF CHANGES
1. Provide Addendum Number 1 which summarizes most of all changes.
See attached document listed below:
S06 Addendum Number 1 - 3 pages
2. Provide the questions received and the Government's responses. This includes a revised Specifications Volume 1, revised Drawings Sheets: A-002, A-101, A-102, AC101, IN101, IN601, IF101, Q-101, FX103, P-103, M-103, EP103, EP104, EL103, T-103, A-601, Q-601, GI000, GI101 and GI201, Lidar Scans, and Justification and Approval for the brand name “Medcare Brand” for patient lift systems.
See attached documents listed below:
S06 Questions - Solicitation 36C26323R0023 S06 Q_A Atch 1.1 - Revised Atch C.1 Specifications Vol 1.1 - 291 pages S06 Q_A Atch 1.2 - Revised Atch C.1 Specifications Vol 1.2 - 634 pages S06 Q_A Atch 2 - Revised Drawings - 15 pages S06 Q_A Atch 3 - Revised Drawing A-601 - 1 page S06 Q_A Atch 4 - Revised Drawing Q-601 - 1 page S06 Q_A Atch 5 - Lidar Scans - 1 page S06 Q_A Atch 6 - Revised Drawings GI000 and GI101 - 2 pages S06 Q_A Atch 7 - Revised Drawing GI201 - 1 page S06 Q_A Atch 8 - Revised Atch E Brand Name J and A - 30 pages
3. Replace the Wage Determination dated 1/6/2023 with the Wage Determination dated 4/14/2023.
See attached document listed below:
S06 Revised Atch F Wage Determination MN20230117 4-14-23 - 9 pages
4. Provide revised Drawings Sheets: MP103i, M-501, M-502, M-503, M-504, M-601, M-702, M-802 and M-804.
See attached documents listed below:
S06 Revised Drawings MP103i, M-501 and M-502 - 3 pages S06 Revised Drawings M-503, M-504 and M-601 - 3 pages S06 Revised Drawings M-702, M-802 and M-804 - 3 pages
ATTACHMENTS:
See attached document: S06 Addendum Number 1 - 3 pages.
See attached document: S06 Questions - Solicitation 36C26323R0023.
See attached document: S06 Q_A Atch 1.1 - Revised Atch C.1 Specifications Vol 1.1 - 291 pages.
See attached document: S06 Q_A Atch 1.2 - Revised Atch C.1 Specifications Vol 1.2 - 634 pages.
See attached document: S06 Q_A Atch 2 - Revised Drawings - 15 pages.
See attached document: S06 Q_A Atch 3 - Revised Drawing A-601 - 1 page.
See attached document: S06 Q_A Atch 4 - Revised Drawing Q-601 - 1 page.
See attached document: S06 Q_A Atch 5 - Lidar Scans - 1 page.
See attached document: S06 Q_A Atch 6 - Revised Drawings GI000 and GI101 - 2 pages.
See attached document: S06 Q_A Atch 7 - Revised Drawing GI201 - 1 page.
See attached document: S06 Q_A Atch 8 - Revised Atch E Brand Name J and A - 30 pages.
See attached document: S06 Revised Atch F Wage Determination MN20230117 4-14-23 - 9 pages.
See attached document: S06 Revised Drawings MP103i, M-501 and M-502 - 3 pages.
See attached document: S06 Revised Drawings M-503, M-504 and M-601 - 3 pages.
See attached document: S06 Revised Drawings M-702, M-802 and M-804 - 3 pages.